Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Adams
New G
0 0 0 1,000 0 009 000000P State Highways in Adams and Franklin Counties
Roadside Safety Improvemen
999 1,000
700 0 0 0 0 009 002699I SR 26 Roadside Safety Improvements 026 700
0 0 0 500 0 013 STUDY 4 Eastern WA Freight corridor study 000 500
T-Nickel
0 0 0 858 0 009,07 602100F SR 21, 23, 27, & 272 GUARDRAIL
IMPROVEMENTS
021 858
700 0 0 2,358 0 0 3,058
Benton
New G
800 0 0 0 0 016 001499C SR 14 Benton County Roadside Safety
Improvements
014 800
10,000 6,000 0 1,000 0 008 539502L US 395/Columbia Drive to SR 240 Interchange 395 17,000
T-Nickel
0 0 0 320 0 016 501401Z GUARDRAIL UPGRADE - BENTON, FRANKLIN
& WALLA WALLA COUNTIES
014 320
0 0 0 402 0 008,13 502403V SR24/VERNITA BRIDGE RAIL RETROFIT 024 402
1,342 0 0 7,638 0 008 524002F SR 240/I-182 TO RICHLAND Y - ADD LANES 240 8,980
2,321 0 0 23,155 0 008 524002G SR 240/RICHLAND Y TO COLUMBIA CENTER
I/C - ADD LANES
240 25,476
14,463 0 6,000 32,514 0 0 52,978
Chelan
A-Nickel
1,000 0 0 0 0 012 200201E US2/97 PESHASTIN EAST - INTERCHANGE 002 1,000
-72 0 0 188 0 012 200221H US 2/DRYDEN - SIGNAL 002 116
New G
8,500 0 0 1,500 0 012 000255P US 2/WENATCHEE RIVER BRIDGE 002 10,000
5,600 0 0 1,400 0 012 000255Q US 2/CHIWAUKUM CREEK 002 7,000
800 0 0 0 0 012 000299R US 2 Roadside Safety Improvements 002 800
607 5,050 0 343 0 012 228500A SR 285/GEORGE SELLAR BRIDGE -
ADDITIONAL EB LANE
285 6,000
ProjectDetail003 Page 1 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Chelan
1,484 2,813 887 816 0 012 228501X SR285/W. END OF THE GEORGE SELLAR
BRIDGE -- INTERSECTION IMPROVEMENT
285 6,000
T-Nickel
0 0 0 147 0 007,09,12,13 200002X NC REGION GUARDRAIL IMPROVEMENT
03-05
000 147
11,738 0 0 3,958 0 012 200201E US2/97 PESHASTIN EAST - INTERCHANGE 002 15,696
188 0 0 188 0 012 200221H US 2/DRYDEN - SIGNAL 002 376
0 0 0 890 0 012,07 F01050B CASCADE & COLUMBIA RIVER UPGRADE 999 890
29,845 887 7,863 9,431 0 0 48,025
Clallam
New G
0 0 0 2,900 0 024,23,35 000000Q State Highways in East Clallam, Jefferson, Kitsap
and Mason Counties Roa
999 2,900
2,000 0 0 0 0 024,35 000000S State Highways in Grays Harbor, East Jefferson and
Clallam counties Road
999 2,000
0 0 0 250 0 024 011200A SR 112, HOKO/PYSHT RIVERS 112 250
1,800 0 0 0 0 024 011299B SR 112 Roadside Safety Improvements 112 1,800
T-Nickel
600 1,273 0 0 0 024 310101F US 101/DAWLEY ROAD VICINITY TO BLYN
HIGHWAY - CLIMBING LANE
101 1,873
101 326 0 0 0 024 310155B US 101/CORRIEA RD VIC TO ZACCARDO RD 101 428
1,576 0 0 0 0 024 310166B US 101/BLYN VIC - PASSING LANES 101 1,576
31 0 0 15 0 024 310174G US 101 /SOL DUC RIVER BRIDGE EAST OF
SAPPHO - BRIDGE RAIL
101 46
844 122 0 0 0 024 311218B SR 112/HOKO-OZETTE ROAD - SAFETY 112 966
6,952 0 1,721 3,165 0 0 11,839
Clark
New G
2,000 0 0 4,000 0 017,49 1205IC1 I-205 / MILL PLAIN INTERCHANGE TO NE
28TH STREET
205 6,000
14,000 25,000 4,000 7,000 0 049 400506A COLUMBIA RIVER CROSSING/ VANCOUVER-
EIS
005 50,000
33,079 0 0 6,921 0 018,49 401493C SR 14/CAMAS/WASHOUGAL WIDENING & I/C 014 40,000
ProjectDetail003 Page 2 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Clark
7,000 15,000 4,000 300 0 049 450000A SR 500/ST JOHNS BLVD. - INTERCHANGE 500 26,300
16,500 15,000 4,000 5,000 0 049 450000E SR 500/NE 42ND AVE. AND 54TH AVE. 500 40,500
0 0 0 10,000 0 018,49 450105B SR501/ RIDGEFIELD INTERCHANGE 501 10,000
0 15,000 27,000 0 8,000 017,18 450208W SR502/WIDENING FROM I-5 TO BATTLE
GROUND
502 50,000
New M
4,000 7,000 6,000 0 0 049,18,20,02,2
8,27,25
P02001A CASCADES TRAINSETS OVERHAUL 999 17,000
T-Nickel
1,233 4,987 31,498 514 0 049,18 400506H I-5/NE 134TH ST INTERCHANGE (I-5/I-205)-
REBUILD TO RELIEVE CONGESTION
005 38,232
0 0 0 7,014 0 049,18,17 400595A I-5/SALMON CREEK TO I-205 - WIDENING 005 7,014
24,730 0 0 7,458 0 017,18 400599R I-5/SR 502 INTERCHANGE 005 32,188
0 0 0 340 0 049,17,18 401406B SR 14/TWO BRIDGE RAIL RETROFITS
VANCOUVER EAST
014 340
262 0 0 503 0 018,15 401406G SR 14/COLUMBIA RIVER GORGE GUARDRAIL
UPGRADE
014 765
3,800 0 0 8,200 0 049 420505A I-205/MILL PLAIN EXIT(112TH CONNECTOR)-
BUILD DIRECT RAMP TO 112TH AVE.
