terena technical programme update terena general assembly meeting riga, latvia 26 october 2007...

9
TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme [email protected]

Upload: jodie-miles

Post on 01-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

TERENA Technical ProgrammeUpdate

TERENA General Assembly MeetingRiga, Latvia26 October 2007

Christoph Graf

TERENA VP Technical Programme

[email protected]

Page 2: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

Slide 2

The Secretariat Technical Staff

›John Dyer - Chief Technical Officer›Valentino Cavalli - Deputy Chief Technical Officer

›Licia Florio - Project Development Officer›Kevin Meynell - Project Development Officer›New PDO from Jan 2008

›IT Support Staff› Dick Visser - System and Network Administrator

› Christian Gijtenbeek - Senior Web Developer› Gijsbert Sliedrecht - Junior Web Developer and System Administrator

Page 3: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

Slide 3

TERENA Technical Committee

›Christoph Graf, SWITCH - Chairman›Andrew Cormack, JANET UK›Diego Lopez, RED.ES›Steve Williams, JANET UK›Martin Sutter, SWITCH›Afrodite Sevasti, GRNET›…

Page 4: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

Slide 4

TERENA Technical Programme Active Portfolio

› Task-Forces and related services› TF-EMC2

› Server Certificate Service - SCS› “Trust broker” service - TACAR

› TF-Mobility› GN2 eduroam Service Activity (SA5)

› TF-ECS› GN2 Videoconferencing Service Activity (SA6)

› TF-CSIRT› Training for CSIRT staff - TRANSITS› CSIRT team accreditation - TI (Trusted Introducer)

› Active FP6 Projects› NoAH› SEREEN2› GN2

Page 5: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

Slide 5

TAC conclusions NREN’s interest in lower-layer research (Lyngby GA)› A general request for having a neutral and open information exchange place where results and discussion are facilitated› As we had earlier, but TF-NGN suffered a severe form of “GEANT2 monopolisation”

› Too early for entering in the area of “working together” on a few common projects?› Probably not, but lacking the community to make this happen

› Start with workshop organisation and e-support (mailing list?)› To regain contact with relevant communities and identify issues with sufficiently large take-up

› Not ready for a TF-like activity now› But clearly working towards this goal and taking up issues as we go

Page 6: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

Slide 6

FP7 Project Proposals

›Result of the 1st Call with TERENA participation:

› FEDERICA negotiation ended in September, expected contract start 01-01-2008

› Other proposals:› VISUALIVE invited to hearing but not to negotiation

› CADIR invited to hearing but not to negotiation

› MOME2 not retained

Page 7: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

Slide 7

FEDERICA - TERENA-led Activities

› NA2 “Building and Consolidating the User Community”

› NA4 “Dissemination and Training” › 4.1 (TERENA) Organise Conferences and Workshops› 4.2 (GARR) Publishing of Dissemination Material, Website etc.

› 4.3 (TERENA) Familiarise End User to the FEDERICA Virtual Infrastructure and Tool-Bench

› JRA2 “Novel paradigms and User Control”› 2.1 (TERENA) Architectural Paradigms for Virtualised Infrastructures

› 2.2 (ICCS) Novel Concepts for Fair Sharing, Security, Accounting and Business Models for Virtualised Infrastructures

› 2.3 (i2Cat) User Controlled Service Provisioning

Page 8: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

Slide 11

FEDRICA - TERENA Resources Budget and Timing

›Estimate Effort PM (TERENA)› NA2 5.0› NA4 17.5› JRA2 9.0› Tot 31.5

›Total Costs incl. Overhead 384.626 euro›Commission Contribution 254.074 euro›Duration 30 months›Expected start date 01-01-2008

Page 9: TERENA Technical Programme Update TERENA General Assembly Meeting Riga, Latvia 26 October 2007 Christoph Graf TERENA VP Technical Programme Christoph.Graf@switch.ch

Slide 12

Thank you!

Questions?