tecnosapien2
DESCRIPTION
perfil minaTRANSCRIPT
5365 5530 5695
3570
3670
3770
Sec 1850N A= 59.8m2/1,495.1m3 B= 88.8m2/2,219.1m3
5365 5530 5695
3560
3660
3760
Sec 1875N A= 24.4m2/610.8m3 B= 63.0m2/1,574.0m3
5365 5530 5695
3550
3650
3750
Sec 1900N A= 6.9m2/173.4m3 B= 675.4m2/16,883.8m3
5365 5530 5695
3540
3640
3740
Sec 1925N B= 1,654.2m2/41,353.9m3
5365 5530 5695
3530
3630
3730
Sec 1950N A= 19.4m2/485.2m3 B= 3,350.8m2/83,770.5m3
5365 5530 5695
3520
3620
3720
Sec 1975N A= 41.7m2/1,043.1m3 B= 5,555.1m2/138,876.7m3
5365 5530 5695
3510
3610
3710
Sec 2000N A= 34.3m2/856.5m3 B= 8,447.3m2/211,182.1m3
5365 5530 5695
3500
3600
3700
Sec 2025N B= 11,823.8m2/295,596.1m3
5365 5530 5695
3490
3590
3690
Sec 2050N A= 13.4m2/334.0m3 B= 15,690.9m2/392,271.8m3
5365 5530 5695
3480
3580
3680
Sec 2075N B= 19,745.7m2/493,643.6m3
5365 5530 5695
3470
3570
3670
Sec 2100N B= 20,216.2m2/505,405.4m3
5365 5530 5695
3460
3560
3660
Sec 2125N A= 17.9m2/446.4m3 B= 17,149.5m2/428,737.6m3
5365 5530 5695
3460
3560
3660
Sec 2150N B= 13,498.3m2/337,458.4m3
5365 5530 5695
3450
3550
3650
Sec 2175N B= 9,957.9m2/248,946.6m3
5365 5530 5695
3450
3550
3650
Sec 2200N A= 6.2m2/155.2m3 B= 5,159.3m2/128,982.8m3
TecnoSapiencia
1:7000 08-11-15