terms & conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- executive...

21
1

Upload: others

Post on 24-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

1

Page 2: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

2

Terms & Conditions

1- Only registered contractor/firm/company with UPPAN having PAN,GST No., Character

certificate issued from office of District Magistrate, registered in labour department and

having experience in building construction projects can quote the rates.

2- Any bidder, who having criminal record, is not allowed to participate in e-tender

process.

3- T.D.S., Cess & other applicable taxes will be deducted as per Govt. Rules.

4- G.S.T. extra as applicable.

5- E-Tender Fee Rs. 1000.00+12%GST=1120.00 only (Non refundable) through DD Of

any Nationalized bank in favour of E.E. U.P. Police Avas Nigam Ltd. Payble at Jalaun.

6- Documents completed in all respect should be submitted in office of E.E./Unit incharge

along with EMD Of Rs. 200000.00 (Two Lacs) only through DD/FDR/RTGS of

Nationalized bank in favour of EE- U.P. Police Avas Nigam Ltd. For the purpose of

RTGS/NEFT the bank details of undersigned are given below.

Name of Account Holder : Executive Engineer

U.P. Police Avas Nigam Ltd., Jalaun

Account Number : 10460100021006

IFSC Code : BARB0ORAIXX

Name of Bank : Bank of Baroda, Savitri Plaza, Raj Marg, Orai

Distt. Jalaun U.P. (285001)

7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or

all tenders or in part thereof without assigning any reason whatsoever and without

assigning any reason whatsoever and without any legal obligation thereof. The

decision of the undersigned will be final and binding to all. UPPAN reserve the right to

increase or decrease the quantity to be ordered.

8- Validity of rates for six months.

9- The contractor shall be completely held responsible for any mishap at site due to in

sufficient safety measures.

10- In respect of all the labour directly or indirectly employed in the works for the

performance of the contractor part of this contract. The contractor shall comply with all

the rules framed by Government from time to time for the protection of the health and

sanitary arrangements for workers employed by the contractor.

Page 3: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

3

11- For any type of substandard quality the suitable deduction will be made from the bill of

PRW as per direction of engineer in charge.

12- All the works shall be carried out as per details specifications of UPPWD and as per

direction of engineer In charge.

13- Minimum 80% of empty cement bags will be recovered from the bill of PRW @ Rs.

1.00 per bags.

14- 5% Extra to be paid above G.F. floor per floor level for item no. 14 to 17, 20 to 23,

26,32 ,34, 38 to 40, 43, 45 to 49, 70 to 80, 85 to 87 and 89 to 101 only.

15- Rate inclusive of cost of petty and consumable material such wire brush, narial Gurra etc.

16- Rates are inclusive of all T&P.

17- In case of any damage/loss of UPPAN material, the cost of the same shall be

deducted from the PRW bill.

18- The Engineer-in-charge shall have the right to take sample for testing as per CPWD

norms or as decided by the Engineer-in charge and get it tested. The contractor shall

bear all charges of sampling, carriage and testing etc.

19- Sample & make of materials/equipment’s and item of work shall have to be approved

by the E/I before execution. The contractor shall ensure to consume the materials

within its expiry date. The material if consumed after the expiry date the affected work

will have to be dismantled or the recovery shall be made by the authority at rate of

double the cost of work in which such materials consumed.

20- The contractor shall confine his equipment, storage of materials operation of his works

& people to the limits as directed by the E/I and shall not unnecessary spread over the

premises with his materials and hutment.

21- If contractor constructed any work in wrong way which is objectionable then contractor

will correct that work without any extra payment including the cost of material.

22- All drawings and designs will be supplies according to the necessity of the particular

works and the contractor will not have any claim for compensation in case of late

supply of necessary design drawings.

23- For carrying out the work the contactor shall be provided with one set of working

drawings. Additional copies if required will be supplied to him on payment of additional

charges as decided by the Engineer-in-charge.

24- In giving their rates the Tenders take into account all fluctuations of the market, as no

claim shall be entertained on this account during the acceptance of the tender.

25- Payment will be made only on Tax Invoice.

Page 4: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

4

26- All subject to Lucknow Jurisdiction only.

27- The contractor must fill the rate in percentage above or percentage below in the

prescribed performa.

28- If the E-Tendering opening date happens to be on a holiday or non-working day due to

any other valid reason, the tender opening process will be done on the next working

day at the same time and place.

29- Curing charges are not included in labour rates.

30- Executive Engineer/Unit Incharge will place work order to the PRW who has quoted

lowest rates i,e L1.

31- Incase of tie rates either work will be decided through lottery or quantum of work will be

distributed among the PRW’s as per discrimination of Executive Engineer with written

acceptance of the parties.