205 12,000
6,114 7,605 0 904 0 017,18 450208W SR502/WIDENING FROM I-5 TO BATTLE
GROUND
502 14,623
50,023 0 0 1,000 0 018,49 P01005A VANCOUVER RAIL PROJECT INCL. 39TH
BRIDGE
999 51,023
162,741 76,498 89,592 59,153 8,000 0 395,985
Columbia
T-Nickel
0 0 0 302 0 016,09 501206Z GUARDRAIL UPGRADE - COLUMBIA,
GARFIELD AND WHITMAN COUNTIES
012 302
0 0 0 273 0 016,09 526101Z GUARDRAIL UPDATE - COLUMBIA,
GARFIELD & WHITMAN COUNTIES
261 273
252 1,904 3,157 0 0 016 F01021A PORT OF COLUMBIA RAILROAD
IMPROVEMENTS
999 5,313
252 3,157 1,904 575 0 0 5,888
Cowlitz
ProjectDetail003 Page 3 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Cowlitz
New G
700 0 0 0 0 019 000499J SR 4 and SR 401 Roadside Safety Improvements 999 700
0 0 0 600 0 019 043200A SR 432 ROADSIDE SAFETY IMPROVEMENTS 432 600
4,000 38,000 0 3,000 0 019 4432TWI I-5 SR 432 TALLEY WAY INTERCHANGES 005 45,000
1,100 2,200 11,700 0 0 019 BRIDGE 1 ABERNATHY BRIDGE 004 15,000
New M
4,000 7,000 6,000 0 0 049,18,20,02,2
8,27,25
P02001A CASCADES TRAINSETS OVERHAUL 999 17,000
T-Nickel
5,000 0 0 0 0 019 400507L I-5/LEXINGTON ACCESS- CONSTRUCT NEW
BRIDGE FROM I-5 TO SR 411
005 5,000
0 24,700 24,597 300 0 018 P01006A KELSO-MARTIN BLUFF 3RD MAINLINE 999 49,597
14,800 42,297 71,900 3,900 0 0 132,897
Douglas
New G
12,000 25,300 8,000 2,000 0 012 202800D SR 28/Junction US 2/97 to 9th Street - Stage 1 028 47,300
0 50 2,990 0 0 012 202801J SR 28/East Wenatchee - Access Control purchase 028 3,040
607 5,050 0 343 0 012 228500A SR 285/GEORGE SELLAR BRIDGE -
ADDITIONAL EB LANE
285 6,000
0 0 0 500 0 013 STUDY 4 Eastern WA Freight corridor study 000 500
New M
450 0 0 2,100 0 012 200201H US 2/South of Orondo - Passing lane 002 2,550
T-Nickel
0 0 0 147 0 007,09,12,13 200002X NC REGION GUARDRAIL IMPROVEMENT
03-05
000 147
13,057 10,990 30,400 5,090 0 0 59,537
Ferry
New G
900 0 0 0 0 007 000000U State Highways in North Stevens and Ferry
Counties Roadside Safety Impro
999 900
0 0 0 800 0 007 TORODA TORODA CREEK ROAD IMPROVEMENTS 000 800
900 0 0 800 0 0 1,700
ProjectDetail003 Page 4 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Franklin
New G
0 0 0 1,000 0 009 000000P State Highways in Adams and Franklin Counties
Roadside Safety Improvemen
999 1,000
9,000 10,000 0 1,000 0 016 501212I US 12/SR 124 BURBANK Interchange 012 20,000
0 0 0 500 0 013 STUDY 4 Eastern WA Freight corridor study 000 500
New M
0 0 0 5,400 0 016 F01001R Port of Pasco - Intermodal Facility Improvements 999 5,400
T-Nickel
0 0 0 114 0 009 501701Z GUARDRAIL UPGRADE - BENTON, FRANKLIN
& WALLA WALLA COUNTIES
017 114
0 0 0 642 0 009 526001Z GUARDRAIL UPGRADE - BENTON, FRANLIN
& WALLA WALLA COUNTIES
260 642
0 0 0 273 0 016,09 526101Z GUARDRAIL UPDATE - COLUMBIA,
GARFIELD & WHITMAN COUNTIES
261 273
0 0 0 996 0 016,08 539701Q SR 397/BRIDGE RAIL RETROFIT-COLUMBIA
RIVER BRIDGE WEST OF KENNEWICK
397 996
0 0 0 858 0 009,07 602100F SR 21, 23, 27, & 272 GUARDRAIL
IMPROVEMENTS
021 858
296 0 0 730 0 009 626002G SR 260,263, & 278/GUARDRAIL
IMPROVEMENTS
260 1,025
0 0 2,750 0 0 016 F01071A CONNELL FEED LOT LOOP TRACK 999 2,750
9,296 2,750 10,000 11,512 0 0 33,557
Garfield
T-Nickel
0 0 0 302 0 016,09 501206Z GUARDRAIL UPGRADE - COLUMBIA,
GARFIELD AND WHITMAN COUNTIES
012 302
0 0 0 281 0 009 512701Z GUARDRAIL UPGRADE - COLUMBIA,
GARFIELD AND WHITMAN COUNTIES
127 281
0 0 0 583 0 0 583
Grant
New G
0 0 0 1,200 0 013,09 009088E I-90/SR 17 TO GRANT/ADAMS COUNTY LINE -
MEDIAN CROSS OVER PROTECTION
090 1,200
ProjectDetail003 Page 5 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Grant
0 0 0 1,200 0 013 009088H I-90 /SILICA ROAD TO EAST OF ADAMS ROAD
- MEDIAN CROSS OVER PROTECTION
090 1,200
955 5 0 40 0 013 201701E SR 17/ North of Moses Lake - Passing lane 017 1,000
0 0 0 12,103 0 013 201729A SR 17/PIONEER WAY TO STRATFORD ROAD -
WIDEN TO FOUR LANE
017 12,103
2,500 0 0 2,500 0 013 SR 17 SR 17 WIDENING 017 5,000
0 0 0 500 0 013 STUDY 4 Eastern WA Freight corridor study 000 500
New M
0 0 0 500 0 013 F01001O Wheeler to Grant Co. Airport Enginering Study 999 500
0 0 0 750 0 013 PED 1 I-90 POTATO HILL BRIDGE BICYCLE AND
PEDSTRIAN BRIDGE
090 750
T-Nickel
0 0 0 147 0 007,09,12,13 200002X NC REGION GUARDRAIL IMPROVEMENT
03-05
000 147
0 0 0 3,253 0 013 209014A I-90/MOSES LAKE AREA - BRIDGE
CLEARANCE
090 3,253
0 0 0 402 0 008,13 502403V SR24/VERNITA BRIDGE RAIL RETROFIT 024 402
0 0 0 447 0 013 509002W I-90/COLUMBIA RIVER BRIDGE - BRIDGE
RAIL RETROFIT
090 447
0 0 0 1,208 0 012,07,09 F01110A PALOUSE RIVER & COULEE CITY RR
ACQUISITION
999 1,208
11,568 7,236 703 1,582 0 012,07,09 F01111A PR & CC CHENEY-COULEE-PULLMAN
UPGRADES
999 21,089
15,023 703 7,241 25,832 0 0 48,799
Grays Harbor
New G
2,000 0 0 0 0 024,35 000000S State Highways in Grays Harbor, East Jefferson and
Clallam counties Road
999 2,000
2,000 0 0 630 0 024 010900A SR 109 MOCLIPS RIVER 109 2,630
0 0 0 1,219 0 024,19,35 301261A US12/VICINITY MONTESANO TO ELMA -
MEDIAN CROSS OVER
012 1,219
0 0 0 3,000 0 024 310134A US 101/W FORK HOQUIAM RIVER BRIDGE -
REPLACEMENT
101 3,000
0 0 0 2,000 0 024 310134B US 101/W FORK HOQUIAM RIVER BRIDGE -
REPLACEMENT
101 2,000
ProjectDetail003 Page 6 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Grays Harbor
T-Nickel
0 0 0 43 0 024 301262A US 12/WYNOOCHEE RIVER BRIDGE - BRIDGE
RAIL
012 43
0 0 0 51 0 024 310174E US 101/QUINAULT RIVER BRIDGE - BRIDGE
RAIL
101 51
160 0 0 123 0 019 310174H US 101/CHEHALIS RIVER BRIDGE IN
ABERDEEN - BRIDGE RAIL
101 283
0 0 0 68 0 019 310515A SR 105/JOHNS RIVER BRIDGE - BRIDGE RAIL 105 68
0 0 0 141 0 019 310710D SR 107/ CHEHALIS RIVER BRIDGE - BRIDGE
RAIL
107 141
84 0 0 0 0 024 310928A SR 109/ COPALIS RIVER BRIDGE - BRIDGE
RAIL
109 84
4,244 0 0 7,275 0 0 11,519
Island
New G
750 0 0 650 0 001,10,24,40,4
2,44
000999N SR 9, SR 11 and SR 20 Roadside Safety
Improvement
999 1,400
0 800 0 0 0 001,10,11,21,3
7,38,40
001199A SR 11, SR 525 and SR 900 Roadside Safety
Improvement
999 800
1,000 0 0 0 0 010,39,40,42 002099F SR 20 and SR 530 Roadside Safety Improvement 999 1,000
100 600 500 0 0 001, 10, 21,
31, 38, 41,
47
016999E SR169, SR410, SR525, SR900 and SR 520
Roadside Safety Improvement
999 1,200
15,000 0 0 3,000 0 010 053255C SR 532/GEN MARK W CLARK MEM BRIDGE 532 18,000
T-Nickel
