teppc 3-25-10 swat summary - r. kondziolka 1 robert kondziolka salt river project march 25, 2010...

28
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western Electricity Coordinating Council Western Electricity Coordinating Council Transmission Expansion Planning Policy Committee Transmission Expansion Planning Policy Committee

Upload: riley-clayton

Post on 27-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1

Robert Kondziolka Salt River Project

March 25, 2010Salt Lake City, Utah

WECC TEPPC Meeting SWAT Update

Western Electricity Coordinating CouncilWestern Electricity Coordinating Council

Transmission Expansion Planning Policy CommitteeTransmission Expansion Planning Policy Committee

Page 2: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 2

SouthwestArea

Transmission

SWATSWAT

SWAT Footprint One of the WestConnect Sub-Regional Planning

Groups

SWAT Footprint One of the WestConnect Sub-Regional Planning

Groups

http://www.westconnect.com

Page 3: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 3

Transmission Projects in WECC Regional Planning, Path Rating Process, or Development

Palo Verde-North Gila II

SWIP

Navajo TransmissionProject Segment 1

SunZia

High Plain Express

Palo Verde–Devers IICalifornia Portion

Pinal West to Pinal CentralPinal Central to BrowningPinal Central to TortolitaMorgan to Pinnacle PeakPalo Verde to Sun Valley

Sun Valley to MorganSPPR

TransWest Express

Chinook

Zephyr

Santa Fe

Tres Amigas

South Line

Page 4: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 4

Palo Verde

Imperial Valley

North Gila

Miguel

Mira Loma

Serrano

Valley

Devers

Vincent

Lugo

Victorville

Adelanto

RinaldiToluca

Crystal

McCullough

Mead

Eldorado

Mohave

Marketplace

Rudd

Four

Corners

YavapaiMoenkopi

Kyrene

Jojoba

PerkinsWestwing

Navajo

Harry Allen

Saguaro

Cholla

Coronado

Nevada

California

Utah

Peacock

Liberty

500 kV line

345 kV line

Major Substation

Major Power Plants

Silver

King

To Intermountain

To Celilo

Sylmar

To Midway

+/- 500 kV DC line

Arizona

DPV2 Project

Harquahala

EHV Transmission Upgrades In Development

2010400MWEnergized

500kV Line Upgrade

2009625MWEnergized

2009625MWEnergized

2010600MW

Page 5: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 5

Status of Major New Transmission ProjectsProject Name Voltage Capacity

Proposed In-Service Sponsor Status

Pinal Central to Browning 500kV 1400MW 2011 - 2nd Qtr SRP In Construction

Pinal West to Pinal Central 500kV 1400MW 2014 - 2nd Qtr SRP In Design & ROW Acquisition

Palo Verde to Sun Valley 500kV 650MW 2014 - 2nd Qtr APS In Design & ROW Acquisition

Sun Valley to Morgan 500kV 1200MW 2016 - 2nd Qtr APS In Design & ROW Acquisition

Morgan to Pinnacle Peak 500kV 1000MW 2010 – 4th Qtr APS In Construction

Arizona Gateway South (Double Circuit) 345kV 2000MW 2014 TEP In Perpetual Federal Permitting

Navajo Transmission Project 500kV 1500MW 2012 DPA In Path Rating Study Process

Palo Verde to North Gila II 500kV 1250MW 2014 - 2nd Qtr APS In Design & ROW Acquisition

Palo Verde to Devers II (California Only) 500kV 1200MW 2012 – 4th Qtr SCE In Siting & Permitting

TransWest Express (Bi-Pole DC) 600kV 3000MW 2015 Anschutz In Siting & Permitting & Path Rating

Chinook and Zephyr (Bi-Pole DC) 500kV 6000MW 2015 TransCan In Siting & Permitting

Pinal Central to Tortolita 500kV 1200MW 2014 - 2nd Qtr TEP In Siting & Permitting

ON-Line … Consolidated into SWIP 500kV 2000MW 2012 - 4th Qtr NVEnergy In Siting & Permitting & Path Rating

SWIP – Southwest Intertie Project (South) 500kV 2000MW Phase I 2012 LS Power In Siting & Permitting & Path Rating

