TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 1 Printed by the House Transportation Committee I1 - Mobility 998 00 DIRECT PROJECT SUPPORT 07/02/01 5,450 0 0 5,450 0 0 0 0 5,450 SUBPROGRAM I-1 998 00 SUBPROGRAM I1 RESERVE 07/02/07 0 0 0 0 1,200 0 83,000 155,000 239,200 998 00 PARK & RIDE/POOL LOTS - OIL 07/07/03 0 0 670 670 0 0 0 0 670 REBATE FUNDS 998 01,05,10,11,21, HOV DESIGN & CONSTRUCTION PROJ. 180 0 0 180 0 0 0 0 180 SUPPORT 005 30 I-5/SR 161 I/C & SR 18 I/C 2,600 0 0 2,600 360 0 0 0 2,960 005 30,33,11 I-5/PIERCE CO. LINE TO TUKWILA I/C - 10/23/00 292 0 8,795 9,087 3,451 0 0 0 12,538 HOV 005 33,11 I-5/PIERCE CO. LINE TO TUKWILA I/C 01/08/96 0 0 230 230 0 0 0 0 230 005 32 I-5/NE 175TH ST TO NE 205TH ST - NB 10/04/04 650 0 860 1,510 5,900 0 0 0 7,410 LANE 005 21,01 I-5/196TH ST SW(SR 524) I/C - PHASE C 730 0 0 730 0 0 0 0 730 005 01,21,44,38 I-5/164TH ST SW TO SR 526 - HOV 05/03/99 26 0 434 460 1,542 0 0 0 2,002 005 44,21 I-5/128TH ST SW (SR96) I/C 140 0 0 140 0 0 0 0 140 IMPROVEMENTS 005 44,38 I-5/SR 526 TO MARINE VIEW DRIVE 03/06/06 6,925 8,300 0 15,225 69,300 110,000 32,000 0 226,525 005 10 I-5/172ND ST NE (SR 531) INTERCHANGE 1,005 3,500 0 4,505 0 0 0 0 4,505 005 42 SR 5, 9, 539, AND 543 - BORDER XING 06/25/01 0 0 95 95 0 0 0 0 95 INFO 005 42 I-5/NB PACE LANE EXTENSION - 06/25/01 0 0 4 4 0 0 0 0 4 BLAINE VIC 005 30,33,11 I-5/PIERCE CO. LINE TO TUKWILA I/C - 10/04/04 250 720 3,900 4,870 42,400 7,730 0 0 55,000 HOV 009 01 SR 9/SR 522 TO 228TH ST. SE - WIDENING 07/16/01 140 0 21 161 0 0 0 0 161 009 01 SR 9/228TH ST SE TO 212TH ST SE(SR 290 0 0 290 0 0 0 0 290 524) 009 44 SR 9/US 2 INTERCHANGE - I/C 01/05/04 250 359 4,300 4,909 101 0 0 0 5,010 MODIFICATION 018 30 SR 18/WEYERHAEUSER WAY TO SR 167 10/06/03 26 0 12,618 12,644 1,732 0 0 0 14,376 020 10,40 SR 20/FREDONIA TO I-5 - WIDENING 1,273 0 0 1,273 0 0 0 0 1,273 090 05 I-90/SUNSET I/C MODIFICATIONS 04/17/00 241 0 7,180 7,421 920 200 0 0 8,541 099 30 SR 99/S. 284TH TO S. 272ND ST - HOV 12/05/05 780 3,000 0 3,780 6,323 2,600 0 0 12,703 099 33,11 SR 99/SR 99 AND SR 518 INTERCHANGE 271 0 0 271 0 0 0 0 271 VIC.

Upload: others

Post on 03-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 1 Printed by the House Transportation Committee

    I1 - Mobility 998 00 DIRECT PROJECT SUPPORT 07/02/01 5,450 0 0 5,450 0 0 0 0 5,450 SUBPROGRAM I-1 998 00 SUBPROGRAM I1 RESERVE 07/02/07 0 0 0 0 1,200 0 83,000 155,000 239,200 998 00 PARK & RIDE/POOL LOTS - OIL 07/07/03 0 0 670 670 0 0 0 0 670 REBATE FUNDS 998 01,05,10,11,21, HOV DESIGN & CONSTRUCTION PROJ. 180 0 0 180 0 0 0 0 180 SUPPORT 005 30 I-5/SR 161 I/C & SR 18 I/C 2,600 0 0 2,600 360 0 0 0 2,960 005 30,33,11 I-5/PIERCE CO. LINE TO TUKWILA I/C - 10/23/00 292 0 8,795 9,087 3,451 0 0 0 12,538 HOV 005 33,11 I-5/PIERCE CO. LINE TO TUKWILA I/C 01/08/96 0 0 230 230 0 0 0 0 230 005 32 I-5/NE 175TH ST TO NE 205TH ST - NB 10/04/04 650 0 860 1,510 5,900 0 0 0 7,410 LANE 005 21,01 I-5/196TH ST SW(SR 524) I/C - PHASE C 730 0 0 730 0 0 0 0 730 005 01,21,44,38 I-5/164TH ST SW TO SR 526 - HOV 05/03/99 26 0 434 460 1,542 0 0 0 2,002 005 44,21 I-5/128TH ST SW (SR96) I/C 140 0 0 140 0 0 0 0 140 IMPROVEMENTS 005 44,38 I-5/SR 526 TO MARINE VIEW DRIVE 03/06/06 6,925 8,300 0 15,225 69,300 110,000 32,000 0 226,525 005 10 I-5/172ND ST NE (SR 531) INTERCHANGE 1,005 3,500 0 4,505 0 0 0 0 4,505 005 42 SR 5, 9, 539, AND 543 - BORDER XING 06/25/01 0 0 95 95 0 0 0 0 95 INFO 005 42 I-5/NB PACE LANE EXTENSION - 06/25/01 0 0 4 4 0 0 0 0 4 BLAINE VIC 005 30,33,11 I-5/PIERCE CO. LINE TO TUKWILA I/C - 10/04/04 250 720 3,900 4,870 42,400 7,730 0 0 55,000 HOV 009 01 SR 9/SR 522 TO 228TH ST. SE - WIDENING 07/16/01 140 0 21 161 0 0 0 0 161 009 01 SR 9/228TH ST SE TO 212TH ST SE(SR 290 0 0 290 0 0 0 0 290 524) 009 44 SR 9/US 2 INTERCHANGE - I/C 01/05/04 250 359 4,300 4,909 101 0 0 0 5,010 MODIFICATION 018 30 SR 18/WEYERHAEUSER WAY TO SR 167 10/06/03 26 0 12,618 12,644 1,732 0 0 0 14,376 020 10,40 SR 20/FREDONIA TO I-5 - WIDENING 1,273 0 0 1,273 0 0 0 0 1,273 090 05 I-90/SUNSET I/C MODIFICATIONS 04/17/00 241 0 7,180 7,421 920 200 0 0 8,541 099 30 SR 99/S. 284TH TO S. 272ND ST - HOV 12/05/05 780 3,000 0 3,780 6,323 2,600 0 0 12,703 099 33,11 SR 99/SR 99 AND SR 518 INTERCHANGE 271 0 0 271 0 0 0 0 271 VIC.

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 2 Printed by the House Transportation Committee

    099 11 SR 99/DUWAMISH RIVER/FIRST AVE S. 04/25/94 0 0 99 99 100 12 0 0 211 BRIDGE 099 11,37,43,36 SR 99/ALASKAN WAY VIADUCT 15,000 0 0 15,000 0 0 0 0 15,000 099 11,37,43,36 SR 99/ALASKAN WAY VIADUCT 0 30,000 0 30,000 0 0 0 0 30,000 099 11,36,37,43 SR 99/ALASKAN WAY VIADUCT 0 0 0 0 12,000 0 0 0 12,000 099 11,36,37,43 SR 99/ALASKAN WAY VIADUCT 8,000 0 6,000 14,000 54,000 0 0 0 68,000 099 36 SR 99/GALER STREET VICINITY 03/03/03 0 0 1,395 1,395 0 0 0 0 1,395 099 32 SR 99/AURORA AVE. N. CORRIDOR 06/06/05 0 0 26 26 7,900 2,100 0 0 10,026 PROJECT 099 32,21 SR 99/KING/SNO CO. LINE TO 148TH ST 03/01/99 0 0 1,050 1,050 0 0 0 0 1,050 SW 161 31,25,30 SR 161/JOVITA BLVD TO S 360TH ST 89 0 0 89 0 0 0 0 89 167 30,47,33,11,37 SR 167/CORRIDOR STUDY 115 0 0 115 0 0 0 0 115 167 47,30,33 SR 167/15TH ST.NW TO 84TH AVE S - 10/02/95 0 0 150 150 19 420 380 0 969 HOV 167 47,30,33 SR 167/15TH ST SW TO 84TH AVE. S - 10/02/95 0 0 68 68 0 0 0 0 68 SC&DI 167 47 SR 167/15TH ST. SW TO 15TH ST. NW - 05/03/04 300 0 12,000 12,300 26,083 2,600 0 0 40,983 HOV 167 33,11 SR 167/84TH AVE S. TO S. GRADY WAY 05/24/93 0 0 0 0 170 0 0 0 170 - HOV 169 05,41 SR 169/196TH SE/JONES RD TO 140TH PL 06/01/93 150 0 0 150 0 0 0 0 150 SE 202 48,45 SR 202/SR 520 TO SAHALEE WAY - 04/05/04 614 6,200 18,700 25,514 24,800 3,530 0 0 53,844 WIDENING 405 11,37,47,41,48, I-405/TUKWILA TO LYNNWOOD 15,000 0 0 15,000 0 0 0 0 15,000 405 41 I-405/SE 8th to I-90 (South Bellevue) 10/01/07 15,000 0 0 15,000 35,000 55,480 80,000 0 185,480 405 11,37,47,41,48, I-405/TUKWILA TO LYNNWOOD - T.A.A. 3,900 0 0 3,900 54 0 0 0 3,954 405 11 I-405/JUNCTION SR 167 - I/C 05/07/01 0 0 640 640 60 0 0 0 700 MODIFICATION 405 41,48 I-405/BELLEVUE DIRECT ACCESS 12/17/01 0 0 8,630 8,630 1,590 0 0 0 10,220 405 01 I-405/BOTHELL TO SWAMP CREEK I/C - 04/13/98 0 0 268 268 71 7 0 0 346 HOV 509 33 SR 509/CORRIDOR DESIGN ANALYSIS 2,400 0 0 2,400 0 0 0 0 2,400 509 33,30 SR 509 CORRIDOR DESIGN & CRITICAL 6,700 20,000 0 26,700 8,300 0 0 0 35,000 R/W 520 43,48 SR 520 BRIDGE -- ENVIRONMENTAL 4,000 0 0 4,000 0 0 0 0 4,000

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 3 Printed by the House Transportation Committee

    IMPACT STATEMENT 520 43,48 SR 520/TRANS LAKE WASHINGTON 1,131 0 0 1,131 0 0 0 0 1,131 STUDY 520 48 SR 520/104TH AVE NE TO 124TH AVE NE 06/25/01 0 0 79 79 0 0 0 0 79 I/C 520 48 SR 520/124TH AVE NE I/C TO W LK 06/25/01 0 0 420 420 0 0 0 0 420 SAMM.PKW 520 48 SR 520/SR 202 INTERCHANGE 12/14/98 0 0 86 86 0 0 0 0 86 522 46,32,01 SR 522/I-5 TO SR 405 MULTI-MODAL 04/30/01 180 0 6,600 6,780 1,500 0 0 0 8,280 PROJECT 522 01 SR 522/SR 9 TO PARADISE LAKE ROAD 05/17/99 220 0 0 220 0 0 0 0 220 522 01,39 SR 522/PARADISE LAKE RD TO 10/06/03 210 520 21,000 21,730 6,330 0 0 0 28,060 SNOHOMISH R. 522 01 BOTHELL - UW CAMPUS ACCESS 0 0 9,000 9,000 0 0 0 0 9,000 524 01 SR 524/24TH AVE SW TO SR 527 - 75 0 0 75 0 0 0 0 75 WIDENING 525 01 SR 525/164TH ST. SW TO SR 99 - 02/05/01 0 0 22 22 6 0 0 0 28 WIDENING 525 01,21 SR 525/JUNCTION SR 99 - NEW 05/10/99 0 0 91 91 32 0 0 0 123 INTERCHANGE 525 21 SR 525/SR 99 TO SR 526 - WIDENING 03/05/01 48 0 8,440 8,488 0 0 0 0 8,488 527 44 SR 527/164TH ST. SE TO 132ND ST. SE 06/25/01 173 0 11,400 11,573 830 0 0 0 12,403 527 44 SR 527/132ND ST. SE TO 112TH ST. SE 04/04/05 700 1,300 136 2,136 19,830 3,550 0 0 25,516 531 39 SR 531/43RD AVE NE TO 67TH AVE NE 92 0 0 92 0 0 0 0 92 532 10 SR 532/TERRY`S CORNER PARK AND 10/06/03 27 0 850 877 0 0 0 0 877 RIDE LOT 539 42 SR 539/HORTON ROAD TO TENMILE 02/05/07 347 9,400 0 9,747 185 26,500 0 0 36,432 ROAD 539 42 SR 539/TENMILE ROAD TO INTERNTL 10/05/10 4,300 550 0 4,850 5,500 5,200 31,500 42,000 89,050 BOUNDARY 900 41 SR 900/SE 78TH ST VIC. TO I-90 VIC. 04/14/03 0 0 5,500 5,500 0 0 0 0 5,500 998 00 NORTHWEST REGION DPS - 2,600 0 0 2,600 0 0 0 0 2,600 SUBPROGRAM I1 998 00 PROJECT DEFINITION SUMMARY 210 0 0 210 410 410 410 0 1,440 000 02 CROSS BASE HIGHWAY 5,000 0 0 5,000 10,000 0 0 0 15,000 017 13 SR 17/PIONEER WAY TO STRATFORD 40 990 0 1,030 0 0 0 0 1,030 ROAD

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 4 Printed by the House Transportation Committee

