tein2 project - initial consideration (revised) - 2003. 12. 20 kilnam chon

11
TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

Upload: lester-hampton

Post on 13-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

TEIN2 Project - Initial Consideration (revised) -

2003. 12. 20

Kilnam Chon

Page 2: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

Content

1.TEIN2 Project

2.ASEM Countries : Asia

3.Backbones

4.Link for Each Developing Country

5.Remark

Appendix

Page 3: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

1. TEIN2 Project

Connecting Asian countries of ASEM, and to Europe for promotion of research and development.

Harmonize development of domestic research and education networks to TEIN2 and other international networks.

Multi-year project in February 2004 - December 2007 with 3 million ecu per year from Europe to cover 80% or less with the rest to be covered by Asia.

DANTE is carrying on the study now.

Page 4: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

2. ASEM Countries: Asia

ASEAN: Brunei, Singapore, Indonesia, Malaysia, Philippines, Thailand, Vietnam

CJK: China, Japan, Korea

Page 5: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

3. Backbones

(1) Inter-Continental Link could use the existing links (Europe to JP, HK, or CN) with 2.5 Gbps, more or expand the current link of France-Korea to 1 Gbps or more, or install a new link.

(2) Intra-Asia Backbone

Connect North Asia Cluster of China-Hong Kong-Japan-Korea to Southeast Asia Cluster of Malaysia-Singapore-Thailand with 1 Gbps or more.

Page 6: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

4. Link for Each Developing Country

Indonesia, Malaysia, Philippines, Thailand,and Vietnam may connect to the proposedcluster (hub) or to one of the North Asiaclusters (CN, HK, JP, KR) at 45~155 Mbps.

Page 7: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

5. Remark

(1) We may support development of domestic

research and education network through

this project. Thus, good representation and

participation from these developing countries are

very important.

(2) We may add other countries in Southeast Asia

and/or South Asia by expanding the project scope

or by developing complementary projects.

Page 8: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

D. West, EUMED, APAN Meetings, Busan, 2003.8.F. Utreras, CLARA, CCIRN Meeting, 2003.10.K. Chon, Latest Gigabit/Lamba Networking in Asia and the WorldK. Chon, APAN

Reference

Page 9: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

Appendix 1: A Candidate Network Topology

DANTE(France)

North Asia Cluster(Korea-China-HongKong-Japan)

South East Asia Cluster(Malaysia-Singapore-Thailand)

Philippines Vietnam Indonesia

1~2.5 Gbps

155~622 Mbps

Page 10: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

Appendix 2: APAN Link Status -1Countries Network Bandwidth(Mbps) Availability AUP/Remark

AU-JP AARNet 155 (plan) R&E

AU-US AARNet 340 Now R&E, 20Gbps in 2004Q2

CN-HK CERNET/HARNET 2 Now R&E, (1~2.5Gbps in 2004)

CN-HK CSTNET (Gloriad) 155 Now R&E, 2.5Gbps in 2004

CN-JP CERNET 10 Now R&E

CN-JP CERNET 45 Now Native IPv6

CN-UK CERNET 45 Now R&E

CN-US CERNET 10 Now Research

CN-US CERNET 200 Now R&E

CN-US CSTNET (Gloriad) 55 Now Research

CN-RU-US Gloriad 10 Gbps 2004 R&E (through Amsterdam)

HK-US HARNET 45 Now R&E

HK-TW HARNET/TANET 10 Now R&E

JP-HK APII 45 Now R&E, (2.5Gbps in 2004Q2)

JP-ID AI3(ITB) 2/1.5 Now R&E

JP-KR APII 2Gbps Now Research (APII)

JP-LK AI3(ICT) 1.5/0.5 (plan) R&E

JP-MY AI3(USM) 1.5/0.5 Now R&E

JP-PH AI3(ASTI) 1.5/0.5 Now R&E

JP-PH MAFFIN 2 Now Research

JP-SG AI3(SICU) 1.5/0.5 Now R&E

JP-SG   1Gbps (plan) R&E

JP-TH AI3(AIT) 1.5/0.5 Now R&E

JP-TH SINET (ThaiSarn) 2 Now R&E

JP-US TransPac 5 Gbps Now R&E, (20Gbps in 2004)

JP-VN AI3(IOIT) 1.5/0.5 Now R&E

Page 11: TEIN2 Project - Initial Consideration (revised) - 2003. 12. 20 Kilnam Chon

Appendix 2: APAN Link Status -2

Countries Network Bandwidth(Mbps) Availability AUP/Remark

KR-CN APII 45~155 2004Q1 R&E

KR-FR KOREN/RENATER 34 Now Research (TEIN)

KR-MY TEIN 8 2004 R&E

KR-SG APII(KOREN) 8 Now R&E

KR-US KOREN/KREONet2 155 Now R&E

LK-JP LEARN 3 Now R&E

MY-TH TEMAN/ThaiSarn 8~45 (plan) R&E

SG-US SingaREN 90 Now R&E

TH-US Uninet 155 Now R&E

TW-HK ASNET/TANET2 155 Now R&E

TW-JP ASNET/TANET2 155 Now R&E

TW-US ASNET/TANET2 622 Now R&E, 5Gbps in 2003Q4

TW-UK ASNET/TANET2 155 Now R&E, through US

US-JP IEEAF 10.6Gbps 2003 Q4 R&E

Non APAN Links  

Countries Network Bandwidth(Mbps) Availability AUP

IN-CH LHC 155 2004 Research (HEP)

IN-US/UK ERNET 16 Now R&E

JP-(US)-EU SINET 2.5 Gbps +155 Now R&E / No Transit

JP-US SINET 5 Gbps Now R&E / No Transit