32- fufonk Lohd`r gksus ds mijkUr ih0vkj0MCY;w0 dks

le;≤ ij vko’;drkuqlkj dk;kZns’k fuxZr fd;s

tk;saxs ,oa dk;kZns’k esa ßfuekZ.k dk;Z dh

fu/kkZfjr vof/kÞ ds vUrxZr dk;Z fd;k tkuk gksxk

;fn ih0vkj0MCY;w0 vkisf{kr izxfr izkIr ugha dj

ikrk gS rks mldks uksfVl fuxZr djrs gq,

dk;kZns’k@VsUMj fujLrhdj.k dj fn;k tk;sxk rFkk

vusZLV euh tCr dj yh tk;sxhA

33- fufonk Lohd`r gksus ds mijkUr bdkbZ }kjk

vko’;drkuqlkj fuxZr dk;kZns’kksa ds lkis{k iw.kZ

fd;s x;s fuekZ.k dk;ksZa ds fcyksa esa 5%

izfrHkwfr /kujkf’k dh dVkSrh dh tk;sxh ,oa dk;Z

iw.kZ gksus ds 6 ekg mijkUr bl /kujkf’k dks

ih0vkj0MCY;w0 ds vuqjks/k ij okfil fd;k tk ldsxk

,oa ;fn bl vof/k esa fuekZ.k dk;Z esa dqN dfe;ka

vkrh gSa rks lEcfU/kr ih0vkj0MCY;w0 dks Bhd

djkuk gksxk ,oa mlds }kjk dfe;ksa dk fujkdj.k u

djkus dh fLFkfr esa Debatable Agency ls dk;Z djk;k

tk;sxk ,oa ;g /kujkf’k ih0vkj0MCY;w0 dh

izfrHkwfr /kujkf’k ls lek;ksftr dh tk;sxhA

Page 5: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

5

34- lUnfHkZr dk;ZLFky tuin yfyriqj dh iqfyl ykbu esa

Vkbi&, ds 16 ux ,oa Vkbi&ch ds 32 ux Hkou fufeZr

fd;s tk jgs gSa ,oa bu Hkouksa ds v/kwjs ,oa

vo’ks"k dk;Z fd;s tkus gSa vr% njsa Mkyus ls

iwoZ ih0vkj0MCY;w }kjk izLrkfor LFky dk fujh{k.k

djuk vko’;d gksxk ftlls muds }kjk vo’ks"k

fuekZ.k dk;ksZa ds enksa ,oa ek=kvksa dk vkadyu

fd;k tk ldsA bl lEcU/k esa ;fn fdlh tkudkjh dh

vko’;drk gks rks bdkbZ izHkkjh ds nwjHkk"k ua0

9415049388 ,oa voj vfHk;Urk ds nwjHkk"k ua0

9415215996 ij lEidZ fd;k tk ldrk gSA

35- mYys[kuh; gS fd bl ifjlj ds fuekZ.k dk;ksZa ij

orZeku esa bdkbZ ds ikl lhfer /kujkf’k ’ks"k gS

ftlds lkis{k dk;kZns’k fuxZr fd;s tk;saxs ,oa

vo’ks"k enksa gsrq ’kklu }kjk vxyh fdLr fuxZr

gksus ds mijkUr gh dk;kZns’k fuxZr fd;s tk

ldsaxsA

36- lHkh izek.k i=ksa tSls& Bsdsnkj dk iathdj.k]

Mªk¶V@,Q0Mh0vkj0 ,oa ANNEXURE-A dh gLrk{kj ;qDr

izfr dks etender.up.nic.in osclkbV ij miyksM fd;k tkuk

vko’;d gksxk ,oa bldh gkMZ dkWih Vs.Mj [kqyus dh

fnukad ls iwoZ bdkbZ dk;kZy; esa tek fd;k tkuk

gksxkA

37& okVj izwfQax ds dk;Z ,oa nhekd jks/kh mipkj ds

dk;ksZa dks ,DliVZ ,tsalht }kjk gh djk;k tk;sxk

,oa blds fy;s vyx ls fufonk;sa vkefU=r dh

tk;saxhA

38& fufonkvksa ds lkFk :0 100@& ukWu T;wfMfl;y LVkEi

isij layXu djuk vfuok;Z gksxkA

Page 6: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

6

39& vlQy fufonk nkrkvksa dh /kjksgj /kujkf’k 30 fnu

ds vUrxZr okfil dj nh tk;sxh ,oa lQy fufonk nkrk

dh /kjksgj /kujkf’k lEiw.kZ fuekZ.k dk;Z iw.kZ

gksus ds 6 ekg mijkUr okfil dh tk;sxhA cSad

Mªk¶V vFkok vkj0Vh0th0,l0 ds ek/;e ls Hkqxrku dh

xbZ /kjksgj /kujkf’k ij dksbZ C;kt ugha fn;k

tk;sxkA

40& iqfyl vkokl fuxe esa iathd`r izek.k i=] Vs.Mj

Qhl dk Mª¶V ,oa /kjksgj /kujkf’k ds izek.k dh

izfr;ka Vs.Mj ds lkFk viyksM djuk vfuok;Z gksxk

,oa ,d izfr bdkbZ dk;kZy; esa VsfDudy fcM [kqyus

ls iwoZ tek djuk vU;Fkk fufonkvks ij fopkj ugha

fd;k tk;sxkA

¼latho lDlsuk½

bdkbZ izHkkjh]

tkykSuA

Page 7: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

7

U.P. POLICE AVAS NIGAM LTD. Labour rates for Civil Work

i=kad%& 60@iqvkfu@fubtk0@¼bZ&VsUMfjax½@2018&19

fnukad% 07&06&2018

Sr.