    028 12 SR 28/JUNCTION US 2/97 TO 9TH STREET 720 0 0 720 20 0 0 0 740 028 12,13 SR 28/WENATCHEE TO 0 0 0 0 96 0 0 0 96 I-90-ADDITIONAL LANES 003 23 SR 3/SR 303 I/C (WAAGA WAY) - NEW 12/06/04 850 2,500 4,000 7,350 12,000 0 0 0 19,350 RAMP 005 25,27 I-5/PORT OF TACOMA RD TO KING CO 909 0 0 909 0 0 0 0 909 LINE 005 25,27 I-5/PORT OF TACOMA RD TO KING CO 01/16/07 0 3,800 0 3,800 4,900 24,000 0 0 32,700 LINE 005 22 I-5/TROSPER ROAD INTERCHANGE - 02/04/02 0 0 45 45 0 0 0 0 45 SIGNALS 005 22 I-5/MARTIN WAY O`XING - BIKE LANES 05/07/07 89 0 0 89 1 620 0 0 710 005 25,27 I-5/PORT OF TACOMA I/C, CORE HOV 03/15/04 590 6 9,500 10,096 5,446 0 0 0 15,542 005 29,27 I-5/SR 16 I/C / 38TH ST I/C, CORE HOV 07/17/00 2,075 4,471 0 6,546 423 0 0 0 6,969 005 29,27 I-5/S 48TH TO S M STREET - CORE HOV 0 231 0 231 0 0 0 0 231 005 28,29,27,25 I-5/TACOMA VIC HOV - PROJECT 280 0 0 280 0 0 0 0 280 DEFINITION 005 20 I-5/GRAND MOUND TO MAYTOWN, 01/10/05 2,710 2,800 3,100 8,610 53,177 7,200 0 0 68,987 WIDENING 005 22 CHEHALIS WESTERN TRAIL 09/04/05 380 85 0 465 1,264 0 0 0 1,729 OVERCROSSING 016 29,27,28 SR 16/I-5 TO TACOMA NARROWS 10/30/00 1,610 2,770 0 4,380 0 0 0 0 4,380 BRIDGE - HOV 016 26 SR 16/36TH ST TO OLYMPIC DR NW, 580 800 0 1,380 140 0 0 0 1,520 CORE HOV 016 29,27,28 SR 16 HOV IMPROVEMENTS BETWEEN 11/24/03 0 0 49,700 49,700 40,800 0 0 0 90,500 OLYMPIC DRIVE AND UNION AVE 101 24 US 101/DAWLEY ROAD VICINITY TO 09/17/07 0 60 0 60 0 1,800 0 0 1,860 BLYN HWY 101 24 US 101/GARDINER VIC - TRUCK LANE 03/21/05 116 57 210 383 1,400 0 0 0 1,783 101 24 US 101/SHORE RD TO KITCHEN RD - 17 290 0 307 0 240 1,600 650 2,797 WIDENING 101 22 US 101/CROSBY BLVD/COOPER POINT 06/07/99 0 0 0 0 81 600 0 0 681 RD I/C 101 24 US 101/SEQUIM - BUILD A BYPASS 02/16/99 30 0 98 128 98 49 0 0 275 101 24 US 101/BLYN VIC - PASSING LANES 02/09/04 46 0 1,400 1,446 0 0 0 0 1,446 104 24 SR 104/SR 19 WESTBOUND - PASSING 53 0 0 53 0 0 0 0 53

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 5 Printed by the House Transportation Committee

    LANE 161 02,25 SR 161/204TH STREET TO 176TH STREET 02/09/04 76 2,900 5,500 8,476 4,300 0 0 0 12,776 161 02 SR 161/234TH STREET TO 204TH STREET 11/03/03 0 300 6,600 6,900 3,000 15 0 0 9,915 167 31 SR 167/NORTH SUMNER NEW 04/07/03 0 250 16,500 16,750 2,520 82 15 0 19,367 INTERCHANGE 167 27,25 SR 167/SR 509 TO SR 161, EIS 990 771 0 1,761 0 0 0 0 1,761 167 27,25 SR 167/SR 509 TO I-5, NEW FREEWAY 400 0 0 400 0 0 0 0 400 167 27,25 SR 167/SR 509 TO I-5, NEW FREEWAY 6,628 0 0 6,628 9,819 6,791 0 0 23,238 167 25 SR 167/I-5 TO SR 161, NEW FREEWAY 2,263 0 0 2,263 0 0 0 0 2,263 167 25 SR 167/I-5 TO SR 161, NEW FREEWAY 0 16,201 0 16,201 0 12,799 0 0 29,000 304 26 SR 304/SR 3 TO BREMERTON FERRY 02/17/04 0 0 11,000 11,000 0 0 0 0 11,000 TERMINAL 305 23 SR 305/POULSBO CITY LIMITS TO 0 2,260 0 2,260 0 0 0 0 2,260 BOND ROAD 410 31 SR 410/214TH AVE E TO 234TH - 160 2,300 0 2,460 0 140 0 0 2,600 WIDENING 509 27 SR 509/MILWAUKEE AVE TO TAYLOR 06/29/98 0 0 13 13 1 0 0 0 14 WAY 509 27 SR 509/PORT OF TACOMA ROAD 02/22/00 0 0 51 51 0 0 0 0 51 510 22 SR 510/I-5 TO MARTIN WAY - WIDENING 01/22/02 0 0 450 450 0 0 0 0 450 510 20 SR 510/MARTIN WAY TO PACIFIC 01/22/02 0 0 1,700 1,700 0 0 0 0 1,700 AVENUE 705 27 I-705/21ST ST I/C TO PORTLAND AVE I/C 08/08/94 76 0 679 755 1 0 1 0 757 998 00 OLYMPIC REGION DIRECT PROJECT 640 0 0 640 0 0 0 0 640 SUPPORT I1 998 00 OLYMPIC REGION PARK & RIDE LOTS 0 37 0 37 0 0 0 0 37 998 00 MAJOR IMPR PROJECT DEFINITION & 300 0 0 300 197 404 498 498 1,897 SUMMARY 004 19 SR 4/SVENSEN`S CURVE - 01/23/06 52 570 0 622 3,358 990 0 0 4,970 REALIGNMENT 005 49 I-5/INTERSTATE BRIDGE - 2,000 0 0 2,000 0 0 0 0 2,000 REPLACEMENT 005 49,18 I-5/NE 134TH ST INTERCHANGE (I-5/I205) 04/02/07 1,500 18 0 1,518 6,620 32,000 0 0 40,138 005 18 I-5/LEXINGTON ACCESS 01/14/08 0 0 0 0 0 5,000 0 0 5,000 005 49 I-5/BURNT BRIDGE CREEK THRU NE 04/19/99 0 0 56 56 12 3 0 0 71 78TH ST 005 49,18,17 I-5/SALMON CREEK TO I-205 - 12 0 0 12 0 0 0 0 12

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 6 Printed by the House Transportation Committee

    WIDENING 014 15 SR 14/HOOD RIVER BRIDGE TO WILLOW 12/16/02 0 132 170 302 0 0 0 0 302 ST 014 15 SR 14/WILLOW ST TO VINE ST - 12/16/02 0 73 45 118 0 0 0 0 118 WIDENING 014 18 SR 14/192ND AVE. INTERCHANGE 04/16/01 0 0 38 38 0 0 0 0 38 (BRADY RD) 205 17 I-205/MILL PLAIN EXIT(112TH 04/24/06 640 11 0 651 9,080 3,800 0 0 13,531 CONNECTOR) 500 17 SR 500/WARD ROAD TO 162ND 05/21/01 180 711 0 891 0 0 0 0 891 AVE-WIDENING 999 00 DIRECT PROJECT SUPPORT 38 0 0 38 0 0 0 0 38 SUBPROGRAM I-1 005 18,49 CLARK COUNTY INTERSTATE PARK & 0 17 0 17 0 0 0 0 17 RIDE LOTS 012 16 US 12/SR 124 TO MCNARY POOL - ADD 10/04/04 1,600 2,800 2,000 6,400 5,400 0 0 0 11,800 LANES 012 16 US 12/ATTALIA VIC. TO US 730 - ADD 10/01/07 0 0 0 0 1,530 8,897 0 0 10,427 LANES 012 16 US 12/SR 124 TO WALLA WALLA - ADD 05/13/02 0 0 7,181 7,181 0 0 0 0 7,181 LANES 012 16 US 12/ATTALIA VIC. - ADD LANES 10/03/05 590 960 0 1,550 6,283 2,500 0 0 10,333 024 14,13 SR 24/I-82 TO KEYS ROAD 04/11/05 1,530 1,640 0 3,170 22,000 9,000 0 0 34,170 082 13 I-82/THRALL ROAD TO MANASTASH 02/02/09 0 0 0 0 78 1,769 7,200 0 9,047 RIDGE 090 13 I-90/HIGHLINE CANAL TO ELK HEIGHTS 07/07/03 0 0 4,200 4,200 0 0 0 0 4,200 090 13 I-90/RYEGRASS SUMMIT TO VANTAGE 07/07/03 0 0 9,200 9,200 0 0 0 0 9,200 240 08 SR 240/STEVENS DRIVE TO I-182 11/06/00 0 0 52 52 0 0 0 0 52 240 08 SR 240/I-182 TO RICHLAND Y - ADD 02/24/03 700 2,700 7,500 10,900 15,000 1,800 0 0 27,700 LANES 240 08 SR 240/RICHLAND Y TO COLUMBIA 10/11/04 890 8,100 2,000 10,990 22,000 2,600 0 0 35,590 CENTER I/C 998 00 DIRECT PROJECT 400 0 0 400 0 0 0 0 400 SUPPORT-SUBPROGRAM I1 395 03,04,07 NORTH SPOKANE CORRIDOR 260 0 0 260 0 0 0 0 260 395 03,04,07 NSC-HAWTHORNE ROAD TO US 2 06/25/01 324 0 0 324 0 0 0 0 324 395 03,04,07 NSC-US 2 TO WANDERMERE & US 2 07/16/07 1,410 10 0 1,420 8,300 71,140 0 0 80,860

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 7 Printed by the House Transportation Committee

    LOWERING 090 04 I-90/PINES ROAD TO SULLIVAN 11/17/03 150 0 12,000 12,150 5,000 0 0 0 17,150 ROAD-WIDEN 090 04 I-90/ARGONNE ROAD TO PINES 11/17/03 0 0 12,000 12,000 5,000 0 0 0 17,000 ROAD-WIDEN 270 09 SR 270/PULLMAN TO IDAHO STATE LINE 01/18/05 1,000 8,100 2,400 11,500 17,000 0 0 0 28,500 395 07 US 395/N SPOKANE TO CANADA 210 0 0 210 340 0 0 0 550 CORRIDOR 999 00 EASTERN REGION DIRECT PROJECT 74 0 0 74 0 0 0 0 74 SUPPORT 144,288 153,570 321,145 619,003 614,684 414,578 236,604 198,148 2,083,017

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 8 Printed by the House Transportation Committee

    I2 - Safety 998 00 DIRECT PROJECT SUPPORT 07/02/01 2,190 0 0 2,190 0 0 0 0 2,190 SUBPROGRAM I-2 999 0 STATEWIDE GUARD RAIL RETROFIT 02/01/04 0 0 4,000 4,000 4,000 4,000 4,000 4,000 20,000 999 0 STATEWIDE BRIDGE RAIL RETROFIT 02/01/04 0 0 2,000 2,000 2,000 2,000 2,000 2,000 10,000 999 00 SAFETY-NEW STARTS 19 0 0 19 0 69,593 97,222 101,222 268,056 998 11,33,41,44,45, EASTSIDE FREEWAYS SAFETY 05/05/03 160 0 1,300 1,460 42 0 0 0 1,502 IMPROVEMENTS 002 44,39 SR 2/OLD SR 2 VIC TO SR 9 VIC - SAFETY 01/05/04 83 0 354 437 0 0 0 0 437 002 44 US 2/SR 9 INTERCHANGE VICINITY 06/11/01 0 0 12 12 8 0 0 0 20 002 39 US 2/SR 522 TO WOODS CREEK BRIDGE 03/07/05 139 243 56 438 910 0 0 0 1,348 002 39 US 2/ 179TH AVE TO WOODS CREEK 03/07/05 95 0 44 139 553 0 0 0 692 BRIDGE 002 39 US 2/REITER ROAD VICINITY - 02/02/04 54 25 509 588 0 0 0 0 588 RECHANNELIZE 002 39 US 2/5TH STREET - SIGNALIZATION 08/25/03 130 0 408 538 0 0 0 0 538 002 39 PICKLE FARM ROAD/GUNN ROAD 03/05/07 28 0 0 28 344 601 0 0 973 005 11 I-5/RAMPS AT 12/01/03 15 0 750 765 265 0 0 0 1,030 MICHIGAN-CORSON/ALBRO/SWIFT 005 46,32 I-5/NORTHGATE WAY TO NE 175TH 05/05/03 0 0 816 816 0 0 0 0 816 STREET 005 44,38 I-5/SB OFF RAMP TO SR 526 - SAFETY 05/02/05 62 0 20 82 209 0 0 0 291 005 21,01,44,38 I-5/52ND AVE W. TO SR 526 - SB SAFETY 02/06/06 155 92 0 247 2,658 9 0 0 2,914 005 44,38 SB ON RAMP FROM BROADWAY TO CD 01/03/05 122 0 78 200 297 0 0 0 497 005 10 I-5/SR 532 NORTHBOUND 03/06/06 541 1,485 0 2,026 4,434 1,243 0 0 7,704 INTERCHANGE RAMPS 005 40 SB RAMPS AT SR 11/OLD FAIRHAVEN 01/03/06 166 51 0 217 1,358 0 0 0 1,575 PARKWAY 005 40,42 I-5/36TH ST VIC. TO SR 542 VIC. 11/18/02 450 342 5,617 6,409 7,010 0 0 0 13,419 005 42 I-5/BAKERVIEW RD TO NOOKSACK R BR 01/03/06 46 0 0 46 516 220 0 0 782 5/828W 009 01,44 SR 9/212TH ST SE VIC TO SR 96 - SAFETY 12/03/07 271 0 0 271 1,518 4,161 0 0 5,950 009 44 SR 9/56TH ST SE AND 42ND ST NE 03/10/03 314 277 441 1,032 1,510 0 0 0 2,542 009 44 SR 9/SR 528 INTERSECTION - SIGNAL 10/06/03 9 0 710 719 0 0 0 0 719 009 39 SR 9/108TH STREET NE (LAUCK ROAD) 01/02/07 70 0 0 70 545 738 0 0 1,353

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 9 Printed by the House Transportation Committee

    009 39 SR 9/SCHLOMAN ROAD TO 256TH 11/20/06 490 127 0 617 3,910 10,600 0 0 15,127 STREET E. 009 39 SR 9/252ND ST NE VICINITY - 11/20/06 25 10 0 35 244 532 0 0 811 RECHANNELIZE 009 10 SR 9/268TH STREET INTERSECTION 11/20/06 200 72 0 272 1,321 1,105 0 0 2,698 009 39,40 SR 9/PRAIRIE RD. TO THUNDER CREEK 11/07/05 481 277 0 758 2,950 970 0 0 4,678 018 30 SR 18/WEYERHAUSER WAY RAMPS 10/06/03 0 0 462 462 64 0 0 0 526 018 30,47 SR 18/EB OFF RAMP TO WEST VALLEY 01/05/04 58 0 710 768 292 0 0 0 1,060 HIGHWAY 018 30 SR 18/WESTBOUND TO I-5 - SIGNING 03/07/05 42 0 15 57 98 0 0 0 155 020 10 SR 20/LIBBY RD VIC TO SIDNEY STREET 10/03/05 154 705 0 859 4,359 1,060 0 0 6,278 VIC 020 10 SR 20/SIDNEY ST. VIC TO SCENIC 05/08/06 183 1,070 0 1,253 2,914 2,287 0 0 6,454 HEIGHTS 020 10 SR 20/OAK HARBOR NCL TO FROSTAD 10/06/03 23 90 1,918 2,031 867 0 0 0 2,898 ROAD 020 10 SR 20/FROSTAD ROAD VICINITY - 10/06/03 6 0 76 82 34 0 0 0 116 GUARDRAIL 020 10 SR 20/MONKEY HILL RD. TO TROXELL 10/06/03 71 410 474 955 2,540 0 0 0 3,495 RD. 020 10 SR 20/NORTHGATE DRIVE TO BANTA 08/02/04 42 640 99 781 619 0 0 0 1,400 ROAD 020 10 SR 20/TROXELL RD. TO DECEPTION 10/06/03 220 740 335 1,295 2,310 0 0 0 3,605 PASS VIC. 020 10 SR 20/DUCKEN ROAD TO ROSARIO 02/07/05 40 0 25 65 2,018 1,510 0 0 3,593 ROAD 020 10 SR 20/DECEPTION & CANOE PASS 10/16/00 440 0 482 922 8,250 0 0 0 9,172 BRIDGES 020 10,40 SR 20/QUIET COVE RD. VIC. TO SR 20 02/06/06 8 498 0 506 2,460 1,380 0 0 4,346 SPUR 020 10,40 SR 20/VICINITY CAMPBELL LAKE ROAD 03/23/98 0 0 44 44 0 0 0 0 44 020 39 SR 20/SAPP RD. TO REED ST.- 10/06/03 23 43 440 506 0 0 0 0 506 RECHANNELIZE 020 39 SR 20/FRUITDALE ROAD INTERSECTION 02/02/04 87 36 427 550 0 0 0 0 550 090 05 I-90/HIGH POINT RD. & 436TH AVE I/C 01/05/04 64 0 1,310 1,374 469 0 0 0 1,843 090 05 I-90/EASTBOUND RAMPS TO SR 18 - 12/01/03 31 0 552 583 0 0 0 0 583 SIGNAL

