Page 1: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Date: November 12, 2013

TENTATIVE

** DRAFT **

Page 2: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

HIGHWAYSALEXANDER STREET 4352761

PLANT CITY @ NGCN: 624564J

RAIL SAFETY PROJECT

INSTALL REMOTE RADIO KEYDOWN

FPN:

DESCRIPTION:PROJECT LENGTH: .001MI

RRU RHP 12,275 0 0 0 0

12,275 0 0 0 0Total:

BAYSHORE BLVD 4130923

FROM GANDY BLVD TO S HOWARD AVE

BIKE PATH/TRAIL

CONSTRUCT A SB BICYCLE LANE

FPN:

DESCRIPTION:PROJECT LENGTH: 2.455MI

CST TALT 0 0 2,087,800 0 0

0 0 2,087,800 0 0Total:

BOUGAINVILLEA AVE 4327151

FROM 30TH STREET TO 46TH STREET

BIKE LANE/SIDEWALK

COT WALK/BIKE PHASE 1

FPN:

DESCRIPTION:PROJECT LENGTH: .998MI

CST TALT 0 0 323,700 0 0

0 0 323,700 0 0Total:

36

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 3: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

BRIDGE PAINTING 4308023

HILLSBOROUGH COUNTY VARIOUS LOCATIONS

BRIDGE - PAINTING

DESIGN G/W 430802 2

FPN:

DESCRIPTION:PROJECT LENGTH: .245MI

CST BRRP 0 1,615,313 0 0 0

CST DIH 0 35,176 0 0 0

PE BRRP 145,000 0 0 0 0

145,000 1,650,489 0 0 0Total:

BROADWAY 4330711

FROM US 41 TO N 62ND ST CSX INTRMD

INTERSECTION IMPROVEMENT

FPN:

DESCRIPTION:PROJECT LENGTH: 1.542MI

CST SA 0 0 1,431,802 0 0

0 0 1,431,802 0 0Total:

CITY OF TAMPA 4242131

TRAFFIC SIGNAL MANAGEMENT PHASE 1

ATMS - ARTERIAL TRAFFIC MGMT

FPN:

DESCRIPTION:

CST SU 1,418,770 0 0 0 0

CST TRIP 1,178,681 0 0 0 0

2,597,451 0 0 0 0Total:

37

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 4: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

CR 580/SAM ALLEN RD 2578623

FM W OF SR39/BUCHMAN HWY TO E OF PARK RD

ADD LANES & RECONSTRUCT

2 TO 4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.682MI

CST CM 0 0 0 1,786,368 0

CST SA 0 0 0 1,003,233 0

CST SU 0 0 0 21,531,107 0

ENV SA 153,373 0 0 0 0

ROW SA 104,999 0 0 0 0

ROW SU 2,000,000 1,657,701 0 0 0

RRU SA 0 0 30,000 400,000 0

RRU SU 0 0 0 600,000 0

2,258,372 1,657,701 30,000 25,320,708 0Total:

CR 581 (BB DOWNS BL) 4054924

FROM PEBBLE CREEK DR TO COUNTY LINE RD

ADD LANES & RECONSTRUCT

4 TO 8 LANES, SEGMENT D

FPN:

DESCRIPTION:PROJECT LENGTH: 1.439MI

CST DIH 1,000 0 0 0 0

CST LF 1,853,100 0 0 0 0

CST LFP 5,000,000 0 0 0 0

CST TRIP 5,000,000 0 0 0 0

11,854,100 0 0 0 0Total:

38

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 5: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

CR582/KNIGHTS GRIFF 4343171

FM ITCHEPACKESASSA CK TO BR # 100265

BRIDGE REPLACEMENT

BRIDGE IN-KIND REPLACEMENT ON CR582/KNIGHTS GRIFFIN RD FROM

FPN:

DESCRIPTION:PROJECT LENGTH: .034MI

CST ACSB 0 0 1,143,413 0 0

PE ACSB 739,000 0 0 0 0

739,000 0 1,143,413 0 0Total:

CYPRESS STREET 4327141

FROM SR 60/U-PATH TO N WESTSHORE BLVD

BIKE LANE/SIDEWALK

COT WALK/BIKE PHASE 1

FPN:

DESCRIPTION:PROJECT LENGTH: 1.114MI

CST TALU 477,350 0 0 0 0

477,350 0 0 0 0Total:

DRAINAGE IMPROVEMENT 4347811

5 LOCATIONS-KENNEDY, HILLSBOROUGH, US 301

DRAINAGE IMPROVEMENTS

KENNEDY @ HENDERON,PACKWOOD, BRUSH/ HILLSBOROUGH @ HOWARD

FPN:

DESCRIPTION:PROJECT LENGTH: 3.337MI

CST DDR 0 0 348,793 0 0

CST DIH 0 0 45,692 0 0

PE DDR 277,000 0 0 0 0

PE DIH 1,000 0 0 0 0

278,000 0 394,485 0 0Total:

39

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 6: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

DRAINAGE IMPROVEMENT 4347812

4 LOCATIONS DALE MABRY AND GANDY

DRAINAGE IMPROVEMENTS

DALE MABRY @ HAMILTON,WALLACE, SWANN/GANDY @ W OF LOIS

FPN:

DESCRIPTION:PROJECT LENGTH: 3.970MI

CST DDR 0 0 389,596 0 0

CST DIH 0 0 51,037 0 0

PE DDR 259,000 0 0 0 0

PE DIH 1,000 0 0 0 0

260,000 0 440,633 0 0Total:

GATX DRIVE 4335861

FROM MARITIME BOULEVARD TO GUY N VERGER BOULEVARD

ADD LANES & RECONSTRUCT

2 TO 4 LANES

FPN:

DESCRIPTION:

CST CIGP 0 1,250,000 0 0 0

CST LFP 0 1,250,000 0 0 0

0 2,500,000 0 0 0Total:

HOOKERS POINT 4353771

RAIL IMPROVEMENTS PHASE 1

RAILROAD CROSSING

RAIL IMPROVEMENTS THROUGHOUT THE PORT'S CARGO YARD

FPN:

DESCRIPTION:

CST CIGP 0 0 0 2,376,952 0

CST LF 0 0 0 123,048 0

CST LFP 0 0 0 2,376,952 0

0 0 0 4,876,952 0Total:

40

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 7: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

HOOKERS POINT 4353781

RAIL IMPROVEMENTS PHASE II

RAILROAD CROSSING

RAIL IMPROVEMENTS THROUGHOUT THE PORT'S CARGO YARD

FPN:

DESCRIPTION:

CST CIGP 0 0 0 0 2,500,000

CST LFP 0 0 0 0 2,500,000

0 0 0 0 5,000,000Total:

I-275 (HOWARD FRKL) 4229044

FM N OF HOWARD FRANKLAND TO S OF SR 60

ADD LANES & RECONSTRUCT

FPN:

DESCRIPTION:PROJECT LENGTH: 1.000MI

DSB ACBR 0 0 0 0 6,052,535

PE ACBR 0 0 0 0 121,000

0 0 0 0 6,173,535Total:

I-275 (SR 93) 4125312

I-275/SR 60 INTERCHANGE

INTERCHANGE - ADD LANES

CYPRESS ST BRD S ABUTMENT TO 275 GEN USE LANE/NB RAMP;ADV RW

FPN:

DESCRIPTION:PROJECT LENGTH: .263MI

ROW DDR 0 0 8,636,403 0 0

ROW DS 0 1,810,681 2,500,000 3,500,000 8,564,776

ROW SA 0 0 0 6,469,327 0

ROW SU 0 1,496,651 500,000 0 0

ROW TRIP 0 1,496,651 500,000 0 0

0 4,803,983 12,136,403 9,969,327 8,564,776Total:

41

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 8: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

I-275 (SR 93) 4325791

FROM S OF NORTH BLVD TO S OF FLORIBRASKA AVE

RIGID PAVEMENT REHABILITATION

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.748MI

CST ACNP 0 2,226,225 0 0 0

0 2,226,225 0 0 0Total:

I-275 (SR 93) 4326071

FM W OF NB/EB KENNEDY RMP TO E OF SR60/MEMORIAL HWY

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.062MI

CST ACNP 0 3,075,545 0 0 0

0 3,075,545 0 0 0Total:

I-275 (SR 93) 4335351

FM N OF HOWARD FRANKLAND TO S OF LOIS AVENUE

INTERCHANGE (NEW)

FPN:

DESCRIPTION:PROJECT LENGTH: 3.568MI

PE ACNP 0 0 0 0 16,577,000

0 0 0 0 16,577,000Total:

42

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 9: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

I-275 (SR 93) SB 4335352

FM N OF REO STREET TO S OF LOIS AVENUE

INTERCHANGE (NEW)

FPN:

DESCRIPTION:PROJECT LENGTH: 3.105MI

PE ACNP 0 0 0 0 9,168,000

0 0 0 0 9,168,000Total:

I-275/I-4 2586431

FROM N HILLSBOROUGH RIVER TO DOWNTOWN INTERCHANGE

INTERCHANGE IMPROVEMENT

OPERATIONAL IMPROVEMENTS RAMP MODIFICATIONS

FPN:

DESCRIPTION:PROJECT LENGTH: .406MI

ROW BNDS 392,522 0 0 0 0

ROW BNIR 3,668,785 1,550,000 0 0 0

ROW DDR 4,303,138 0 1,087,900 0 0

ROW DIH 5,000 5,000 5,000 0 0

ROW DS 201,055 210,000 42,000 0 0

8,570,500 1,765,000 1,134,900 0 0Total:

I275/SR93 NB FLYOVER 4335355

FROM SR 60 EB TO I-275 NB

INTERCHANGE RAMP (NEW)

FPN:

DESCRIPTION:PROJECT LENGTH: .596MI

PE ACNP 0 0 0 0 3,338,000

0 0 0 0 3,338,000Total:

43

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 10: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

I-275/SR93 NB XPR LN 4335354

FM N OF HOWARD FRANKLAND TO S OF TRASK STREET

INTERCHANGE (NEW)

FPN:

DESCRIPTION:PROJECT LENGTH: 2.717MI

PE ACNP 0 0 0 0 7,638,000

0 0 0 0 7,638,000Total:

I-4 (SR 400) 4303351

FM I-75 (SR 93A) TO EAST OF WILLIAMS RD

INTERCHANGE IMPROVEMENT

INCLUDING ENTRANCE RAMPS FR NB I-75 TO SB I-75

FPN:

DESCRIPTION:PROJECT LENGTH: .549MI

PE DDR 0 0 0 122,000 0

PE DIH 0 0 0 1,000 0

0 0 0 123,000 0Total:

I-4 (SR 400) 4303361

FROM TAMPA BYPASS CANAL TO EAST OF I-75

ADD LANES & REHABILITATE PVMNT

FPN:

DESCRIPTION:PROJECT LENGTH: 1.625MI

PE DIH 0 0 0 0 1,000

PE DS 0 0 0 0 1,138,000

0 0 0 0 1,139,000Total:

44

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 11: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

I-75 (SR 93A) 4289531

FM WB SR60 ENTRANCE RAMP TO S OF CSX/CR 574

INTERCHANGE IMPROVEMENT

IMPROVE WB SR 60 TO NB I-75 ENTRANCE RAMP. INCLUDES 2 LANE

FPN:

DESCRIPTION:PROJECT LENGTH: 1.666MI

PE ACNP 2,194,000 0 0 0 0

2,194,000 0 0 0 0Total:

I-75 (SR 93A) 4289561

FM S OF SELMON EXP OVRPSS TO N OF SR 60

INTERCHANGE IMPROVEMENT

EB SR 60 TO SB I-75 RAMP PLUS ALL SB CD RD WIDENING/NEW CST

FPN:

DESCRIPTION:PROJECT LENGTH: 1.340MI

PE DDR 1,368,000 0 0 0 0

1,368,000 0 0 0 0Total:

I-75 (SR 93A) 4292511

FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP

INTERCHANGE IMPROVEMENT

INTERIM INTERCHANGE IMPROVEMENT

FPN:

DESCRIPTION:PROJECT LENGTH: 2.336MI

PE DDR 2,325,000 0 0 0 0

2,325,000 0 0 0 0Total:

45

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 12: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

I-75 (SR 93A) NB/SB 4322711

FR OVER ALAFIA RIVER TO BRIDGE # 100358/359

BRIDGE-REPAIR/REHABILITATION

FULL DECK REPLACEMENT OF DEFICIENT PANELS

FPN:

DESCRIPTION:PROJECT LENGTH: .307MI

CST BRRP 0 0 9,963,558 0 0

CST DIH 0 0 1,402,891 0 0

PE BRRP 913,000 0 0 0 0

913,000 0 11,366,449 0 0Total:

I-75 (SR93A)& SR 60 4289551

FM S OF SR60 @ SLIP RMP TO N OF SR 60 AT CSX BRG

INTERCHANGE IMPROVEMENT

RECONSTR EB SR 60 TO NB I-75 LOOP RAMP. CONST NEW NB CD RD

FPN:

DESCRIPTION:PROJECT LENGTH: 1.557MI

PE DDR 0 1,275,000 0 0 0

PE DIH 1,000 0 0 0 0

1,000 1,275,000 0 0 0Total:

I-75(SR93A)NB ONRAMP 4289541

FROM EB/WB I-4 TO SOUTH OF BYPASS CANAL

INTERCHANGE IMPROVEMENT

RAMP MODIFICATION ONLY

FPN:

DESCRIPTION:PROJECT LENGTH: 1.677MI

CST ACNP 0 0 0 0 18,284,445

PE DDR 1,980,000 0 0 0 0

1,980,000 0 0 0 18,284,445Total:

46

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 13: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

I75(SR93A)OVER CR574 4307051

FM WOODBERRY RD TO E MLK JR BLVD

BRIDGE-REPAIR/REHABILITATION

FULL DECK REPLACEMENT OF THE EXISTING DECK PANEL BRIDGE

FPN:

DESCRIPTION:PROJECT LENGTH: .071MI

CST BRRP 0 0 0 3,408,951 0

CST DIH 0 0 0 98,489 0

PE BRRP 0 0 287,000 0 0

PE DIH 0 0 1,000 0 0

RRU BRRP 0 0 20,000 75,000 0

0 0 308,000 3,582,440 0Total:

I-75(SR93A)SB OFFRMP 4289571

FROM S OF BYPASS CANAL TO EB/WB I-4

INTERCHANGE IMPROVEMENT

RAMP MODIFICATION ONLY

FPN:

DESCRIPTION:PROJECT LENGTH: 1.866MI

PE DDR 1,482,000 0 0 0 0

1,482,000 0 0 0 0Total:

LONG BRIDGE REPAIR 4307061

HILLSBOROUGH COUNTY VARIOUS LOCATIONS

BRIDGE-REPAIR/REHABILITATION

GOES WITH 430706 2

FPN:

DESCRIPTION:PROJECT LENGTH: 3.419MI

CST BRRP 0 2,020,678 0 0 0

CST DIH 0 112,211 0 0 0

PE BRRP 180,000 0 0 0 0

180,000 2,132,889 0 0 0Total:

47

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 14: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

MARITIME BOULEVARD 4353591

FROM GATX DRIVE TO CONTAINER YARD ENTRANC

NEW ROAD CONSTRUCTION

FPN:

DESCRIPTION:

CST CIGP 0 1,250,000 0 0 0

CST LFP 0 1,250,000 0 0 0

0 2,500,000 0 0 0Total:

MARTIME BOULEVARD 4335841

FROM SHORELINE DRIVE TO GATX DRIVE

ROAD RECONSTRUCTION - 2 LANE

FPN:

DESCRIPTION:

CST CIGP 900,000 0 0 0 0

CST LFP 900,000 0 0 0 0

1,800,000 0 0 0 0Total:

PALM AVENUE 4327161

FROM NORTH BOULEVARD TO NEBRASKA AVENUE

BIKE LANE/SIDEWALK

COT WALK/BIKE PHASE 1

FPN:

DESCRIPTION:PROJECT LENGTH: 1.008MI

CST TALT 679,400 0 0 0 0

679,400 0 0 0 0Total:

48

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 15: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PORTWIDE ACCESS 4353601

IMPROVEMENTS

NEW ROAD CONSTRUCTION

RECONSTRUCTION OF ACCESS ROAD PORTWIDE

FPN:

DESCRIPTION:

CST CIGP 750,000 0 0 0 0

CST LFP 750,000 0 0 0 0

1,500,000 0 0 0 0Total:

SR 39/N WHEELER ST 4347371

FROM REYNOLDS ST TO N OF I-4 INTERCHANGE

RESURFACING

2 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.407MI

CST DDR 0 0 1,139,877 0 0

CST DIH 0 0 129,376 0 0

PE DDR 514,000 0 0 0 0

514,000 0 1,269,253 0 0Total:

SR 39/REDMAN PARKWAY 4326461

FR N OF CHARLIE GRIFFIN TO SR 600/US 92/BAKER ST

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 2.450MI

CST DDR 0 0 856,418 0 0

CST DIH 0 0 21,820 0 0

CST DS 0 0 1,476,140 0 0

PE DS 1,109,000 0 0 0 0

1,109,000 0 2,354,378 0 0Total:

49

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 16: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 566 /THONOTOSASSA 4255031

FROM W BAKER ST TO N OF I-4

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: .925MI

CST DIH 0 0 110,477 0 0

CST DS 0 0 1,753,042 0 0

0 0 1,863,519 0 0Total:

SR 569 (39TH ST) 4338661

FROM N OF E ADAMO DR TO S OF E 7TH AVE

RAILROAD CROSSING

REPLACE CROSSING,NGCN: 624370D (A-LINE) 624467A (S-LINE)