No. Name of Item Unit

Rates

(Rs. per unit)

1 2 3 4

EARTH WORK

1 Surface dressing and levelling upto 15cm. depth over area including

clearing of grass and small plants including cost of all T&P etc. sq.m. 6.50

2 Jungle clearance as per P.W.D. specification. sq.m. 5.00

3 Making Layout of building works including making of pucca

pillars (Burji) and marking centre line including cost of lime and all T&P (Only plinth area of ground floor to be measured and paid).

sq.m. 8.50

4 Earth work in excavation upto 1.5m lift and 50m lead including all

material, labour, T&P etc. required to complete the work :

(i) In soft soil. cu.m. 90.00

(ii) In hard soil (to be certified by Ex. Engr. on measurement book with

reasons before payment). cu.m. 98.00

5 Add extra for additional lift / lead beyond 1.5 mtr./50 mtr. or part

thereof. per cu.m.

per lift /

lead

25.00

6 Filling of earth / sand in layers including its watering and ramming

to desired compaction. cu.m. 57.00

7 Making of sand Pile under floor 100mm.dia @ 60cm. apart (for

depth of filling greater than 1.00mtr.) each 25.00

8 Boring and casting of 30cm. dia single under-reamed pile in black

cotton soil with hand operated auger machine including all labour T&P, casting of pile with renforcement including cost of binding

wire complete for proper completion of work as per IS code.

Rmt. 177.00

9 Same as above item no. 8 but for double under-reamed bulb. extra/Bulb 202.00

10 Same as above item no. 8 but for 25cm. Dia pile. Rmt. 158.00

11 Same as above item no. 9 but for 25cm. Dia pile. extra/Bulb 190.00

12 Pile Testing Job 12,650.00

Page 8: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

8

13 Dismentaling of RCC pile upto 300 mm dia and upto depth of 1

Meter I/C of disposal of Malawa each 240.00

CONCRETE

14 Laying and compaction of cement concrete 1:6:12/1:5:10/1:4:8 in foundation and under floor including all T&P etc.

cu.m. 380.00

15 RCC work in specified mix including all labour and T&P required for proper completion of work:

(i) In foundation(Raft,Footing etc. ) cu.m. 570.00

(ii) In super structure(slab,beam & T-beam etc.) cu.m. 780.00

(iii) In super structure (column, lintel, chajja & loft etc.) cu.m. 900.00

16 RCC work in thin precast / insitu shelves 25 to 50mm thick,

including shuttering and finishing with rendering and reinforcement etc. complete with departmental shuttering.

sq.m. 275.00

17 RCC work in thin shelves 25 to 50mm thick, including shuttering and finishing with rendering and reinforcement etc. with PRW's

shuttering material.

sq.m. 350.00

18 Laying of 25 to 40 mm thick DPC in 1:2:4 cement concrete mix

with WPC @ 1.0 Kg./bag of cement. sq.m. 82.00

19 2 coat of Bitumen painting 85/25 over DPC (1.7kg./m2 ) including

cost of fuel, kerosene oil, brush and cleaning of surface. sq.m. 20.00

20 Same as above as in item No.17 but over roof. sq.m. 22.00

21 Fixing and removal of Pucca shuttering with departmental material,

including cleaning of plates and stacking after use including the cost

of all consumable materials like nails, shuttering oil, packing material, filler material, etc. complete (area to be measured as per

code-provisions only.)

sq.m. 65.00

22(i) As in item No.21 but including of all required shuttering materials

such as plates, ballies, planks, battens, braces, etc. complete for load bearing structures of repetitive nature.

sq.m. 325.00

for plinth beam sq.m. 175.00

(ii) Same as in item No. 22(i) but in case of shuttering for frame

structures of non- repetitive nature. sq.m. 335.00

23 Fixing & Removal of Kachha shuttering with contractors material

and plastering with neat cement finish including 'Khali lipai' etc. complete in all respect (Cost of cement and sand to be recovered

from PRW's bills ).

sq.m. 280.00

24 Extra rate for shuttering for curved surfaces and single use situations in all shuttering items above.

sq.m. 42%

25 Extra rate for shuttering for every extra 1.00 mtr. height or part thereof above 3.15 mtr. Height .

sq.m. 37%

26 RB facia 4/7.5 cm. thick in 1:3 including cost of fixing of scaffolding.

sq.m. 139.00

27 Extra rate for handmixing of concrete (only for RCC). cu.m. 11.00

28 Making scaffolding with departmental material. sq.m. 11.00

29 A Same as above but with PRW's material. sq.m. 30.00

Page 9: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

9

29 B Extra rate on item no. 29A above 3 storey building (This rate is

applicable for outer periphery of building) sq.m. 55.00

Note. Only one face of wall internal/external shall be measured

(only once). For item no. 28 & 29.

30 Hire charges of concrete mixer for mixing of concrete along with

fuel and operator. cu.m. 210.00

31 Hire charges of concrete vibrator for mixing of concrete along with

fuel and operator. cu.m. 90.00

32 MS Iron work in reinforcement including cost of binding wire and

making and placing of cover blocks.

(i) Upto 12 mm. dia. kg. 8.00

(ii) Over 12 mm. dia. kg. 7.00

33 Making C.C. Gola / Brick Hand Rail including plastering, neat cement finish etc.

Rmt. 22.00

34 Filling of ballast / cinder. cu.m. 200.00

35 Filling of brick bats in soak pit cu.m. 55.00

36 Collection & stacking of brickbats, grit, sand etc. cu.m. 55.00

BRICK WORK

37 Brick work in foundation in specified mix. cu.m. 570.00

38 Brick work in S.S. in 230 mm th. wall in specified mix. cu.m. 730.00

39 Brick work in S.S. in 115mm th. wall in specified mix. cu.m. 845.00

40 Brick work in S.S. in 75 mm th. wall in specified mix. cum 930.00

41 Brick work in steps upto 1.5 mtr. width. each 135.00

42 Fixing of angle iron nosing in steps upto 1.50mtr. Length. each 45.00

43 Brick work in pillars / columns for circular work. cu.m. 580.00

44 Brick work in mud mortar in foundation and super structure for

temporary works. cu.m. 460.00

45 Random course rubble masonary in 1:6/1:4 in cement and coarse sand mortar in foundation and plinth excluding supply of material.