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 10 Printed by the House Transportation Committee

    090 05 I-90/EB RAMPS TO SR 202 - 01/08/07 25 0 0 25 190 717 0 0 932 ROUNDABOUT 092 44,39 SR 92/SR 9 TO 84TH ST NE VIC. 02/09/04 105 200 1,887 2,192 1,678 0 0 0 3,870 099 11 SR 99/S 138TH ST VIC TO N OF S 130TH 02/05/07 28 0 0 28 974 2,311 0 0 3,313 ST 099 01,21 SR 99/SR 525 VICINITY TO GIBSON 03/10/03 0 0 290 290 0 0 0 0 290 ROAD 164 31 SR 164/SE 368TH PLACE & 158TH 03/01/04 180 74 490 744 490 0 0 0 1,234 AVENUE SE 164 31 SR 164/196TH AVE SE VIC. TO 244TH 10/04/04 55 220 254 529 2,538 0 0 0 3,067 AVE SE 167 30 NB RAMPS TO ELLINGSON ROAD 02/06/06 174 6 0 180 738 0 0 0 918 169 31 SR 169/JUNCTION SE 400TH STREET - 04/29/02 0 0 151 151 17 17 0 0 185 SIGNAL 169 47,05 SR 169/SE 288TH ST. VIC. - SAFETY 10/11/04 390 196 261 847 1,105 0 0 0 1,952 202 45,05 SR 202/244TH AVENUE NE 01/03/06 182 27 0 209 817 0 0 0 1,026 INTERSECTION 202 05 SR 202/JCT 292ND AVE SE 02/06/06 201 3 0 204 1,101 0 0 0 1,305 202 05 SR 202/FALL CITY, RIVERSIDE PARK 04/07/03 0 0 82 82 0 0 0 0 82 VIC. 202 05 SR 202/PRESTON-FALL CITY ROAD & SR 10/02/06 0 0 0 0 1,539 870 0 0 2,409 203 203 45 SR 202/NE STILLWATER HILL TO 03/22/99 0 0 39 39 0 1 0 0 40 KENNEDY DR 203 45 SR 203/MORRISON ST. TO NE 55TH ST. 05/05/03 0 0 280 280 0 0 0 0 280 203 45 SR 203/JUNCTION NE 77TH STREET 11/13/00 0 0 130 130 0 0 0 0 130 203 45 SR 203/NE 124TH/NOVELTY RD VIC. 11/03/03 79 25 1,760 1,864 0 0 0 0 1,864 515 33 SR 515/SE 222ND PLACE TO SE 217TH 03/03/03 0 0 721 721 0 0 0 0 721 STREET 515 11 SR 515/SE 182ND ST TO SE 176TH ST VIC 03/06/06 161 12 0 173 929 0 0 0 1,102 516 47 SR 516/208TH AND 209TH AVE. SE 12/12/05 99 185 0 284 1,139 0 0 0 1,423 522 32 SR 522/83RD PLACE NE - SIGNAL 03/07/05 58 0 20 78 359 0 0 0 437 522 45 SR 522/NE 195TH STREET - SIGNAL 02/07/05 255 324 72 651 1,500 0 0 0 2,151 525 10 SR 525/CAMERON ROAD TO SR 20 - 03/20/00 0 0 587 587 15 0 0 0 602 SAFETY 527 01 SR 527/186TH PLACE SE - SIGNAL 03/06/06 116 0 0 116 774 0 0 0 890 530 39 SR 530/ARLINGTON HEIGHTS 05/03/04 72 80 648 800 463 0 0 0 1,263

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 11 Printed by the House Transportation Committee

    RD/JORDAN RD 530 39 SR 530/JORDAN ROAD TO 139TH AVE NE 05/03/04 0 34 474 508 335 0 0 0 843 531 10 SR 531/11TH AVE. NE TO 16TH DR. NE 05/05/03 0 0 260 260 0 0 0 0 260 VIC. 531 10,39 SR 531/33RD AVE VIC. TO 43RD AVE NE 10/04/04 101 98 162 361 174 0 0 0 535 532 10 SR 532/JUNCTION 102ND AVENUE NW 02/02/04 95 180 462 737 6 0 0 0 743 539 42 SR 539/JUNCTION KELLY 06/19/00 0 0 54 54 33 0 0 0 87 ROAD-RECHANNELIZE 539 42 SR 539/KING TUT RD AND BARTLETT RD 02/02/04 110 260 716 1,086 220 0 0 0 1,306 542 42 SR 542/SCENIC VIEWPNT TO 03/22/04 46 0 760 806 311 0 0 0 1,117 EXCELSIOR TRAIL 900 11 SR 900/57TH AVE S TO S 129TH ST VIC 03/17/03 0 0 260 260 0 0 0 0 260 998 00 NORTHWEST REGION DPS - 850 0 0 850 0 0 0 0 850 SUBPROGRAM I2 998 00 PROJECT DEFINITION SUMMARY 2,000 0 0 2,000 200 2,000 2,000 2,000 8,200 998 00 ADVANCE PRELIM. ENGINEERING 100 0 0 100 0 0 0 0 100 -SUBPROG. I2 998 00 PRIVATE DEVELOPMENT REVIEW 1,100 0 0 1,100 0 0 0 0 1,100 002 12 US 2 /WINTON RD. INTERSECTION 07/07/03 88 0 550 638 0 0 0 0 638 RELOCATION 002 12 US2/97 PESHASTIN EAST - 09/04/07 2,100 0 0 2,100 1,870 20,600 0 0 24,570 INTERCHANGE 002 12 US 2/DRYDEN - SIGNAL 09/24/07 46 0 0 46 0 260 0 0 306 024 13 SR 24/SOUTH WAHLUKE SLOPE - 11/03/03 36 0 255 291 0 0 0 0 291 GUARDRAIL 026 13 SR 26/ADAMS ROAD - LEFT TURN 12/09/02 0 0 218 218 0 0 0 0 218 LANES 028 12 SR 28/EAST WENATCHEE 31ST TO 11/06/06 68 636 0 704 338 1,960 0 0 3,002 HADLEY 028 13 SR 28/QUINCY EAST - LEFT TURN 12/08/03 6 0 558 564 0 0 0 0 564 LANES 090 13 I-90/MOSES LAKE WEST-SAFETY 12/15/03 2 0 930 932 0 0 0 0 932 IMPROVEMENTS 090 13 I-90/SR 26 INTERCHANGE-RAMP 10/11/04 18 20 1,443 1,481 3,710 0 0 0 5,191 IMPROVEMENTS 090 13 I-90/GEORGE VICINITY EAST - SAFETY 10/04/04 50 0 130 180 590 0 0 0 770 097 12 US 97A/ENTIAT PARK ENTRANCE - 10/04/04 60 0 160 220 20 0 0 0 240

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 12 Printed by the House Transportation Committee

    TURN LANES 243 13 SR 243/WANAPUM AREA - LEFT TURN 10/28/02 0 0 255 255 0 0 0 0 255 LANES 998 00 DIRECT PROJECT SUPPORT - I2 170 0 0 170 0 0 0 0 170 998 00 PROJECT DEFINITION AND SUMMARY - 650 0 0 650 650 650 650 650 3,250 I2 998 00 DEVELOPMENT REVIEW 230 0 0 230 233 233 233 233 1,162 998 20 OLYMPIC REGION ACCIDENT 07/02/01 0 0 274 274 0 0 0 0 274 REDUCTION 003 35 SR3/ALLYN TO SR 106 VICINITY - 03/12/07 0 43 0 43 1,237 4,660 0 0 5,940 SAFETY 003 26 SR 3/NB OFF RAMP AT LOXIE EAGANS 03/24/03 0 0 319 319 0 0 0 0 319 BLVD 003 35 SR 3/IMPERIAL WAY TO SUNNYSLOPE - 01/03/05 127 0 532 659 1,270 0 0 0 1,929 SAFETY 005 20 I-5/COUNTY LINE TO PRAIRIE CREEK 01/05/04 0 0 342 342 0 0 0 0 342 BRIDGE 005 28,02,29,27,25 I-5/INTELLIGENT TRANSPORTATION 09/07/04 0 0 500 500 0 0 0 0 500 SYSTEM 005 29,28 I-5/BRIDGEPORT WAY ON-RAMPS - 05/10/04 84 0 656 740 0 0 0 0 740 SAFETY 005 22 I-5/AIRDUSTRIAL NB ON RAMP - 12/04/06 13 0 0 13 419 518 0 0 950 SAFETY 005 22 I-5/PACIFIC AVE I/C SB OFF RAMP - 02/09/04 68 0 290 358 0 0 0 0 358 SIGNAL 007 02,29 SR7/SR 507 TO SR 512 - SAFETY 06/22/98 1 0 0 1 0 0 0 0 1 008 35 SR8/MCCLEARY - NEW INTERCHANGE 05/13/02 0 0 350 350 4 0 0 0 354 012 35 US 12/KEYS ROAD I/S - SAFETY 04/28/03 0 0 500 500 0 0 0 0 500 016 26 BURLEY OLALLA INTERCHANGE 12/14/09 0 0 0 0 0 980 10,130 4,100 15,210 016 26 SR 16/BURLEY-OLALLA INTERSECTION 02/09/04 150 0 539 689 0 0 0 0 689 -SAFETY 101 24 US 101/W SEQUIM BAY RD TO VIC 05/10/04 100 0 451 551 0 0 0 0 551 DAWLEY RD 101 24 US 101/CORRIEA RD VIC TO ZACCARDO 01/03/05 0 0 90 90 290 0 0 0 380 RD 104 24,23 SR 104/HOOD CANAL BRIDGE EAST 02/24/03 0 0 0 0 680 120 0 0 800 HALF

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 13 Printed by the House Transportation Committee

    104 24 SR 104/JCT SR 19 INTERSECTION 02/07/05 1 0 169 170 460 0 0 0 630 SAFETY 104 23 SR 104/MILLER BAY ROAD - SAFETY 03/08/04 39 0 185 224 76 0 0 0 300 112 24 SR 112/HOKO-OZETTE ROAD - SAFETY 10/18/04 0 0 750 750 190 25 0 0 965 160 26 SR 160/SR 16 TO LONGLAKE ROAD VIC 01/03/05 137 1,930 350 2,417 1,700 0 0 0 4,117 161 02 SR 161/OHOP VALLEY RD/SKI PARK RD 02/02/04 83 0 161 244 0 0 0 0 244 161 31 SR 161/SR 167 EASTBOUND RAMP - 03/13/06 0 0 0 0 1,931 0 0 0 1,931 SAFETY 161 25 SR 161/128TH TO 176TH - SAFETY 04/12/04 318 130 1,500 1,948 2,300 3,700 0 0 7,948 161 25 SR 161/35TH AVE SE VIC TO SR 512 EB 04/07/03 4 0 112 116 0 0 0 0 116 RAMP 162 31 SR 162/SR 165 INTERSECTION 04/04/05 20 8 5 33 99 0 0 0 132 IMPROVEMENT 162 02 SR 162/VOIGHTS CREEK VICINITY - 12/23/02 0 0 1,421 1,421 0 0 0 0 1,421 SAFETY 165 31 SR 165/ SR 162 TO 128TH ST 04/04/05 162 82 41 285 800 0 0 0 1,085 302 26 SR 302/ELGIN-CLIFTON ROAD 02/07/05 52 30 142 224 477 0 0 0 701 INTERSECTION 303 23 SR 303/DAWN ROAD VIC TO SR 3 - 06/25/01 0 0 16 16 30 0 0 0 46 SAFETY 305 23 SR 305/MADISON AVE 02/07/05 113 0 231 344 277 0 0 0 621 INTERSECTION-SIGNAL 410 31 SR 410/JEFFERSON AVE - SAFETY 04/05/04 26 0 223 249 0 0 0 0 249 507 20 SR 507/OLD MILITARY RD - SAFETY 04/11/05 65 16 24 105 465 0 0 0 570 507 02 SR 507/ROY WYE RECHANNELIZATION 05/03/04 63 0 102 165 0 0 0 0 165 507 02 SR 507/VIC EAST GATE RD TO 208TH ST 04/14/08 100 569 0 669 9 1,319 0 0 1,997 512 29,25 SR 512/VIC SR 7 TO VIC SR 167 - SAFETY 10/04/04 204 648 416 1,268 4,780 0 0 0 6,048 512 29 SR 512/EB OFF-RAMP TO PACIFIC AVE 04/05/04 86 280 907 1,273 366 0 0 0 1,639 702 02 SR 702/40TH AVE S./ALLEN ROAD - 11/06/06 55 0 0 55 440 142 0 0 637 SAFETY 998 00 OLYMPIC REGION DIRECT PROJECT 200 0 0 200 0 0 0 0 200 SUPPORT I2 998 00 SAFETY PROJECT DEFINITION AND 840 0 0 840 840 840 840 840 4,200 SUMMARY 998 00 ADVANCE PRELIMINARY ENGINEERING 100 0 0 100 0 0 0 0 100 - SAFETY 998 00 DEVELOPER REVIEW 850 0 0 850 850 850 850 850 4,250

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 14 Printed by the House Transportation Committee

    005 17,18 I-5/I-205 TO N. FORK LEWIS RIVER 04/11/05 110 0 15 125 710 0 0 0 835 BRIDGE 006 19 SR 6/ BRIDGE 6/8 RAIL RETROFIT 04/11/05 20 0 36 56 66 0 0 0 122 014 18 SR14/32ND ST INTERSECTION 01/10/05 101 37 127 265 300 0 0 0 565 IMPROVEMENT 014 15 SR14/HOOD RIVER BRIDGE 04/05/04 80 0 270 350 0 0 0 0 350 SIGNALIZATION 014 15 SR14/MARBLE RD VIC TO BELLE 04/23/07 50 176 0 226 12 4,160 0 0 4,398 CENTER RD 014 15 SR14/CAPE HORN BR. VIC TO CAPE 04/23/07 50 138 0 188 12 1,390 0 0 1,590 HORN RD. 101 19 US 101/FORT COLUMBIA VIC. - 04/05/04 35 0 802 837 0 0 0 0 837 REALIGNMENT 101 19 US 101/SANDRIDGE RD.-SAFETY 01/17/06 60 21 0 81 680 0 0 0 761 IMPROVEMENTS 101 19 US 101/SR 103-INTERSECTION 01/17/06 45 21 0 66 545 0 0 0 611 IMPROVEMENTS 101 19 US 101/SR 401 INTERSECTION SIGNAL 04/05/04 100 0 490 590 0 0 0 0 590 205 17,49 I-205/SR 500 TO I-5 -SAFETY 04/11/05 110 0 190 300 340 0 0 0 640 IMPROVEMENTS 205 49 I-205/MILL PLAIN SB OFF RAMP 07/11/05 75 0 0 75 431 0 0 0 506 IMPROVEMENT 205 17,49 I-205/PADDEN NORTH BOUND OFF 04/12/04 40 0 260 300 0 0 0 0 300 RAMP-SIGNAL 500 49 SR 500/ST JOHNS BLVD. - INTERCHANGE 870 323 0 1,193 682 0 0 0 1,875 500 49 SR 500/NE 42ND AVE. AND 54TH AVE. 101 601 0 702 0 0 0 0 702 500 49 SR 500/THURSTON WAY - 12/11/00 30 0 543 573 0 0 0 0 573 INTERCHANGE 500 17 SR 500/124TH AVE. - SAFETY 03/25/02 92 474 0 566 860 0 0 0 1,426 IMPROVEMENTS 500 49 SR 500/42ND AVE. TO 54TH AVE. - 125 0 0 125 0 0 0 0 125 STUDY 500 49 SR500/EAST BOUND OFF RAMP TO 04/05/04 25 0 73 98 0 0 0 0 98 ANDRESEN RD 500 17 SR 500/ WARD RD TO 162ND AVE - 04/11/05 0 0 990 990 0 0 0 0 990 STAGE 2 500 17 SR 500/NE 112TH AVE. - INTERCHANGE 10/27/03 300 0 23,000 23,300 0 0 0 0 23,300