1,532 0 0 651 0 010 102023I SR 20/DUCKEN ROAD TO ROSARIO ROAD 020 2,183
18,382 500 1,400 4,301 0 0 24,583
Jefferson
New G
0 0 0 2,900 0 024,23,35 000000Q State Highways in East Clallam, Jefferson, Kitsap
and Mason Counties Roa
999 2,900
2,000 0 0 0 0 024,35 000000S State Highways in Grays Harbor, East Jefferson and
Clallam counties Road
999 2,000
ProjectDetail003 Page 7 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Jefferson
750 0 0 650 0 001,10,24,40,4
2,44
000999N SR 9, SR 11 and SR 20 Roadside Safety
Improvement
999 1,400
0 0 0 2,500 0 024 010100A US 101/MT WALKER NB & SB
PASSING/TRUCK LANE
101 2,500
9,000 0 0 500 0 024 010100B US 101, HOH RIVER (SITE #2) 101 9,500
48,436 66 0 113,591 0 024, 23 310407B SR 104/HOOD CANAL BRIDGE EAST HALF 104 162,093
1,940 11,488 0 0 0 024 900012G PORT TOWNSEND FERRY TERMINAL
IMPROVEMENTS
015 13,428
T-Nickel
300 1,576 0 0 0 024 310102F US 101/GARDINER VICINITY - CLIMBING
LANE
101 1,876
45 0 0 15 0 024 310174F US 101/HOH RIVER BRIDGE - BRIDGE RAIL 101 60
0 0 0 154 0 024 311602B SR 116/SR 19 TO INDIAN ISLAND - BRIDGE
RAIL
116 154
62,471 0 13,130 120,310 0 0 195,911
King
A-Nickel
255 150 0 227 0 047,05 101817C SR 18/COVINGTON WAY TO MAPLE VALLEY 018 632
-2,179 0 0 2,070 0 005 109070C I-90/EASTBOUND RAMPS TO SR 18 - SIGNAL 090 -109
32,008 -5,992 -32,008 5,992 0 037 151902A SR 519 INTERMODAL ACCESS PROJECT 519 0
-5,000 0 0 0 0 037,11,43,46 800515C I-5 CONC REHAB IN PIERCE, KING, SNOH CO 005 -5,000
-40,000 -40,000 -40,000 120,000 0 011,37,43,36 809936M SR 99/ALASKAN WAY VIADUCT - DES/EARLY
RW
099 0
54,420 -61,420 0 7,000 0 041 840541F I-405/SE 8TH TO I-90 (SOUTH BELLEVUE) 405 0
32,560 -16,000 -40,000 23,440 0 041,48,45,01 840561A I-405/SR 520 TO SR 522 405 0
-13,933 -13,042 0 26,975 0 043,48 852002I SR 520 PROJECT DESIGN 520 0
New G
0 800 0 0 0 001,10,11,21,3
7,38,40
001199A SR 11, SR 525 and SR 900 Roadside Safety
Improvement
999 800
500 500 0 0 0 010,39,43,44,4
8
009299O SR 92, SR 520, SR 530 and SR 534 Roadside
Safety Improvement
999 1,000
100 0 0 280 0 011 009988A SR 99 /SR 599 TO HOLDEN STREET - MEDIAN
CROSS OVER PROTECTION
099 380
ProjectDetail003 Page 8 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
King
100 600 500 0 0 001, 10, 21,
31, 38, 41,
47
016999E SR169, SR410, SR525, SR900 and SR 520
Roadside Safety Improvement
999 1,200
600 0 0 0 0 001,05,32,39,4
3,45,46
020399H SR 203 and SR 522 Roadside Safety Improvement 999 600
16,000 0 0 800 0 031 041000A SR 410, WHITE RIVER 410 16,800
900 0 0 300 0 002,31 041099K SR 410 and SR 164 Roadside Safety Improvement 999 1,200
600 2,400 0 0 0 032 099555A SR 99/SPOKANE STREET OC TIMBER 099 3,000
1,000 7,220 515 400 0 039 1002XXB US 2/Baring vic. - Passing Lanes 002 9,135
18,000 50,000 26,000 6,000 0 030 100502K I-5/SR 161 I/C & SR 18 I/C 005 100,000
9,087 1,789 0 384 0 011,37 100511J I-5/SOUTH SEATTLE NORTHBOUND VIADUCT 005 11,260
5,000 10,500 0 320 0 043 100524Q I-5/BOSTON TO SHELBY, SB I-5, WESTSIDE 005 15,820
5,798 1,000 0 450 0 046 100525P I-5/5TH AVE NE TO NE 92ND ST -NOISE WALL 005 7,248
2,500 0 0 2,500 0 043 1005SCN I-5 SHIP CANAL BRIDGE NOISE MITIGATION 005 5,000
23,000 2,000 0 5,000 0 037,41 109040S I-90/SEATTLE TO MERCER ISLAND - TWO
WAY TRANSIT/HOV
090 30,000
0 0 0 552 0 011 109926D SR 99/DUWAMISH RIVER/FIRST AVE S.
BRIDGE - NEW SOUTHBOUND BRIDGE
099 552
2,000 7,000 0 1,000 0 032 1099WID SR 99 / AURORA AVE IMPROVEMENTS -
PHASE 2
099 10,000
2,500 0 0 0 0 041,05,11 116927B SR 169/140TH WAY SE 169 2,500
6,250 0 0 0 0 033 1509000 SR 509/518 INTERCHANGE 509 6,250
0 0 0 13,000 0 046,32,01 152201C SR 522/I-5 TO I-405 MULTI-MODAL PROJECT 522 13,000
58 0 0 265 0 001,45 152221C SR 522/NORTH CREEK VIC TO BEAR CREEK
VIC
522 323
12,000 0 0 0 0 030,33 805CHG I-5 AT 272ND INTERCHANGE 005 12,000
240,000 440,000 740,000 80,000 400,000 100,00011,37,43,36 809936Z SR 99 - ALASKAN WAY VIADUCT PROJECT 099 2,000,000
89,000 50,000 0 7,000 0 025,30,31,47 8167012 SR 167 - SR 410 TO 15TH ST SW - HOV 167 146,000
0 0 0 12,600 0 030,47,33,11 816701B SR 167 HOT LANES PILOT PROJECT 167 12,600
11,000 9,000 0 10,000 0 011 8405001 I-405 / I-5 TO SR 181 405 30,000
4,000 14,000 0 2,000 0 011, 37 8405003 I-405 / SR 167 TO SR 169 405 20,000
60,000 35,000 0 15,000 0 011 8405004 I-405 / SR 515 INTERCHANGE
IMPROVEMENTS
405 110,000
28,000 8,000 0 14,000 0 011 8405005 SR 167 / I-405 TO SE 180TH ST 167 50,000
0 5,000 0 0 30,000 115,00041 8405006 I-405 / 44TH ST TO 112TH AVE 405 150,000
ProjectDetail003 Page 9 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
King
16,000 0 0 4,000 0 041 8405007 I-405 / 112TH AVE TO I-90 405 20,000
143,000 82,000 0 25,000 0 041, 48 8405009 I-405 / NE 8TH ST TO SR 520 BRAIDED
CROSSING
405 250,000
23,000 19,000 0 25,000 0 041 8405010 I-405 / NE 10TH ST OVERCROSSING 405 67,000
0 6,000 0 0 0 164,00001,45 8405011 I-405 / NE 124TH ST TO SR 522 405 170,000
0 0 0 0 10,000 10,00001 8405012 I-405 / BRICKYARD PARK & RIDE 405 20,000
0 0 0 0 0 60,00045 8405013 I-405 / NE 132ND ST INTERCHANGE 405 60,000
40,000 0 0 5,000 0 001 8405014 I-405 / 195TH ST TO SR 527 405 45,000
15,000 0 0 15,000 0 030,33 850901F SR 509/ I-5 - Freight & Congestion Relief Project
(Low)
509 30,000
35,000 0 0 15,000 0 033,11 851808A SR 518/SEATAC AIRPORT TO I-5/I-405
INTERCHANGE
518 50,000
50,000 100,000 170,000 50,000 130,000 043, 48 852000T SR 520 - BRIDGE REPLACEMENT & HOV
PROJECT
520 500,000
0 563 3,042 0 13,181 7,51634 900005F FAUNTLEROY FERRY TERMINAL
PRESERVATION
007 24,302
0 66,424 0 0 0 011,26,40 944460V CONSTRUCT REPLACEMENT
AUTO-PASSENGER FERRY 4-CL 5-NL
055 66,424
0 0 0 100 0 030 ALGONA ALGONA TRAFFIC SIGNAL 999 100
0 0 0 2,500 0 005,47 CCCCC1 SR 169 @ 516 (FOUR CORNERS 169 2,500
0 0 0 1,500 0 005,41 ISSATLS ISSAQUAH TRAFFIC LIGHT SYNCHRONIZE 997 1,500
35 0 0 380 0 005,47 MCOP005 SR 18 /SE 304th to SR 516 - Median Cross Over
Protection
018 415
19,000 19,000 19,000 0 0 011,37,41,48,0
5,33,30
Seismc1 BRIDGE SESIMIC RETROFIT - HIGH RISK
ZONE
999 57,000
0 10,000 15,000 0 4,688 030,27,29,28,2
2,44,38
Seismc2 BRIDGE SEISMIC RETROFIT - MODERATE
RISK ZONE
999 29,688
New M
0 0 0 6,920 0 011,33,34,37 01P003A East Marginal Way Ramps 999 6,920
0 0 0 4,000 0 011,41,37 09FMB02 STRANDER BLVD./ SW 27TH ST CONNECTION 999 4,000
23,000 23,000 0 2,200 0 011 P01201A KING STREET STATION TRACK