cu.m. 1121.00

IRON & WOOD WORK

46 Fixing of Flush door / jalli door shutters in frame including fixing of all fittings cost of all nuts and bolts, screws of 'ISI' make etc. but

excluding cost of door fittings.

sq.m. 195.00

47 Fixing of M.S. Iron grill in wooden window/ Ventilator frame

including cost of screws. sq.m. 51.00

48 Fixing of windows / ventilator in position in opening sizes including

grouting of holdfasts as following:-

(i) Upto 1.5 sq. m. each 160.00

(ii) Above 1.5 sq.m. each 195.00

49 Fixing of door chowkhat including grouting of hold fasts i/c cutting of hole.

each 140.00

50 Fixing of glass panes including cost of clips & ISI mark putty sq.m. 125.00

Page 10: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

10

51 Same as above item no. 49 but with Aluminium beading/MS

beading with rubber packing. sq.m. 110.00

52 Fixing of Aluminium sheet at the bottom of toilet door shutters

including cost of brass nails and screws. sq.m. 145.00

53 Fixing of barbed wire fencing including cost of clips (each wire). Rmt. 6.00

54 Loading or unloading of steel bars. M.T. 120.00

55 Loading or unloading of cement bags and stacking within 50 mtr.

lead. Bag 4.00

56 Fixing and grouting of M.S. railing in staircase or balcony. R.M. 80.00

57 Making gangway for carrying of concrete for slab including cost of

narial rassi and removing the same for each storey (not more than

2.1 mtr. wide).

Job (each

floor)

850.00

(i) Fixing of palmet including cost of CP clips and Rawal Plugs, screws

etc. R.M. 40.00

(ii) -do- but including cost of flat (5mm. X 25mm.) iron hold fast. R.M. 45.00

58 Permanent fixing of AC / CGI Sheet including cost of wind ties of 35 X 5 mm. flat with 'J' hooks, bitumen washers, limpet washer,

holding down clamps etc. complete.

sq.m. 60.00

59 Temporary fixing of AC / CGI sheet including cost of J.hooks brick

clamping down etc. complete. sq.m. 40.00

60 Grouting of bolts for almirahs Excluding cost of nuts and bolts

minimum 10mm. dia. each 20.00

61 Grouting of garrage steel shutter, Rolling shutter, boundary gates &

other heavy gates in opening or columns complete:

(i) Above 3.00 sq. m. but upto 6.00sq.m. each 800.00

(ii) Above 6.00 sq.m. each 850.00

62 Filling of PCC 1:5:10 in back hollow portion of pressed steel

door/window frames only. Rmt. 25.00

ROOF WORK

63 Filling in position bitumen Mix filler into expansion joint including cost of fuel.

Rmt. 10.00

64 Fixing of A.C. / Aluminium sheet over expansion joint including cost of gutty and screws.

R.M. 89.00

65 Making khurrah 30X30cm size on terrace. each 60.00

66 Fixing of spout pipe including making holes and repairing it. each 55.00

67 Fixing of A.C. / P.V.C. rain water pipe including cost of MS clamps

(20mm. X 5mm), required solution, nuts and bolts etc. complete. Rmt. 60.00

68 15-20 mm. thick cement plaster over slopy roof in 1:3 c/cs mortar

with neat cement & WPC including making panel, marks as per direction of Engineer Incharge.

sq.m. 45.00

69 Making CC Gola/Vatta at the junction of wall & roof, 30cm. high

with 12mm thick water proofing plaster over wall from the finished

surface of Vatta.

mtr. 65.00

Page 11: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

11

70 40mm. thick Metal Koba water proofing Treatment with cement

plaster embedded with stone chips in two layers. As per specifications.

sq.m. 92.00

71 20mm.thick water proofing cement plaster(in two layers) sq.m. 80.00

Condition:-10 year written gaurantee on stamp paper shall be given by Agency before release of final payment for item no. 67 to 70.

PLASTER

72 12 mm. thick cement plaster on wall. i/c Labour T&P Comp. sq.m. 80.00

73 Extra for rough surface over wall. sq.m. 6.50

74 10 mm. thick cement plaster in ceiling including chipping of RCC

surface i/c cost of labour T&P comp. sq.m. 90.00

75 Extra for neat cement rendering over plaster where ever is require. sq.m. 9.00

76 20 mm. thick cement plaster in dado including neat cement finish i/c

labour T&P Comp. sq.m. 110.00

77 Making 12 / 20 mm. groove in plaster. i/c Labour T&P Comp. R.M. 9.00

78 Making drip coarse (TAPAK) & 12mm. X 40mm. i/c Labour T&P

Comp

R.M. 20.00

79 Engraving lines in plaster work (as per architectural design) i/c

Labour T&P Comp. sq.m. 15.00

80 Finishing of ceiling with cement rendering where plaster is not

done including chiselling to get a smooth surface.i/c Labour T&P

Comp. only.

sq.m. 30.00

81 Extra rate for rough cast / pebble-dash plaster. sq.m. 48.00

82 Grit washed plaster over 1:4 cement plaster as per direction

including making panels as per architectural requirement.i/c Labour

T&P only.