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 15 Printed by the House Transportation Committee

    501 18 SR 501 RAMP SIGNALS 04/04/05 102 0 180 282 880 0 0 0 1,162 502 18 SR 502/10TH AVE. TO 72ND AVE. - 04/09/07 390 0 0 390 2,237 1,270 0 0 3,897 SAFETY 503 17 SR 503/4TH PLAIN/SR 500 INTERSECTION 04/23/07 80 74 0 154 23 740 0 0 917 503 18 SR 503/ GABRIEL RD. INTERSECTION 04/10/06 81 197 0 278 296 0 0 0 574 999 00 DIRECT PROJECT SUPPORT 170 0 0 170 0 0 0 0 170 SUB-PROGRAM I2 998 00 PROJECT DEFINITION AND SUMMARY 550 0 0 550 548 548 548 548 2,742 999 00 SW REGION DEVELOPER REVIEW 420 0 0 420 420 420 420 420 2,100 012 14 US 12/OLD NACHES HIGHWAY 03/03/08 43 0 0 43 2,643 18,049 13,900 0 34,635 INTERCHANGE 022 15 SR 22/I-82 TO MCDONALD ROAD 05/11/09 0 0 0 0 0 264 6,830 0 7,094 024 13 SR 24/KEYS ROAD INTERSECTION 12/03/01 0 0 0 0 410 0 0 0 410 024 15,13 SR 24/RIVERSIDE DR. - I/S 04/17/06 42 0 0 42 595 0 0 0 637 IMPROVEMENTS 090 13 SCR REGION WIDE BRIDGE RAIL 203 0 0 203 0 0 0 0 203 RETROFIT 090 13 I-90/HYAK TO EASTON 1,100 1,030 0 2,130 0 0 0 0 2,130 090 05,13 I-90 INTERSTATE RAMP SAFETY 04/04/05 20 0 7 27 165 0 0 0 192 124 16 SR 124/EAST JCT. SR 12 - 12/08/03 50 32 238 320 0 0 0 0 320 RECONSTRUCTION 182 16 I-182/US 395 I/C - ROADSIDE SAFETY 07/07/03 0 0 108 108 0 0 0 0 108 395 08,16 US 395/KENNEWICK VARIABLE 12/01/03 74 0 301 375 0 0 0 0 375 MESSAGE SIGN 395 16 US 395/HILLSBORO STREET 05/13/02 0 0 2,637 2,637 928 0 0 0 3,565 INTERCHANGE 999 00 DIRECT PROJECT SUPPORT - 160 0 0 160 0 0 0 0 160 SUBPROGRAM I2 998 00 PROJECT DEFINITION AND SUMMARY 850 0 0 850 350 350 350 350 2,250 998 00 ADVANCE PRELIM. ENGINEERING 30 0 0 30 0 0 0 0 30 SUBPRGM I2 999 00 SOUTH CENTRAL REGION DEVELOPER 07/16/01 500 0 0 500 580 580 580 580 2,820 REVIEWS 090 09,06 I-90/SALNAVE RD TO VIC GEIGER RD 03/17/03 0 0 397 397 0 0 0 0 397 SAFETY 090 06 I-90/GEIGER ROAD TO US 2 MEDIAN 10/11/04 100 0 540 640 140 0 0 0 780 BARRIER

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 16 Printed by the House Transportation Committee

    090 04 I-90/SULLIVAN-STATE LINE MEDIAN 10/11/04 130 0 830 960 82 0 0 0 1,042 BARRIER 090 06,03,04 I-90/US 195 TO PINES ITS 03/31/03 184 0 2,530 2,714 0 0 0 0 2,714 090 06 I-90/GEIGER TO US 195 - ITS 198 0 0 198 55 0 0 0 253 195 09,06 US 195/HATCH ROAD TO I-90 0 267 0 267 0 0 0 0 267 206 04 SR 206/SR206 AND BRUCE RD I/S 04/04/05 67 35 22 124 375 0 0 0 499 ROUNDABOUT 290 03 SR 290/HELENA STREET-ADD TURN 12/08/03 61 16 619 696 0 0 0 0 696 LANE 290 04 SR 290/FANCHER RD TO SULLIVAN 04/16/01 0 51 830 881 0 0 0 0 881 RD-WIDEN 291 06 SR 291/NINE MILE RD SAFETY 03/07/05 12 270 19 301 3,470 0 0 0 3,771 IMPROVEMENTS 395 07 US 395/COLUMBIA R BR 395/545 THRIE 11/15/04 34 0 112 146 82 0 0 0 228 BEAM 904 09 SR 904/HES SAFETY IMPROVEMENTS 07/07/03 5 0 223 228 0 0 0 0 228 999 00 EASTERN REGION DIRECT PROJECT 150 0 0 150 0 0 0 0 150 SUPPORT 998 00 PROJECT DEFINITION AND SUMMARY 360 0 0 360 365 365 365 365 1,820 998 00 EASTERN REGION DEVELOPER 540 0 0 540 540 540 540 540 2,700 REVIEWS 31,099 17,312 87,790 136,201 128,764 173,458 141,458 118,698 698,580

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 17 Printed by the House Transportation Committee

    I3 - Economic Initiatives 998 00 DIRECT PROJECT SUPPORT 07/02/01 1,570 0 0 1,570 0 0 0 0 1,570 SUBPROGRAM I-3 998 00 SCENIC BYWAYS PROGRAM 10/07/02 188 0 0 188 0 0 0 0 188 998 00 LOCAL PROGRAMS SCENIC BYWAYS 03/03/97 237 96 0 333 0 0 0 0 333 PROJECTS 998 00 SCENIC BYWAY ADMINISTRATION 500 0 0 500 500 500 500 500 2,500 998 00 REST AREA IMPROVEMENT PROGRAM 160 0 0 160 160 160 160 160 800 998 00 SAFETY REST AREAS WITH SANITARY 07/07/03 0 0 50 50 50 50 50 50 250 DISPOSAL 999 00 SUBPROGRAM I3 RESERVE 1 0 0 1 1 2,100 5,900 8,000 16,002 005 21 I-5/196TH ST SW / SR 524 I/C - WESTSIDE 12/31/01 0 0 2,394 2,394 0 0 0 0 2,394 005 40 I-5/2ND STREET BRIDGE - REPLACE 04/05/04 400 210 6,300 6,910 5,300 0 0 0 12,210 BRIDGE 009 42 SR 9/NOOKSACK RD VIC TO CHERRY ST 06/14/04 710 550 5,500 6,760 8,800 0 0 0 15,560 018 47 SR 18/SE 312TH WAY TO SE 304TH 10/09/95 0 0 110 110 0 2 0 0 112 STREET 018 47 SR 18/SE 304TH ST. TO COVINGTON 12/18/00 0 0 130 130 0 0 0 0 130 WAY 018 47,05 SR 18/COVINGTON WAY TO MAPLE 01/03/00 0 0 211 211 0 0 0 0 211 VALLEY 018 05 SR 18/MAPLE VALLEY TO 04/21/03 0 1,100 49,000 50,100 16,400 1,300 0 0 67,800 ISSAQUAH/HOBART RD 018 05 SR 18/ISSAQUAH/HOBART ROAD 12/11/00 0 0 110 110 0 0 0 0 110 VICINITY 020 10 SR 20/TROXELL ROAD TO CORNET BAY 02/07/05 0 73 5 78 151 0 0 0 229 RD 020 10,40 SR 20/LUNZ ROAD TO CORNET BAY 02/06/06 1 0 0 1 560 590 0 0 1,151 ROAD 519 37 SR 519 INTERMODAL ACCESS PROJECT 06/12/00 5,360 1,500 9,320 16,180 35,690 0 0 0 51,870 530 39 SR 530/LAKE CAVANAUGH RD. TO 170 0 0 170 0 0 0 0 170 MONTAGUE CR 530 39 SR 530/MONTAGUE CREEK BR TO HAZEL 06/05/95 0 0 65 65 0 0 0 0 65 VIC. 530 39 SR 530/BOULDER CREEK TO FORTSON 44 0 0 44 0 0 0 0 44

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 18 Printed by the House Transportation Committee

    MILL RD 543 42 SR 543/I-5 TO INTERNATIONAL BNDY. 05/13/02 190 2,854 92 3,136 13,000 5,200 0 0 21,336 998 00 NORTHWEST REGION DPS - 700 0 0 700 0 0 0 0 700 SUBPROGRAM I3 998 00 PROJECT DEFINITION SUMMARY 65 0 0 65 370 370 370 0 1,175 020 12 SR 20/WINTHROP AREA - BIKE PATH 07/18/05 0 0 0 0 513 0 0 0 513 090 13 I-90/MOSES LAKE AREA - BRIDGE 12/12/05 53 340 0 393 3,200 0 0 0 3,593 CLEARANCE 243 13 SR 243/WANAPUM NORTH - REBUILD 66 150 0 216 0 0 0 0 216 ROADWAY 090 13 I-90/CLE ELUM RIVER BR. 90/134N-S 03/15/04 59 0 653 712 0 0 0 0 712 241 15 SR 241/NORTH SUNNYSIDE - 25 0 0 25 0 0 0 0 25 RECONSTRUCTION 397 16,08 I-82 TO SR 397 INTERTIE 07/07/03 0 0 4,970 4,970 0 0 0 0 4,970 10,499 6,873 78,910 96,282 84,695 10,272 6,980 8,710 206,939

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 19 Printed by the House Transportation Committee

    I4 - Environmental Retrofit 998 00 DIRECT PROJECT SUPPORT 07/02/01 210 0 0 210 0 0 0 0 210 SUBPROGRAM I-4 998 00 ENVIRONMENTAL RETROFIT PROJECT 10/01/01 0 0 1,100 1,100 8,800 17,000 19,000 20,000 65,900 RESERVE 998 00 WDFW SURVEY OF DOT FISH PASSAGE 07/02/01 1,400 0 10 1,410 0 0 0 0 1,410 BARRIERS 401 19 CEMENT CREEK - FISH BARRIER 09/16/02 0 0 1 1 0 0 0 0 1 REMOVAL 099 30 HYLEBOS CREEK - FISH BARRIER 04/29/02 0 0 11 11 0 0 0 0 11 REMOVAL 142 15 SNYDER CANYON CREEK - FISH 06/10/02 0 0 15 15 0 0 0 0 15 BARRIER 112 00 SR 12/BEAR CREEK - FISH BARRIER 07/07/03 0 0 450 450 0 0 0 0 450 REMOVAL 005 00 I-5/SWAMP CREEK - FISH BARRIER 07/07/03 0 0 130 130 0 0 0 0 130 REMOVAL 092 00 SR 92/CATHERINE CREEK - FISH 07/07/03 0 0 310 310 0 0 0 0 310 BARRIER 532 00 SR 532/X TRIB TO PILCHUCK - FISH 07/07/03 0 0 100 100 0 0 0 0 100 BARRIER 101 00 SR 101/FLETCHER CREEK - FISH 07/07/03 0 0 30 30 0 0 0 0 30 BARRIER 101 00 SR 101/ENNIS CREEK - FISH BARRIER 07/07/03 0 0 50 50 0 0 0 0 50 101 00 SR 101/X TRIB TO BIG - FISH BARRIER 07/07/03 0 0 20 20 0 0 0 0 20 305 00 SR 305/X TRIB TO LIBERTY - FISH 01/05/04 0 0 110 110 10 0 0 0 120 BARRIER 101 00 SR 101/BUTTE CREEK - FISH BARRIER 01/05/04 0 0 90 90 10 0 0 0 100 007 00 SR 7/X TRIB TO TILTON R - FISH 01/05/04 0 0 140 140 10 0 0 0 150 BARRIER 090 00 I-90/SWAMP CREEK - FISH BARRIER 01/05/04 0 0 110 110 10 0 0 0 120 REMOVAL 122 00 SR 122/X TRIB MAYFIELD LK - FISH 01/03/05 0 0 30 30 270 0 0 0 300 BARRIER 101 00 SR 101/X TRIB TO PACIFIC - FISH 01/03/05 0 0 10 10 90 0 0 0 100

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 20 Printed by the House Transportation Committee

    BARRIER 504 00 SR 504/X TRIB TO N TOUTLE - FISH 01/03/05 0 0 20 20 180 0 0 0 200 BARRIER 003 00 SR 3/SPRING CREEK - FISH BARRIER 01/03/05 0 0 40 40 340 0 0 0 380 REMOVAL 012 00 SR 12/HIGHLAND CREEK - FISH 01/03/05 0 0 0 0 100 10 0 0 110 BARRIER 005 00 INDIAN CREEK - FISH BARRIER 07/05/05 0 0 0 0 1,000 100 0 0 1,100 REMOVAL 012 00 SR 12/MILLER CREEK - FISH BARRIER 07/05/05 0 0 0 0 55 0 0 0 55 101 00 SR 101 MP 155.35 UNMAMED 01/03/06 0 0 0 0 20 110 0 0 130 TRIBUTARY 999 00 CHRONIC ENVIRONMENTAL RETROFIT 03/01/05 700 0 250 950 3,600 4,350 3,950 1,150 14,000 999 00 FISH BARRIER REMOVAL - 07/01/05 150 0 0 150 350 3,341 1,101 0 4,942 PLACEHOLDER 999 00 STORM WATER RETROFIT TIED TO 07/01/04 1,665 0 3,315 4,980 10,160 10,368 13,661 10,833 50,001 PCCP REHAB PROJECTS 002 44 US 2/SNOHOMISH RIVER TO JUNCTION 09/28/98 0 0 0 0 30 0 0 0 30 SR 204 005 40,42 I-5/NORTH OF LAKEWAY 03/01/04 0 0 1,200 1,200 300 0 0 0 1,500 INTERCHANGE 009 39 SR 9/GRIBBLE CREEK VICINITY 04/11/05 79 12 6 97 190 0 0 0 287 090 41,05 I-90/TIBBETTS CREEK VICINITY 01/03/05 69 0 170 239 4,000 0 0 0 4,239 092 44 SR92/STEVENS CREEK CULVERT 04/11/05 120 0 2 122 280 0 0 0 402 REPLACEMENT 169 11 SR 169/FIFTH AVE. SE - NOISE WALLS 24 0 0 24 0 0 0 0 24 405 41 I-405/COAL CREEK- FISH PASSAGE 03/25/02 0 0 9 9 0 0 0 0 9 532 10 SR 532/PILCHUCK CREEK TRIBUTARY 12/19/05 40 0 0 40 113 0 0 0 153 542 40 SR 542/TOAD CREEK - FISH BARRIER 01/05/04 18 33 160 211 0 0 0 0 211 REMOVAL 542 42 SR 542/HIGH CREEK - FISH BARRIER 01/05/04 30 22 110 162 0 0 0 0 162 REMOVAL 542 42 SR 542/BAPTIST CAMP CREEK 01/05/04 30 33 94 157 0 0 0 0 157 542 42 SR 542/HEDRICK CREEK 01/05/04 35 33 130 198 0 0 0 0 198 998 00 NORTHWEST REGION DPS - 34 0 0 34 0 0 0 0 34 SUBPROGRAM I4 998 07,09,12,13 REGIONWIDE ENVIRONMENTAL 06/06/05 0 0 75 75 0 0 0 0 75