IMPROVEMENTS
999 48,200
0 0 0 520 0 033 PED 2 DES MOINES CREEK TRAIL 520
T-Nickel
0 0 0 1,580 0 030 100502K I-5/SR 161 I/C & SR 18 I/C 005 1,580
ProjectDetail003 Page 10 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
King
687 0 0 47,540 0 030,33,11 100505A I-5/PIERCE CO. LINE TO TUKWILA I/C - HOV 005 48,227
0 0 0 5,881 0 032 100529C I-5/NE 175TH ST TO NE 205TH ST -
NORTHBOUND AUXILIARY LANE
005 5,881
292 0 0 2,214 0 047,05 101817C SR 18/COVINGTON WAY TO MAPLE VALLEY 018 2,506
153 82 0 1,713 0 005 101820C SR 18/MAPLE VALLEY TO
ISSAQUAH/HOBART RD
018 1,948
0 0 0 1,102 0 005 101822A SR 18/ISSAQUAH/HOBART ROAD TO
TIGERGATE
018 1,102
0 0 0 1,290 0 005 101826A SR 18/TIGERGATE TO I-90 - WIDENING 018 1,290
0 0 0 12,029 0 037,41 109040T I-90/SEATTLE TO MERCER ISLAND - TWO
WAY TRANSIT/HOV
090 12,029
2,279 0 0 476 0 005 109070C I-90/EASTBOUND RAMPS TO SR 18 - SIGNAL 090 2,755
721 0 0 79 0 005 109079A I-90/EB RAMPS TO SR 202 - ROUNDABOUT 090 801
2,596 0 0 9,722 0 030 109908R SR 99/S. 284TH TO S. 272ND ST - HOV 099 12,318
2,076 0 0 7,898 0 032 109956C SR 99/AURORA AVE. N. CORRIDOR PROJECT -
WIDENING/HOV IMPROVEMENTS
099 9,974
0 0 0 21,125 0 031,25,30 116100C SR 161/JOVITA BLVD TO S 360TH ST - WIDEN
TO FIVE LANES, STG 2
161 21,125
0 0 0 601 0 030 116700C SR 167/ELLINGSON RD I/C NB OFF RAMP 167 601
8,804 0 0 30,303 0 030,47,33,11 116703E SR 167/15TH ST. SW TO 15TH ST. NW - HOV 167 39,107
0 0 0 354 0 045,05 120214T SR 202/244TH AVENUE NE INTERSECTION 202 354
0 0 0 229 0 005 120216S SR 202/JCT 292ND AVE SE 202 229
902 0 0 1,514 0 005 120219L SR 202/PRESTON-FALL CITY ROAD & SR 203 202 2,417
0 0 0 0 0 045 120311C SR 203/NE 124TH/NOVELTY RD VIC. 203 0
0 0 0 803 0 047 151632D SR 516/208TH AND 209TH AVE. SE 516 803
0 5,992 32,008 0 0 037 151902A SR 519 INTERMODAL ACCESS PROJECT 519 38,000
16,767 60,515 15,493 7,033 0 048 152040A SR 520/W LAKE SAMMAMISH PKWY TO SR
202 - HOV AND INTERCHANGE STG 3
520 99,807
0 0 0 4,267 0 046,32,01 152201C SR 522/I-5 TO I-405 MULTI-MODAL PROJECT 522 4,267
0 0 0 8,000 0 001 152219A SR 522/UWBCC CAMPUS ACCESS 522 8,000
10,836 0 0 2,689 0 041 190098U SR 900/SE 78TH ST VIC. TO I-90 VIC. -
WIDENING AND HOV
900 13,525
0 0 0 8,622 0 037,11,43,46 800515B I-5 BOEING ACCESS RD TO NORTHGATE EIS 005 8,622
5,000 0 21,300 2,000 111,000 037,11,43,46 800515C I-5 CONC REHAB IN PIERCE, KING, SNOH CO 005 139,300
0 0 0 2,150 0 043 800524P I-5/ROANOKE VICINITY NOISE WALL 005 2,150
ProjectDetail003 Page 11 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
King
0 0 0 3,917 0 011,37,43,36 809936K ALASKAN WAY VIADUCT - EIS 099 3,917
0 0 0 5,000 0 011,37,43,36 809936L ALASKAN WAY VIADUCT - ROW 099 5,000
40,000 40,000 40,000 6,829 0 011,37,43,36 809936M SR 99/ALASKAN WAY VIADUCT - DES/EARLY
RW
099 126,829
0 0 0 8,952 0 030,47,33,11,3
7
816700U SR 167/CORRIDOR STUDY 167 8,952
69,000 26,000 0 29,126 0 011,37 840502B I-405/W VALLEY HIWY TO MAPLE VALLEY
HIWY
405 124,126
45,580 101,900 0 24,253 0 041 840541F I-405/SE 8TH TO I-90 (SOUTH BELLEVUE) 405 171,733
24,440 32,295 40,000 52,709 0 041,48,45,01 840561A I-405/SR 520 TO SR 522 405 149,444
0 0 0 20,194 0 033 850902A SR 509 DESIGN AND CRITICAL R/W 509 20,194
0 0 0 1,413 0 043,48 852002G SR 520 ENVIRONMENTAL IMPACT
STATEMENT
520 1,413
0 0 0 4,294 0 043,48 852002H SR 520 EARLY ROW 520 4,294
13,933 13,042 0 7,052 0 043,48 852002I SR 520 PROJECT DESIGN 520 34,028
1,204,225 1,010,850 1,114,318 859,629 698,869 456,516 5,344,407
Kitsap
A-Nickel
8,824 -9,473 0 398 0 026 301632A SR 16/BURLEY OLALLA INTERCHANGE 016 -251
New G
0 0 0 2,900 0 024,23,35 000000Q State Highways in East Clallam, Jefferson, Kitsap
and Mason Counties Roa
999 2,900
0 0 0 900 0 026 016000A SR 16 /NW OF TACOMA NARROWS TO SE OF
BURLEY/OLALLA - MEDIAN CROSS OVER P
016 900
13,900 0 0 1,100 0 035 300344C SR 3/BELFAIR BYPASS - NEW ALIGNMENT 003 15,000
0 0 0 2,000 0 023,24 3003HCH SR 3 HCB HOLDING LANE 003 2,000
48,436 66 0 113,591 0 024, 23 310407B SR 104/HOOD CANAL BRIDGE EAST HALF 104 162,093
0 0 0 5,000 0 023,24 3307STU SR 307 / SR 104 SAFETY CORRIDOR STUDY 307 5,000
0 1,849 5,954 0 48,060 25,39323 930513E BAINBRIDGE ISLAND MULTIMODAL
TERMINAL IMPROVEMENTS
002 81,256
0 66,424 0 0 0 011,26,40 944460V CONSTRUCT REPLACEMENT
AUTO-PASSENGER FERRY 4-CL 5-NL
055 66,424
T-Nickel
0 0 0 13,628 0 023 300341B SR 3/SR 303 I/C (WAAGA WAY) - NEW RAMP 003 13,628
ProjectDetail003 Page 12 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Kitsap
2,355 11,786 0 925 0 026 301632A SR 16/BURLEY OLALLA INTERCHANGE 016 15,066
1,973 1,910 0 0 0 026 316006B SR 160/SR 16 TO LONGLAKE ROAD VIC 160 3,883
195 0 0 0 0 026,35 330316A SR 303/PORT WASHINGTON NARROWS
BRIDGE - BRIDGE RAIL
303 195
116 0 0 12 0 023 330519A SR 305/AGATE PASS BRIDGE - BRIDGE RAIL 305 128
75,799 5,954 72,562 140,453 48,060 25,393 368,221
Kittitas
New G
0 0 0 1,100 0 013,14,15 000000R State Highways in East Yakima County Roadside
Safety Improvements
999 1,100
0 0 0 1,000 0 012,13 009799S US 97 Kittitas, Chelan and Okanogan Counties
Roadside Safety Improvement
097 1,000
30,225 147,534 147,534 0 109,708 013 509009B I-90 SNOQUALMIE PASS EAST - HYAK TO
KEECHELUS DAM
090 435,000
T-Nickel
0 0 0 447 0 013 509002W I-90/COLUMBIA RIVER BRIDGE - BRIDGE
RAIL RETROFIT
090 447
30,225 147,534 147,534 2,547 109,708 0 437,547
Klickitat
New G
0 0 0 1,000 0 015 009799T US 97 Klickitat County Roadside Safety
Improvements
097 1,000
0 0 0 1,900 0 015 014299D SR 142 Roadside Safety Improvements 142 1,900
T-Nickel
262 0 0 503 0 018,15 401406G SR 14/COLUMBIA RIVER GORGE GUARDRAIL
UPGRADE
014 765
262 0 0 3,403 0 0 3,665
Lewis
New G
0 600 5,400 0 0 020 000655E SR 6/ROCK CREEK (6/103) 006 6,000
0 600 5,400 0 0 020 000655F SR 6/ROCK CREEK (6/102) 006 6,000
1,700 0 0 0 0 020 000799M SR 7 Lewis County Roadside Safety Improvements 007 1,700
ProjectDetail003 Page 13 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Lewis
6,050 500 0 100 0 020 400694B SR 6/SO. FORK CHEHALIS RIVER BRIDGE-
REPLACEMENT
006 6,650
1,800 0 0 200 0 020 450807A SR 508/UNAMED (508/25) 508 2,000
12,000 40,000 80,000 4,000 24,000 020 5frtmob I-5/Mellen Street to Grand Mound 005 160,000
New M
1,000 0 0 6,000 0 020 F01130C CHEHALIS JCT TO BLAKESLY JCT VIA
CENTRALIA - PS&P/TRMW
999 7,000
