    Galfar-Almisnad Engineering & Contracting WLL.

    10. Concrete placement: - Sufficient concrete pumps will be engaged to ensure thepredetermined rate of pouring. Parking and waiting time for the concrete truckswill be minimized by proper planning and coordination.