FPN:

DESCRIPTION:PROJECT LENGTH: .290MI

CST DDR 0 162,816 0 0 0

CST DIH 0 25,204 0 0 0

PE DDR 237,000 0 0 0 0

PE DIH 1,000 0 0 0 0

RRU DDR 30,000 800,000 0 0 0

268,000 988,020 0 0 0Total:

SR 569/39TH/40TH ST 4290611

FROM SR 60/E ADAMO DR TO S OF E 15TH AVE

RESURFACING

2 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: .777MI

CST DDR 1,302,868 0 0 0 0

CST DIH 7,210 0 0 0 0

CST HSP 271,405 0 0 0 0

1,581,483 0 0 0 0Total:

50

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 17: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 574 (E MLK BLVD) 4290591

FROM 42ND ST TO E OF I-4

RESURFACING

2 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.808MI

CST DDR 0 2,193,246 0 0 0

CST DIH 0 74,200 0 0 0

0 2,267,446 0 0 0Total:

SR 574 (MLK BLVD) 2558933

FROM E OF PARSONS AVE TO E OF KINGSWAY RD

ADD LANES & RECONSTRUCT

3 TO 4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: .800MI

CST CM 0 1,786,944 0 0 0

CST SU 0 2,569,460 0 0 0

RRU DDR 0 50,000 0 0 0

RRU LF 0 1,000 0 0 0

ROW DDR 177,725 0 0 0 0

ROW DS 211,385 0 0 0 0

ROW SA 2,969,205 1,628,940 0 0 0

ROW SU 263,685 0 0 0 0

3,622,000 6,036,344 0 0 0Total:

51

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 18: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 574 (MLK BLVD) 2558934

FROM EAST OF KINGSWAY RD TO E OF MCINTOSH RD

ADD LANES & RECONSTRUCT

2 TO 4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 2.256MI

CST DDR 0 0 0 21,878,255 0

CST DIH 0 0 0 561,000 0

ENV DDR 10,959 0 0 0 0

ROW DDR 671,250 49,000 1,204,845 0 0

ROW DIH 490,000 290,000 280,000 0 0

ROW DS 446,406 1,496,651 4,337,587 0 0

ROW SU 8,108,721 3,953,540 0 0 0

9,727,336 5,789,191 5,822,432 22,439,255 0Total:

SR 574 (MLK BLVD) 4274951

@ N DOVER RD

RAILROAD CROSSING

FPN:

DESCRIPTION:PROJECT LENGTH: .020MI

CST DDR 0 25,016 0 0 0

CST DIH 0 5,478 0 0 0

PE DDR 176,000 0 0 0 0

PE DIH 1,000 0 0 0 0

RRU DDR 10,000 125,000 0 0 0

187,000 155,494 0 0 0Total:

52

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 19: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 574 (MLK BLVD) 4290721

FROM W OF VALRICO RD TO E OF MCINTOSH RD

RESURFACING

2 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: .760MI

CST DDR 730,270 0 0 0 0

CST DIH 95,217 0 0 0 0

RRU DDR 50,000 0 0 0 0

875,487 0 0 0 0Total:

SR 574 (MLK BLVD) 4306851

AT GALLAGHER ROAD

ADD LEFT TURN LANE(S)

FPN:

DESCRIPTION:PROJECT LENGTH: .249MI

CST DDR 849,202 0 0 0 0

CST DIH 58,730 0 0 0 0

RRU DDR 75,000 0 0 0 0

982,932 0 0 0 0Total:

SR 574 (MLK BLVD) 4338651

FM E IDA ST TO W OF 30TH FM E OF 38TH ST TO 39TH

RAILROAD CROSSING

RR REPLACEMENT @ NGCN: 626906N AND NGCN: 624837B

FPN:

DESCRIPTION:PROJECT LENGTH: .651MI

CST DDR 0 0 84,007 0 0

CST DIH 0 0 14,894 0 0

PE DDR 0 234,000 0 0 0

PE DIH 0 1,000 0 0 0

RRU DDR 0 20,000 420,000 0 0

0 255,000 518,901 0 0Total:

53

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 20: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 574/W REYNOLDS ST 4347361

FROM E OF TURKEY CREEK RD TO THONOTOSASSA RD

RESURFACING

2 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 2.231MI

CST DDR 0 0 1,760,874 0 0

CST DIH 0 0 199,859 0 0

PE DDR 659,000 0 0 0 0

659,000 0 1,960,733 0 0Total:

SR 582 (FOWLER AVE) 4290772

FM W OF NEBRASKA AVE TO W OF BRUCE B DOWNS BLV

RESURFACING

6 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.511MI

CST HSP 1,124,966 0 0 0 0

CST SA 3,857,530 0 0 0 0

4,982,496 0 0 0 0Total:

SR 583 (56TH ST) 4307111

FM N US92/SR600/HILLS AVE TO N OF HENRY AVENUE

RAILROAD CROSSING

CSX: 624849-V

FPN:

DESCRIPTION:PROJECT LENGTH: .133MI

CST DIH 0 40,202 0 0 0

CST DS 0 289,751 0 0 0

RRU DDR 350,000 0 0 0 0

350,000 329,953 0 0 0Total:

54

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 21: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 60 4275011

FM W OF VALRICO STATION TO WEST OF SKYWOOD DR

RAILROAD CROSSING

FPN:

DESCRIPTION:PROJECT LENGTH: .094MI

CST DDR 0 204,156 0 0 0

CST DIH 0 31,603 0 0 0

PE DDR 190,000 0 0 0 0

PE DIH 1,000 0 0 0 0

RRU DDR 20,000 500,000 0 0 0

211,000 735,759 0 0 0Total:

SR 60 (ADAMO DR) 4055252

FROM E OF US 301 TO W OF FALKENBURG RD

ADD LANES & RECONSTRUCT

4 TO 6 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.231MI

CST DDR 0 0 14,955,210 0 0

CST DIH 0 0 722,197 0 0

RRU LF 0 0 1,782,580 0 0

0 0 17,459,987 0 0Total:

SR 60 (ADAMO DR) 4347381

FROM E OF FALKENBURG RD TO W OF LAKE KATHY ENTR

RESURFACING

7 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: .739MI

CST SA 0 0 3,535,682 0 0

PE DS 603,000 0 0 0 0

603,000 0 3,535,682 0 0Total:

55

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 22: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 60 (CCAMPBLL CWY) 4245072

FM PINELLAS COUNTY LINE TO N OF ROCKY POINT DR

ITS FREEWAY MANAGEMENT

FPN:

DESCRIPTION:PROJECT LENGTH: 5.012MI

CST DIH 0 0 0 0 449,599

CST DITS 0 0 0 0 5,307,852

CST DS 0 0 0 0 2,870,102

PE DIH 0 0 0 500 0

PE DITS 0 0 0 0 95,000

0 0 0 500 8,722,553Total:

SR 60 (KENNEDY BLVD) 4168561

FROM ARMENIA AVE TO BREVARD AVE

TRAFFIC SIGNAL UPDATE

5 LOCATIONS

FPN:

DESCRIPTION:PROJECT LENGTH: 1.122MI

CST DDR 0 0 0 0 1,773,387

CST DIH 0 0 0 0 75,075

PE DDR 856,000 0 0 0 0

ROW DDR 0 0 1,446,300 0 0

ROW DIH 0 0 160,000 0 0

856,000 0 1,606,300 0 1,848,462Total:

SR 60 (SR 589) 4335353

FROM N OF INDEPENDENCE TO I-275 AT WESTSHORE

INTERCHANGE (NEW)

FPN:

DESCRIPTION:PROJECT LENGTH: 3.555MI

PE ACNP 0 0 0 0 9,187,755

0 0 0 0 9,187,755Total:

56

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 23: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 60 (SR 685) 4289691

FROM SR600 (DALE MABRY) TO S WOODLYNNE AVE

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.047MI

CST DDR 0 3,276,642 0 0 0

CST DIH 0 10,600 0 0 0

0 3,287,242 0 0 0Total:

SR 60 (W KENNEDY BL) 4311321

FM W OF N/S CHURCH AVE TO SR685/HENDERSON/MANTANZAS

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: .750MI

CST DDR 38,259 0 0 0 0

CST DIH 20,600 0 0 0 0

CST HSP 277,688 0 0 0 0

CST SA 1,105,308 0 0 0 0

1,441,855 0 0 0 0Total:

SR 60 ADAMO 4352771

@ NGCN: 624820X

RAIL SAFETY PROJECT

INSTALL REMOTE RADIO KEYDOWN

FPN:

DESCRIPTION:PROJECT LENGTH: .001MI

RRU RHP 12,275 0 0 0 0

12,275 0 0 0 0Total:

57

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 24: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SR 60 VALRICO 4352751

