teknis penyusunan sub-project proposal proposed activities & description
DESCRIPTION
Teknis Penyusunan Sub-Project Proposal Proposed Activities & Description. Iik Wilarso. Dewan Pendidikan Tinggi Direktorat Jenderal Pendidikan Tinggi Departemen Pendidikan Nasional September-Oktober, 2001. Rektor Pimpinan Univ./Fakultas. Penyadaran Kepemimpinan Dukungan Komitmen. BAA - PowerPoint PPT PresentationTRANSCRIPT
Teknis PenyusunanTeknis PenyusunanSub-Project ProposalSub-Project Proposal
Proposed Activities & Proposed Activities & DescriptionDescription
Dewan Pendidikan TinggiDirektorat Jenderal Pendidikan Tinggi
Departemen Pendidikan NasionalSeptember-Oktober, 2001
Iik Wilarso
• BAA• BAKeu• BAU• BAPSI
• Akses data/
informasi
• Pelaporan
• Diskusi
Penyusunan Proposal Penyusunan Proposal Secara TerpaduSecara Terpadu
RektorRektorPimpinan Univ./FakultasPimpinan Univ./Fakultas
Staf AkademikPimpinan PS/Jur.
TaskForce
Identifikasi masalahPengembangan isu strategisSolusi alternatifRencana Aktivitas
• Mahasiswa• Alumni
• Sosialisasi/
brosur/diskusi
• Penyadaran• Kepemimpinan
• Dukungan• Komitmen
• Persetujuan
• Komitmen
• Data• Informasi
• Komitmen
• Kesadaran• Dukungan
Komitmen DanaPendamping 8%
Characteristic ofCharacteristic ofSelf-Evaluation ReportSelf-Evaluation Report
Strengthening SP/ISS Past Performance
Process Management
Resources, including physical facilities
Academic Supports
Sustainability
New Study Programs Demand driven Excess/Idle Capacities Supportive of Internal
Environtment
Self-Evaluation
CurrentSituation
SituationalAnalysis
PositionDirectives &Assumptions
Conclusions
FutureSituation
StrategicMoves
Proposal ProjectProposal Project
ImplementionPrograms
(Activities)
FuturePosition
InstitutionalObjective Performance
Indicators
Resources
ProjectObjective
Objectives
Project
DRK/DIP/DIK
Others
PenetapanPenetapanProposed ActivitiesProposed Activities
Ketentuan dalam penetapan suatu aktivitas : Aktivitas bukan merupakan kegiatan investasi (invesment) Aktivitas harus mempunyai alasan :
Mengapa aktivitas tersebut dibutuhkan Mengapa aktivitas tersebut dipilih
InvestasiInvestasi merupakan suatu konsekuensi logis dari adanya suatu aktivitas
INVESTMENTINVESTMENTAND ACTIVITIESAND ACTIVITIES
REDUCED DURATIONOF SKRIPSI
IMPROVEDEFFICIENCY
INDICATOR:Base 4 smstMid 2.5 smstFinal 1.5 smst
ACTIVITIES: • Research Staffs & Students• Improved supervision• Remedial courses
ResourcesRequired
TPSDP
OthersINVESMENT :Procurement
Laboratoryequipment
ACTIVITIESACTIVITIES(1 dari 3)
Attribute aktivitas : Judul Tujuan Jadwal waktu pelaksanaan Indikator keberhasilan Penanggungjawab (person in charge)
ACTIVITIESACTIVITIES(2 dari 3)
Jenis Aktivitas :Jenis Aktivitas : Terkait dengan sistem
Memperbaiki sistem yang ada Contoh : Improving Teaching-Learning Process
Membuat sistem baru, untuk melengkapi sistem yang sudah ada Contoh : Develop Research Collaboration, Short Semester, etc
Mengubah sistem yang lama menjadi sistem yang baru Contoh : Develop Management Information System
[Manual System Otomated System] dsb
Terkait dengan proses Contoh : Improving Teaching Methodology
ACTIVITIESACTIVITIES(3 dari 3)
KriteriaKriteria aktivitas yg baik : aktivitas yg baik : Tidak kompleks Keberhasilannya dapat diukur Cakupan tidak terlalu luas dan tidak terlalu sempit
Terlalu luas beban kerja yg tinggi untuk PIC Terlalu sempit membutuhkan banyak PIC
Output/Out Come-nya berkontribusi tinggi (significant) terhadap perbaikan yang diinginkan
Berkelanjutan (sustainable)
students as the primary beneficiarystudents as the primary beneficiary
COMPREHENSIVENESS AND COMPREHENSIVENESS AND COHERENT ACTIVITIESCOHERENT ACTIVITIES
IMPR
OV
ED
GPA RESOURCES
• Physical• Laboratories• Equipment• Textbooks• Journals• Funding
INPUT• Student admission• Staff recruitment
MANAGEMENT• Atmosphere• Leadership• Teaching load• Student load• Evaluation• etc.