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 21 Printed by the House Transportation Committee

    MAINTENANCE 002 12 US 2/MILL CREEK FISH PASSAGE 10/03/05 115 0 0 115 950 0 0 0 1,065 020 12 SR 20/MAZAMA AREA - FISH BARRIER 12/12/05 0 0 0 0 470 0 0 0 470 020 12 SR 20/TWISP EAST - FISH BARRIER 02/09/04 0 0 730 730 0 0 0 0 730 005 28 I-5/MURRAY CREEK - STORMWATER 07/07/03 11 0 240 251 0 0 0 0 251 RETROFIT 005 02,22 I-5/MCALLISTER CREEK - 0 0 0 0 33 0 0 0 33 STORMWATER 005 22 I-5/WOODLAND CREEK - STORMWATER 89 0 0 89 0 0 0 0 89 OUTFALL 101 24 US 101/CHICKEN COOP CREEK - FISH 03/21/05 110 47 87 244 481 0 0 0 725 PASSAGE 104 24 SR 104/1.2 MILE WEST OF HOOD CANAL 51 0 0 51 91 0 0 0 142 BR 106 35 SR 106/SKOBOB CREEK - FISH PASSAGE 03/07/05 150 0 180 330 950 0 0 0 1,280 106 35 SR 106/X TRIB SKOKOMISH 11/08/04 50 60 130 240 66 0 0 0 306 112 24 SR 112/JIM CREEK - FISH PASSAGE 03/10/03 0 0 497 497 0 0 0 0 497 112 24 SR 112/1.76 MILE E OF SR 113 JUNCTION 02/02/04 95 29 220 344 0 0 0 0 344 305 23 SR 305/BJORGEN CREEK - FISH 05/09/05 250 26 22 298 1,110 0 0 0 1,408 PASSAGE 998 00 OLYMPIC REGION DIRECT PROJECT 18 0 0 18 0 0 0 0 18 SUPPORT I4 012 20 US 12/SILVER CREEK-FISH BARRIER 03/10/03 0 0 416 416 0 0 0 0 416 REMOVAL 142 15 SR 142/BOWMAN CREEK FISH 01/09/06 80 0 0 80 563 0 0 0 643 PASSAGE REMOVAL 090 03 I-90/DIVISION STREET EB ON-RAMP 06/23/03 0 133 3,850 3,983 0 0 0 0 3,983 REVISION 395 07 US 395/DEADMAN CRK FISH BARRIER 12/08/03 30 12 990 1,032 0 0 0 0 1,032 RETROFIT 999 00 EASTERN REGION DIRECT PROJECT 120 0 0 120 0 0 0 0 120 SUPPORT 5,773 440 15,660 21,873 34,632 35,279 37,712 31,983 161,478

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 22 Printed by the House Transportation Committee

    I7 - Tacoma Narrows Project 016 28,26 SR 16/NEW TACOMA NARROWS BRIDGE 04/08/02 0 0 330,000 330,000 140,000 64,000 0 0 534,000 0 0 330,000 330,000 140,000 64,000 0 0 534,000

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 23 Printed by the House Transportation Committee

    P1 - Roadway Preservation 998 00 DIRECT PROJECT SUPPORT 07/02/01 6,075 0 0 6,075 0 0 0 0 6,075 SUBPROGRAM P-1 998 00 ROADWAY PRESERVATION PROJECT 10/06/03 330 0 1,020 1,350 75,000 253,100 294,000 324,000 947,450 RESERVE 998 00 STATEWIDE PAVEMENT MANAGEMENT 1,500 0 0 1,500 1,500 1,500 1,500 1,500 7,500 998 00 PITS AND QUARRIES 10/01/01 0 0 150 150 0 0 0 0 150 998 00 UNSAFE WORK ZONE TRAFFIC COUNTS 200 0 0 200 200 200 200 200 1,000 999 00 PRIMARY CONTROL MONUMENTS - 540 0 0 540 540 540 540 540 2,700 PAVING 998 00 PAVEMENT PERFORMANCE 630 0 0 630 630 630 630 630 3,150 EVALUATION 999 00 CONCRETE PAVEMENT 07/01/04 5,000 0 10,000 15,000 30,500 31,100 40,700 32,700 150,000 REHABILITATION 002 38,44 US 2/I-5 TO SR 204 - PAVING 05/21/01 0 0 1 1 0 0 0 0 1 002 39 US 2/BR 522/150 VIC TO WOODS CRK BR 02/07/05 114 0 173 287 578 0 0 0 865 2/22 002 39 US 2/S. FK SKYKOMISH RV. BR. TO 10/28/02 0 0 675 675 0 0 0 0 675 BNRR BR. 005 11 I-5/RAMPS AT 12/01/03 16 0 982 998 353 0 0 0 1,351 MICHIGAN/CORSON/ALBRO/SWIFT 005 43 I-5/JAMES ST. VIC. TO UNION ST. VIC. 10/06/03 58 0 2,500 2,558 0 0 0 0 2,558 005 43,46 I-5/UNION ST. TO NE 103RD VIC. 05/05/03 0 0 1,769 1,769 0 0 0 0 1,769 005 46,32 I-5/NORTHGATE WAY TO NE 175TH 05/05/03 0 0 596 596 0 0 0 0 596 STREET 005 21,01,44,38 I-5/52ND AVE W TO SR 526 -SB PAVING 02/06/06 188 0 0 188 3,711 13 0 0 3,912 005 21,01,44,38 I-5/52ND AVE W TO SR 526-NB PAVING 01/02/07 50 0 0 50 596 3,310 0 0 3,956 005 44,38 I-5/SR 526 TO LOWELL ROAD - NB&SB 10/03/05 243 0 0 243 3,560 0 0 0 3,803 PAVING 005 10 I-5/VIC 300TH ST NW AND STARBIRD RD 02/18/03 0 0 2,321 2,321 0 0 0 0 2,321 005 10 I-5/SR 532 TO HILL DITCH BRIDGE - 12/05/05 199 0 0 199 5,740 187 0 0 6,126 PCCP 005 40,42 I-5/36TH STREET VIC. TO SR 542 VIC. 11/18/02 37 0 3,114 3,151 673 0 0 0 3,824 005 42 I-5/BAKERVIEW RD TO NOOKSACK R BR 01/03/06 155 0 0 155 1,751 740 0 0 2,646 5/828W

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 24 Printed by the House Transportation Committee

    005 42 I-5/FERNDALE TO BLAINE - REPLACE 05/05/03 0 0 165 165 0 0 0 0 165 FENCE 005 42 I-5/DAKOTA CREEK BR. VIC. TO SR 543 03/11/02 0 0 75 75 0 0 0 0 75 009 44 SR 9/SR 96 VIC. TO SR 2 VIC. - PAVING 03/10/03 0 0 1,422 1,422 0 0 0 0 1,422 009 44 SR 9/NEW BUNK FOSS RD VIC TO SR 204 03/10/03 0 0 944 944 0 0 0 0 944 009 44 SR 9/SR 204 VIC TO 60TH ST NE - 02/07/05 208 0 255 463 1,390 0 0 0 1,853 PAVING 009 39,10 SR 9/STILLAGUAMISH R BR TO LAKE 04/15/02 0 0 14 14 5 2 0 0 21 CREEK BR 009 42 SR 9/CHERRY ST TO INT`L 01/03/05 36 0 70 106 139 0 0 0 245 BOUNDARY-PAVING 011 40 SR 11/COOK RD TO COLONY RD VIC - 11/08/04 16 0 428 444 1,100 0 0 0 1,544 PAVING 011 40 SR 11/WHATCOM C.L. TO BELLINGHAM 10/06/03 19 0 1,005 1,024 0 0 0 0 1,024 C.L. 011 40 SR 11/IRIS LANE VICINITY TO I-5 - 10/11/04 31 0 127 158 590 0 0 0 748 PAVING 018 47,31 SR 18/`C` ST. SW I/C TO SE 304TH ST. BR. 04/14/03 0 0 4,040 4,040 138 0 0 0 4,178 020 10 SR 20/HOFFMAN RD TO FROSTAD RD - 10/06/03 0 0 301 301 128 0 0 0 429 PAVING 020 40,10 SR 20/SWINOMISH SLOUGH BR TO SR 10/11/04 46 0 346 392 2,080 0 0 0 2,472 536 020 10,40 SR 20/SR 20 SPUR TO SWINOMISH 10/11/04 37 0 277 314 1,730 0 0 0 2,044 SLOUGH BR. 020 40 SR 20/I-5 TO N. SKAGIT ST. - PAVING 02/10/03 0 0 650 650 0 0 0 0 650 090 41,48,05 I-90/EASTGATE I/C TO 436TH AVE SE I/C 03/25/02 199 0 4,740 4,939 1,880 0 0 0 6,819 096 44 SR 96/132ND ST SE TO 125TH ST SE 01/13/03 0 0 261 261 0 0 0 0 261 -PAVING 099 30 SR 99/PIERCE CO. LINE TO S. 325TH 05/07/01 0 0 1,160 1,160 0 0 0 0 1,160 STREET 099 30 SR 99/S. 325TH ST. TO S. 310TH ST. 04/01/02 0 0 1,000 1,000 0 0 0 0 1,000 099 30,33 SR 99/S. 310TH ST. TO S. 252ND ST. 05/07/01 0 0 770 770 0 0 0 0 770 099 33 SR 99/S. 252ND STREET TO SR 516 - 04/05/04 65 0 874 939 0 0 0 0 939 PAVING 099 33 SR 99/SR 516 TO S. 216TH STREET - 01/27/03 0 0 764 764 0 0 0 0 764 PAVING 099 33 SR 99/S 216TH ST. TO S 208TH ST.- 10/06/03 0 0 342 342 0 0 0 0 342

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 25 Printed by the House Transportation Committee

    PAVING 099 33,11 SR 99/S 170TH ST. TO W MARGINAL 04/05/99 0 0 280 280 0 0 0 0 280 WAY SW 099 11 SR 99/SPOKANE ST BR TO ALASKAN 02/13/06 38 0 0 38 1,379 0 0 0 1,417 WAY VIAD. 104 32,01 SR 104/244TH ST SW TO 22ND AVE - 02/07/05 58 0 138 196 1,620 0 0 0 1,816 PAVING 164 31 SR 164/SE 436TH ST TO HIGH POINT ST 01/03/05 67 0 150 217 760 0 0 0 977 169 31 SR 169/NEWAUKUM CREEK BR TO 03/03/03 0 0 528 528 0 0 0 0 528 264TH AVE SE 169 31,47 SR 169/264TH AVE SE TO GREEN RIVER 03/03/03 0 0 741 741 0 0 0 0 741 BR. 169 47,31,05 SR 169/GREEN RIVER BR. VIC. TO SR 516 12/06/04 49 0 289 338 2,430 0 0 0 2,768 181 33,11 SR 181/SR 516 TO I-405 - PAVING 03/11/02 112 0 0 112 0 0 0 0 112 202 45 SR 202/SR 522 TO SAMMAMISH RIVER 01/03/05 110 0 121 231 703 0 0 0 934 BRIDGE 202 45,48 SR 202/154TH PL NE VIC TO GILMAN 12/09/02 0 0 921 921 0 0 0 0 921 STREET 202 45,05 SR 203/EVANS CREEK SLOUGH TO SR 05/29/01 0 0 307 307 2 4 0 2 315 203 202 05 SR 202/TOKUL CR VIC TO SNOQUALMIE 12/06/04 81 0 100 181 289 0 0 0 470 R BR 203 45 SR 203/NE BIG ROCK ROAD TO SLOUGH 01/03/05 86 0 107 193 497 0 0 0 690 BR VIC 204 44 SR 204/US 2 TO SR 9 - PAVING 12/06/04 75 0 231 306 804 0 0 0 1,110 410 31 SR 410/SR 164 TO 288TH AVE SE - 02/24/03 0 0 380 380 0 0 0 0 380 PAVING 410 31 SR 410/WEYERHAUSER RD TO SCATTER 02/24/03 0 0 487 487 0 0 0 0 487 CRK BR 410 31 SR 410/SLIPPERY CREEK BR TO 02/24/03 0 0 340 340 0 0 0 0 340 GREENWATER 410 31,02 SR 410/CRYSTAL MNT. BLVD TO 05/05/03 173 0 612 785 1,510 0 0 0 2,295 CHINOOK PASS 509 27 SR 509/SLAYDEN ROAD TO KING CO 01/03/05 126 0 100 226 659 0 0 0 885 LINE 509 33 SR 509/SW NORMANDY RD TO S 01/03/06 43 0 0 43 684 0 0 0 727 NORMANDY WYE

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 26 Printed by the House Transportation Committee

    509 33 SR 509/S. NORMANDY RD. TO S. 160TH 03/24/03 0 0 1,280 1,280 0 0 0 0 1,280 ST. 515 11,47 SR 515/SE 192ND ST TO BENSON RD - 02/06/06 40 0 0 40 872 0 0 0 912 PAVING 515 11 SR 515/S. 15TH STREET TO SR 900 - 04/07/03 0 0 406 406 0 0 0 0 406 PAVING 516 33 SR 516/I-5 TO N. CENTRAL AVE. - 12/06/04 110 0 184 294 2,445 0 0 0 2,739 PAVING 520 43 SR 520/SR 513 INTERCHANGE RAMP - 02/24/03 0 0 648 648 0 0 0 0 648 PAVING 520 43 SR 520/MONTLAKE INTERCHANGE 02/24/03 0 0 267 267 0 0 0 0 267 FLYER STOP 522 43,46,32 SR 522/I-5 TO NE 147TH STREET - 04/09/01 0 0 260 260 0 0 0 0 260 PAVING 522 32 SR 522/NE 147TH ST. TO SWAMP CREEK 02/07/05 64 0 174 238 2,200 0 0 0 2,438 BR. 522 01 SR 522/CITY STREET TO HALL ROAD - 02/07/05 23 0 30 53 382 0 0 0 435 PAVING 524 21 SR 524 SPUR (44TH W)/196TH SW TO I-5 08/04/03 32 0 370 402 0 0 0 0 402 UXG 524 21,01 SR 524/I-5 TO FLORAL HILLS CEMETERY 02/07/05 7 0 52 59 754 0 0 0 813 VIC. 524 01 SR 524/FLORAL HILLS CEM TO NORTH 01/10/05 110 0 139 249 532 0 0 0 781 CRK BR 525 10 SR 525/CAMERON ROAD TO SR 20 - 01/13/92 0 0 200 200 0 0 0 0 200 PAVING 526 38 SR 526/BROADWAY AVE WYE CONN. - 02/10/03 0 0 231 231 0 0 0 0 231 PAVING 527 01 SR 527/SR 522 TO I-405 VIC. - PAVING 04/14/03 0 0 946 946 0 0 0 0 946 528 38 SR 528/COLUMBIA AVE TO 55TH DRIVE 10/06/03 9 0 560 569 0 0 0 0 569 NE 529 38 SR 529/I-5 TO RAILROAD BRIDGE - 04/07/03 0 0 491 491 0 0 0 0 491 PAVING 529 38 SR 529/SNOHOMISH RIVER BRIDGE TO 10/06/03 33 0 1,005 1,038 0 0 0 0 1,038 SR 528 530 39 SR 530/SKAGLUND HILL VIC TO HAZEL 10/11/04 128 0 84 212 729 0 0 0 941 VIC