@ NGCN: 624451H

RAIL SAFETY PROJECT

INSTALL REMOTE RADIO KEYDOWN

FPN:

DESCRIPTION:PROJECT LENGTH: .001MI

RRU RHP 12,275 0 0 0 0

12,275 0 0 0 0Total:

SR 676 (CAUSEWAY BL) 2555991

FROM 1/4 MI W OF US 41 TO 1/4 E OF US 301

ADD LANES & RECONSTRUCT

2 TO 4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 3.414MI

ROW DS 1,067,770 0 0 0 0

1,067,770 0 0 0 0Total:

SR 685 (FLORIDA AVE) 4338621

FROM N OF W HUMPHREY ST TO N OF W BUSCH BLVD

RAILROAD CROSSING

FPN:

DESCRIPTION:PROJECT LENGTH: .051MI

CST DDR 0 0 0 150,685 0

CST DIH 0 0 0 23,326 0

PE DDR 0 0 103,000 0 0

PE DIH 0 0 1,000 0 0

RRU DDR 0 0 10,000 300,000 0

0 0 114,000 474,011 0Total:

58

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 25: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

SUBSTRUCTURE REPAIR 4307512

HILLSBOROUGH COUNTY VARIOUS LOCATIONS

BRIDGE-REPAIR/REHABILITATION

FPN:

DESCRIPTION:PROJECT LENGTH: 7.728MI

CST BRRP 1,001,830 0 0 0 0

CST DIH 32,171 0 0 0 0

1,034,001 0 0 0 0Total:

SUBSTRUCTURE REPAIR 4324322

HILLSBOROUGH COUNTY VARIOUS PROJECTS

BRIDGE-REPAIR/REHABILITATION

FPN:

DESCRIPTION:PROJECT LENGTH: 13.114MI

CST BRRP 1,269,269 0 0 0 0

CST DIH 130,969 0 0 0 0

1,400,238 0 0 0 0Total:

US 301 (SR 43) 4154893

FM SR 674/SUNCITY CTR BL TO CR 672/BALM ROAD

ADD LANES & RECONSTRUCT

2 TO 6 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 3.814MI

CST DDR 0 27,897,605 0 0 0

CST DIH 0 530,000 0 0 0

CST DS 0 15,448,048 0 0 0

0 43,875,653 0 0 0Total:

59

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 26: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

US 41 (SR 45) 4314951

FROM US 92/US 41/ SR 600 TO S OF E SLIGH AVE

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.014MI

CST DDR 1,656,344 0 0 0 0

CST DIH 20,600 0 0 0 0

CST HSP 347,934 0 0 0 0

2,024,878 0 0 0 0Total:

US 41 GIBSONTON 4340291

FROM N OF OLD US 41A TO S OF ARCHIE CREEK

RAILROAD CROSSING

NGCN:624797 CSX TO REPLACE EXISTING CROSSING WITH A PLATFORM

FPN:

DESCRIPTION:PROJECT LENGTH: .100MI

CST DDR 0 0 0 414,579 0

CST DIH 0 0 0 54,310 0

PE DDR 0 0 233,000 0 0

PE DIH 0 0 1,000 0 0

RRU DDR 0 0 10,000 350,000 0

0 0 244,000 818,889 0Total:

US 41(SR 569/N 40TH) 4314921

FROM S OF E 15TH AVE TO S OF E CONOVER ST

RESURFACING

6 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.880MI

CST DDR 0 110,474 0 0 0

CST DIH 0 53,000 0 0 0

CST DS 0 4,639,322 0 0 0

0 4,802,796 0 0 0Total:

60

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 27: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

US 41(SR45/NEBRASKA) 4290771

FROM N OF FOWLER AVE TO S OF LINNWOOD DR

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: .883MI

CST DDR 813,829 0 0 0 0

CST DIH 48,985 0 0 0 0

862,814 0 0 0 0Total:

US 60 HOPEWELL 4348251

VIRTUAL WEIGH STATION

MCCO WEIGH STATION STATIC/WIM

REMODEL BLDG & RAMPS/AD VIRTUAL SCREENING SITES IN BOTH DIRS

FPN:

DESCRIPTION:PROJECT LENGTH: 5.037MI

CST DIH 0 75,644 0 0 0

CST DWS 0 1,068,477 0 0 0

PE DIH 28,367 0 0 0 0

PE DWS 189,111 0 0 0 0

217,478 1,144,121 0 0 0Total:

USB 41 (SR 45/SR 60) 4271712

FM W OF 14TH ST TO E OF 19TH ST

TRAFFIC SIGNAL UPDATE

TRAFFIC SIGNAL PULLED OUT FM RESURFACING ON SEG 1 DUE TO R/W

FPN:

DESCRIPTION:PROJECT LENGTH: .452MI

CST DDR 0 412,446 0 0 0

CST DIH 0 52,162 0 0 0

0 464,608 0 0 0Total:

61

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 28: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

USB 41(SR60/685/45) 4289681

FROM E MERIDIAN AVE TO W OF N 14TH ST

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: .635MI

CST DDR 850,162 0 0 0 0

CST DIH 90,996 0 0 0 0

941,158 0 0 0 0Total:

USB41(SR685/FLORIDA) 4314901

FROM N OF BEARSS AVE TO NEBRASKA AVE

RESURFACING

4 LANES

FPN:

DESCRIPTION:PROJECT LENGTH: 1.453MI

CST DDR 0 1,488,770 0 0 0

CST DIH 0 21,200 0 0 0

0 1,509,970 0 0 0Total:

WILLOW AVENUE 4327171

FROM SWANN AVENUE TO MAIN STREET

BIKE LANE/SIDEWALK

COT WALK/BIKE PHASE 1

FPN:

DESCRIPTION:PROJECT LENGTH: 1.367MI

CST TALT 0 0 395,900 0 0

CST TALU 0 0 36,000 0 0

0 0 431,900 0 0Total:

FLP: AVIATION

62

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 29: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PETER O'KNIGHT 4296411

AIRPORT

AVIATION REVENUE/OPERATIONAL

HANGAR EXTENSION

FPN:

DESCRIPTION:

CAP DPTO 0 2,121,300 0 0 0

CAP LF 0 530,400 0 0 0

0 2,651,700 0 0 0Total:

PETER O'KNIGHT 4296421

AIRPORT

AVIATION REVENUE/OPERATIONAL

HANGAR G REHABILTATION

FPN:

DESCRIPTION:

CAP DPTO 0 98,600 0 0 0

CAP LF 0 316,600 0 0 0

0 415,200 0 0 0Total:

PETER O'KNIGHT 4296491

AIRPORT

AVIATION PRESERVATION PROJECT

PARKING LOT REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 52,100 0 0 0

CAP LF 0 52,200 0 0 0

0 104,300 0 0 0Total:

63

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 30: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PETER O'KNIGHT 4312691

AIRPORT

AVIATION PRESERVATION PROJECT

TIE-DOWN AREA G & H RECONSTRUCTION

FPN:

DESCRIPTION:

CAP DPTO 0 0 480,300 0 0

CAP LF 0 0 120,100 0 0

0 0 600,400 0 0Total:

PETER O'KNIGHT 4312701

AIRPORT

AVIATION PRESERVATION PROJECT

TIE-DOWN AREA J REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 63,500 0 0

CAP LF 0 0 15,900 0 0

0 0 79,400 0 0Total:

PETER O'KNIGHT 4312711

AIRPORT

AVIATION REVENUE/OPERATIONAL

HANGAR A REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 107,200 0 0

CAP LF 0 0 26,900 0 0

0 0 134,100 0 0Total:

64

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 31: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PETER O'KNIGHT 4317921

AIRPORT

AVIATION PRESERVATION PROJECT

RUNWAY 4/22 REHABILITATION

FPN:

DESCRIPTION:

CAP DDR 34,306 23,690 0 0 0

CAP DPTO 302,371 183,898 0 0 0

CAP LF 2,255,735 0 0 0 0

2,592,412 207,588 0 0 0Total:

PETER O'KNIGHT 4329791

AIRPORT

AVIATION PRESERVATION PROJECT

RUNWAY 18/36 REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 408,600 0

CAP LF 0 0 0 102,200 0

0 0 0 510,800 0Total:

PETER O'KNIGHT 4329801

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY F REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 225,920 0

CAP LF 0 0 0 56,480 0

0 0 0 282,400 0Total:

65

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 32: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PETER O'KNIGHT 4352371

AIRPORT

AVIATION PRESERVATION PROJECT

REPAIR SEAWALL

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 696,640

CAP LF 0 0 0 0 174,160

0 0 0 0 870,800Total:

PETER O'KNIGHT 4352391

AIRPORT

AVIATION REVENUE/OPERATIONAL

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 240,000

CAP LF 0 0 0 0 60,000

0 0 0 0 300,000Total:

PLANT CITY AIRPORT 4225512

AVIATION REVENUE/OPERATIONAL

HANGAR EXPANSION

FPN:

DESCRIPTION:

CAP DDR 1,841,414 0 0 0 0

CAP DPTO 158,586 0 0 0 0

CAP LF 638,700 0 0 0 0

2,638,700 0 0 0 0Total:

66

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 33: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PLANT CITY AIRPORT 4225513

AVIATION REVENUE/OPERATIONAL

HANGAR A REHBILITATION

FPN:

DESCRIPTION:

CAP DPTO 173,120 0 0 0 0

CAP LF 43,280 0 0 0 0

216,400 0 0 0 0Total:

PLANT CITY AIRPORT 4296141

AVIATION REVENUE/OPERATIONAL

HANGAR C REHABILITATION

FPN:

DESCRIPTION:

CAP DDR 0 91,360 0 0 0

CAP LF 0 22,840 0 0 0

0 114,200 0 0 0Total:

PLANT CITY AIRPORT 4352211

AVIATION REVENUE/OPERATIONAL

EXPAND HANGAR FACILITES

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 959,200

CAP LF 0 0 0 0 2,717,500

0 0 0 0 3,676,700Total:

67

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 34: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PLANT CITY AIRPORT 4352361

AVIATION REVENUE/OPERATIONAL

REHABILITATE MAINTENANCE FACILITY

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 240,000

CAP LF 0 0 0 0 60,000

0 0 0 0 300,000Total:

TAMPA EXECUTIVE 4280621

AIRPORT

AVIATION REVENUE/OPERATIONAL

HANGAR REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 166,000 0 0 0 0

CAP LF 41,600 0 0 0 0

207,600 0 0 0 0Total:

TAMPA EXECUTIVE 4296151

AIRPORT

AVIATION PRESERVATION PROJECT

APRON A REHABILITATION

FPN:

DESCRIPTION:

CAP DDR 0 69,000 0 0 0

CAP FAA 0 300,000 0 0 0

CAP LF 0 69,100 0 0 0

0 438,100 0 0 0Total:

68

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 35: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA EXECUTIVE 4296171

AIRPORT

AVIATION SAFETY PROJECT

AUTOMATIC GATES REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 162,720 0 0 0

CAP LF 0 40,680 0 0 0

0 203,400 0 0 0Total:

TAMPA EXECUTIVE 4312551

AIRPORT

AVIATION REVENUE/OPERATIONAL

HANGAR EXPANSION

FPN:

DESCRIPTION:

CAP DDR 0 0 103,791 0 0

CAP DPTO 0 0 2,224,483 0 0

CAP FAA 0 0 349,800 0 0

CAP LF 0 0 1,008,200 0 0

0 0 3,686,274 0 0Total:

TAMPA EXECUTIVE 4312561

AIRPORT

AVIATION REVENUE/OPERATIONAL

OPERATIONS AND MAINTENANCE FACILITY REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 85,000 0 0

CAP LF 0 0 24,900 0 0

0 0 109,900 0 0Total:

69

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 36: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA EXECUTIVE 4312571

AIRPORT

AVIATION REVENUE/OPERATIONAL

TAXI-THRU HANGARS REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 210,000 0 0

CAP LF 0 0 56,600 0 0

0 0 266,600 0 0Total:

TAMPA EXECUTIVE 4329811

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY D REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 172,480 0

CAP LF 0 0 0 43,120 0

0 0 0 215,600 0Total:

TAMPA EXECUTIVE 4329821

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY E REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 849,440 0

CAP LF 0 0 0 212,360 0

0 0 0 1,061,800 0Total:

70

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 37: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA EXECUTIVE 4329831

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY F REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 575,118 0

CAP LF 0 0 0 148,020 0

0 0 0 723,138 0Total:

TAMPA EXECUTIVE 4329841

AIRPORT

AVIATION PRESERVATION PROJECT

RUNWAY 5/23 AND ASSOCIATED TAXIWAY LIGHTING REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 415,000 0

CAP LF 0 0 0 415,000 0

0 0 0 830,000 0Total:

TAMPA EXECUTIVE 4329851

AIRPORT

AVIATION PRESERVATION PROJECT

RUNWAY 5/24 AND ASSOCIATED TAXIWAY SIGNAGE REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 288,600 0

CAP FAA 0 0 0 450,000 0

CAP LF 0 0 0 138,700 0

0 0 0 877,300 0Total:

71

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 38: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA EXECUTIVE 4329861

AIRPORT

AVIATION PRESERVATION PROJECT

RUNWAY 5/23 MALSR LIGHT POLES REPLACEMENTS

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 127,900 0

CAP LF 0 0 0 32,000 0

0 0 0 159,900 0Total:

TAMPA EXECUTIVE 4329871

AIRPORT

AVIATION PRESERVATION PROJECT

RUNWAY 5/23 PAPI REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 166,000 0

CAP LF 0 0 0 41,600 0

0 0 0 207,600 0Total:

TAMPA EXECUTIVE 4329881

AIRPORT

AVIATION PRESERVATION PROJECT

RUNWAY 5/23 REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 72,800 0

CAP FAA 0 0 0 2,619,600 0

CAP LF 0 0 0 218,300 0

0 0 0 2,910,700 0Total:

72

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 39: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA EXECUTIVE 4329891

AIRPORT

AVIATION PRESERVATION PROJECT

RUNWAY 5/234 REILS REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 84,300 0

CAP LF 0 0 0 84,300 0

0 0 0 168,600 0Total:

TAMPA EXECUTIVE 4330011

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY C REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 385,360 0

CAP LF 0 0 0 96,340 0

0 0 0 481,700 0Total:

TAMPA EXECUTIVE 4352311

AIRPORT

AVIATION SAFETY PROJECT

RUNWAY PROTECTION ZONE TREE TRIMMING

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 407,600

CAP LF 0 0 0 0 101,900

0 0 0 0 509,500Total:

73

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 40: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA EXECUTIVE 4352321

AIRPORT

AVIATION PRESERVATION PROJECT

REHABILITATE SERVICE ROAD

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 170,240

CAP FAA 0 0 0 0 450,000

CAP LF 0 0 0 0 42,560

0 0 0 0 662,800Total:

TAMPA EXECUTIVE 4352331

AIRPORT

AVIATION REVENUE/OPERATIONAL

FIRE SUPPRESSION SYSTEM REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 120,400

CAP LF 0 0 0 0 30,100

0 0 0 0 150,500Total:

TAMPA EXECUTIVE 4352341

AIRPORT

AVIATION REVENUE/OPERATIONAL

REHABILITATE TERMINAL BUILDING

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 284,240

CAP LF 0 0 0 0 71,060

0 0 0 0 355,300Total:

74

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 41: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA EXECUTIVE 4352351

AIRPORT

AVIATION REVENUE/OPERATIONAL

REHABILITATE MAINTENANCE FACILITY

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 240,000

CAP LF 0 0 0 0 60,000

0 0 0 0 300,000Total:

TAMPA INTERNATIONAL 4157591

AIRPORT

AVIATION PRESERVATION PROJECT

TERMINAL AND AIRFIELD REHABILITATION

FPN:

DESCRIPTION:

CAP DDR 0 294,900 0 0 0

CAP FAA 0 1,769,400 0 0 0

CAP LF 0 295,000 0 0 0

0 2,359,300 0 0 0Total:

TAMPA INTERNATIONAL 4208081

AIRPORT

AVIATION CAPACITY PROJECT

AIRFIELD/AIRSIDE/TERMINAL INFRASTRUCTURE REHABILITATION

FPN:

DESCRIPTION:

CAP DIS 0 5,400,000 0 0 0

CAP LF 0 5,400,000 0 0 0

0 10,800,000 0 0 0Total:

75

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 42: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4259202

AIRPORT

AVIATION SECURITY PROJECT

ACCESS CONTROL SYSTEM REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 0 0 3,032,200 0 0

CAP LF 0 0 3,032,200 0 0

0 0 6,064,400 0 0Total:

TAMPA INTERNATIONAL 4280571

AIRPORT

AVIATION REVENUE/OPERATIONAL

LONG TERM PARKING GARAGE LIGHTING FIXTURES REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 73,688 0 0 0 0

CAP LF 937,500 0 0 0 0

1,011,188 0 0 0 0Total:

TAMPA INTERNATIONAL 4280572

AIRPORT

AVIATION PRESERVATION PROJECT

LANDSIDE FACILITY INTERIOR LED SIGNAGE REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 2,028,800 0 0 0 0

CAP LF 2,028,800 0 0 0 0

4,057,600 0 0 0 0Total:

76

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 43: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4280573

AIRPORT

AVIATION PRESERVATION PROJECT

NORTH EMPLOYEE PARKING LOT PAVEMENT REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 31,200 0 0 0 0

CAP FAA 232,100 0 0 0 0

CAP LF 46,200 0 0 0 0

309,500 0 0 0 0Total:

TAMPA INTERNATIONAL 4280574

AIRPORT

AVIATION REVENUE/OPERATIONAL

LANDSIDE TICKET LEVEL RESTROOM REFURBISHMENT

FPN:

DESCRIPTION:

CAP DPTO 251,500 0 0 0 0

CAP FAA 1,508,800 0 0 0 0

CAP LF 251,500 0 0 0 0

2,011,800 0 0 0 0Total:

TAMPA INTERNATIONAL 4280575

AIRPORT

AVIATION REVENUE/OPERATIONAL

AIRSIDE E AIRLINE AND TSA SPACE REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 160,900 0 0 0 0

CAP LF 161,000 0 0 0 0

321,900 0 0 0 0Total:

77

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 44: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4280576

AIRPORT

AVIATION PRESERVATION PROJECT

AIRSIDE C PAGING SYSTEM AMPS AND MIXERS REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 80,400 0 0 0 0

CAP LF 80,500 0 0 0 0

160,900 0 0 0 0Total:

TAMPA INTERNATIONAL 4280577

AIRPORT

AVIATION PRESERVATION PROJECT

AIRSIDE C PASSENGER BOARD BRIDGES REPAINTING

FPN:

DESCRIPTION:

CAP DPTO 99,000 0 0 0 0

CAP LF 99,100 0 0 0 0

198,100 0 0 0 0Total:

TAMPA INTERNATIONAL 4280578

AIRPORT

AVIATION PRESERVATION PROJECT

AIRSIDE A INT/EXT STAIRS, WALLS & DOORS REFURBISHMENT

FPN:

DESCRIPTION:

CAP DPTO 120,700 0 0 0 0

CAP LF 120,700 0 0 0 0

241,400 0 0 0 0Total:

78

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 45: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4280579

AIRPORT

AVIATION PRESERVATION PROJECT

AIRSIDE A FIRE SYSTEM UPGRADE

FPN:

DESCRIPTION:

CAP DPTO 201,200 0 0 0 0

CAP LF 201,200 0 0 0 0

402,400 0 0 0 0Total:

TAMPA INTERNATIONAL 4280781

AIRPORT

AVIATION PRESERVATION PROJECT

FBO (SIGNATURE) TAXIWAY/RAMP ASPHALT PAVEMENT REHAB

FPN:

DESCRIPTION:

CAP DDR 2,135,105 0 0 0 0

CAP DPTO 310,585 0 0 0 0

CAP LF 2,445,690 0 0 0 0

4,891,380 0 0 0 0Total:

TAMPA INTERNATIONAL 4280782

AIRPORT

AVIATION PRESERVATION PROJECT

FBO (JET CENTER) RAMP AND APRON ASPHALT PAVEMENT REHAB

FPN:

DESCRIPTION:

CAP DPTO 1,000,000 0 0 0 0

CAP LF 1,000,000 0 0 0 0

2,000,000 0 0 0 0Total:

79

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 46: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4296001

AIRPORT

AVIATION PRESERVATION PROJECT

STRUCTURAL AND PAVEMENT INSPECTION AND DESIGN

FPN:

DESCRIPTION:

CAP DPTO 0 221,900 0 0 0

CAP LF 0 221,900 0 0 0

0 443,800 0 0 0Total:

TAMPA INTERNATIONAL 4296011

AIRPORT

AVIATION PRESERVATION PROJECT

COMMON USE PASSENGER PROCESSING SYSTEM ENHANCEMENT

FPN:

DESCRIPTION:

CAP DPTO 0 823,000 0 0 0

CAP LF 0 823,000 0 0 0

0 1,646,000 0 0 0Total:

TAMPA INTERNATIONAL 4296021

AIRPORT

AVIATION PRESERVATION PROJECT

AIRSIDE A ROOF REPAIR

FPN:

DESCRIPTION:

CAP DPTO 0 114,000 0 0 0

CAP LF 0 1,124,500 0 0 0

0 1,238,500 0 0 0Total:

80

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 47: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4296031

AIRPORT

AVIATION PRESERVATION PROJECT

RAMP FOR CONCRETE JOINT AND SLAB REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 0 179,200 0 0 0

CAP FAA 0 1,084,000 0 0 0

CAP LF 0 179,200 0 0 0

0 1,442,400 0 0 0Total:

TAMPA INTERNATIONAL 4296041

AIRPORT

AVIATION PRESERVATION PROJECT

AIRFIELD SLAB REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 0 262,500 0 0 0

CAP FAA 0 1,575,000 0 0 0

CAP LF 0 262,500 0 0 0

0 2,100,000 0 0 0Total:

TAMPA INTERNATIONAL 4296071

AIRPORT

AVIATION PRESERVATION PROJECT

AIRSIDE E BAGGAGE SORT SYSTEM RECONFIGURATION

FPN:

DESCRIPTION:

CAP DDR 0 400 0 0 0

CAP DPTO 0 2,884,831 0 0 0

CAP LF 0 4,958,000 0 0 0

0 7,843,231 0 0 0Total:

81

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 48: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4312481

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY W (W1-W5) CONCRETE JOINT AND SLAB REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 175,200 0 0

CAP FAA 0 0 1,051,500 0 0

CAP LF 0 0 175,300 0 0

0 0 1,402,000 0 0Total:

TAMPA INTERNATIONAL 4312491

AIRPORT

AVIATION PRESERVATION PROJECT

STRUCTURAL AND PAVEMENT REPAIRS

FPN:

DESCRIPTION:

CAP DDR 0 0 452 0 0

CAP DPTO 0 0 755,300 0 0

CAP LF 0 0 837,300 0 0

0 0 1,593,052 0 0Total:

TAMPA INTERNATIONAL 4312501

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY W FROM W-1 TO W-5 ASPHALT PAVEMENT REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 303,700 0 0

CAP FAA 0 0 1,822,500 0 0

CAP LF 0 0 303,800 0 0

0 0 2,430,000 0 0Total:

82

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 49: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4312511

AIRPORT

AVIATION SAFETY PROJECT

AIRCRAFT RESCUE FIRE FIGHTING TRAINING FACILITY RELOCATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 263,400 0 0

CAP FAA 0 0 4,824,300 0 0

CAP LF 0 0 1,344,800 0 0

0 0 6,432,500 0 0Total:

TAMPA INTERNATIONAL 4312521

AIRPORT

AVIATION REVENUE/OPERATIONAL

LONG TERM PARKING GARAGE LEVEL 2 REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 350,000 0 0

CAP LF 0 0 389,700 0 0

0 0 739,700 0 0Total:

TAMPA INTERNATIONAL 4312531

AIRPORT

AVIATION REVENUE/OPERATIONAL

LONG TERM PARKING GARAGE LEVEL 1 REHABILTATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 350,000 0 0

CAP LF 0 0 389,700 0 0

0 0 739,700 0 0Total:

83

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 50: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4312541

AIRPORT

AVIATION REVENUE/OPERATIONAL

LONG TERM PARKING GARAGE BC LEVEL REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 420,548 0 0

CAP LF 0 0 428,300 0 0

0 0 848,848 0 0Total:

TAMPA INTERNATIONAL 4313001

AIRPORT

AVIATION CAPACITY PROJECT

APRON IMPROVEMENTS AT NORTH TERMINAL

FPN:

DESCRIPTION:

CAP DIS 0 0 5,000,000 0 0

CAP LF 0 0 5,000,000 0 0

0 0 10,000,000 0 0Total:

TAMPA INTERNATIONAL 4329661

AIRPORT

AVIATION PRESERVATION PROJECT

RAP BLUE (US AIR) CONCRETE JOINT AND SLAP REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 330,000 0

CAP LF 0 0 0 330,000 0

0 0 0 660,000 0Total:

84

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 51: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4329681

AIRPORT

AVIATION REVENUE/OPERATIONAL

EMPLOYEE SURFACE PARKING EXPANSION

FPN:

DESCRIPTION:

CAP DDR 0 0 0 802,700 0

CAP LF 0 0 0 2,820,600 0

0 0 0 3,623,300 0Total:

TAMPA INTERNATIONAL 4329691

AIRPORT

AVIATION PRESERVATION PROJECT

RAMP FEDEX/EMORY AND TAXIWAY K CONCRETE JOINT AND SLAB

FPN:

DESCRIPTION:

CAP DDR 0 0 0 82,286 0

CAP DPTO 0 0 0 402,714 0

CAP LF 0 0 0 485,000 0

0 0 0 970,000 0Total:

TAMPA INTERNATIONAL 4329701

AIRPORT

AVIATION PRESERVATION PROJECT

STRUCTURAL AND PAVEMENT INSPECTION AND DESIGN

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 234,000 0

CAP LF 0 0 0 234,100 0

0 0 0 468,100 0Total:

85

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 52: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4329711

AIRPORT

AVIATION PRESERVATION PROJECT

RAMP RED (DELTA) CONCRETE JOINT AND SLAB REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 350,000 0

