technology application partners for ncrst-e

17
Technology Application Partners for NCRST-E NCRST-E Fall 2001 Advisory Board Meeting

Upload: claus

Post on 27-Jan-2016

29 views

Category:

Documents


0 download

DESCRIPTION

Technology Application Partners for NCRST-E. NCRST-E Fall 2001 Advisory Board Meeting. New Technology Application Projects. There have been new TAP’s selected, three of which have been associated with the NCRST-E: Virginia DOT Washington DOT Veridian. New TAP linked to NCRST-E - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Technology Application Partners for NCRST-E

Technology Application Partners for NCRST-E

NCRST-E Fall 2001

Advisory Board Meeting

Page 2: Technology Application Partners for NCRST-E

New Technology Application Projects

There have been new TAP’s selected, three of which have been associated with the NCRST-E:

Virginia DOTWashington DOTVeridian

Page 3: Technology Application Partners for NCRST-E

TAP’s, NCRST-E, and RSPA ContactsIncreased Coordination Roles

New TAP linked to NCRST-E

Virginia DOT; Dan Widner [email protected] 804 - 786 - 6762

Washington DOT; E. [email protected]

Veridian; John Albasini [email protected] 228 - 688 - 1504

Designated RSPA contact

Aviva [email protected] 617 - 494 - 3470

Chip [email protected] 202 - 366 - 5911

Aviva Brecher

Page 4: Technology Application Partners for NCRST-E

Regional Database Development for Transportation Planning

john. @

John AlbasiniVERIDIANBuilding 1100, Room 11139Stennis (228) 688-1504

albasini veridian.com

Page 5: Technology Application Partners for NCRST-E

Project Partners

Gulf Regional Planning Commission (GRPC) Largest MPO in south Mississippi covering

six coastal countiesSouthern Rapid Rail Transit Commission (SRRTC)

Planning agency comprised of commissionersfrom Alabama, Louisiana and Mississippi

Mississippi State University Hosting IMS web server Providing additional data for project

Additional Interested PartiesVirginia Department of Transportation (VDOT)Mississippi Department of Marine Resources

Page 6: Technology Application Partners for NCRST-E

Project Location

Page 7: Technology Application Partners for NCRST-E

Transportation/Environmental Concern

Project will allow transportation planners and environmental scientists to rapidly evaluate a project area and determine alternative solutions without having to conduct multiple fieldinvestigations.

Page 8: Technology Application Partners for NCRST-E

Proposed Remote Sensing/GIS Solution Paradigm

1. Change detection analysis for updating landcover/ landuse

2. Sharing of data across the Internet via an Internet Map Server (IMS)

3. GIS based planning tool for automatic calculation of environmental impacts, creation of impact matrices and development of alignment mapping.

Page 9: Technology Application Partners for NCRST-E

Project Funding and Cost Sharing

RSPA Funding Cost ShareMilestone

1. Database updating and development $70,517 $81,200 $151,717

2. Development and Integration of IMS $30,000 $16,000 $ 46,000

3. Development of GIS planning tool $41,500 $ 3,000 $ 44,500

4. Training on planning tool $ 7,000 $ 6,500 $ 13,500

Grand Total $149,017 $106,700 $255,717

Total Cost

Page 10: Technology Application Partners for NCRST-E

Project Deliverables

1. GIS Vector Database with Imagery on CD-ROM

2. Report detailing DEM Comparison

3. Universal Resource Listing (URL) address for active IMS web site

4. Decision Support Planning Tool.

5. Quarterly Reports

6. Final Report

Page 11: Technology Application Partners for NCRST-E

PROJECT TITLE: Automating Wetlands Identification to meet Federal Reporting Requirements

Integration with existing GIS architecture to streamline the process for planned road construction projects

Page 12: Technology Application Partners for NCRST-E

“As is” Planning Process

Wetland surveys are conducted using:– 1987 Corps of Engineers Wetlands Delineation

Manual

Supplemental information from:– National Wetland Inventory– 1959 Soil Survey (USDA-SCS)– Aerial photography– Field Reconnaissance

Page 13: Technology Application Partners for NCRST-E

Remote Sensing and the Planning Process

Remotely sensed wetlands data can be introduced early in the planning process

Benefits include:– Incorporation with other available GIS data layers – Good preliminary indication of potential impact – Provides an accurate guide to field reconnaissance

and survey

Page 14: Technology Application Partners for NCRST-E

Integration with VDOT’s GIS Architecture

Derived wetland polygons will be made available through VDOT GIS– Thin client, web-enabled, enterprise wide

Oracle, ESRI/SDE, and ArcIMS software

– Data will be integrated with other enterprise GIS Data

Page 15: Technology Application Partners for NCRST-E

Planned Investigative Approach

Route 17, City of Chesapeake Virginia

Page 16: Technology Application Partners for NCRST-E

Review VDOT wetland identification processes for projects

Review completed processes for Route 17 Acquire Erdas Sub-pixel software Identify and acquire imagery Establish reflectance ranges for vegetation

types

Planned Investigative Approach

Page 17: Technology Application Partners for NCRST-E

Unsupervised and supervised classification routine refinement

Output polygons to compare with existing GIS data (soil types, NWI)

Compare to existing field reconnaissance data Load polygons into enterprise GIS to make available to

Environmental Analysts Environmental Analysts “redline” data Redlines available to others via internal web GIS

Planned Investigative Approach