temporary gym & open space · 2020-08-06 · construct temporary gym facility at location of...
TRANSCRIPT
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Relocate playground in Washington Square Village above garage (Estimated construction time, 9 months)
Create temporary play area and plaza on LaGuardia Place (9 months)
Relocate dog run to University Village (9 months)
Create new seating area along Bleecker Street south (9 months)
Construct temporary gym facility at location of former Washington Square Village Playground (9 months)
Create new plazas at the north and south end of block and renovate Mercer Playground (9 months)
TemporaryGym
456
321
WSV 1 WSV 2
WSV 3 WSV 4
WSVRetail
Adrienne’sGarden
ColesAthletic Center
SilverTower 2
SilverTower 1
505LaGuardia
MortonWilliams
West 3rd Street
Bleecker Street
West Houston Street
LaG
uard
ia P
lace
Mer
cer
Stre
et
Temporary Gym & Open SpacePhase 1
Private SpacesExisting Buildings
New Public Space(Previous Phase)
New Buildings(Current Phase)
New Public Space(Current Phase)
Entry Points
New Building (Previous Phase)
1
65
2
3
4
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
ZipperBuilding
1
23
TemporaryGym
WSV 1 WSV 2
WSV 3 WSV 4
WSVRetail
SilverTower 2
SilverTower 1
505LaGuardia
MortonWilliams
West 3rd Street
Bleecker Street
West Houston Street
LaG
uard
ia P
lace
Mer
cer
Stre
et
Adrienne’sGarden
Zipper Building & Open SpacePhase 2
Construct Zipper Building (gym, academic, retail, dorm, faculty housing, hotel, and supermarket relocation) (Estimated construction time, 54 months)
Create new 11,000 sf publicly accessible playground in University Village (9 months)
Create a new esplanade along former Greene Street to access new playground, dog run, and zipper building (9 months)
Private SpacesExisting Buildings
New Public Space(Previous Phase)
New Buildings(Current Phase)
New Public Space(Current Phase)
Entry Points
New Building (Previous Phase)
1
2
3
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
ZipperBuilding
BleeckerSchool
1
2
TemporaryGymSite
Construction of Bleecker Building with Public School and NYU academic and dormitory space (timing of building dependent on DOE and SCA time table) (Estimated construction time, 36 Months)
Temporary interim open space to be provided if Phase 4 project delayed (9 months)
2 VSW1 VSW
4 VSW3 VSW
WSVRetail
SilverTower 2
SilverTower 1
505LaGuardia
West 3rd Street
Bleecker Street
West Houston Street
LaG
uard
ia P
lace
Mer
cer
Stre
et
Adrienne’sGarden
Bleecker SchoolPhase 3
Private SpacesExisting Buildings
New Public Space(Previous Phase)
New Buildings(Current Phase)
New Public Space(Current Phase)
Entry Points
New Building (Previous Phase)
1
2
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Mercer Building
345
12
ZipperBuilding
BleeckerSchool
WSV Playground
PhilosophyGarden
Public LawnTricycle Garden
Mercer PlazaWSV 3 WSV 4
Create new seating and landscape areas along West 3rd and Bleecker streets (Estimated construction time, 9 months)
Construct new parking garage on Washington Square Village in northeast portion of the block (21 months)
Construct new Mercer Building and below grade space on middle and eastern portion of the block (63 months)
Create new plazas and play areas along Mercer Street (9 months)
Create new publicly accessible open space and playground in Washington Square Village (12 months)
WSV 1 WSV 2
WSV 3 WSV 4
WSVRetail
SilverTower 2
SilverTower 1
505LaGuardia
West 3rd Street
Bleecker Street
West Houston Street
LaG
uard
ia P
lace
Mer
cer
Stre
et
Adrienne’sGarden
Mercer Building & Open SpacePhase 4
Private SpacesExisting Buildings
New Public Space(Previous Phase)
New Buildings(Current Phase)
New Public Space(Current Phase)
Entry Points
New Building (Previous Phase)
1
1
2
354
Construct new LaGuardia Building and below grade space (Estimated construction time, 39 months)
Rebuild LaGuardia and Adrienne’s gardens and public plazas along LaGuardia Place and around building, statue of Fiorella LaGuardia retains prominence in the newly designed site (12 months)
1
2
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
LaGuardia Building
12
Mercer Building
ZipperBuilding
BleeckerSchool
WSV 3 WSV 4
LaGuardia Building & Open Space
Phase 5
Private SpacesExisting Buildings
New Public Space(Previous Phase)
New Buildings(Current Phase)
New Public Space(Current Phase)
Entry Points
New Building (Previous Phase)