EPCM - Engineering, Procurement,Construction Management
EPCM stands for Engineering, Procurement, Construction Management. This type of contract isdifferent to an EPC Contract in that the Contractor is not directly involved in the construction but
is responsible for administering the Construction Contracts.
EPC - Engineering Procurement
Construction
EPC stands for Engineering, Procurement, Construction and is a prominent form of contracting
agreement in the construction industry. The engineering and construction contractor will carry outthe detailed engineering design of the project, procure all the equipment and materials
necessary, and then construct to deliver a functioning facility or asset to their clients. Companies
that deliver EPC Projects are commonly referred to as EPC Contractors.
The EPC phase of the project is also nown as the E!ecution phase which normally follows what
is now as a "EE# or "ront End Engineering #esign phase. The "EE# is a basic engineering
design used as the basis for the EPC phase. The "EE# can be divided into seperate pacages
covering different portions of the project. The "EE# pacages are used as the basis for bidding
on when the client offers the EPC wor to the maret,
$ormally the EPC Contractor has to e!ecute and deliver the project within an agreed time and
budget, commonly nown as a %ump &um Turn 'ey (%&T') Contract. *n EPC %&T' Contract
places the ris for schedule and budget on the EPC Contractor.
The Project +wner or client to the EPC Contractors will normally have a presence in the EPC
Contractors offices during the e!ecution of the EPC Contract. The Client places what can be
termed a Project Managment Team or PMT to overloo the EPC Contractor. The client PMT may
require specialist help and bring on board Project Management Consultants or PMCs to assist.
The PMT - PMC will ensure the EPC Contractor is carrying out the wors in accordance with the
agreed scope of wors and in accordance with the Contract. t is quite common for theEngineering and Construction Contractor which delivered the "EE# to be offered a Project
Management Consultancy (PMC) Contract.
n some instances which can be related to the time a project owner would lie the project
delivered, an engineering and construction company can be given wor on a direct reimbursable
basis to start with followed by conversion to %&T' once sufficient time and resources can be
allocated to quantifying and pricing the scope of wors. +ne method to convert from a
reimbursable to %&T' Contract is called an +pen /oo Estimate or +/E in which the Contractor
will open all their woring documentation or boos for representatives of the client to assess what
the total scope of wors for delivering the project will be. *n agreed %&T' scope of wors and
![Page 2: Terms Used in Project Mgmt and Engg](https://reader031.vdocuments.us/reader031/viewer/2022020307/563db863550346aa9a933e1c/html5/thumbnails/2.jpg)
7/17/2019 Terms Used in Project Mgmt and Engg
http://slidepdf.com/reader/full/terms-used-in-project-mgmt-and-engg 2/3
price will be negotiated and agreed between EPC Contractor and Project +wner during the
e!ecution of EPC activities.
LSTK - Lumpsum Turnkey%&T' stands for %ump &um Turn 'ey. This is a contractual agreement in which a fi!ed price is
agreed for the e!ecution of a project or part of a project. +nce the final development is
completed a finished functioning asset is handed over to the client, hence the term 0Turn 'ey0
which effectively means ready to operate.
PMC - Project Management ConsultantPMC stands for Project Management Consultant or Project Management Contract. 1nder a
project management contract an engineering contractor will overloo the EPC Contractors worto ensure compliance with client scope of wors.
+ther terms for these type of services include Project Management &ervices (PM&) and Project
Management &ervices Contracts (PM&C).
FEED - Front End Engineering Design
"EE# stands for "ront End Engineering #esign. The "EE# is basic engineering which comesafter the Conceptual design or "easibility study. The "EE# design focuses the technical
requirements as well as rough investment cost for the project. The "EE# can be divided into
seperate pacages covering different portions of the project. The "EE# pacage is used as the
basis for bidding the E!ecution Phase Contracts (EPC, EPC, etc) and is used as the design
basis.
* good "EE# will reflect all the clients project specific requirements and avoid significant
changes during the e!ecution phase. "EE# Contracts usually tae around 2 year to complete for
larger si3ed projects. #uring the "EE# phase there is close communication between Project
+wners and +perators and the Engineering Contractor to wor up the project specificrequirements.
EPC - Engineering ProcurementConstruction nstallationEPC stands for Engineering Procurement Construction and nstallation which is a common form
of contracting arrangment in the +ffshore Construction ndustry. *s opposed to an EPC contract,
![Page 3: Terms Used in Project Mgmt and Engg](https://reader031.vdocuments.us/reader031/viewer/2022020307/563db863550346aa9a933e1c/html5/thumbnails/3.jpg)
7/17/2019 Terms Used in Project Mgmt and Engg
http://slidepdf.com/reader/full/terms-used-in-project-mgmt-and-engg 3/3
the offshore facility or vessel that is constructed has to be transported and installed at the project
location.
LS - LumpSum%ump &um refers to a fi!ed price for the delivery of a project
EPC - Engineering Procurementnstallation CommisioningEPC stands for Engineering Procurement nstallation Commissioning is typically a %ump &um
Turn 'ey (%&T') type Contract integrating the responsibility going from the conception to the
final acceptance of one or more elements of a production system. t can be awarded for all, or
part, of a field development.
TK - TurnKey
Turn 'ey is related to project delivery in which the developed project is handed over to the client
when fully operable.
PM&C 4 Project Management &ervices
Contract
PM& 4 Project Management &ervices
+/E 4 +pen /oo Estimate