PROCESS• Teachers attendance• Teaching method• Scoring method• Curriculum (?)• Assignments• Exams ad tests• etc.
Mechanism & design: bukan investasi, karenainvestasi disajikan pd resource required
Breakdown ActivityBreakdown ActivityCause-Root
Analysis
Problems Statement………………………………………………………………
Restraining forces
Driving forces
Force-FieldAnalysis
TitleBackground
Rational
Objective
Mechanism &design
PerformanceIndicatorsResourcesrequired
ImplementationSchedule
Sustainability
Person in charge
Assumptions
Table 7b : Project Cost by Activities and Components.
Staff Development
Degree Non-Degree
Overseas Domestic Overseas Domestic
Equipment Civil Work Book & Journal …Etc TotalNo. Activities
($US) (Rp) ($US) (Rp) ($US) (Rp) ($US)
1 R1
2 R2
3 A1
4 A2
5 E1
6 E2
etc ...etc
Total
Background
Rational
Objective
Mechanism &design
PerformanceIndicatorsResourcesrequired
ImplementationSchedule
Sustainability
Person in charge
Assumptions
ProposalProposalSubProjectSubProject
Revised Self-Evaluation
(Ch III Session 2-12)
Situational(SWOT)Analysis
Directives &Assumptions
(Ch II Session A)
CurrentSituation
Position(Ch III Session 2-12)
Conclusions
FuturePosition
Resources(Ch II Section F & App.)
PerformanceIndicators
(Ch II Section D)
Objectives (Ch II Section B)
StrategicMoves
(Ch II Section B)
FutureSituation
ADB Project
DRK/DIP/DIK
Others
ImplementionPrograms(Activities)(Ch II Section C)
SustainableSustainableActivityActivity
1. Tabel 3.4. Waktu Tunggu lama2. Tabel 3.... First Salary rendah3. Employer Ability to compete with other graduates rendah
1. Knowledge lulusan tidak sesuai dng labor market2. Management Skill lulusan rendah3. Computer Skill lulusan rendah4. Kemampuan Berbahasa Inggris rendah
Possible Problems :
Proposed Activity :Improving Graduates’
English Skills
1. Kemampuan berbahasa Inggris Mahasiswa rendah2. Kemampuan berbahasa Inggris Dosen rendah3. Motivasi Mahasiswa untuk belajar Bhs Inggris rendah4. Mata Kuliah yg disampaikan dlm Bhs Inggris tidak ada5. Tugas dari Dosen untuk study literature tidak ada6. Bahan Pustaka yg berbahasa Inggris sedikit7. UPT Bahasa Inggris di PT tsb ada
Faktor yg berpengaruh :
1. Memperbaiki Teaching- Learning Process yang berkaitan dengan Bahasa Inggris - Beberapa MK disampaikan dalam Bhs Inggris - Tugas utk Study literature ditingkatkan2. Memotivasi & mendorong mahasiswa untuk berbahasa Inggris
Mechanism & design :
1. Non Degree Traning untuk Dosen belajar Bahasa Inggris2. Equipments Lab. Bahasa utk mahasiswa belajar sendiri (self access)
Resource required :
Background
Rational
Objective
Mechanism &design
PerformanceIndicatorsResourcesrequired
ImplementationSchedule
Sustainability
Person in charge
PenyusunanProposalSub-Project
Revised Self-Evaluation
(Ch III Session 2-12)
Situational(SWOT)Analysis
Directives &Assumptions
(Ch II Session A)
CurrentSituation
Position(Ch III Session 2-12)
Conclusions
FuturePosition
Resources(Ch II Section F & App.)
PerformanceIndicators
(Ch II Section D)
Objectives (Ch II Section B)
StrategicMoves
(Ch II Section B)
FutureSituation
ADB Project
DRK/DIP/DIK
Others
ImplementionPrograms(Activities)(Ch II Section C)
Tahap I
Pelaksana :Task Force PS/ISS
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
R
PenyusunanPenyusunanProposal Proposal Sub-ProjectSub-Project
ImplementionPrograms(Activities)(Doc I Section 2-5)
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
The Whole Plan
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
AACTIVITY 1
Background Describe briefly the problems identified in the self-evaluation pertinent to the plannedactivity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
EACTIVITY 1
Background Describe briefly the problems identified in the self-evaluation pertinent to the plannedactivity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
A&E
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
O
Tahap II
Pelaksana :Task Force PS/ISS
Matrix RAISE++Matrix RAISE++
+
++
++
..
