Temporary Shoring Specifications, Applications, & Best Practices Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer ALDOT Bureau of

Upload: others

Post on 16-Sep-2019

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary ShoringSpecifications, Applications, & Best Practices

Stephen M. (Matt) Revell, P.E.Assistant Geotechnical Engineer ALDOT Bureau of

Page 2: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary ShoringSpecifications, Applications, & Best Practices

Page 3: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary ShoringSpecifications, Applications, & Best Practices

Page 4: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary ShoringSpecifications, Applications, & Best Practices

Page 5: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Presentation Objectives

• Objectives of Temporary Shoring

• ALDOT’s approach

• Our arsenal

Page 6: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Objectives of Temporary Shoring

26’

0.7 x 26’ = 18’

Page 7: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Objectives of Temporary Shoring

Page 8: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Objectives of Temporary Shoring

Page 9: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Objectives of Temporary Shoring

What does temporary shoring have to accomplish?

1. Provide adequate space to perform the required work

2. Safely resist all live and dead loads while the work is

being performed

3. Maintain pre-construction conditions above/behind the

shoring system

Only distinction between “permanent” and “temporary” is

longevity

Page 10: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

ALDOT’s Approach to Temporary Shoring

206.06 – Removal of Existing Drainage and Other Facilities

• Incidental

214.05 – Structure Excavation for Minor Structures

• Incidental

215.03 – Excavation for Bridges

• 215-B: Cofferdams or Sheeting and Shoring, LS

503.03 – Structure Foundations

• 503-B: Cofferdam and Pumping, LS• Must be steel sheet piles

505.03 – Piling

• 505-I: Temporary Steel Sheet Piling, SF

529.02 – Retaining Walls

• Incidental

Page 11: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

ALDOT’s Approach to Temporary Shoring

570 – Soil Nail Retaining Wall

• 570-C: Temporary Soil Nail Wall, SY

572 – Soldier Beam and Lagging

• Has the ability to be quantified and paid for as temporary

Page 12: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

What’s in our toolbox?

2 basic types of temporary earth retention systems:

Top-down construction• Soil Nail Wall

• Soldier Pile and Lagging

• Sheet piles

Bottom-up construction• MSE

Page 13: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soil Nail Walls

Page 14: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soil Nail Walls

Page 15: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soil Nail Walls

Page 16: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soil Nail Walls

Design Considerations:

Soils must be able to stand vertical for short periods of time

Generally not recommended for use in existing fill sections

• Testing frequency

Good Assumption: Length of nails = Height of wall

• Need for temporary or permanent construction easements

Internal design by contractor

Can be installed in low-head room environments

Multiple facing options for temporary applications

Versatility: Medium

Construction Difficulty: Medium

Page 17: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soil Nail Walls

Page 18: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soil Nail Walls

Page 19: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soldier Pile and Lagging

Page 20: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soldier Pile and Lagging

Page 21: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soldier Pile and Lagging

Page 22: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soldier Pile and Lagging

Page 23: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Soldier Pile and Lagging

Design Considerations:

Soils must be able to stand vertical for short periods of time

Recommended for cut or fill sections

Can be either cantilevered or tied back

• Need for temporary or permanent construction easements

Internal design by contractor

Versatility: High

• Soldier piles can be driven or drilled

• Cantilevered or tied-back

Construction Difficulty: Medium

Page 24: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Sheet Piling

Page 25: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Sheet Piling

Page 26: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Sheet Piling

Page 27: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Sheet Piling

Page 28: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Sheet Piling

Design Considerations:

Can be either cantilevered or tied back

• Need for temporary or permanent construction easements

Design by Contractor

Can be driven or vibrated

Cheap

Versatility: Medium

• Requires penetration of 1-1.5 x wall height

• Relatively large deflections

Construction Difficulty: Low

Page 29: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary MSE Structures

Page 30: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary MSE Structures

Page 31: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary MSE Structures

Page 32: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary MSE Structures

Page 33: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary MSE Structures

Page 34: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary MSE Structures

Page 35: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary MSE Structures

Page 36: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Temporary MSE Structures

Design Considerations:

Ideal for phase construction

Rapid installation

• Minimal construction equipment

Design by Contractor

Cheap

Versatility: High

Construction Difficulty: Low

Currently no Special Provision for Temporary Structures

• In progress…

Page 37: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Final Thoughts

We have more than just sheet piles at our disposal now

Need to provide contractors adequate information to design

these systems

Every situation is unique

• There is no one-size-fits-all solution to temporary shoring

If we can identify where temporary shoring will be required,

we can provide the appropriate recommendations and

information to keep risk and bid prices down

Page 38: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure

Thank You

Stephen M. (Matt) Revell, P.E.Assistant Geotechnical Engineer ALDOT Bureau of Materials & Tests