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 27 Printed by the House Transportation Committee

    539 42 SR 539/KELLOGG RD TO HORTON RD - 01/03/05 80 0 116 196 451 0 0 0 647 PAVING 539 42 SR 539/BAY-LYN DR VIC TO BADGER 08/05/02 0 0 79 79 0 0 0 0 79 ROAD 539 42 SR 539/SR 546/BADGER RD TO INT`L 12/06/04 88 0 116 204 404 0 0 0 608 BNDRY 542 40,42 SR 542/BRITTON RD TO CEDARVILLE RD 10/03/05 151 0 0 151 1,767 0 0 0 1,918 542 42 SR 542/MARSHALL HILL RD TO COAL 12/13/04 131 0 121 252 1,106 0 0 0 1,358 CREEK BR 542 42 SR 542/NOOKSACK R BR TO COAL 02/07/05 127 0 56 183 1,060 0 0 0 1,243 CREEK BR 542 42 SR 542/WELLS CREEK RD. TO MT. 04/07/03 0 0 3,726 3,726 0 0 0 0 3,726 BAKER VIC. 544 42 SR 544/SR 539 TO SR 9 - PAVING 12/06/04 121 0 97 218 2,313 0 0 0 2,531 546 42 SR 546/SR 539 TO SR 9 01/03/05 162 0 451 613 1,510 0 0 0 2,123 547 42 SR 547/FROST RD TO SAAR CRK BR - 01/03/06 30 0 0 30 521 0 0 0 551 PAVING 548 42 SR 548/BLAINE RD TO FLEET RD - 02/06/06 111 0 0 111 926 0 0 0 1,037 PAVING 900 11 SR 900/I-405 VIC. TO HARRINGTON AVE. 04/04/05 82 0 12 94 601 0 0 0 695 NE 998 00 NORTHWEST REGION DPS - 1,100 0 0 1,100 0 0 0 0 1,100 SUBPROGRAM P1 998 00 PAVEMENT PROJECT SCOPING 1,500 0 0 1,500 1,500 1,500 1,500 0 6,000 998 00 REGION PIT AND QUARRY SITES 101 0 0 101 0 0 0 0 101 998 07,12 REGIONWIDE GUARDRAIL UPDATE 11/04/02 0 0 150 150 0 0 0 0 150 YEAR 2003 998 07,09,12,13 NC REGION ELECTRICAL UPDATE 08/05/02 0 0 200 200 0 0 0 0 200 2001-2003 998 07,09,12,13 NC REGION SIGN UPDATE 09/30/02 0 0 100 100 0 0 0 0 100 998 12,13,07,09 NC REGION SIGN UPDATE 2003 - 2005 10/04/04 40 0 128 168 138 0 0 0 306 998 07,09,12,13 NC REGION GUARDRAIL UPDATE - YEAR 12/08/03 50 0 521 571 0 0 0 0 571 2004 998 07,09,12,13 NC REGION GUARDRAIL UPDATE - YEAR 11/01/04 50 0 300 350 232 0 0 0 582 2005 998 07,09,12,13 NC REGION GUARDRAIL UPDATE - YEAR 11/07/05 40 0 0 40 584 0 0 0 624 2006

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 28 Printed by the House Transportation Committee

    002 12 US 2/STEVENS PASS EAST - PAVING 10/28/02 25 0 2,431 2,456 0 0 0 0 2,456 002 12 US 2/COLES CORNER VICINITY - 12/08/03 77 0 1,620 1,697 0 0 0 0 1,697 PAVING 002 12 US 2/LEAVENWORTH VICINITY - 10/28/02 0 0 151 151 0 0 0 0 151 PAVING 002 12 US 2/97 EASY ST. TO JCT. SR 28 - PAVING 11/20/06 0 0 0 0 1,020 0 0 0 1,020 002 12 US 2/97 JCT SR 28 TO ROCKY REACH - 10/02/06 0 0 0 0 1,386 0 0 0 1,386 PAVE 002 12 US 2/COULEE CITY AREA EAST - 2006 11/07/05 12 0 0 12 528 0 0 0 540 SEAL 002 12 US 2/ORONDO TO MOSES COULEE - 11/01/04 33 0 324 357 555 0 0 0 912 2005 SEAL 017 13,12 SR 17/MOSES LAKE NORTH - 2004 CHIP 12/08/03 43 0 1,070 1,113 0 0 0 0 1,113 SEAL 017 12 SR 17/JCT. SR 174 TO 8 MI NW - 2006 11/07/05 5 0 0 5 235 0 0 0 240 SEAL 020 07 SR 20/TONASKET TO 4.5 MILES E-2006 11/07/05 4 0 0 4 119 0 0 0 123 SEAL 020 07 SR 20/WAUCONDA SUMMIT EAST - 2006 11/07/05 5 0 0 5 236 0 0 0 241 SEAL 024 13 SR 24/COLUMBIA RIV TO 19 MI. E-2004 12/08/03 18 0 462 480 0 0 0 0 480 SEAL 026 13 SR 26/VANTAGE AREA TO ROYAL 12/09/02 0 0 3,580 3,580 0 0 0 0 3,580 CITY-PAVING 026 09 SR 26/OTHELLO WEST - 2004 CHIP SEAL 12/08/03 23 0 602 625 0 0 0 0 625 028 12 SR 28/E. WENATCHEE TO ROCK ISLAND 10/02/06 0 0 0 0 2,000 0 0 0 2,000 - PAVE 028 12 SR 28/ROCK ISLAND TO CRESCENT BAR 10/03/05 97 0 0 97 1,522 0 0 0 1,619 - PAVE 028 13,12 SR 28/SOAP LAKE EAST - 2004 CHIP 12/08/03 25 0 658 683 0 0 0 0 683 SEAL 090 13 I-90/GEORGE VICINITY EAST - PAVING 10/04/04 199 0 982 1,181 4,410 0 0 0 5,591 090 13 I-90/MOSES LAKE WEST - PAVING 12/15/03 143 0 3,860 4,003 0 0 0 0 4,003 090 13 I-90/MOSES LAKE EAST - 2004 CHIP 12/08/03 4 0 84 88 0 0 0 0 88 SEAL 097 13,12 US 97/BLEWETT PASS SOUTH - PAVING 12/08/03 116 0 2,540 2,656 0 0 0 0 2,656 097 07 US 97/TONASKET SOUTH - PAVING 10/03/05 197 0 0 197 4,885 0 0 0 5,082

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 29 Printed by the House Transportation Committee

    097 12 US 97/BREWSTER NORTH - PAVING 10/04/04 80 0 740 820 126 0 0 0 946 097 12 US 97A/JCT US 2/97 NORTH - PAVING 11/20/06 0 0 0 0 830 0 0 0 830 097 12 US 97A/WENATCHEE NORTH - PAVING 12/08/03 44 0 2,640 2,684 0 0 48 0 2,732 097 12 US 97A/ENTIAT TO NORTH CHELAN - 02/19/02 9 102 914 1,025 1,726 0 0 0 2,751 PAVING 097 12 US 97/CHELAN FALLS SOUTH - PAVING 02/10/03 0 0 1,160 1,160 0 0 0 0 1,160 097 07 US 97/TONASKET TO 11.75 MI. N-2006 11/07/05 7 0 0 7 329 0 0 0 336 SEAL 155 12 SR 155/25 MI S TO GRAND COULEE-2006 11/07/05 15 0 0 15 715 0 0 0 730 SEAL 155 07,12 SR 155/OMAK EAST - 2005 SEAL 11/01/04 15 0 128 143 231 0 0 0 374 170 13 SR 170/WARDEN WEST - 2004 CHIP SEAL 12/08/03 5 0 109 114 0 0 0 0 114 172 12 SR 172/WITHROW VIC. - 2005 SEAL 11/01/04 16 0 151 167 266 0 0 0 433 174 12 SR 174/SR 17 TO GRAND COULEE - 2006 11/07/05 13 0 0 13 611 0 0 0 624 SEAL 243 13 SR 243/MATTAWA VIC - 2004 CHIP SEAL 12/08/03 27 0 694 721 0 0 0 0 721 262 13 SR 262/POTHOLES RESERVOIR 11/01/04 24 0 232 256 404 0 0 0 660 AREA-2005 SEAL 283 13 SR 283/GEORGE VIC. NORTH - 2005 SEAL 11/01/04 17 0 163 180 289 0 0 0 469 285 12 SR 285/CITY OF WENATCHEE - PAVING 10/02/06 108 0 0 108 2,276 0 0 0 2,384 285 12 SR 285 CO/CITY OF WENATCHEE - 10/02/06 9 0 0 9 847 0 0 0 856 PAVING 998 00 DIRECT PROJECT SUPPORT - P1 1,000 0 0 1,000 0 0 0 0 1,000 998 00 PAVEMENT PROJECT SCOPING 741 0 0 741 1,005 1,005 1,005 1,005 4,761 998 00 NORTH CENTRAL PAVEMENT 305 0 0 305 305 305 305 305 1,525 INVESTIGATION 998 00 PITS & QUARRIES 02/20/01 396 0 0 396 396 396 396 396 1,980 998 01,19,24 OLYMPIC REGION BST 08/05/02 0 0 799 799 0 0 0 0 799 003 35 SR 3/IMPERIAL WAY TO SUNNYSLOPE - 01/03/05 41 0 21 62 682 0 0 0 744 PAVING 003 23 SR 3/THOMPSON RD TO SR 104 - PAVING 02/02/04 57 0 2,190 2,247 0 0 0 0 2,247 005 02,22,28 I-5/NISQUALLY RIVER BR TO FORT 02/09/04 132 0 2,540 2,672 0 0 0 0 2,672 LEWIS RD 005 20 I-5/COUNTY LINE TO PRAIRIE CREEK 01/05/04 143 0 860 1,003 0 0 0 0 1,003 BRIDGE 007 02 SR 7/ELBE R/R CROSSING TO ALDER 07/05/05 174 0 0 174 3,356 0 0 0 3,530 007 29,27 SR 7/SR 512 TO I-5 - PAVING 04/11/05 150 0 81 231 2,550 0 0 0 2,781

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 30 Printed by the House Transportation Committee

    012 19,24,35 US 12/BRADY TO MALONE - PAVING 04/28/03 0 0 3,930 3,930 0 0 0 0 3,930 016 27,28 SR 16/CENTER ST OFF RAMP TO 03/01/04 197 0 1,380 1,577 0 0 0 0 1,577 JACKSON AVE 101 24 US 101/MORSE CREEK TO WATKINS RD 11/18/02 0 0 647 647 0 0 0 0 647 -PAVING 101 35 US 101/SR 106 TO SR 108 - PAVING 02/07/05 93 0 46 139 2,907 0 0 0 3,046 101 24 US 101/DOYLE ST TO FRONT ST - 12/09/02 0 0 231 231 0 0 0 0 231 PAVING 101 24 SR 101/MT WALKER TO BRINNON LANE 02/23/04 82 0 1,500 1,582 0 0 0 0 1,582 -PAVE 101 24 US 101/OLYMPIC NAT`L PARK TO 11/17/03 37 0 1,030 1,067 0 0 0 0 1,067 INDIAN CR 101 24 SR 101/KITCHEN-DICK RD TO 03/01/04 83 0 1,610 1,693 0 0 0 0 1,693 DUNGENESS RIV 101 24 US 101/SR 104 TO QUILCENE RIVER - 02/09/04 107 0 2,430 2,537 0 0 0 0 2,537 PAVE 101 19 US 101/PACIFIC CO LINE TO VIC LUND 03/07/05 127 0 30 157 2,190 0 0 0 2,347 ROAD 101 24 SR101/SITKUM-SOL DUC RD TO BEAR 02/09/04 127 0 3,350 3,477 0 0 0 0 3,477 CREEK RD 101 24 US 101/GOLF COURSE RD TO LINCOLN 02/21/06 16 0 0 16 680 0 0 0 696 ST 105 19 SR 105/PACIFIC CO LINE TO BONGE 03/01/04 90 0 1,319 1,409 0 0 0 0 1,409 AVENUE 107 19 SR 107/CHEHALIS RIVER TO SR 12 - 12/31/01 0 0 0 0 772 0 0 0 772 PAVING 107 19 SR 107/SR 101 TO CHEHALIS RIVER - 01/03/05 111 0 802 913 1,218 0 0 0 2,131 PAVING 109 24 SR 109/COPALIS BEACH TO 01/09/06 8 0 0 8 3,646 0 0 0 3,654 ROOSEVELT BEACH 112 24 SR 112/MAKAH RESERVATION TO 08/26/02 0 0 1,850 1,850 0 0 0 0 1,850 HOKO RIVER 121 20 SR 121/MAYTOWN I/C TO 93RD AVE. I/C 03/08/04 139 0 1,970 2,109 0 0 0 0 2,109 161 02 SR 161/VIC CLEAR LAKE SO TO 255TH 03/17/03 0 0 2,842 2,842 0 0 0 0 2,842 ST E 161 02,25 SR 161/176TH ST TO SR 512 - PAVING 04/07/03 52 0 3,452 3,504 0 0 0 0 3,504 161 02 SR 161/255TH ST EAST TO 176TH ST 04/05/04 219 0 2,880 3,099 0 0 0 0 3,099

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 31 Printed by the House Transportation Committee

    EAST 167 25,31 SR 167/N MERIDIAN TO KING COUNTY 04/07/03 0 0 3,240 3,240 0 0 0 0 3,240 LINE 302 35,26 SR 302/SR 3 TO ELGIN-CLIFTON RD - 02/07/05 74 0 38 112 3,167 0 0 0 3,279 PAVING 305 23 SR 305/SEABOLD RD TO NOLL ROAD - 07/05/05 20 0 0 20 1,136 0 0 0 1,156 PAVING 308 23 SR 308/SR3 TO NAVAL RESERVATION 04/12/04 79 0 1,390 1,469 0 0 0 0 1,469 BOUNDARY 410 31 SR 410/214TH TO MUNDY LOSS RD - 12/13/04 45 0 487 532 1,117 0 0 0 1,649 PAVING 507 02 SR 507/ROY TO SR 7 - PAVING 04/04/05 101 0 62 163 1,970 0 0 0 2,133 509 27 SR 509/28TH ST TO 11TH ST - PAVING 09/03/02 0 0 500 500 0 0 0 0 500 509 27 SR 509/11TH STREET TO BROWN`S 07/05/05 30 0 0 30 670 0 0 0 700 POINT 512 29 SR 512/I-5 TO SR 7 - PAVING 04/05/04 0 0 312 312 128 0 0 0 440 998 00 OLYMPIC REGION DIRECT PROJECT 740 0 0 740 0 0 0 0 740 SUPPORT P1 998 00 OLYMPIC REGION PAVMENT PROJECT 1,219 0 0 1,219 1,200 1,200 1,200 1,200 6,019 SCOPING 998 00 ADVANCE PRELIMINARY ENGINEERING 101 0 0 101 0 0 0 0 101 P1 998 00 PAVEMENT INVESTIGATION 01/06/03 127 0 0 127 0 0 0 0 127 999 00 PITS AND QUARRIES 60 0 0 60 60 60 60 60 300 999 49 SW REGIONWIDE BST 07/14/03 0 0 335 335 0 0 0 0 335 998 15,17,18,19,20, SW REGION PERMANENT SIGNING- 11/15/04 30 0 208 238 0 0 0 0 238 03/05 004 19 SR4/SKAMOKAWA TO I-5 PAVING 01/17/06 174 0 0 174 5,926 8,159 0 0 14,259 005 17,18 I-5/I-205 TO N. FORK LEWIS RIVER 04/11/05 100 0 13 113 1,880 0 0 0 1,993 BRIDGE 005 17,18 I 5/ 179TH ST TO 319TH ST - PAVING 04/14/03 0 0 64 64 0 0 0 0 64 006 20 SR 6/S FK CHEHALIS R BR TO CHEHALIS 04/28/03 0 0 132 132 0 0 0 0 132 R BR 006 19,20 SR6/US101 TO PE ELL- PAVING 04/11/05 231 0 2,200 2,431 4,160 0 0 0 6,591 012 20,14 US 12/LAKE CREEK TO WILDCAT 04/07/03 150 0 6,300 6,450 101 0 0 0 6,551 CREEK-PAVING 014 15 SR14/US97 TO BENTON COUNTY LINE 01/10/05 197 0 1,730 1,927 1,620 0 0 0 3,547