+
+
++
+
..
+++
+
+++
+++
…
+
+
+
+++
..
+
+++
+
-
..
++
Activity 1
Activity 2
Activity 3
…..
Activity n
OthA&EEAR
Improving Relevance* Activity 1Improving Academic Atmosphere* Activity 3Improving Efficiency & Productivity* Activity 2* Activity 3 (see Activity 3 in Improving Academic Atmosphere)
….
PenyusunanPenyusunanProposal Proposal Sub-ProjectSub-Project
ImplementionPrograms(Activities)(Doc I Section 2-5)
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
ACTIVITY 1Background Describe briefly the problems identified in the self-evaluation pertinent to the planned
activity. This may include also analysis regarding why the problems had occurred andpossible solutions to them. The link between the planned activities presented in theChapter 2 to 5 and the problem analysis (SWOT analysis and other conclusion drawnfrom the self-evaluation) presented in the Document II should be explicitly mentioned,by making explicit references to the relevant sections of Document II.
Rationale Discuss in sufficient detail how this activity would possibly resolve the problemsreferred in the background section. Empirical or theoretical facts can be used as aground to support the argument
Objectives State clearly the objective of this activity, including the intended outcomes. Descriptionshould clearly present all direct as well as indirect benefits to the respective S1 studyprogram
Mechanismand design
Explain how the activity will be set up and how it will be implemented.<detail activity a>.<detailactivity b>.<detail activity c>.
Indicators Baseline Mid Final<indikator 1><indikator 2>
Performanceindicators
<indikator 3>
Resourcesrequired
Explain additional resources needed from the TPSDP investment to implement theactivity. If there are any additional investment required in addition to TPSDP funds toimplement the plan, describe clearly all past, current, and future investment fromsources outside of this project. The proposer should assure the reviewers that doublefunding of the same activities by TPSDP and non-TPSDP resources would be prevented
5 years plan Yr 1 Yr 2 Yr 3 Yr4<Detail activity a><Detail activity b>
Implementa-tion schedule
<Detail activity c>
Sustainabili-ty
Describe how this activity will be maintained after the period of this project. Aspectsdescribed should include its financial implication, allocation of resources to support thisactivity, and management commitment
Person incharge
Name of staff who will be responsible for this activity
The Whole Plan
Tahap III Pelaksana :Task Force PS/ISS
IdentifikasiResources
yg dibutuhkan
Staff
Library Physical Facilities
Laboratories
Funding
Daftar Kebutuhan Resources& prioritas pengadaannya
Survey PasarKebutuhan Dana
PenyusunanPenyusunanProposal Proposal Sub-ProjectSub-ProjectTahap IV
Draft Sub-ProjectProposal PS A.
Draft Sub-ProjectProposal PS B.
Pimpinan Perguruan Tinggi
DRK KomitmenKirim ke DPT
Task Force Perguruan Tinggi Rangkum anggaran yg diusulkan dari PS/ISS Usahakan DRK Komitmen dari Pimpinan PT Sesuaikan Usulan Anggaran dengan DRK komitmen Susun Chapter 1 & binding document
SE-Report
PenyusunanPenyusunanUsulan AnggaranUsulan Anggaran
Kapasitas/Kemampuan Institusi dalam Mengoperasionalkan institusi Men-generate revenue/income??
DayaTampung
Berlebihan
KualitasLulusanrendah
PenyediaanDana
Pendamping
Kemampuan men-generate revenuesebanding dengan
Kemampuan disbursement anggaran
Usulan Anggarandisesuaikan dengankemampuanmenyediakan danapendamping
!Kemampuan men-generate revenueRp. 100 juta/thn atauRp. 400 juta/4 thn
Contoh :
Anggaran yg diusulkanRp. 400 juta x 100/8 = Rp. 5 milyarequivalent dng US$ 555.556 dngkurs US$ 1 = Rp. 9.000
RAISE++
Pelaksanaan & Penanggungjawab :Ketua Program Studi & PIC
Pelaksana & Penanggungjawab :Sub-Project Management Unit (SPMU)
Menyediakan dana Pengadaan/Penyediaan Resources
Kegiatan untuk meningkatkan RAISE
Koordinasi PIC
KebutuhanSumberdaya
Sumberdaya Investment
Activities