technologies needs and gaps
DESCRIPTION
TRANSCRIPT
Information Dominance;
Anytime, Anywhere…
PEOC4I.NAVY.MIL
Program Executive Office
Command, Control, Communications,
Computers and Intelligence (PEO C4I)
PMW/A 170
Technology Needs and Gaps
29 January 2013
Vince Squitieri
Program Manager
PMW/A 170
619-524-7930
Statement A: Approved for public release, distribution is unlimited (24 JANUARY 2013)
SATELLITE COMMUNICATIONS (SATCOM)
• Modems
• Increased/Asymmetric/Dynamic Throughput
• Asymmetric SATCOM Systems Compatibility (Split IP)
• Jam Resistant Capability for Wideband SATCOM
• Amplifiers
• Improved Efficiencies/Reduced Heat
• Increased Output Power
• Antennas
• Improved G/T
• Reduced Side Lobes
• Improved Reliability
• Reduced Radar Cross Section
• Interface Standards
• Leverage Maritime Arial Layer Network (MALN)
• Electrical Environmental Effects (E3)
Technology Needs PMW/A 170
TACTICAL COMMUNICATIONS
• Modems
• Increased/Asymmetric/Dynamic Throughput
• Jam Resistant
• Amplifiers
• Improved Efficiencies/Reduced Heat
• Increased Output Power
• Antennas
• Reduced Number of Antennas
• Reduced Radar Cross Section
• RF Distribution Technologies
• Dynamic Mobile Adhoc Networking
• Time Division Multiple Access (TDMA)
• Open Shortest Path First (OSPF)
• Interface Standards & Seam Issues
• Maritime Arial Layer Network (MALN)
• Electrical Environmental Effects (E3)
NAVIGATION SYSTEMS
• Assured Positioning, Navigation, & Timing (PNT) Services
• Real Time Service Oriented Architecture (SOA) for PNT
Systems
• Hostile Electronic Attack Direction and Location
• Jam and Spoof Resistant GPS
2
Gaps
• Communications Alternatives to Space Based Satellites
• RF Interference Mitigation
• Throughput Improvement
• HF Anti-Jam Technologies
• Dynamic Bandwidth Interfaces
3
Small Business Innovative Research Cryogenic Analog RF Module (CARM)
Cooler
Output Coax
Custom Waveguide feedthrough
Aluminium enclosure
Input WR42 standard flange
Increasing Shipboard Receive Rates Without Increasing Antenna Size
4
CARM General Status
• CARM-02: Ka-band RF Module for GBS
antenna
Completely assembled and tested
at HYPRES
Tested at B&Z (amplifier
manufacturer in Long Island, NY)
using their noise temperature
measurement set-up
Planning evaluation at Aberdeen
Proving Grounds
5
Bandwidth Analysis Toolkit (BATTM)
Bandwidth Data
0
2
4
6
8
10
12
14
5:05 7:05 9:05 11:05 13:05 15:05 17:05 19:05 21:05 23:05 1:05 3:05 5:05 7:05 9:05 11:05 13:05
Time
Ba
nd
wid
th (
No
tio
na
l)
Chat Email Web AIS VTC MIDB NetPrec CST GaleLite
Bandw
idth
Dem
and (
Mbps)
Bandwidth Demand for CVN
BAT is able to produce stochastic time phased bandwidth demand for all Navy platforms that is a
function of operational scenario (including threat and neutral forces), missions being performed
and systems being used.
6
METRON BAT Analysis Products
Website #hits BW
Facebook.com 25000 600kbps
Yahoo.com 20141 590kbps
ESPN.com 100 585kbps
Go.com 23192 40kbps
Bandwidth Data
0
2
4
6
8
10
12
1 9 17 25 33 41 49 57 65 73 81 89 97 105 113 121 129 137 145 153 161 169 177 185 193 201 209 217
Time
Ba
nd
wid
th (
No
tio
na
l)
Email Web AIS VTC MIDB NetPrec CST GaleLite
Predictive Model Output Warfighting Thinline Output
Available BW
N I P R E M A I L
.com
57%
.mil
13%
.gov
15%
.org
7%
.net
8%
Detailed Analysis: Email Detailed Analysis: Web Detailed Analysis: Chat Outside of Strike
Group: 82%
Inside of Strike
Group: 18%
BW # Hits
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40 0:45 0:50 0:55 1:00 1:05 1:10 1:15
LOG
1%
STK
23%
SUW
24%
ASW
32%
INTEL
20%
7
Small Business Innovative Research Prioritized Unbalanced Traffic Total Yield (PUTTY)
An Approach to Topology Management in Directional Networks 8
Science and Technology POC’s
• PEO C4I APEO for S&T Bob Parker [email protected]
• PMW 170 Technical Director Kurt Fiscko [email protected]
• PEO C4I SBIR/STTR Mgr Lisa Riley [email protected]
9
10
We get IT.
We also integrate it, install it and
support it. For today and tomorrow.
Visit us at www.peoc4i.navy.mil