4,000 7,000 6,000 0 0 049,18,20,02,2
8,27,25
P02001A CASCADES TRAINSETS OVERHAUL 999 17,000
T-Nickel
16,000 3,000 0 8,095 0 020 400506M I-5/CHEHALIS RIVER FLOOD CONTROL 005 27,095
26,000 4,500 0 7,682 0 020 400507R I-5/ RUSH ROAD TO 13TH STREET- ADD
ADDITIONAL LANES
005 38,182
159 0 0 21 0 020 412207G SR 122/ CINEBAR ROAD TO JERRELLS ROAD-
GUARDRAIL UPGRADE
122 180
0 0 0 3,925 0 020 P01010C HIGH SPEED CROSSOVERS-WINLOCK 999 3,925
68,709 96,800 56,200 30,023 24,000 0 275,732
Lincoln
New G
1,010 0 0 0 0 007 000000T State Highways in Lincoln County Roadside Safety
Improvements
999 1,010
0 0 0 1,000 0 007,09 000000Y State Highways in Whitman and South Spokane
Counties Roadside Safety Imp
999 1,000
T-Nickel
0 0 0 858 0 009,07 602100F SR 21, 23, 27, & 272 GUARDRAIL
IMPROVEMENTS
021 858
304 0 0 50 0 007 602502E SR 25/SPOKANE RIVER BRIDGE - THRIE
BEAM GUARDRAIL
025 354
0 0 0 1,208 0 012,07,09 F01110A PALOUSE RIVER & COULEE CITY RR
ACQUISITION
999 1,208
11,568 7,236 703 1,582 0 012,07,09 F01111A PR & CC CHENEY-COULEE-PULLMAN
UPGRADES
999 21,089
12,882 703 7,236 4,698 0 0 25,519
Mason
ProjectDetail003 Page 14 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Mason
New G
0 0 0 2,900 0 024,23,35 000000Q State Highways in East Clallam, Jefferson, Kitsap
and Mason Counties Roa
999 2,900
2,000 0 0 0 0 024,35 000000S State Highways in Grays Harbor, East Jefferson and
Clallam counties Road
999 2,000
13,900 0 0 1,100 0 035 300344C SR 3/BELFAIR BYPASS - NEW ALIGNMENT 003 15,000
1,000 5,000 9,700 0 0 035 3003IMP SR 3 / BELFAIR AREA IMPROVEMENTS 003 15,700
0 0 0 1,000 0 035 310116D US 101/Lynch Road Interchange 101 1,000
2,000 0 0 1,000 0 035 310124C US 101/SR 3 On-ramp to US 101 Northbound -
New Ramp
101 3,000
4,871 71 0 1,200 0 035 310133D US 101/PURDY CREEK BRIDGE
REPLACEMENT
101 6,142
0 0 0 500 0 035 3101LLW SR 101 / MP 341 TO VIC LILLIWAUP 101 500
T-Nickel
0 0 0 947 0 035 310603A SR 106/SKOBOB CREEK - FISH PASSAGE 106 947
23,771 9,700 5,071 8,647 0 0 47,189
Okanogan
New G
600 600 0 0 0 007,12 002099G SR 20 & SR 525 Roadside Safety Improvements 020 1,200
0 0 0 0 3,300 13,00007 015555R SR 155/OKANOGAN RIVER 155 16,300
0 0 0 800 0 007 TORODA TORODA CREEK ROAD IMPROVEMENTS 000 800
New M
0 0 0 1,171 0 012 202005A SR 20/WINTHROP AREA - BIKE PATH 020 1,171
T-Nickel
0 0 0 147 0 007,09,12,13 200002X NC REGION GUARDRAIL IMPROVEMENT
03-05
000 147
0 0 0 890 0 012,07 F01050B CASCADE & COLUMBIA RIVER UPGRADE 999 890
600 0 600 3,008 3,300 13,000 20,508
Pacific
New G
700 0 0 0 0 019 000499J SR 4 and SR 401 Roadside Safety Improvements 999 700
5,600 0 0 1,400 0 019 000655A SR 6/WILLAPA RIVER-LILLY WHEATON 006 7,000
0 800 3,200 0 0 019 010155D SR 101/MIDDLE NEMAH RIVER BRIDGE 101 4,000
ProjectDetail003 Page 15 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Pacific
1,400 7,000 3,600 0 0 019 010555W SR 105/SMITH CREEK 105 12,000
0 2,400 12,000 0 8,600 019 010555X SR 105/NORTH RIVER 105 23,000
0 1,200 11,600 0 0 019 410194A SR 101/BONE RIVER 101 12,800
T-Nickel
0 0 0 355 0 019 410505B SR 105/SMITH CREEK BRIDGES - BRIDGE
RAIL RETROFIT
105 355
0 0 0 222 0 019 410505G SR 105/ SMITH CREEK BRIDGE TO ALEXSON
ROAD GUARDRAIL UPGRADE
105 222
0 0 0 130 0 019 440107G SR 401/ US 101 TO EAST OF MEGLER REST
AREA VICINITY-GUARDRAIL UPGRADE
401 130
7,700 30,400 11,400 2,107 8,600 0 60,207
Pend Oreille
New G
10,800 0 0 1,200 0 007 003155I SR 31/SLATE CREEK 031 12,000
T-Nickel
0 0 0 13,575 0 007 603199A SR 31/METALINE FALLS TO INT`L BORDER 031 13,575
10,800 0 0 14,775 0 0 25,575
Pierce
New G
2,000 0 0 0 0 024,35 000000S State Highways in Grays Harbor, East Jefferson and
Clallam counties Road
999 2,000
0 0 0 1,000 0 002,20 000000V State Highways in Pierce and Thurston Counties
Roadside Safety Improveme
999 1,000
0 800 0 0 0 001,10,11,21,3
7,38,40
001199A SR 11, SR 525 and SR 900 Roadside Safety
Improvement
999 800
0 0 0 500 0 025,31 016700A SR 167/SR 410 TO PIERCE/KING COUNTY LINE
- MEDIAN CROSS OVER PROTECTION
167 500
6,000 0 0 0 0 025,27 01F015A Shaw Rd. Extension 999 6,000
16,000 0 0 800 0 031 041000A SR 410, WHITE RIVER 410 16,800
0 0 0 300 0 031 041000C SR 410 / TRAFFIC AVE TO 166TH AVE E-
MEDIAN CROSS OVER PROTECTION
410 300
900 0 0 300 0 002,31 041099K SR 410 and SR 164 Roadside Safety Improvement 999 1,200
24,786 97,899 0 2,500 0 025,27,29 300569H I-5/SR 167/TACOMA IMPROVEMENTS 005 125,185
ProjectDetail003 Page 16 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Pierce
60,000 60,000 0 60,000 0 027,25 316718A SR 167/SR 509 TO I-5 - NEW FREEWAY 167 180,000
0 0 5,000 0 5,000 002,28 370401A SR 704/CROSS BASE HIGHWAY - NEW
ALIGNMENT
704 10,000
89,000 50,000 0 7,000 0 025,30,31,47 8167012 SR 167 - SR 410 TO 15TH ST SW - HOV 167 146,000
0 0 0 850 0 002 EVAC ORTING BRIDGE FOR KIDS 162 850
7,700 6,300 0 1,000 0 002 ORTING BR SR 162 PUYALLUP RIVER BRIDGE 162 15,000
0 10,000 15,000 0 4,688 030,27,29,28,2
2,44,38
Seismc2 BRIDGE SEISMIC RETROFIT - MODERATE
RISK ZONE
999 29,688
New M
0 0 0 4,200 0 025 01F010A LINCOLN AVE GRADE SEPARATION 000 4,200
4,000 7,000 6,000 0 0 049,18,20,02,2
8,27,25
P02001A CASCADES TRAINSETS OVERHAUL 999 17,000
2,449 160 13,356 0 29,920 02,27,28,29,02 PO1008A PT DEFIANCE (LAKEWOOD) BYPASS-PHASE 1 999 45,885
T-Nickel
0 0 0 21,125 0 031,25,30 116100C SR 161/JOVITA BLVD TO S 360TH ST - WIDEN
TO FIVE LANES, STG 2
161 21,125
593 908 908 0 0 002 300029N REGION WIDE BRIDGE RAIL/GUARD RAIL
UPGRADE
000 2,409
13,178 13,845 0 2,811 0 025,27 300504B I-5/PORT OF TACOMA RD TO KING CO LINE -
HOV
005 29,834
40,600 62,820 52,148 0 0 029,27 300567A I-5/SR 16 I/C / 38TH ST I/C - CORE HOV 005 155,568
12,540 0 0 73,904 0 029,27 300568A I-5/S 48TH TO PACIFIC AVENUE - CORE HOV 005 86,444
149 0 0 58 0 025 300590D I-5/ARDENA ROAD OVERCROSSING - BRIDGE
RAIL
005 207
0 0 0 9,173 0 002,29 300706B SR 7/SR 507 TO SR 512 - SAFETY 007 9,173
0 0 0 47,816 0 029,27,28 301636A SR 16/I-5 TO TACOMA NARROWS BRIDGE -
HOV
016 47,816
30 0 0 4,873 0 026 301638B SR 16/36TH ST TO OLYMPIC DR NW - CORE
HOV
016 4,903
1,906 0 0 0 0 031 316109A SR 161/SR 167 EASTBOUND RAMP - SAFETY 161 1,906
0 0 0 5,574 0 002,25 316114A SR 161/204TH STREET TO 176TH STREET -
WIDENING
161 5,574
6,180 9,200 0 3,217 0 031,25 316118A SR 161/36TH TO JOVITA - WIDENING 161 18,597
