E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 1 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

Subject: FUEL - GENERAL - REVISE THE ELECTRICAL BONDING OF THE EQUIPMENT IN THE FUEL TANKS – ADDITIONAL WORK

Reference Documents:

Description Type Number Rev. Date (d/m/y)

FUEL - GENERAL - REVISE THE ELECTRICAL BONDING OF THE EQUIPMENT IN THE FUEL TANKS

SB A340-28-4097 05 03/Jun/10

FUEL - GENERAL - REVISE THE ELECTRICAL BONDING OF THE EQUIPMENT IN THE FUEL TANKS

SBIT SEMB/914.0701/09 -- 29/Oct/09

AC Configuration modified (Y/N):

N

Rotable Inventory modified (Y/N):

N

337/SEG VOO or equiv. required (Y/N):

N

Summary The ADDITIONAL WORK required by this EO is only applicable to aircraft on which the Revision 03 or any previous revision of Airbus Service Bulletin A340-28-4097 has been embodied by means of accomplishment of LAN Engineering Orders AD-28-0086 or AD-28-0087 as per A/C applicability. The embodiment of SB A340-28-4097 was mandated by the requirements of EASA AD 2007-0278.

Prepared by: Reviewed by:

Constantino Restrepo P. Aircraft System Engineer

Luis A. Ramirez C. Lic. Ing. Esp. DGAC 138

System Group Leader

GERENCIA DE SOPORTE TECNICO

SUBGERENCIA DE INGENIERIA

E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 2 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

I Revision Control Record Items

Affected Rev. Nº

Description of Change Approval Name / Date

All

00

Initial Release

Luis Ramirez C Systems Group Leader

Base Engineering Date: ___ / ____ / 2010

GERENCIA DE SOPORTE TECNICO

SUBGERENCIA DE INGENIERIA

E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 3 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

II Cost information EO issued for the following reason

Airworthiness:

Commercial:

Contractual:

Reliability: X

III Parts List

REFER TO MODIFICATION JIC ON MAINTENIX

IV Required Equipment and Tools REFER TO MODIFICATION JIC ON MAINTENIX V Required Drawings Item Drawing Number Rev Description Remarks N/A N/A N/A N/A N/A

VI Weight and Balance change It is required to update W&B report after accomplishment of this EO? (Y/N/Calc): N Item Weight (lbs) Arm (in) Moment (lbs-in)

TOTAL N/A N/A N/A

VII Electrical Load changes

It is required to update the Electrical Load after accomplishment of this EO? (Y/N): N Element Removed Load Added Load Affected Bus

TOTAL N/A N/A N/A

GERENCIA DE SOPORTE TECNICO

SUBGERENCIA DE INGENIERIA

E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 4 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

Table 1. AREA EQUIPMENT

& SYSTEMS ELECTRICAL BONDING METHOD

Figure Kit No.

Rib 2-3

Water Drain

Install the bonding lead. Bond the pipe clamp to the pipe. Bond the bolt to the structure.

Refer to figure 1, Sheet 1 and Sheet 2

284097C02S01

Rib 18-19 (RH)

Ventilation Intake System

Bond the contact surfaces between Elbow and Flame arrestor. Bond two of the unions of the Elbow and Flame arrestor.

Refer to figure 2

None

Table 2.

Qty Description Action 2 screw Item (1) Retain 2 washer Item (2) Retain 4 rivet Item (3) Discard

Table 3

Qty Description Action 4 rivet MS20470AD5-10A Item 3 Install 2 bonding lead F2818007601200 Item 4 Install 2 screw Item (1) Install 2 washer Item (2) Install 2 clamp NSA5519-4B Item 7 Install 2 screw NAS1096-1-7 Item 5 Install 2 washer NAS1149DN632K item 6 Install 2 washer NAS1149DN616H item 8 Install 2 nut MS21042-06 Item 9 Install

Table 4.

Qty Description Action 4 bolt Item (15) Retain 4 washer Item (16) Retain 4 nut Item (3) Retain 1 O-ring Item (18) Retain

Table 5.

Qty Description Action 4 bolt Item (15) Install 4 washer Item (16) Install 4 nut Item (3) Install 1 O-ring Item (18) Install

GERENCIA DE SOPORTE TECNICO

SUBGERENCIA DE INGENIERIA

E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 5 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

Figure 1 Sheet 1

Electrical Bonding Installation Water Drain System

GERENCIA DE SOPORTE TECNICO

SUBGERENCIA DE INGENIERIA

E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 6 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

Figure 1 Sheet 2

Electrical Bonding Installation Water Drain System

GERENCIA DE SOPORTE TECNICO

SUBGERENCIA DE INGENIERIA

E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 7 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

Figure 2

Electrical Bonding Installation Ventilation Intake System

GERENCIA DE SOPORTE TECNICO

SUBGERENCIA DE INGENIERIA

E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 8 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

Engineering Deviation Authorization

E.O. Step and Comments Authorized Deviation (application must be signed here)

References Engineering Approval Signature

Mechanic License Nº

& Signature

Inspector License Nº

& Signature

GERENCIA DE SOPORTE TECNICO

SUBGERENCIA DE INGENIERIA

E N G I N E E R I N G O R D E R

E.O. Nº: Revision: Rev. date: Page:

SB-28-0124 00 15/Nov/2010 9 de 9

Lan Engineering Services This document and attachment are Lan property and can not be used, copied o given to any other party without the written authorization of the Engineering Director

Discrepancy Report

Discrepancy Nr. Mechanic

License Nr. & Signature Inspector. License. Nº & Signature