sq.m. 250.00

83 Flush / struck pointing on wall.i/c Labour T&P only sq.m. 35.00

84 Same as above but on floors.i/c Labour T&P only sq.m. 32.00

85 Extra for plastering on circular, curved surface.i/c Labour T&P only sq.m. 40.00

86 Extra labour charges for making vertical slit 3" wide and 11/2 to

21/2' long in parapet etc. no. 100.00

FLOORING

87 25 mm. thick cement concrete flooring 1:2:4 including fixing of glass strips.i/c Labour T&P Comp.

sq.m. 88.00

88 40 mm. thick cement concrete flooring 1:2:4 including fixing of

glass strips. i/c Labour T&P Comp. sq.m. 100.00

89 50 mm. thick cement concrete flooring 1:2:4 including fixing of

glass strips.i/c Labour T&P Comp. sq.m. 102.00

90 75 mm. thick cement concrete flooring 1:2:4 including fixing of

glass strips.i/c Labour T&P Comp. sq.m. 110.00

91 25 / 40 mm. thick mosaic marble chips flooring including rubbing

cutting and including cost of oxalic acid, wood dust, old clothes, oil,

mansion polish @ 0.054 kg.per sq.m. etc i/c Labour T&P Comp.

sq.m. 260.00

Page 12: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

12

92 20 mm. thick mosaic dado including cutting & rubbing, cost of

consumable items and mansion polish @ 0.054 kg. per sq.m. i/c Labour T&P Comp.

sq.m. 280.00

93 Kota / marble stone flooring including machine cutting, rubbing and

polishing including cost of all consumable material mansion polish

@ 0.054 kg. per sq.m. etc. i/c Labour T&P Comp.

sq.m. 300.00

94 Same as above but in steps riser, skirting including bull nosing..i/c

Labour T&P sq.m. 420.00

95 20 mm. thick plain skirting 15/10cm. heigh with neat cement

finish..i/c Labour T&P sq.m. 120.00

96 Fixing glazed tiles on walls/floors joints filled with white

cement.i/c cost of making base for fixing tile comp. with labour

T&P.

sq.m. 170.00

97 20 mm. thick mosaic skirting 15/10 cm. heigh including cutting and

rubbing, cost of consumable items and mansion polish @ 0.054 kg.

per sq.m.i/c Labour T&P Comp.

Rmt. 60.00

98 Brick on edge flooring dry joints filled with sand.i/c Labour T&P

Comp. sq.m. 48.00

99 Brick on flat flooring joints filled with sand. sq.m. 38.00

100 Brick on end for lining around the aprun or where ever is

required.in 1:3c/cs mortar. i/c cost of labour T&P. Rmt. 18.00

101 Red stone flooring including its dressing including cost of matching

pigment,excluding polishing but including laying lean concrete at

bottom.i/c Labour T&P Comp.

sq.m. 135.00

102A Labour charge of fixing vitrified tile with designer floor with dibby

and border or any other pattern as per approved design i/c Labour T&P Comp.

sq.m. 180.00

B -do- but plain work with border sq.m. 156.00

C Fixing of vertified skirting i/c Labour T&P Comp. Rmt. 43.00

103 Labour charge for Dholpur stone work on wall lining etc. (Vener

work) 40 mm thick in cement mortor in 1:3 in cement corse sand including cramping joining in white cement mortor 1:2 white

cement stone dust with an ad mixture of pigment matching of stone

i/c Labour T&P Comp.

sq.m. 552.00

104 Labour charge for laying 6.5 cm thick layer of sand mixture with

4% bitumin including heating the sand and mixing properly as per

direction icluding cost of fuel wood i/c Labour T&P Comp.

sq.m. 35.00

105 Cleaning of floor before handover. i/c of thiner, acid nirma etc.

comp. sq.m. 20.00

MISCELLANEOUS

106 Cartage including loading and unloading of materials such as

cement shuttering material, steel, brick, etc. beyond 100 mtr. upto 2

km. with tractor trolley.

3 MT/ trip

or 3.5

m3/trip

600.00

Page 13: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

13

107 Same as above but for Debries only.

Condition:- No cartage is permitted within 100X100mtr. area site. If cartage is essential it should be permitted by Executive Engineer

Mentioning with proper reasons i

3 MT/ trip

or 3.5

m3/trip

600.00

108 Shifting of departmental concrete mixer beyond 100 mtr. upto 500 mtr.

each 320.00

109 Shifting of departmental concrete mixer beyond 500 mtr. upto 1000 mtr.

job 490.00

110 Breaking of Brick Ballast and its stacking :

(i) 40 mm. Size. cu.m. 125.00

(ii) 25 mm. Size. cu.m. 130.00

111 Making window sill in 25 mm thick with 1:1.5:3 CC with neat

cement finish Rmt. 60.00

112 Fixing of 40 to 50 mm precast cement jali reinforced with tor steel

upto 16 mm dia also finished with 1:3 cement sand mortor sq.m. 160.00

113 Excavation trenches of requfor sockets and dressing of sides,

ramming of bottoms depth upto 5 mtr.including getting out the

excavated soil and then returing the soil as required in layers not

exceeding

A Pipes, Cables, etc. not exceeding 80 mm dia Rmt. 45.00

B Above 80 mm to 200 mm dia Rmt. 57.00

114 Fixing of terrazzo tiles 20 mm average thick made up of 6 mm chips laid on 25 mm thick bed of mortor joints filled with neat cement

slurry mixed with pigment to match the shade of tiles including

rubbing cutting and cost oxalic acid wood dust etc. complet with

labour T&P only.