0 0 0 2,439 0 002 316119A SR 161/234TH STREET TO 204TH STREET E -
WIDENING
161 2,439
ProjectDetail003 Page 17 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Pierce
0 0 0 480 0 002 316511A SR 165/SR 165 GUARDRAIL UPGRADE -
GUARD RAIL
165 480
0 0 0 371 0 027,25 316712A SR 167/SR 509 TO SR 161, EIS 167 371
16,653 0 0 17,969 0 027,25 316718A SR 167/SR 509 TO I-5 - NEW FREEWAY 167 34,622
0 0 0 6,038 0 025 316718C SR 167/I-5 TO SR 161 - NEW FREEWAY 167 6,038
4,300 0 0 1,700 0 031 341015A SR 410/214TH AVE E TO 234TH - WIDENING 410 6,000
0 0 0 15,000 0 002,28 370401A SR 704/CROSS BASE HIGHWAY - NEW
ALIGNMENT
704 15,000
3,900 0 0 0 0 002 P01007B HIGH SPEED CROSSOVERS-KETRON 999 3,900
1,065 3,379 7,480 1,775 0 02,27,28,29,02 PO1008A PT DEFIANCE (LAKEWOOD) BYPASS-PHASE 1 999 13,699
313,928 99,892 322,311 292,776 39,608 0 1,068,516
San Juan
New G
0 66,424 0 0 0 011,26,40 944460V CONSTRUCT REPLACEMENT
AUTO-PASSENGER FERRY 4-CL 5-NL
055 66,424
0 0 66,424 0 0 0 66,424
Skagit
A-Nickel
3,800 0 0 52 0 010,40 102027C SR 20/QUIET COVE RD. VIC. TO SR 20 SPUR 020 3,852
New G
750 0 0 650 0 001,10,24,40,4
2,44
000999N SR 9, SR 11 and SR 20 Roadside Safety
Improvement
999 1,400
1,000 0 0 0 0 010,39,40,42 002099F SR 20 and SR 530 Roadside Safety Improvement 999 1,000
500 500 0 0 0 010,39,43,44,4
8
009299O SR 92, SR 520, SR 530 and SR 534 Roadside
Safety Improvement
999 1,000
5,000 0 0 5,000 0 040 1005000 I-5/ SR 11 INTERCHANGE/ JOSH WILSON RD
REALIGNMENT
005 10,000
100 0 0 1,076 0 010,40 100560A I-5/300TH ST NW VIC TO ANDERSON RD VIC 005 1,176
0 0 0 497 0 040,10 100569B I-5/SR 11 VIC TO WEIGH STATION VIC 005 497
1,600 3,050 14,000 500 0 040 102029S SR 20/ Sharpes Corner Vic. - Interchange 020 19,150
0 66,424 0 0 0 011,26,40 944460V CONSTRUCT REPLACEMENT
AUTO-PASSENGER FERRY 4-CL 5-NL
055 66,424
0 0 0 800 0 040 STUDY 3 SR 534 ACCESS POINT DECISION REPORT 005 800
ProjectDetail003 Page 18 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Skagit
T-Nickel
0 0 0 1,343 0 040 100566B I-5/2ND STREET BRIDGE - REPLACE BRIDGE 005 1,343
1,532 0 0 651 0 010 102023I SR 20/DUCKEN ROAD TO ROSARIO ROAD 020 2,183
5,746 0 0 1,314 0 010,40 102027C SR 20/QUIET COVE RD. VIC. TO SR 20 SPUR 020 7,060
48,132 2,527 0 20,628 0 010,40 102039A SR 20/FREDONIA TO I-5 - WIDENING 020 71,287
16,089 13,292 2,978 27,526 0 040 902019U ** Anacortes Multimodal Terminal ** NA 001 59,885
0 0 0 2,470 0 010 P01101A MT. VERNON SIDING UPGRADE 999 2,470
84,249 16,978 85,793 62,506 0 0 249,527
Skamania
New G
100 600 500 0 0 001, 10, 21,
31, 38, 41,
47
016999E SR169, SR410, SR525, SR900 and SR 520
Roadside Safety Improvement
999 1,200
T-Nickel
262 0 0 503 0 018,15 401406G SR 14/COLUMBIA RIVER GORGE GUARDRAIL
UPGRADE
014 765
362 500 600 503 0 0 1,965
Snohomish
New G
350 0 0 850 0 039 000299Q US 2 & SR 92 Roadside Safety Improvement 002 1,200
750 0 0 650 0 001,10,24,40,4
2,44
000999N SR 9, SR 11 and SR 20 Roadside Safety
Improvement
999 1,400
0 800 0 0 0 001,10,11,21,3
7,38,40
001199A SR 11, SR 525 and SR 900 Roadside Safety
Improvement
999 800
500 500 0 0 0 010,39,43,44,4
8
009299O SR 92, SR 520, SR 530 and SR 534 Roadside
Safety Improvement
999 1,000
600 0 0 0 0 001,05,32,39,4
3,45,46
020399H SR 203 and SR 522 Roadside Safety Improvement 999 600
22,400 0 0 5,600 0 038 052955B SR 529/EBEY SLOUGH 529 28,000
15,000 0 0 3,000 0 010 053255C SR 532/GEN MARK W CLARK MEM BRIDGE 532 18,000
100 0 0 1,076 0 010,40 100560A I-5/300TH ST NW VIC TO ANDERSON RD VIC 005 1,176
38,500 0 0 5,500 0 021 1005INC1 I-5 / 196TH ST (SR 524) I/C SB BRAIDED RAMP 005 44,000
ProjectDetail003 Page 19 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Snohomish
5,600 12,100 0 500 0 001,21 1005INC2 I-5 / SR 525 INTERCHANGE NEW RAMP PHASE
1
005 18,200
37,200 0 0 3,200 0 038 1005INC4 I-5 / 41ST ST INTERCHANGE IMPROVEMENTS 005 40,400
15,600 0 0 2,200 0 010 1005INC5 I-5 / 172ST ST (SR 531 SMOKEY POINT)
INTERCHANGE IMPROVEMENTS
005 17,800
3,000 0 0 1,000 0 044 1009MR1 SR 9 / MARSH ROAD INTERSECTION
IMPROVEMENTS
009 4,000
0 0 0 931 0 021 109970E SR 99 N OF LINCOLN WAY SIDEWALKS 099 931
11,000 58,000 50,000 4,000 0 001,44 109INT SR 9 CORRIDOR IMPROVEMENTS 009 123,000
14 0 0 446 0 010 153100S SR 531/LAKEWOOD SCHOOLS SIDEWALKS 531 460
9,433 21,024 28,938 1,910 0 010 1532000 SR 532 - I-5 SAFETY CORRIDOR IMPMTS 532 61,305
0 0 0 1,540 0 038 JJJJJJ1 STATE AVE OVER-CROSSING 000 1,540
19,000 19,000 19,000 0 0 011,37,41,48,0
5,33,30
Seismc1 BRIDGE SESIMIC RETROFIT - HIGH RISK
ZONE
999 57,000
0 10,000 15,000 0 4,688 030,27,29,28,2
2,44,38
Seismc2 BRIDGE SEISMIC RETROFIT - MODERATE
RISK ZONE
999 29,688
New M
0 0 0 4,300 0 038 99F011B 41ST ST./ RIVERFRONT PARKWAY PHASE 2 000 4,300
0 0 0 1,800 0 038 RAIL 2 SNOHOMISH RIVERFRONT
REDEVELOPMENT (RAIL)
1,800
0 0 0 5,000 0 010 RAIL 3 STANWOOD COMMUTER RAIL STATION 000 5,000
0 0 0 1,500 0 021 RAIL 4 MULKILTEO TEMPORARY SOUNDER
STATION
1,500
T-Nickel
603 0 0 90 0 039 100236E PICKLE FARM ROAD/GUNN ROAD 002 694
9 0 0 2,416 0 021,01,44,38 100535H I-5/52ND AVE W. TO SR 526 - SB SAFETY 005 2,424
88,000 0 0 112,968 0 044,38 100543M I-5/SR 526 TO MARINE VIEW DRIVE - HOV
LANES
005 200,968
1,243 0 0 6,011 0 010 100552S I-5/SR 532 NORTHBOUND INTERCHANGE
RAMPS
005 7,255
0 0 0 8,876 0 001 100900E SR 9/SR 522 TO 228TH ST. SE - WIDENING 009 8,876
11,585 14,183 34,789 1,115 0 001 100900F SR 9/212TH ST SE TO 176TH ST SE - WIDEN
TO FIVE LANES, STG 3
009 61,672
3,935 0 0 990 0 001,44 100900V SR 9/176TH ST SE VIC TO SR 96 - SAFETY 009 4,925
ProjectDetail003 Page 20 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Snohomish
0 0 0 12,962 0 001 100901B SR 9/228TH ST SE TO 212TH ST SE(SR 524) -
WIDEN TO FIVE LANES, STG 2
009 12,962
537 0 0 275 0 039 100924A SR 9/108TH STREET NE (LAUCK ROAD) 009 812
10,495 0 0 1,617 0 039 100930H SR 9/SCHLOMAN ROAD TO 256TH STREET E. 009 12,112
527 0 0 81 0 039 100930I SR 9/252ND ST NE VICINITY - RECHANNELIZE 009 609
1,139 0 0 175 0 010,39 100931C SR 9/268TH STREET INTERSECTION 009 1,314
8,657 63,087 32,122 4,092 946 039 152234E SR 522/SNOHOMISH RIVER BRIDGE TO US 2 -
WIDENING AND SAFETY
522 108,905
634 0 0 6,445 0 044 152720A SR 527/132ND ST. SE TO 112TH ST. SE -
WIDEN TO FIVE LANES
527 7,079
0 0 0 0 0 021 910413O ** Edmonds Multimodal Terminal ** MMTA 006 0