CAP LF 0 0 0 350,000 0

0 0 0 700,000 0Total:

TAMPA INTERNATIONAL 4329721

AIRPORT

AVIATION REVENUE/OPERATIONAL

LONG TERM PARKING GARAGE LEVEL 3 REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 420,000 0

CAP LF 0 0 0 420,000 0

0 0 0 840,000 0Total:

TAMPA INTERNATIONAL 4329731

AIRPORT

AVIATION REVENUE/OPERATIONAL

LONG TERM PARKING GARAGE LEVEL 4 REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 434,000 0

CAP LF 0 0 0 435,600 0

0 0 0 869,600 0Total:

86

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 53: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4329741

AIRPORT

AVIATION REVENUE/OPERATIONAL

GEORGE BEAN PARKWAY AND BESSIE COLEMAN SERVICE ROAD

FPN:

DESCRIPTION:

CAP DDR 0 0 0 1,112,765 0

CAP LF 0 0 0 2,885,000 0

0 0 0 3,997,765 0Total:

TAMPA INTERNATIONAL 4352151

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY T REALIGNMENT AND CORPORATE ROAD ASPHALT SERVICE

FPN:

DESCRIPTION:

CAP DDR 0 0 0 0 2,715,538

CAP DPTO 0 0 0 0 1,200,492

CAP LF 0 0 0 0 3,916,030

0 0 0 0 7,832,060Total:

TAMPA INTERNATIONAL 4352241

AIRPORT

AVIATION REVENUE/OPERATIONAL

CARGO PARKING LOT REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 307,500

CAP LF 0 0 0 0 307,500

0 0 0 0 615,000Total:

87

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 54: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA INTERNATIONAL 4352251

AIRPORT

AVIATION PRESERVATION PROJECT

TAXIWAY B SHOULDER REHABILITATION

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 95,500

CAP FAA 0 0 0 0 573,000

CAP LF 0 0 0 0 95,500

0 0 0 0 764,000Total:

TAMPA INTERNATIONAL 4352261

AIRPORT

AVIATION PRESERVATION PROJECT

AIRFIELD SLAB REPLACEMENT

FPN:

DESCRIPTION:

CAP DPTO 0 0 0 0 275,000

CAP FAA 0 0 0 0 1,650,000

CAP LF 0 0 0 0 275,000

0 0 0 0 2,200,000Total:

FLP: SEAPORTPORT OF TAMPA 4127461

SEAPORT CAPACITY PROJECT

INTERMODAL CARGO HANDLING

FPN:

DESCRIPTION:

PLN DDR 0 0 1,316,385 0 0

0 0 1,316,385 0 0Total:

88

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 55: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PORT OF TAMPA 4228262

CONTAINER YARD IMPROVEMENTS

SEAPORT CAPACITY PROJECT

GROWTH MANAGEMENT-2015 FACILITIES EXPANSION

FPN:

DESCRIPTION:

CAP GMR 10,400,000 0 0 0 0

CAP LF 10,400,000 0 0 0 0

20,800,000 0 0 0 0Total:

PORT OF TAMPA 4313021

SEAPORT CAPACITY PROJECT

BIG BEND CHANNEL IMPROVEMENTS

FPN:

DESCRIPTION:

CAP DIS 0 0 5,000,000 0 0

CAP LF 0 0 1,250,000 0 0

0 0 6,250,000 0 0Total:

PORT OF TAMPA 4348171

GANTRY CRANE REPLACEMENT AND ENHANCEMENT

SEAPORT CAPACITY PROJECT

FPN:

DESCRIPTION:

CAP GMR 0 0 0 0 10,000,000

CAP LF 0 0 0 0 10,000,000

0 0 0 0 20,000,000Total:

89

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 56: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

PORT OF TAMPA 4351301

HOOKERS POINT IMPROVEMENT

SEAPORT CAPACITY PROJECT

FPN:

DESCRIPTION:

CAP LF 2,200,000 0 0 0 0

CAP PORT 2,200,000 0 0 0 0

4,400,000 0 0 0 0Total:

TAMPA PORT AUTHORITY 4330051

AVIATION SAFETY PROJECT

INTERMODAL IMPROVEMENTS

FPN:

DESCRIPTION:

CAP DDR 0 0 0 1,029,649 0

CAP LF 0 0 0 1,029,649 0

0 0 0 2,059,298 0Total:

TAMPA PORT AUTHORITY 4332401

SEAPORT CAPACITY PROJECT

EASTPORT BERT DEVELOPMENT

FPN:

DESCRIPTION:

CAP GMR 0 0 0 5,000,000 0

CAP LF 0 0 0 5,000,000 0

0 0 0 10,000,000 0Total:

90

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 57: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA PORT AUTHORITY 4350091

PORT OF TAMPA

SEAPORT CAPACITY PROJECT

FPN:

DESCRIPTION:

CAP DPTO 1,463,486 0 0 0 0

CAP LF 487,828 0 0 0 0

1,951,314 0 0 0 0Total:

TAMPA PORT AUTHORITY 4350101

PORT OF TAMPA INTERMODAL CAPACITY IMPROVEMENTS

SEAPORT CAPACITY PROJECT

FPN:

DESCRIPTION:

CAP DDR 0 1,121,196 0 0 0

CAP DPTO 0 27,002 0 0 0

CAP LF 0 382,732 0 0 0

0 1,530,930 0 0 0Total:

FLP: TRANSITHART 4022511

BLOCK GRANT PROGRAM- OPERATING

OPERATING FOR FIXED ROUTE

OPERATIONAL ASSISTANCE FOR ADMINISTRATIVE EXPENSES

FPN:

DESCRIPTION:

OPS DDR 4,149,346 3,368,839 4,010,470 4,169,908 4,633,028

OPS DPTO 125,383 1,005,109 361,471 310,874 0

OPS LF 4,274,729 4,373,948 4,371,941 4,480,782 4,633,028

8,549,458 8,747,896 8,743,882 8,961,564 9,266,056Total:

91

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 58: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

HART 4081091

FTA SECTION 5307

CAPITAL FOR FIXED ROUTE

CAPITAL PLANNING

FPN:

DESCRIPTION:

CAP FTA 16,100,005 16,287,445 16,528,240 7,201,278 0

16,100,005 16,287,445 16,528,240 7,201,278 0Total:

HART 4106931

CORRIDOR PROGRAM 200X- OPERATING

URBAN CORRIDOR IMPROVEMENTS

INTER-COUNTY SEVICE BETWEEN HILLSBOROUGH & PINELLAS

FPN:

DESCRIPTION:

OPS DDR 0 172,100 172,100 0 0

OPS DPTO 172,100 0 0 172,100 183,508

172,100 172,100 172,100 172,100 183,508Total:

HART 4149632

SURFACE TRANSPORTATION PROGRAM

PURCHASE VEHICLES/EQUIPMENT

BUS REPLACEMENTS

FPN:

DESCRIPTION:

CAP SU 5,000,000 0 8,200,000 7,150,000 6,220,000

5,000,000 0 8,200,000 7,150,000 6,220,000Total:

92

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 59: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

HART 4207411

CORRIDOR PROGRAM 51X-OPERATING

URBAN CORRIDOR IMPROVEMENTS

INTER-COUNTY SERVICE BETWEEN PASCO & HILLSBOROUGH OPERATING

FPN:

DESCRIPTION:

OPS DDR 0 240,125 0 0 0

OPS DPTO 240,125 0 240,125 240,125 251,532

240,125 240,125 240,125 240,125 251,532Total:

HART 4303221

CORRIDOR PROGRAM 20X-OPERATING

TRANSIT IMPROVEMENT

INTER-COUNTY SERVICE BETWEEN PASCO & HILLSBOROUGH OPERATING

FPN:

DESCRIPTION:

OPS DPTO 400,000 241,000 241,000 241,000 252,407

400,000 241,000 241,000 241,000 252,407Total:

HART 4351411

TAMPA STREETCAR CAPITAL MAINTENANCE

FIXED GUIDEWAY IMPROVEMENTS

FPN:

DESCRIPTION:

CAP SU 0 0 100,000 0 880,006

0 0 100,000 0 880,006Total:

93

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 60: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

HART 4352111

SERVICE DEVELOPMENT OPERATING ACTIVITIES

URBAN CORRIDOR IMPROVEMENTS

SERVICE DEVELOPMENT FOR ROUTE 60

FPN:

DESCRIPTION:

OPS DPTO 440,000 0 0 0 0

440,000 0 0 0 0Total:

HILLSBOROUGH 4299251

RURAL MAP 21 ADA

TRANSIT IMPROVEMENT

MAP 21 ADA SERVICES; EXTENSIONS, EXPANSION, VOUCHERS TRANSIT

FPN:

DESCRIPTION:

OPS DU 0 0 108,373 285,132 0

OPS LF 0 0 108,373 285,132 0

0 0 216,746 570,264 0Total:

HILLSBOROUGH 4299261

NON URBAN MAP 21

OPERATING/ADMIN. ASSISTANCE

WORKFORCE DEVELOPMENT PLANNING/MOBILITY EMPLOYMENT ACTIVITY

FPN:

DESCRIPTION:

OPS DU 0 0 0 142,715 0

OPS LF 0 0 0 142,715 0

0 0 0 285,430 0Total:

94

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 61: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

HILLSBOROUGH CTY MPO 4022551

TRANSIT PLANNING SECTION 5305

PTO STUDIES

TRANSPORTATION PLANNING ACTIVITIES

FPN:

DESCRIPTION:

PLN DDR 0 36,564 36,564 33,915 38,734

PLN DPTO 36,561 0 0 0 0

PLN DU 292,979 292,980 292,980 299,283 309,875

PLN LF 37,006 37,006 37,006 33,915 38,734

366,546 366,550 366,550 367,113 387,343Total:

NEW NORTH 4240931

TRANSPORTATION ALLIANCE (NNTA)

COMMUTER TRANS. ASSISTANCE

COMMUNITY 2GO! PILOT PROGRAM

FPN:

DESCRIPTION:

OPS DDR 0 150,000 0 0 0

OPS DPTO 0 0 0 39,000 0

OPS LF 0 150,000 0 39,000 0

0 300,000 0 78,000 0Total:

NEW NORTH 4242121

TRANSPORTATION ALLIANCE (NNTA)

COMMUTER TRANS. ASSISTANCE

COMMUTER ASSISTANCE PROGRAM TRAVEL DEMAND MANAGEMENT

FPN:

DESCRIPTION:

CAP SU 195,000 0 0 0 0

195,000 0 0 0 0Total:

95

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 62: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TAMPA DOWNTOWN 4242111

PARTNERSHIP

COMMUTER TRANS. ASSISTANCE

COMMUTER ASSISTANCE PROGRAM TRAVEL DEMAND MANAGEMENT

FPN:

DESCRIPTION:

CAP SU 195,000 0 0 0 0

195,000 0 0 0 0Total:

TBARTA 4082052

TAMPA BAY AREA TRANSPORTATION AUTHORITY

COMMUTER TRANS. ASSISTANCE

TRAVEL DEMAND MGT/OUTREACH AND EDUCATION; COMMUTER SERVICES

FPN:

DESCRIPTION:

OPS SU 230,000 0 0 0 350,000

230,000 0 0 0 350,000Total:

TBARTA 4301751

SERVICE TRANSPORTATION

PURCHASE VEHICLES/EQUIPMENT

CAPITAL / CURRENT VAN POOL / RIDESHARE/TELECOMMUTE

FPN:

DESCRIPTION:

CAP SU 310,800 0 386,400 800,000 800,000

310,800 0 386,400 800,000 800,000Total:

96

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 63: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Facility Item No. Phase Fund 2014/15 2015/16 2016/17 2017/18 2018/19

DRAFT Five Year Tentative Work ProgramFY July 1, 2014 Through June 30, 2019District Seven Florida Department of Transportation

HILLSBOROUGH

November 12, 2013

TRANSPORTATION MGMT 4125331

ORGANIZATION COORDIN GROUP

COMMUTER TRANS. ASSISTANCE

OPERATING ASSISTANCE

FPN:

DESCRIPTION:

OPS DDR 320,000 0 430,000 0 0

OPS DPTO 0 0 0 430,000 469,000

320,000 0 430,000 430,000 469,000Total:

TRANSPORTATION PLANNINGHILLSBOROUGH COUNTY 2592841

MPO UPWP

TRANSPORTATION PLANNING

TRANSPORTATION PLANNING ACTIVITIES

FPN:

DESCRIPTION:

PLN PL 1,032,032 1,032,032 1,032,032 1,032,032 1,032,032

1,032,032 1,032,032 1,032,032 1,032,032 1,032,032Total:

HILLSBOROUGH COUNTY 2592851

MPO SVC TRANSPORTATION PROGRAM

PLANNING MODELS/DATA UPDATE

LRTP UPDATES AND DATA COLLECTIONS

FPN:

DESCRIPTION:PROJECT LENGTH: .000M

PLN SU 0 600,000 400,000 400,000 400,000

PLN SU 600,000 0 0 0 0

600,000 600,000 400,000 400,000 400,000Total:

159,721,584 156,754,226 147,729,004 128,151,589 154,670,070County Total:

97

PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; ADM-Administration

Page 64: TENTATIVE - Plan Hillsborough · description: project length: 1.682mi cst cm 0 0 0 1,786,368 0 cst sa 0 0 0 1,003,233 0 cst su 0 0 0 21,531,107 0 env sa 153,373 0 0 0 0 row sa 104,999

Work Program Fund Codes as of 12/03/2012

ACBR Advance Construction (BRT) GRSC Growth Management for Small County Outreach ProgramACCM Advance Construction (CM) HP Federal Highway PlanningACEN Advance Construction (EBNH) HPP High Priority Projects, SAFETEA-LU EarmarkACIM Interstate Maintenance (AC/Regular) HRRR High Risk Rural RoadACNH Principle Arterial (AC/Regular) HSP Safety (Highway Safety Program)ACNP Advance Construction (NHPP) HSR High Speed Rail Corridor Section 1010ACSA Advance Construction (SA) IMAC Interstate Maintenance (AC/Regular)ACSB Advance Construction (SABR) IVH Intelligent Vehicle Highway SystemACSE Advance Construction (SE) LF Local FundsACSL Advance Construction (SL) LFF Local Fund - for Matching F/AACSN Advance Construction (SN) LFP Local Fund for ParticipatingACSU Advance Construction (SU) LFR Local Funds/ReimbursableACTA Advance Construction (TALT) LFRF Local Funds/Reimbursable Outside 5 yearsACTL Advance Construction (TALL) NCPD National Corridor Planning & DevelopmentACTN Advance Construction (TALN) NHAC Principle Arterial (AC/Regular)ACTU Advance Construction (TALU) NHPP IM, Brdg Repl, Natnl Hwy-MAP21BNIR Intrastate R/W & Bridge Bonds NHRE Nat Hwy Perform-ResurfacingBNDS Bond - State NSTP FTA EARMARK 2010BNBR Amendment 4 Bonds (Bridges) PKBD Turnpike Master Bond FundBRAC Bridge (AC/Regular) PKYI Turnpike ImprovementBRP State Bridge Replacement PL Metro Plan (85% FA; 15% other)BRRP State Bridge Repair and Rehabilitation PLHD Public Lands Highway DiscretionaryBRT Fed Bridge Repl – On System POED 2012 SB1998-Seaport InvestmentBRTZ BRT (AC/Regular) PORB Port Funds Returned From BondsCIGP County Incentive Grant Program PORT SeaportsCIGR CIGP for Growth Management RED Redistribution Any AreaCM Congestion Mitigation - AQ RHH Rail Highway Crossings - HazardDDR District Dedicated Revenue RHP Rail Highway Crossings - Protective DevicesDDRF District Dedicated Revenue Matching Funds S112 STP Earmarks - 2006DEM Environmental Mitigation S115 STP Earmarks - 2004DEMW Environmental Mitigation-Wetlands S117 STP Earmarks - 2005DI St. - S/W Inter/Intrastate Highway S129 STP Earmarks - 2008DIH State In-house Product Support SCED 2012 SB1998-Small Co OutreachDIRS Advance Acquistion of Intrastate Corridor SCOP Small County OutreachDIS Strategic Intermodal System SA STP, Any AreaDITS Statewide ITS SE STP, EnhancementDPTO State PTO SL STP, Areas<=200K PopulationDRA Rest Area's SN STP, Mandatory, Non-UrbanDS State Primary Highways and PTO SR2E Safe Routes - EitherDSB1 Skyway SR2N Safe Rts to School – Non-infrastrucDSB3 Pinellas Bayway SR2S Safe Routes - InfrastructureDSB6 Tampa-Hillsborough Expressway Authority SS Safety (Highway Safety Program)DSF State Primary Matching Funds ST10 STP EARMARK - 2010DU State Primary/Federal Reimbursement SU STP, Urban Area's >200K PopulationDWS Weigh Stations TALL Transportation Alts - <200KEB Equity Bonus TALN Transportation Alts - <5KEBNH Equity Bonus Supplementing NH TALT Transportation Alts - Any AreaFBD Ferryboat Discretionary TALU Transportation Alts - >200KF001 Federal Discretionary - US 19 TCSP Trans, Community & Systems PresentationF002 Corridors/Borders - US19 D7 TIMP Transportation Improvements, SAFETEA-LU EarmarkFAA Federal Aviation Administration TRIP Trans Regional Incentive ProgramFBD Ferryboat Discretionary XA Any AreaFTA Federal Transit Administration XL Areas <= 200k PopulationFTAT FHWA Transfer to FTA (non-bud) XU Areas > 200k Population