Project kV MW 20XX ID I

SunZia Southwest Trans Project (2 Circuits) 500kV 3000MW 2014 SW Power In Path Rating Process & Permitting

High Plains Express Initiative (2 Circuits) 500kV 3500MW 2017+ Xcel Feasibility Studies

Page 6: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 6

A—Palo Verde-North Gila• 500-kV, 100 miles

B—Palo Verde-Blythe• 500-kV, 110 miles

C—North of Parker• Potential double circuit, 230/500-kV, 190 miles

C—South of Parker• Potential double circuit, 230/500-kV, 330 miles

D−Imperial Valley• Potential 500-kV network addition to the Southern California grid in Imperial County, California, miles TBD

Western Area Power AdministrationTransmission Infrastructure Program

Sonoran-Mohave Renewable Transmission (SMRT) Project

Page 7: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 7

SWAT 2010 Progress • CRT Subcommittee

– RMR Studies for Yuma and Mohave counties– Yuma 230kV Ring and Western TIP SMRT

• SATS Subcommittee– 2009 study work approved and filed– Alternative evaluation and VAR Margin study

• Short Circuit Work Group– Expanding area to include southern California– Retained consultant for CAPE, ASPEN, PSS/E

• NM Subcommittee– Wind collector and integration system, include pass through

• SWAT Renewable Transmission Task Force – Coordination with TEPPC studies

Page 8: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 8

SWAT 2010 Progress• CATS Subcommittee

– Development of WestConnect Base Cases

– Joint MOD-029 Studies

• Transmission Corridor Planning Committee– WGA Roadmap/Primer for Transmission Development

BLM Arizona Restoration Design Energy Projects Western’s Transmission Infrastructure Program (SMRT) Arizona Corporation Commission Biennial Transmission

Assessment 4th Qtr 2009 - Utilities filed reports identifying top 3 renewable

transmission projects and workshop to address filings Initiating 6th BTA

Page 9: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

Arizona Renewable Generation Interconnection Requests

APS

Solar

Wind

SRP

Solar

Wind

TEP

Solar

Wind

WAPA

Solar

Wind

CAISO

Solar

Interconnection Queue Listing

As of 2/8/10

8102MW

3244MW

260MW

125MW

150MW

400MW

1000MW

300MW

400MW

800MW

500MW

150MW

500MW

280MW

480MW

300MW

250MW

87MW

80MW

45MW

150MW

297MW

300MW

900MW

99MW

99MW

40MW

500MW

390MW

2095MW

1400MW

700MW200MW

125MW

180MW

180MW

180MW

180MW

500MW

700MW

700MW

700MW

700MW

150MW

150MW

2950MW

1275MW

1600MW

500MW

500MW

125MW

250MW

110MW

150MW

10MW

200MW

600MW

300MW

500MW

480MW

5MW

100MW20MW

20MW

20MW

20MW

20MW

20MW

20MW

18.9MW

70MW

20MW

20MW

125MW

125MW

500MW

250MW

250MW

50MW

50MW

50MW

340MW

600MW

200MW

100MW

2000MW

290MW

960MW

750MW

TEPPC 3-25-10 9SWAT Summary - R. Kondziolka

Page 10: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 10

Page 11: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 11

Page 12: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 12

Page 13: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 13

Page 14: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 14

Morgan 500/230kV Substation

Page 15: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 15

Morgan 500/230kV Substation

Page 16: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 16

Morgan to Pinnacle Peak 500/230kV Transmission Line

Page 17: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 17

Pinnacle Peak 500/230kV Substation

Page 18: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 18

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 19: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 19

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 20: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 20

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 21: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 21

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 22: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 22

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 23: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 23

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 24: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 24

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 25: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 25

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 26: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 26

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 27: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 27

Pinal Central to Abel to Browning 500/230kV Transmission Line

Page 28: TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1 Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah WECC TEPPC Meeting SWAT Update Western

TEPPC 3-25-10 SWAT Summary - R. Kondziolka 28

Western Electricity Coordinating CouncilWestern Electricity Coordinating Council

Transmission Expansion Planning Policy CommitteeTransmission Expansion Planning Policy Committee

Robert E. KondziolkaRobert E. [email protected]

(602) 236-0971(602) 236-0971

Questions?Questions?

Contact InformationContact Information

Details http://www.westconnect.com