60,724 47,251 0 10,249 0 021 952515K ** Mukilteo Multimodal Terminal ** MMTA 012 118,224
0 0 0 13,000 0 038 P01102A PA JCT. TO DELTA JCT. SPEED INCREASE 999 13,000
2,750 0 0 250 0 010 P01104A STANWOOD SIDING UPGRADES 999 3,000
369,886 179,849 245,946 226,617 5,634 0 1,027,931
Spokane
New G
840 170 0 0 0 007,09 000000W State Highways in Spokane, Stevens and Pend
Oreille Counties Roadside Sa
999 1,010
0 0 0 1,000 0 007,09 000000Y State Highways in Whitman and South Spokane
Counties Roadside Safety Imp
999 1,000
0 0 3,200 0 16,000 14,80003 029055L SR 290/SPOKANE RIVER 290 34,000
42,500 42,500 65,000 0 0 003,06,07 6000NSC NORTH SPOKANE CORRIDOR 395 150,000
0 0 0 663 0 004 609049A I-90/HARVARD ROAD PEDESTRIAN
OVERCROSSING
090 663
0 0 0 600 0 003 609201C SR 902 MEDICAL LK INTERCHANGE 902 600
New M
200 0 0 800 0 004,07 600229S US 2/Colbert Road Intersection Improvements 002 1,000
0 0 0 1,500 0 007,09 F01112A GEIGER SPUR CONNECTION 000 1,500
T-Nickel
18,470 0 0 41,908 0 004,03,07 600001A NSC-FRANCIS AVENUE TO FARWELL ROAD -
CONSTRUCT NEW ROADWAY
395 60,378
35,640 35,500 0 8,564 0 003,04,07 600003A NSC-US 2 TO WANDERMERE & US 2
LOWERING - CONSTRUCT NEW ROADWAY
395 79,704
ProjectDetail003 Page 21 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Spokane
0 0 0 7,771 0 004 609029I I-90/PINES ROAD TO SULLIVAN ROAD-WIDEN
ROADWAY AND ADD LANES
090 7,771
0 0 0 4,291 0 004 609029V I-90/ARGONNE ROAD TO PINES ROAD-WIDEN
ROADWAY AND ADD LANES
090 4,291
652 0 0 85 0 006,03 609047J I-90/THRIE BEAM GUARDRAIL ON TWO
BRIDGES
090 737
0 0 0 52 0 004 609049D I-90/SULLIVAN-STATE LINE MEDIAN
BARRIER
090 52
296 0 0 730 0 009 626002G SR 260,263, & 278/GUARDRAIL
IMPROVEMENTS
260 1,025
0 0 0 1,208 0 012,07,09 F01110A PALOUSE RIVER & COULEE CITY RR
ACQUISITION
999 1,208
11,568 7,236 703 1,582 0 012,07,09 F01111A PR & CC CHENEY-COULEE-PULLMAN
UPGRADES
999 21,089
0 0 0 3,500 0 007,09 F01112A GEIGER SPUR CONNECTION 000 3,500
110,165 68,903 85,406 74,254 16,000 14,800 369,528
Stevens
New G
1,010 0 0 0 0 007 000000T State Highways in Lincoln County Roadside Safety
Improvements
999 1,010
900 0 0 0 0 007 000000U State Highways in North Stevens and Ferry
Counties Roadside Safety Impro
999 900
840 170 0 0 0 007,09 000000W State Highways in Spokane, Stevens and Pend
Oreille Counties Roadside Sa
999 1,010
T-Nickel
304 0 0 50 0 007 602502E SR 25/SPOKANE RIVER BRIDGE - THRIE
BEAM GUARDRAIL
025 354
398 0 0 50 0 007 602511D SR 25/COLUMBIA RIVER BRIDGE - THRIE
BEAM GUARDRAIL
025 448
3,452 0 170 100 0 0 3,722
Thurston
New G
0 0 0 1,000 0 002,20 000000V State Highways in Pierce and Thurston Counties
Roadside Safety Improveme
999 1,000
ProjectDetail003 Page 22 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Thurston
16,500 15,000 0 1,500 0 002 351025A SR 510/YELM LOOP - NEW ALIGNMENT 510 33,000
0 0 0 5,000 0 022 NOISE1 THURSTON NOISE WALL 005 5,000
0 10,000 15,000 0 4,688 030,27,29,28,2
2,44,38
Seismc2 BRIDGE SEISMIC RETROFIT - MODERATE
RISK ZONE
999 29,688
0 0 0 500 0 022 STUDY1 WEST OLYMPIA ACCESS STUDY 101 500
New M
4,000 7,000 6,000 0 0 049,18,20,02,2
8,27,25
P02001A CASCADES TRAINSETS OVERHAUL 999 17,000
T-Nickel
28,053 41,724 0 2,673 0 020 300581A I-5/GRAND MOUND TO MAYTOWN -
WIDENING
005 72,450
29 0 0 15 0 022 300590E I-5/CAPITOL BLVD OVERCROSSING - BRIDGE
RAIL
005 44
0 0 0 3,875 0 020,22 P01007A HIGH SPEED CROSSOVERS-CENTENNIAL 999 3,875
3,875 0 0 0 0 020 P01007C HIGH SPEED CROSSOVERS-TENINO 999 3,875
52,457 21,000 73,724 14,563 4,688 0 166,432
Wahkiakum
New G
700 0 0 0 0 019 000499J SR 4 and SR 401 Roadside Safety Improvements 999 700
1,900 0 0 0 0 016 001299P US 12 Waitsburg to Asotin Roadside Safety
Improvements
012 1,900
T-Nickel
990 0 0 3,390 0 019 400495B SR 4/SVENSEN`S CURVE - REALIGNMENT 004 4,380
3,590 0 0 3,390 0 0 6,980
Walla Walla
New G
3,230 0 0 1,000 0 016 01F025A SR 125/ SR 12 Interconnect (Myra Rd. Ext 999 4,230
33,577 0 0 2,423 0 016 501203X US 12 MCDONALD ROAD TO WALLA WALLA
- ADD LANES
012 36,000
9,000 10,000 0 1,000 0 016 501212I US 12/SR 124 BURBANK Interchange 012 20,000
T-Nickel
0 0 0 199 0 016 501202Z WALLA WALLA TO WALLULA PLANNING
STUDY
012 199
ProjectDetail003 Page 23 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Walla Walla
532 138 0 1,865 0 016 501203X US 12 MCDONALD ROAD TO WALLA WALLA
- ADD LANES
012 2,535
0 0 0 5,285 0 016 501204C US 12/SR 124 TO MCNARY POOL - ADD
LANES
012 5,285
8,900 0 0 1,527 0 016 501205D US 12/ATTALIA VIC. TO US 730 - ADD LANES 012 10,427
2,501 0 0 6,449 0 016 501211W US 12/ATTALIA VIC. - ADD LANES 012 8,950
0 0 0 494 0 016 512401Z GUARDRAIL UPGRADE - BENTON, FRANKLIN
AND WALLA WALLA COUNTIES
124 494
0 0 0 91 0 016 573001Z GUARDRAIL UPGRADE - BENTON, FRANKLIN
& WALLA WALLA COUNTIES
730 91
252 1,904 3,157 0 0 016 F01021A PORT OF COLUMBIA RAILROAD
IMPROVEMENTS
999 5,313
57,991 3,157 12,042 20,334 0 0 93,524
Whatcom
New G
50 0 0 320 0 040,42 000588B I-5 /SR 11 TO 36TH STREET - MEDIAN CROSS
OVER PROTECTION
005 370
100 0 0 790 0 042 000588C I-5 /MAIN STREET TO SR 548 - MEDIAN
CROSS OVER PROTECTION
005 890
750 0 0 650 0 001,10,24,40,4
2,44
000999N SR 9, SR 11 and SR 20 Roadside Safety
Improvement
999 1,400
0 800 0 0 0 001,10,11,21,3
7,38,40
001199A SR 11, SR 525 and SR 900 Roadside Safety
Improvement
999 800
1,000 0 0 0 0 010,39,40,42 002099F SR 20 and SR 530 Roadside Safety Improvement 999 1,000
3,000 0 0 750 0 039 053000A SR 530 SAUK RIVER (SITE #2) 530 3,750
0 0 0 1,300 0 040,42 054299L SR 542 and SR 547 Roadside Safety Improvement 999 1,300
0 0 0 4,680 0 040,42 100585Q I-5/36TH ST VIC. TO SR 542 VIC. 005 4,680
71 0 0 308 0 042 100590B I-5/SR 542 VIC TO BAKERVIEW ROAD 005 379
7,550 2,600 0 150 0 042 1005XXD I-5/Downtown Bellingham On/Off Ramps - Ramp
Reconstruction
005 10,300
25,000 0 0 5,000 0 042 SAFETY 2 I-5 BLAINE INTERCHANGE 005 30,000
New M
0 0 0 3,000 0 042 P01105A Swift Customs Facility/Blaine & White Rock Siding 999 3,000
ProjectDetail003 Page 24 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Whatcom
5,000 0 0 0 0 042 RAIL 1 BELLIGNHAM WATERFRONT RESTORATION
PROJECT
000 5,000
T-Nickel
0 0 0 996 0 040 100584A SB RAMPS AT SR 11/OLD FAIRHAVEN
PARKWAY
005 996
0 0 707 0 0 042 100591Y I-5/BAKERVIEW RD TO NOOKSACK R BR
(SLATER RD INTERCHANGE)-SAFETY IMPRV.