sq.m. 98.00

115 Fixing of pavers/cheqered tiles over LC with 20 mm thick plaster in

1:4 cement and corse sand mortor with labour T& P compt. sq.m. 84.00

116 Fixing of rough sand stone icluding cutting of edges and making to

required size compt. With labour T& P only. sq.m. 92.00

117 Extra for grouting with cement mortor in joints of laid brick on

edge/flat in flooring sq.m. 7.00

118 Fixing of marble partition stone upto 2'X3' size including chase etc.

cutting compt. Nos. 140.00

119 Fixing of chicken mesh with nails and cement mortor labour only. sq.m. 20.00

120 Fixing of RCC hume pipe in culvert/drain in position

A 150 mm to 200 mm dia Rmt. 63.00

B 250 mm to 450 mm dia Rmt. 97.00

C 500 mm & above Rmt. 134.00

121 Casting and fixing of bed blocks for beam supports. Nos. 19.00

122 Construction of brick masonry open surface drain with B/W in 1:4

cement mortor including 75 mm thick bed lean concrete and 25 mm thick cc bottem flooring etc compt. With labour T& P.

A for 250 mm wide and 300 mm deep Rmt. 145.00

B for 300 mm wide and 300 mm deep Rmt. 171.00

Page 14: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

14

C for 450 mm wide and 450 mm deep Rmt. 202.00

123 Making starter for column each 51.00

124 Extra for grit finish/ plaster in round independent column of all sizes

with required scafolding each 565.00

125 Extra for grit finish in corbelling of round column . Rmt. 25.00

126 Ploughing of exiting round of 15 to 25 cm. by tractor and dressing

of ground for devloping the area. sq.m. 8.00

127 Laying of CC road 1:2:4 mix 3" thick I/c making joints labour T &

P compt. sq.m. 82.00

128 Laying of CC road 1:2:4 mix 4" thick I/c making joints labour T &

P compt. sq.m. 89.00

129 Laying of CC road 1:2:4 mix 6" thick I/c making joints labour T &

P compt. sq.m. 97.00

130 Filling with mix hot bitumin and sand in cc road groove/joints i/c

cost of labour material T&P comp. Rmt. 19.00

131 Fixing of main hole frame and cover in septic tank and soak pit each 127.00

132 Fixing of footrest in septic tank Nos. 44.00

133 Making pace around column for pouring of concrete and placing for

one floor hight Nos. 91.00

134 Making of center Line piller and making center line for boundrywall each 70.00

135 Shifting of material by head load upto 50 meter only

A General material cu.m. 120.00

B R.C.C. Malwa upto 100 m. lead cu.m. 139.00

C Brick Per 1000 183.00

D Cement Per bag 5.00

E Steel M.T. 133.00

136 Stacking of bricks Per 1000 61.00

137A Making ornamental cornice 4"x4" with POP including supply of all material, labour and T& P required for proper completion of work

Rmt. 127.00

B -do- But making ornamental beading 2" wide Rmt. 57.00

138 Hire charges of JCB machine with fuel & operator Per hour 1,100.00

139 Hire charges of Leveller i/c fuel & operator Per hour 650.00

140 Hire charges of 5KVA generator i/c cost of fuel & operator, and maintainance of generator complete forthroughout the month.

per month 7,500.00

141 Hire charges of tanker including cost of water per trip 990.00

BORING & PUMPS

142 Boring charges in ordinary soil strata upto 2"dia for hand pump. i/c

labour T&P Compt. Rft. 65.00

143 Boring charges in ordinary soil strata upto 4"dia for India Mark-

II/submersible pump upto1.5HP i/c labour T&P Compt. Rft. 100.00

144 Fixing / Refixing of submersible arrangement with lowering GI pipe

to desired depth and including cost of all consumable materials. i/c

labour T&P Compt.

each 900.00

Page 15: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

15

145 Fixing / Refixing of submersible pump upto 1.5 H.P. includng

lowering of pipe to desired depth and including cost of all consumable materials. i/c labour T&P Compt.

each 1,550.00

146 Same as above for item No. 173 but for hand pump.i/c labour T&P

Compt. each 400.00

147 -do- but India mark II.i/c labour T&P Compt. each 770.00

148 Boring Charges in bundelkhand area with DTH Machine of 6" to 8"

dia Rft. 174.00

149 Lowering charges of MS/PVC pipe Rft. 30.00

150 Packing of pee gravel including cost of material cu.m. 3,500.00

151 Transportation and installation of DTH machine job 10,000.00

152 Arrangementt of water for boring job 3,250.00

153 Making threding/welding etc for MS pipe in boring job 2,950.00

154 Extra charge for stone cutting Rft. 174.00

155 Development of Tubewell by air compressor 150 PSI Hour 3,200.00

156 Development of tubewell by OP unit Hour 450.00

157 Cartage of air compressor job 10,000.00

DISMANTLING

158 Dismantling or brick work in mud mortar including stacking of

bricks. cu.m. 60.00

159 -do- but in lime or cement mortar. cu.m. 120.00

160 Dismantling of brick, C.C. floor. sq.m. 8.00

161 Dismantling of door, window, chaukhats. each 25.00

162 Dismantling of C.G.I. sheet / perlins / trusses complete. sq.m. 8.00

163 Dismantling of RCC / RB work. cu.m. 240.00

164 Dismantling of plaster including racking out of joints making good

the damaged brickwork included in the above rates. sq.m. 8.00

165 Dismantling of GI water supply line including stacking at store. Rmt. 4.00

A 15 mm to 32 mm Rmt. 9.00

B 40 mm Rmt. 19.00

C 50 mm. Rmt. 25.00

D 65 mm to 80 mm Rmt. 38.00

E 100 mm Rmt. 44.00

ROAD WORK

166 Supply & Filling of carted earth upto 8.00 km distance from site. cu.m. 360.00

A Compaction of filled up earth with road roller including watering, dressing to proper camber, etc.