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 32 Printed by the House Transportation Committee

    014 49,17,18 SR 14/BLANDFORD DRIVE TO WEST 04/16/01 0 0 8 8 0 0 0 0 8 CAMAS 101 19 US101/SR6 TO GRAYS HARBOR COUNTY 04/16/07 0 0 0 0 177 2,070 0 0 2,247 LINE 101 19 US101/ ASTORIA BRIDGE TO SR4- 01/17/06 47 0 0 47 4,577 0 0 0 4,624 PAVING 103 19 SR 103/JCT US 101 TO STACKPOLE 04/07/03 0 0 964 964 156 2,335 0 0 3,455 RD-PAVING 105 19 SR105/US101 TO COUNTY LINE RD.- 04/11/05 127 0 486 613 1,850 0 0 0 2,463 PAVING 123 20 SR 123/JCT US 12 TO PIERCE COUNTY 04/05/04 37 0 376 413 23 0 0 0 436 LINE 131 20 SR 131/WOODS CREEK ROAD TO US 12 04/05/04 39 0 518 557 26 0 0 0 583 141 15 SR 141/LOOP RD TO CARR RD 02/24/03 0 0 980 980 0 0 0 0 980 INCLUDING SPUR 142 15 SR 142/LYLE TO GOLDENDALE-PAVING 02/24/03 0 0 487 487 0 0 0 0 487 197 15 SR 197/COLUMBIA RIVER TO SR 02/24/03 0 0 152 152 0 0 0 0 152 14-PAVING 205 17,49 I-205/SR 500 TO I-5-DOWEL BAR 04/11/05 119 0 2,100 2,219 3,800 0 0 0 6,019 RETROFIT 409 19 SR 409/FERRY DOCK TO SR 4 -PAVING 07/06/04 90 0 671 761 0 0 0 0 761 502 17,18 SR 502/I-5 TO BATTLE GROUND - 04/05/04 84 0 1,270 1,354 0 0 0 0 1,354 PAVING 503 18 SR 503/ROCK CREEK RD TO HAM 04/05/04 58 0 2,335 2,393 0 0 0 0 2,393 RD-PAVING 503 18 SR503/HAM ROAD TO I-5-PAVING 04/11/05 197 0 255 452 4,620 0 0 0 5,072 504 18 SR 504/CASTLE ROCK TO TOUTLE 03/10/03 0 0 3,147 3,147 0 0 0 0 3,147 RIVER BR 505 20,18 SR 505/WINLOCK TO SR 504-PAVING 03/10/03 0 0 2,639 2,639 0 0 0 0 2,639 507 20 SR 507/I-5 TO LEWIS COUNTY 07/09/01 0 0 660 660 0 0 0 0 660 LINE-PAVING 508 20 SR 508/I-5 TO SR 7-PAVING 01/16/01 0 0 396 396 0 0 0 0 396 999 00 DIRECT PROJECT SUPPORT 650 0 0 650 0 0 0 0 650 SUB-PROGRAM P1 999 00 PRESERVATION PROJECT SCOPING 1,421 0 0 1,421 1,421 1,421 1,421 1,421 7,105 998 00 ADVANCE PRELIMINARY FUNDING 101 0 0 101 100 100 0 0 301 998 00 SW REGION PAVEMENT MANAGEMENT 139 0 0 139 140 140 0 0 419

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 33 Printed by the House Transportation Committee

    998 00 SW REGION PITS AND QUARRIES 180 0 0 180 180 180 0 0 540 012 16 US 12/WALLULA JUNCTION VIC. - 01/21/03 0 0 821 821 0 0 0 0 821 PAVING 012 09 US 12/COLUMBIA C/L TO POMEROY - 12/30/02 0 0 9 9 0 0 0 0 9 PAVING 012 09 US 12/ALPOWA SUMMIT WEST - PAVING 10/14/02 0 0 9 9 0 0 0 0 9 012 16 US 12/TUCANNON RIVER TO SR 261 - 12/30/02 0 0 4 4 0 0 0 0 4 PAVING 012 16 US 12/SR 261 TO GARFIELD C/L - PAVING 12/30/02 0 0 7 7 0 0 0 0 7 012 09 US 12/ALPOWA SUMMIT EAST - PAVING 10/14/02 0 0 13 13 0 0 0 0 13 012 16 US 12/WAITSBURG VIC. - PAVING 04/28/03 0 0 982 982 0 0 0 0 982 012 09 US 12/POMEROY VICINITY-PAVING 02/13/06 52 0 0 52 1,769 0 0 0 1,821 012 14 US 12/WILDCAT CR. TO WINDY 02/17/04 42 0 439 481 0 0 0 0 481 POINT-PAVING 012 14,13 US 12/NACHES VICINITY-PAVING 03/06/06 43 0 0 43 1,427 0 0 0 1,470 012 09 US 12/STEMBER CREEK 02/13/06 31 0 0 31 486 0 0 0 517 VICINITY-PAVING 012 16 US 12/DIXIE VICINITY-PAVING 03/01/04 45 0 870 915 0 0 0 0 915 012 16 US 12/ATTALIA VIC. TO UP/NP 02/17/04 23 0 242 265 0 0 0 0 265 RR-PAVING 022 15 SR 22/I-82 TO TOPPENISH - PAVING 03/22/04 5 0 600 605 0 0 0 0 605 022 08 SR 22/PROSSER VICINITY-PAVING 02/02/04 6 0 139 145 0 0 0 0 145 024 15 SR 24/FIRE STA. TO TAYLOR 02/09/04 76 0 1,620 1,696 0 0 0 0 1,696 RANCH-PAVING 024 15,08 SR 24/SR 241 VICINITY-PAVING 02/17/04 28 0 300 328 0 0 0 0 328 082 16 I-82/COFFIN ROAD VICINITY-PAVING 02/02/04 22 0 489 511 0 0 0 0 511 082 08,16 I-82/PROSSER VICINITY-PAVING 02/02/04 26 0 801 827 0 0 0 0 827 090 13 SNOQUALMIE PASS PAVEMENT DESIGN 1,540 0 0 1,540 0 0 0 0 1,540 PROJECT 090 13 I-90/INDIAN JOHN HILL - PCCP 02/24/03 0 0 15 15 0 0 0 0 15 REPLACEMENT 090 13 I-90/EAST CLE ELUM RAMP-PAVING 04/05/04 34 0 256 290 0 0 0 0 290 090 05 I-90/EDGEWICK ROAD I/C-PAVING 04/04/05 47 0 9 56 367 0 0 0 423 090 05 I-90/HOMESTEAD VALLEY ROAD 04/04/05 38 0 19 57 222 0 0 0 279 I/C-PAVING 090 05 I-90/TINKHAM ROAD I/C-PAVING 04/04/05 48 0 17 65 423 0 0 0 488 090 05 I-90/DENNY CREEK I/C-PAVING 04/04/05 41 0 12 53 378 0 0 0 431

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 34 Printed by the House Transportation Committee

    090 13 I-90/EAST EASTON 04/04/05 36 0 12 48 311 0 0 0 359 INTERCHANGE-PAVING 090 13 I-90/GOLD CREEK TO EASTON 02/02/04 48 0 1,890 1,938 0 0 0 0 1,938 HILL-PAVING 090 13 I-90/WEST CLE ELUM 04/04/05 23 0 9 32 234 0 0 0 266 INTERCHANGE-PAVING 090 13 1-90/OAKS AVENUE 04/04/05 26 0 10 36 266 0 0 0 302 INTERCHANGE-PAVING 090 13 I-90/BULLFROG INTERCHANGE-PAVING 04/04/05 31 0 12 43 322 0 0 0 365 090 13 I-90/RYEGRASS SUMMIT TO 02/17/04 0 0 530 530 0 0 0 0 530 VANTAGE-PAVING 097 15 US 97/SATUS CREEK BRIDGE 97/106 - 03/24/08 90 0 0 90 50 1,585 0 0 1,725 PAVING 097 15 US 97/DRY CREEK BRIDGE VIC. - 02/10/03 0 0 290 290 0 0 0 0 290 PAVING 097 15 US 97/CANAL BRIDGE TO SR 22 - 02/10/03 0 0 463 463 0 0 0 0 463 PAVING 097 15 US 97/KLICKITAT C/L TO SATUS CREEK 02/10/03 0 0 730 730 0 0 0 0 730 097 13 US 97/ELLENSBURG TO 02/09/04 150 0 1,970 2,120 0 0 0 0 2,120 VIRDEN-PAVING 097 15 US 97/TOPPENISH TO WAPATO - 03/01/04 40 0 381 421 0 0 0 0 421 DRAINAGE 097 15 US 97/SATUS CREEK BR. 97/106 02/17/04 7 0 68 75 0 0 0 0 75 VIC.-PAVING 124 16 SR 124/COPPEI CREEK TO SR 12 - 04/28/03 0 0 254 254 0 0 0 0 254 PAVING 124 16 SR 124/MCFEELY RD. TO COPPEI 03/08/04 127 0 3,010 3,137 0 0 0 0 3,137 CR.-PAVING 125 16 SR 125/MILITARY ROAD TO SR 12 - 03/10/03 0 0 1,620 1,620 0 0 0 0 1,620 PAVING 129 09 SR 129/CLARKSTON VICINITY - PAVING 03/15/04 60 0 451 511 0 0 0 0 511 223 15 SR 223/GRANGER VICINITY-PAVING 02/17/04 9 0 101 110 0 0 0 0 110 225 08 SR 225/BENTON CITY VICINITY-PAVING 11/01/04 50 0 508 558 0 0 0 0 558 241 15,08 SR 241/SUNNYSIDE TO SR 24-PAVING 02/17/04 50 0 531 581 0 0 0 0 581 261 16 SR 261/LYON`S FERRY 02/17/04 18 0 186 204 0 0 0 0 204 VICINITY-PAVING 395 16,09 US 395/CREST LOCH RD. TO EAST ELM 02/10/03 0 0 580 580 0 0 0 0 580

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 35 Printed by the House Transportation Committee

    RD. 395 16 US 395/FOSTER WELLS RD. TO CREST 02/10/03 0 0 556 556 0 0 0 0 556 LOCH RD 395 16 US 395/PASCO VICINITY-PAVING 03/06/06 31 0 0 31 556 0 0 0 587 397 16 SR 397/COLUMBIA RIVER TO OREGON 04/22/02 47 0 0 47 0 0 0 0 47 STREET 410 14 SR 410/NWR LINE TO BUMPING 02/17/04 66 0 693 759 0 0 0 0 759 RIV.-PAVING 410 14 SR 410/SAWMILL FLAT 02/17/04 8 0 82 90 0 0 0 0 90 VICINITY-PAVING 410 14 SR 410/CLIFFDALE VICINITY-PAVING 02/17/04 17 0 185 202 0 0 0 0 202 410 14 SR 410/ROCK CREEK RD. TO NILE 02/17/04 17 0 184 201 0 0 0 0 201 RD.-PAVING 821 13 SR 821/THRALL ROAD 02/17/04 13 0 128 141 0 0 0 0 141 VICINITY-PAVING 823 14 SR 823/SELAH VIC. - PAVING 02/21/06 18 0 0 18 416 0 0 0 434 903 13 SR 903/CLE ELUM VICINITY-PAVING 04/05/04 64 0 647 711 0 0 0 0 711 999 00 DIRECT PROJECT SUPPORT - 1,100 0 0 1,100 0 0 0 0 1,100 SUBPROGRAM P1 970 13 SR 970/CLE ELUM TO TEANAWAY 04/05/04 90 0 1,110 1,200 0 0 0 0 1,200 RIVER-PAVING 998 00 PAVEMENT PROJECT SCOPING 3,120 0 0 3,120 0 0 0 0 3,120 998 00 ADVANCE PRELIMINARY ENGINEERING 162 0 0 162 0 0 0 0 162 999 00 PITS AND QUARRIES 240 0 0 240 0 0 0 0 240 998 09 2004 EASTERN REGION CHIP SEAL - PE 72 0 0 72 0 0 0 0 72 998 09 2005 EASTERN REGION CHIP SEAL - PE 99 0 0 99 2 0 0 0 101 002 03 US 2/SPOKANE RIVER TO EUCLID 05/02/05 104 0 15 119 1,390 0 0 0 1,509 AVE-PAVING 002 06 US 2/HOUSTON AVE TO CENTER ROAD 01/03/05 231 0 1,730 1,961 1,280 0 0 0 3,241 - PAVING 002 07 US 2/ROCKLYN ROAD TO 12/16/02 0 0 45 45 0 0 0 0 45 DAVENPORT-PAVING 020 07 SR 20/REPUBLIC TO WALKER HILL RD 12/01/03 0 0 41 41 0 0 0 0 41 020 07 SR 20/OKANOGAN CO LINE TO GRAVES 03/17/03 0 0 112 112 0 0 0 0 112 MTN RD 020 07 SR 20/SPRUCE CANYON RD TO MILL 03/17/03 0 0 23 23 0 0 0 0 23 CREEK RD

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 36 Printed by the House Transportation Committee