005 707
484 0 0 13,420 0 042 100955A SR 9/NOOKSACK RD VIC TO CHERRY ST 009 13,904
62,111 8,000 0 8,726 0 042 153910A SR 539/TENMILE ROAD TO SR 546 -
WIDENING
539 78,837
5,145 0 0 13,087 0 042 154302E SR 543/I-5 TO INTERNATIONAL BNDY. 543 18,232
180 0 0 0 0 042 P01100A BELLINGHAM-GP AREA UPGRADES 999 180
110,441 707 11,400 53,177 0 0 175,725
Whitman
New G
0 0 0 1,000 0 007,09 000000Y State Highways in Whitman and South Spokane
Counties Roadside Safety Imp
999 1,000
0 800 3,200 0 0 009 019555K SR 195/SPRING FLAT CREEK 195 4,000
3,200 0 0 800 0 009 602704A SR 27/PINE CREEK BRIDGE - BRIDGE
REPLACEMENT
027 4,000
T-Nickel
0 0 0 68 0 009 512801Z GUARDRAIL UPGRADE - COLUMBIA,
GARFIELD AND WHITMAN COUNTIES
128 68
0 0 0 858 0 009,07 602100F SR 21, 23, 27, & 272 GUARDRAIL
IMPROVEMENTS
021 858
0 0 0 1,079 0 009 619400C SR 194/GUARDRAIL IMPROVEMENTS 194 1,079
296 0 0 730 0 009 626002G SR 260,263, & 278/GUARDRAIL
IMPROVEMENTS
260 1,025
3,000 0 0 17,890 0 009 627000E SR 270/PULLMAN TO IDAHO STATE LINE -
WIDEN ROADWAY AND ADD LANES
270 20,890
0 0 0 1,208 0 012,07,09 F01110A PALOUSE RIVER & COULEE CITY RR
ACQUISITION
999 1,208
11,568 7,236 703 1,582 0 012,07,09 F01111A PR & CC CHENEY-COULEE-PULLMAN
UPGRADES
999 21,089
18,064 3,903 8,036 25,214 0 0 55,217
ProjectDetail003 Page 25 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
Yakima
New G
0 0 0 1,100 0 013,14,15 000000R State Highways in East Yakima County Roadside
Safety Improvements
999 1,100
0 0 0 1,900 0 014,15 000000X State Highways in West Yakima County Roadside
Safety Improvements
999 1,900
400 1,600 0 0 0 015 024155O SR 241/ DRY CREEK BRIDGE 241 2,000
0 0 0 250 0 014 041000B SR 410 RATTLESNAKE CREEK 410 250
457 1,479 0 4,065 0 014 501211N US 12/TIETON RIVER WEST CROSSING 012 6,000
0 0 0 4,000 0 014 501211P US 12/TIETON RIVER EAST CROSSING 012 4,000
19,000 0 0 10,000 0 014 508201O I-82/VALLEY MALL BLVD I/C
IMPROVEMENTS
082 29,000
0 0 0 111 0 014,13 582301Z SR 823 GOODLANDER TO HARRISON ROAD
SIDEWALK COMPLETION
823 111
1,000 0 0 600 0 014 Chronic US 12, Naches River 012 1,600
7,300 0 0 0 0 014 WENAS WENAS CORRIDOR/SR 823 IMPROVEMENTS 823 7,300
T-Nickel
0 0 4,000 0 0 014 501208J US 12/OLD NACHES HIGHWAY -
INTERCHANGE
012 4,000
264 6,583 0 0 0 015 502201U SR 22/I-82 TO MCDONALD ROAD 022 6,847
779 0 0 25,099 0 014,13 502402E SR 24/I-82 TO KEYS ROAD - ADD LANES 024 25,878
0 0 0 331 0 014 541002Z GUARDRAIL UPGRADE - YAKIMA COUNTY 410 331
0 0 0 25 0 014 582302Z GUARDRAIL UPGRADE - YAKIMA COUNTY 823 25
0 0 0 640 0 015 F01171A TS&W YAKAMA SAWMILL TRAFFIC
UPGRADES
999 640
29,199 4,000 9,662 48,121 0 0 90,982
(None)
New G
3,918 3,915 4,000 1,002 4,000 2,00000 FISH05 Fish Passage Barriers 999 18,836
6,000 6,000 6,000 0 6,000 18,00000 FMSIB FMSIB RESERVE 999 42,000
2,000 2,000 2,000 2,000 2,000 6,00000 PED BK PEDESTRIAN SAFETY 997 16,000
3,000 3,000 3,000 7,000 3,000 11,00000 PK RIDE PARK & RIDE PLACEHOLDER - GAS TAX
FUNDED
000 30,000
New M
2,000 2,000 2,000 2,000 2,000 6,00000 000SAFE SAFE ROUTES TO SCHOOLS 999 16,000
ProjectDetail003 Page 26 of 28 Apr 21, 2005 12:31PM
Printed by the Senate Transportation Committee - Ver 1 : 05STCv13 (4/18/05)
As Passed Senate Floor 4-20-05 Advanced Nickel Projects (A-Nickel), Other Nickel Projects (T-Nickel), New Gas Tax Projects and New
Multimodal Projects
($ in Thousands)
Leg Dist PIN Project Title Route 05-07 07-09 09-11 11-13 13-15 Future Total
(None)
6,000 6,000 6,000 0 6,000 18,00000 FMSIB FMSIB RESERVE 999 42,000
4,000 4,000 5,000 559 5,000 21,00000 PED BK PEDESTRIAN SAFETY 997 39,559
0 8,750 20,644 0 10,080 120,00000 WTPRAIL WTP Freight and Passenger Rail Strategy 999 159,474
T-Nickel
-6 -6 -6-4 0 000 00MMRWC MIDDLE MANAGEMENT REDUCTION - W 997 -22
423 0 0 173 0 000 199903M PUGET SOUND AREA AND SR 2 GUARDRAIL
UPGRADE
999 596
67 0 0 1,279 0 000 199903N GEORGE WASHINGTON MEMORIAL BRIDGE
RAIL UPGRADE
999 1,346
66,525 0 0 0 0 000 944460U ** Construct Replacement Auto-Passenger Ferry 3
** NA
056 66,525
15,689 14,091 954 7,465 0 000 999940D ** Catch-Up Preservation ** NA 021 38,199
109,616 49,592 49,750 21,474 38,080 202,000 470,512
ProjectDetail003 Page 27 of 28 Apr 21, 2005 12:31PM