cu.m. 19.00

167 Labour charges to Laying of 10c.m. thick compacted W.B.M. with stone ballast including laying of ballast, binding material, stone

chiping, watering and compaction with road roller including cost of

hire charges of roller, fuel & operator i/c labour T&P Compt.(loose

quantity to be measured)

cu.m. 370.00

Page 16: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

16

168 Same as above item No.185 but compacted thickness 7.5 c.m.

(Comsumption stone ballast 0.099 cu.m/ sq.m. screening material 0.021 cu.m/sq.m.)

cu.m. 370.00

169 Scarifying of metalled (W.B.M.) road with brush and disposal of

rubbish including road roller for repairing of scarified surface. sq.m. 8.50

170 Bitumen tack coat W.B.M. surface excluding cost of bitumien and including maintenance of side of parties and watering them during

operation including supply of labour, macines, fuel-wood and T& P

etc required for proper completion of work as per M.O.T. specification No. 502 and per direction of Engineer-in-charge with

10 kg of bitumen per 10 m2

per sq.m. 26.00

171 Ist coat bitumen painting over W.B.M surface Excluding cost of

bitumen and grite but including supply of fuelwood etc and

including maintenance of side patties and watering them during operation as per direction of the Engineer-in-charge. Including roller

charges and its fule, wages of fire and tar boiler main and T& P etc.

required for prper completion of the work as per M.O.T. specifiaction No. 506..

per sq.m. 36.50

172 Bitumen tack coat over painted surface excluding cost of bitumen,

including maintenance of side patties and watering them during

operation including supply of labour, macines, fuel-wood and T& P

etc required for proper completion of work as per M.O.T. specification No. 502 and per direction of Engineer-in-charge with

10 kg of bitumen per 10 m2

per sq.m. 10.50

173 Cleaning of existing painted surface laying peimix carpet 2cm thick

over at tack coat with grade aprooved grade and bitumen including heating the paint tow required temperature mixing either in mixer or

in hand drum excluding cost& cartage of material maintenance of

side patries and watering them during operation of proper completion of work as per direction of Engineer in charge and as

per M.O.T. Specification No. 507 Including supply of labour T&P

and machine required for proper completion of the work.

per sq.m. 39.00

174 Cleaning the peimix surface and laying seal coat type 'A' with 6mm

graded premixed grit and bitumen including heating the paint tow required temperature excluding cartage and cost of material and

including maintenance of side patries and watering them during

operation of proper completion of work as per direction of Engineer in charge and as per M.O.T. Specification No. 511 Including supply

of labour T&P and machine required for proper completion of the

work.

per sq.m. 16.00

WATER SUPPLY & SANITARY WORKS

175 Fixing of Indian W.C. pan without cistern but including fixing of P/S trap as required.

each 230.00

176 Fixing of Indian / European type W.C. pan with cistern including all

fittings and cost of all minor materials.

each 350.00

177 Fixing of wash hand basin including all fittings, consumable

materials.

each 225.00

Page 17: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

17

178 Fixing of automatic flushing cistern 5 to 10 ltr. each 180.00

179 Fixing of foot rest. Pair 30.00

180 Fixing of urinal, squatting plate including fixing of all fittings and

pipe & cost of all consumable materials.

each 250.00

181 Fixing of sink including all fittings. each 250.00

182 Fixing of gully trap with C.C. blocks each 150.00

183 Fixing of C.I. Pipe excluding cost of clamps but including spun yarn

(2" to 4" dia.)

Rmt. 40.00

184 Fixing of P.V.C. pipe 2"/3"/4" dia. excluding cost of clamps, P.V.C.

solution.

Rmt. 19.00

185 Fixing of P.V.C. pipe 2"/3"/4" dia. including cost of clamps, P.V.C.

solution.

Rmt. 52.00

186 Fixing of C.I. / P.V.C. fittings 2" to 4" dia. such as collar, bend, Tee etc.

each 45.00

187 Lead chaulcked jointing of joint to C.I. pipes & fittings including cost of fuel and spun yarn :

(i) Same as above but of 4" dia. each 42.00

(ii) Same as above but of 3" dia. each 37.00

(iii) Same as above but of 2" dia. each 32.00

188 Fixing of Nahani Trap with C.C. blocks. each 38.00

189 Fixing of looking mirror with back sheet including brass screws,

gutty and screws.

each 60.00

190 Fixing towel rail / ring, soap dish, glass self including gutty and

screws.

each 50.00

191 Making nitch in wall and finishing the same. each 140.00

192 Making connection to main / jet pump. each 350.00

193 Making platform for water tank. each 500.00

194 Fixing of P.V.C. / A.C. water tank including making connection to

the tank.