    020 07 SR 20/TIGER TO RUBY MOUNTAIN - 05/16/05 251 0 23 274 3,718 0 0 0 3,992 PAVING 020 07 SR 20/RUBY MOUNTAIN TO METCALF 03/17/03 0 0 1,218 1,218 0 0 0 0 1,218 LAKE 020 07 SR 20/METCALF LAKE TO PEND 05/15/06 13 0 0 13 3,528 0 0 0 3,541 OREILLE MILL 020 07 SR 20/METCALF LAKE TO NEWPORT - 03/17/03 0 0 416 416 0 0 0 0 416 BST 020 07 SR 20/REPUBLIC TO WALKER HILL 05/07/01 0 0 77 77 0 0 0 0 77 RD-PAVING 021 09 SR 21/LIND TO I-90 - BST 03/17/03 0 0 335 335 0 0 0 0 335 021 07 SR 21/JCT SR 174 TO KELLER FERRY - 03/17/03 0 0 244 244 0 0 0 0 244 BST 021 07 SR 21/KELLER FERRY TO JCT SR 20 - BST 12/01/03 0 0 1,106 1,106 0 0 0 0 1,106 021 07 SR 21/JCT SR 20 TO CANADA - BST 03/17/03 0 0 843 843 0 0 0 0 843 023 07 SR 23/LORDS CREEK RD TO JCT SR 28 - 12/01/03 0 0 271 271 0 0 0 0 271 BST 025 07 SR 25/B REINBOLD RD TO SPOKANE 03/17/03 0 0 112 112 0 0 0 0 112 RIVER-BST 025 07 SR 25/GOLD HILL TO 12/30/02 0 0 162 162 0 0 0 0 162 BOSSBURG-PAVING 025 07 SR 25/US 395 TO GOLD HILL-PAVING 12/30/02 20 0 60 80 0 0 0 0 80 025 07 SR 25/BOSSBURG ROAD VICINITY - 12/30/02 0 0 29 29 0 0 0 0 29 SAFETY 025 07 SR 25/BOSSBURG ROAD TO CANADA - 05/08/06 20 0 0 20 5,156 0 0 0 5,176 PAVING 027 09 SR 27/JCT US 195 TO PALOUSE-ALBION 05/02/05 231 0 18 249 3,115 0 0 0 3,364 ROAD 027 09 SR 27/PALOUSE TO GARFIELD - BST 03/17/03 0 0 152 152 0 0 0 0 152 028 07 SR 28/HARRINGTON TO DAVENPORT - 05/10/04 94 0 3,216 3,310 0 0 0 0 3,310 PAVING 031 07 SR 31/TIGER TO PEND OREILLE RIVER 12/01/03 0 0 281 281 0 0 0 0 281 BR-BST 090 07 I-90/ADAMS COUNTY LINE TO 01/05/04 150 0 6,180 6,330 0 0 0 0 6,330 SPOKANE COUNTY 090 09,07 I-90/LINCOLN COUNTY LINE TO 11/01/04 27 0 2,980 3,007 1,110 0 0 0 4,117 SALNAVE ROAD

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 37 Printed by the House Transportation Committee

    090 09,06 I-90/SALNAVE ROAD TO GEIGER 03/17/03 0 0 3,530 3,530 0 0 0 0 3,530 ROAD-PAVING 090 04 I-90/SULLIVAN ROAD TO IDAHO- 04/07/03 154 0 3,310 3,464 0 0 0 0 3,464 PAVING 090 09,07 I-90/TOKIO TO LINCOLN COUNTY 12/15/03 34 0 2,200 2,234 0 0 0 0 2,234 LINE-PAVING 127 09 SR 127/CENTRAL FERRY TO CHURCH 12/29/03 14 0 1,620 1,634 0 0 0 0 1,634 HILL ROAD 174 07 SR 174/GRANT CO LINE TO JCT SR 21 - 03/17/03 0 0 345 345 0 0 0 0 345 BST 195 09 US 195/JCT SR 271 TO VIC PLAZA 05/01/06 44 0 0 44 2,221 0 0 0 2,265 RD-PAVING 195 09 US 195/CORNWALL RD TO EXCELSIOR 03/03/03 0 0 1,851 1,851 0 0 0 0 1,851 DR-PCCP 206 04 SR 206/BRUCE RD TO MT SPOKANE 12/01/03 0 0 764 764 0 0 0 0 764 PARK - BST 231 07 2003-05 REGION BST SAFETY 05/10/04 71 0 925 996 0 0 0 0 996 RESTORATION 261 09 SR 261/SUTTON RD TO I-90 - BST 12/01/03 0 0 402 402 0 0 0 0 402 290 03 SR 290/DIVISION ST TO RIVERPOINT 05/02/05 20 0 6 26 251 0 0 0 277 BLVD 291 07 SR 291/WYLIE DRIVE TO JCT SR 231 - 12/01/03 0 0 402 402 0 0 0 0 402 BST 291 07,06 SR 291/SPOKANE CO LINE TO WYLIE DR 12/01/03 0 0 563 563 0 0 0 0 563 395 07 US 395/IMMEL ROAD TO 03/11/02 0 0 2,200 2,200 0 0 0 0 2,200 ARDEN-PAVING 395 07 US 395/BOYDS TO CANADA - BST 03/17/03 0 0 416 416 0 0 0 0 416 395 07 US 395/COLVILLE TO COLUMBIA 11/15/04 1 0 1,510 1,511 1,030 0 0 0 2,541 RIVER-PAVING 902 07,09 SR 902/JCT I-90 TO LAKELAND 12/01/03 0 0 79 79 0 0 0 0 79 VILLAGE-BST 998 00 EASTERN REGION DIRECT PROJECT 1,700 0 0 1,700 0 0 0 0 1,700 SUPPORT 998 00 PAVEMENT PROJECT SCOPING 873 0 0 873 880 880 880 880 4,393 998 00 ADVANCE PRELIMINARY ENGINEERING 184 0 0 184 180 180 180 180 904 998 00 EASTERN REGION PVT & SOILS 162 0 0 162 160 160 160 160 802 INVESTIGATION

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 38 Printed by the House Transportation Committee

    998 00 EASTERN REGION PIT & QUARRY 520 56 0 576 576 576 576 576 2,880 MGMT PLAN 47,333 158 224,879 272,370 284,158 313,578 345,301 365,755 1,581,162

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 39 Printed by the House Transportation Committee

    P2 - Structures Preservation 998 00 DIRECT PROJECT SUPPORT 07/02/01 5,135 0 0 5,135 0 0 0 0 5,135 SUBPROGRAM P2 998 00 PRIMARY CONTROL MONUMENT - 71 0 0 71 71 71 71 71 355 BRIDGE 998 00 SUBPROGRAM P2 RESERVE 07/07/03 3 0 3,530 3,533 15,696 12,718 78,100 106,000 216,047 998 00 BRIDGE CONDITION SURVEY 11,400 0 0 11,400 11,400 11,400 11,400 11,400 57,000 998 00 SCOUR EVALUATION AND REPAIR 500 0 0 500 650 680 690 720 3,240 998 00 BRIDGE AND STRUCTURES MINOR CAP 07/07/03 0 0 100 100 0 0 0 0 100 03-05 998 00 BRIDGE PLANNING 820 0 0 820 820 820 820 820 4,100 999 00 SEISMIC RETROFIT PROJECTS 07/01/03 0 0 0 0 6,600 7,000 7,350 7,650 28,600 998 01 SR 2,I-5,I-405,SR522 & 526 SIGN BRIDGES 05/21/01 0 0 11 11 0 0 0 0 11 002 38,44 US 2/SNOHOMISH RIVER TO SR 204 09/28/98 70 0 100 170 1 0 0 0 171 002 44 US 2/EBEY IS. VIADUCT & EBEY SL. BR 05/21/01 0 0 5 5 1,160 2,151 23,100 2,080 28,496 002 38,44 US 2/SNOH. R. & EBEY SL. BR. WB 07/11/05 35 0 0 35 3,273 0 0 0 3,308 -SEISMIC 002 39 US 2/S. FORK SKYKOMISH RIVER 07/11/05 2 0 0 2 360 0 0 0 362 BRIDGE 002 39 US 2/BARCLAY CREEK BR. - REPLACE 12/17/01 0 0 95 95 0 0 0 0 95 BRIDGE 002 39 US 2/ANTHRACITE CREEK BR. - SCOUR 07/07/03 3 0 51 54 0 0 0 0 54 REPAIR 005 11 I-5/KLICKITAT DR. - DECK 01/08/96 0 0 10 10 0 0 0 0 10 RESURFACING 005 11,37 I-5/SOUTH SEATTLE NORTHBOUND 11/07/05 287 0 0 287 463 9,820 0 0 10,570 VIADUCT 005 11 I-5/ALBRO PL. TO CORSON AVE - 12/04/04 173 0 1,971 2,144 0 0 0 0 2,144 SEISMIC 005 11 I-5/SPOKANE STREET I/C BRIDGES - 05/12/03 0 0 4,620 4,620 0 0 0 0 4,620 SEISMIC 005 43,46 I-5/NORTH SEATTLE BRIDGES - SEISMIC 01/26/04 162 0 1,880 2,042 4 0 0 0 2,046 005 46,32 I-5/NE NORTHGATE WAY TO NE 175TH 05/20/02 0 0 873 873 0 0 0 0 873 STREET 005 44, 38 I-5/EVERETT VICINITY BRIDGES - 12/04/04 0 0 165 165 0 0 0 0 165

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 40 Printed by the House Transportation Committee

    SEISMIC 005 38 I-5/SNOHOMISH RIVER BR. - BRIDGE 07/11/05 24 0 0 24 276 4 0 0 304 REPAIR 005 38 I-5/STEAMBOAT SLOUGH BRIDGES 04/18/05 69 0 4 73 187 0 0 0 260 5/648E&W 005 40 I-5/SKAGIT RIVER BRIDGE - PAINTING 10/07/02 0 0 594 594 0 0 0 0 594 005 40 I-5/BURLINGTON VICINTY BRIDGES - 12/04/04 101 0 983 1,084 0 0 0 0 1,084 SEISMIC 005 42 I-5/BELLINGHAM BRIDGES - SEISMIC 10/08/01 0 0 144 144 4 0 0 0 148 005 42 I-5/VIC. LAKEWAY DRIVE - REPLACE 12/06/04 0 0 4 4 220 0 0 0 224 SIGN BR 005 42 I-5/NOOKSACK RIVER BRIDGE - 03/06/06 21 0 0 21 644 0 0 0 665 PAINTING 005 42 I-5/DAKOTA CREEK BRIDGES - BRIDGE 03/10/03 0 0 860 860 0 0 0 0 860 REPAIR 009 39,38 SR 9/GETCHELL ROAD BRIDGE - 05/30/06 0 0 0 0 116 39 0 0 155 SEISMIC 009 39 SR 9/STILLAGUAMISH RIVER (HALLER 11/19/01 0 0 1,010 1,010 9 0 0 0 1,019 BRIDGE) 009 10 SR 9/LAKE CREEK BRIDGE - SCOUR 04/15/02 0 0 2 2 2 2 0 0 6 REPAIR 009 39,40 SR 9/SAMISH RIVER BRIDGE 9/223 07/03/00 0 0 13 13 0 0 0 0 13 009 39 SR 9/SKAGIT RIVER BRIDGE - PAINTING 10/07/02 0 0 381 381 0 0 0 0 381 009 42 SR 9/NORTH FORK NOOKSACK RIVER 12/09/02 0 0 299 299 0 0 0 0 299 BR. 018 31,47 SR 18, GREEN RIVER BRIDGE - DECK 04/14/03 0 0 106 106 0 0 0 0 106 REHAB. 020 10 SR 20/DECEPTION & CANOE PASS 04/07/03 0 0 600 600 0 0 0 0 600 BRIDGES 020 39 SR 20/GULCH BRIDGE - REPLACE 01/29/07 0 0 0 0 238 1,750 560 0 2,548 BRIDGE 020 39 SR 20/DAMNATION CREEK BR 04/23/01 0 0 12 12 13 0 0 0 25 -REPLACE BRIDGE 020 39 SR 20/GORGE CREEK BRIDGE - 02/10/03 0 0 314 314 0 0 0 0 314 PAINTING 090 37 I-90/EASTBOUND I-90 BRIDGE AT I-5 11/20/00 0 0 100 100 0 0 0 0 100 090 37 I-90/I-5 INTERCHANGE - SEISMIC 12/04/04 117 0 912 1,029 0 0 0 0 1,029

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 41 Printed by the House Transportation Committee

    090 41 I-90/EAST CHANNEL BRIDGES 07/11/05 22 0 0 22 927 0 0 0 949 090 41 I-90/EAST CHANNEL BRIDGE 90/40N 01/03/06 35 0 0 35 189 0 0 0 224 090 41,48 I-90/I-405 VICINITY BRIDGES - SEISMIC 12/01/03 73 0 3,500 3,573 0 0 0 0 3,573 090 41,48 I-90/EASTGATE VICINITY BRIDGES - 06/18/01 0 0 0 0 237 199 0 0 436 SEISMIC 099 11 SR 99/SPOKANE STREET OVERCROSS - 09/11/00 63 0 1,630 1,693 94 0 0 0 1,787 SEISMIC 099 27 FIRST AVENUE SOUTH BRIDGE - 09/08/03 187 0 1,260 1,447 0 0 0 0 1,447 99/530W 099 11 SR 99/1ST AVE S BRIDGE - PAINTING 05/05/03 0 0 1,500 1,500 0 0 0 0 1,500 099 11,37,43,36 SR 99/ALASKAN WAY VIADUCT 99/540 700 0 0 700 0 0 0 0 700 099 43, 37 SR 99/SENECA ST AND COLUMBIA ST 12/04/04 0 0 1,075 1,075 0 0 0 0 1,075 RAMPS 099 36,43 SR 99/GEORGE WASHINGTON BRIDGE - 03/03/03 0 0 6,100 6,100 188 0 0 0 6,288 SEISMIC 099 36,43 SR 99/GEORGE WASHINGTON BRIDGE 12/05/05 90 0 0 90 2,037 400 0 0 2,527 -PAINTING 202 45 SR 202/SAMMAMISH RIVER BRIDGES - 03/31/03 0 0 151 151 0 0 0 0 151 SCOUR 203 39 SR 203/SKYKOMISH RIVER BRIDGE - 07/07/03 15 0 91 106 0 0 0 0 106 SCOUR 405 11,37,47,41,48, I-405/RENTON TO KIRKLAND BRGS. - 06/18/01 0 0 0 0 148 160 0 0 308 SEISMIC 410 31 SR 410/SCATTER CREEK BRIDGE - 83 0 0 83 0 0 0 0 83 SEISMIC 522 32 SR 522/SWAMP CREEK BRIDGE - SCOUR 04/29/02 0 0 38 38 0 0 0 0 38 REPAIR 522 01 SR 522/I-405 I/C EAST TO NORTH RAMP 05/05/03 2 0 363 365 0 0 0 0 365 522 39 SR522/SNOHOMISH RIVER BRIDGE 01/05/04 0 0 0 0 350 0 0 0 350 522/138 522 39 SR 522/SNOHOMISH RIVER BRIDGE - 03/01/04 0 0 424 424 0 0 0 0 424 SCOUR 526 38 SR 526/VIC. EVERGREEN WAY 07/11/05 2 0 0 2 149 0 0 0 151 PEDESTRIAN BR. 529 38 SR 529/SNOHOMISH RIVER TO EBEY 01/12/98 0 0 4 4 0 0 0 0 4 SLOUGH 529 38 SR 529/SNOHOMISH RIVER BRIDGES 07/05/05 125 0 0 125 1,224 0 0 0 1,349

  • TEIS - CAPITAL PROJECTS & FACILITIES REPORTING SYSTEM Apr 08, 2003 PROJECT LIST 9:57:06AM House Transportation Committee Project List ($ in Thousands) CN St. PE RW CN Route Leg Dist Project Description Date 03-05 03-05 03-05 03-05 05-07 07-09 09-11 11-13 10-Yr Tot

    Construction List - 03HTCPL4 House Transportation Committee Project List (4/4/2003 1:57:49 PM) LTPR001AX 42 Printed by the House Transportation Committee

    529/10E&W 529 38 SR529/UNION SLOUGH BRIDGE 529/15 01/03/06 24 0 0 24 285 0 0 0 309 E&W 529 38 SR 529/STEAMBOAT AND EBEY 02/22/00 0 0 7 7 0 0 0 0 7 SLOUGH BRIDGES 529 38 SR 529/STEAMBOAT SLOUGH BRIDGES 02/23/98 0 0 102 102 15 0 0 0 117 529 38 SR 529/EBEY SLOUGH BRIDGE - 02/22/00 0 0 4 4 0 0 0 0 4 BRIDGE REHAB 529 38 SR 529/EBEY SLOUGH BR. - REPLACE 03/05/07 0 13 0 13 2,651 12,000 0 0 14,664 BRIDGE 539 42 SR 539/NOOKSACK RIVER BRIDGE - 12/09/02 0 0 375 375