SAFET Y BARRIERS

TemporaryPrecast Concrete Safety Barriers

www.deltabloc.co.uk

Product Range – Temporary Safety BarriersType Element

lengthPerformance* Remarks

Temporary Systems

SB 50 6mT3 W2 ASI A free standing, high-performing, slim type

lightweigt barrierN2 W5/W3# ASI A

DB 65S 6mN2 W4 ASI B

free standing, high-performing, slim type barrierH1 W5 ASI B

DB 80

4m N2 W4 ASI B

free standing, multifunctional system which covers a high spectrum of applications6m

N2 W3 ASI B

H1 W4 ASI B

H2 W6 ASI B

DB 100 6m H4a W6 ASI B free standing, high containment barrier

DB „2 in 1“ – Temporary to Permanent Systems

DB 80E 6mN2 W3 ASI B free standing in temporary application

H2 W1 ASI B embedded and rigid in permanent application

* ASI = Impact Severity Level (ISL) according to TD 19/06

# Normalised working width W3 at reduced speed limit 50mph

Find out more details on http://productfinder.deltabloc.com

Temporary Safety Barriers

The DELTABLOC® Temporary Safety Barrier range offers maximum safety and protection for both construction workers and road users. Across the UK and Europe there are more than 500km of DELTABLOC® Temporary Systems currently in use!

DELTABLOC® Temporary Safety barrier barriers are fully accepted by the Highways Agency for use on the UK road network and are available to meet all containment levels specified in “Design Manual for Roads and Bridges TD19/06“

Complete installation service with LANTRA National Highway Sector Scheme 2B accreditation

DELTABLOC® DB 100 provides the only temporary ASI B solution for H4a applications in the UK

Rely on trustworthy crash tested DELTABLOC® quality!

Available nationwide with DELTABLOC® stockyards in your region!

DELTABLOC® High-performance Safety Barriers The Best Choice in Safety!

M1 Junction 28-31

A1(M), Parapet Schemes

The slim DELTABLOC® DB 65SQuickly installed for efficient safety

A1(M) Parapet Schemes Workforce protection

upgrading parapet connectionsThe slim DELTABLOC® DB 65S was the

only Temporary Barrier System able to be installed without compromising safety

due to the tight working area width. The simplicity of installation process and agile

working across several site locations in one shift lead to maximum operational

efficiency for a total of 3km.DB 65S – N2 | W4 | ASI B

M1 Junction 28-31 Managed Motorway Workforce/crossover protection

upgrading to managed motorwayThe DELTABLOC® DB 65S was proposed as a viable

alternative to traditional steel systems predominantly used on the network. It was seen by the client as a

high-performing, cost-effective option, with simple, quick installation with multiple crews working per shift/carriageway.

Crash cushions were also installed on all approaches for added safety across the entire 10km stretch.

DB 65S – N2 | W4 | ASI B

TemporaryPrecast Concrete Safety Barriers

UNITED KINGDOM

V1.0 Errors and omissions excepted. No warrenty as to accuracy or completeness. © 2014 DELTA BLOC United Kingdom Ltd. Designed & produced by Corporate Publishing Group (CPG) • www.cpg.at