each 350.00

195 Making hole for C.I. / P.V.C. / G.I pipe and making good the same

in masonary/RCC work.

each 40.00

196 Making connection in old manhole or existing sewer line. each 1,000.00

197 Making Masonary chamber 30X30X45 cm. including fixing of C.I.

cover complete in all respect.

each 270.00

198 Making manholes including excavation, concreting, brick work,

R.C.C., plastering etc. complete:

(i) Upto 60 X 60 x 60 cm. each 700.00

(ii) Upto 90 X 90 x 90 cm. each 1,100.00

(iii) Upto 100 X 100 X 120 cm. each 1,200.00

199 Add / Deduct per 10 cm. depth on Item No. 184 per 10cm. 25.00

200 Laying G.I. Pipe including cost of M.S. hooks, soot gola, safeda oil

plug etc. as per direction of E/I

A- On wall surface open :

(i) 15 mm. to 25 mm. Rmt. 30.00

Page 18: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

18

(ii) 32 mm. to 65 mm. Rmt. 36.00

B- In ground :

(i) 15 mm. to 25 mm. Rmt. 32.00

(ii) 32 mm. to 65 mm. Rmt. 48.00

C- In wall concealed :

(i) 15 mm. to 25 mm. Rmt. 45.00

201 Fixing of stop cock, bib cock, shower, pillar cock, ball cock, gate

valve upto 1" dia. including cost of consumable materials.

Rmt. 40.00

202 Laying of S.W. Pips 4" to 6" dia. Including jointing in 1:1 c/fs

mortar & excavation, refilling, concreting etc. complete.

Rmt. 90.00

203 Fixing of C.P. Jali, P.V.C. Jali & plug etc. each 7.00

204 Cutting of tar road or C.C. flooring 300 mm dia each 82.00

205 Laying and fixing of GI/CI/DF spun pipe including digging and

filling earth work upto 900 mm depth and cutting and threading of GI pipe

A 150 mm Rmt. 160.00

B 100 mm Rmt. 135.00

C 80 mm and 65 mm Rmt. 115.00

206 Fixing of GI or CI DF/Spun pipe fittings such as bend, reducer tail piece, long screw, union, flange etc.

A 150 mm each 155.00

B 100 mm, 80 mm & 65 mm each 132.00

207 Fixing of sluice valve, reflex valve or fire hydrant or air valve, non

return vavle etc.

A 150 mm Nos. 450.00

B 100 mm to 80 mm Nos. 350.00

C 65 mm to 50 mm Nos. 300.00

208 Making T point in GI, CI, DF or spun Pipe 150 mm to 65 mm each 260.00

209 Ceiling of gap between floor and trap including removal of malwa

and fixing of jali or grating

each 301.00

210 Making of RCC cover for main hole or chamber or fixing of gali

trap jali

each 201.00

211 Painting GI pipe line two coat 100 mm to 80 mm dia Rmt. 12.00

212 Wrapping of GI pipe line 100 mm to 80 mm dia with polythene sheet in two layers

Rmt. 16.00

213 Making of water tank connection inlet outlet over flow clean outlet each points

each 159.00

214 Laying of GI pipe line of open area

A 100 mm Rmt. 76.00

B 150 mm Rmt. 69.00

215 Shifting of GI pipe 100 mm to 150 dia from store to site by head

laod above 50 meter distance and upto 350 meter distance

Rmt. 8.00

A 65 mm to 80 mm Rmt. 7.00

216 Making hot & cold water mixture in GI line each 260.00

Page 19: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

19

217 Fixing of concealed bottel trap line or concealed water pipe icluding

chase cutting and repair

each 98.00

LABOUR SUPPLY

218 Masson Mistry/Mistry per day 450.00

219 Masson Grade-I per day 450.00

220 Masson Grade-II per day 400.00

221 (a) Painter - Grade-I per day 400.00

(b) Painter (Normal Painting Work) Grade-II per day 326.00

222 White Washer/Painter-II per day 270.00

223 Plumber Electrician (Licenced with kit) Grade-I per day 415.00

224 Plumber Electrician (Licenced with kit) Grade-II per day 350.00

225 Mate per day 285.00

226 Beldar skilled/Bandhani Semi-skilled.Mail.Kelper to plumber per day 270.00

Page 20: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

20

Page 21: Terms & Conditionsuppoliceavasnigam.com/wp-content/uploads/2018/06/lalitpur.pdf7- Executive Engineer/Unit In charge, UPPAN reserve the right to accept or reject any or ... supply of

21

ANNEXURE-A

DO HEREBY WARRANTY THAT

(i) The contractor is familiar with requirement of the contract.

(ii) The contractor has investigated the site and satisfied himself regarding the character

of the work and local conditions that may affect the work on its performance.

(iii) The contractor is satisfied that the work can be performed and completed as required

in the contract.

(iv) The contractor accepts all risks directly or indirectly connected with the performance of

the contract.

(v) The contractor had no collusion with other contractor or with any of the men of the

Engineer-in-charge but only by the contract document.

(vi) The contractor is financially solvent.

(vii) The contractor is experienced and competent to perform the contract to the satisfaction

of the E./I.

(viii) The statements submitted in the bids are true.

(ix) The contractor is familiar with all general and special laws, acts, ordinances rules and

regulations of the municipal, Distt., State & Central Government that may affect the

work, its performance or personnel employed therein.

Signature of Suppliers/Contractor with seal

Date:

Place:

Address: