techno electric and engineering company limited meet/220869_20110831.pdf · techno electric and...

38
Private & Confidential TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED INVESTOR PRESENTATION August 2011

Upload: truonganh

Post on 15-Jul-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

Private & Confidential 

TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED  INVESTOR PRESENTATION 

August 2011 

Page 2: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

2

Section 1: Introduction and Company Overview 

Section 2: Financial Performance 

Section 3: Industry Outlook 

CONTENTS 

Page 3: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

INTRODUCTION AND COMPANY OVERVIEW 

Section 1 

Page 4: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

4

Company and Business Overview 

Incorporated  in  1963,  Techno  Electric  and  Engineering  Company Limited (Techno) is headquartered in Kolkata 

Techno is involved in the following business segments: 

EPC contracting focused on the Indian power sector –  

– Turnkey  projects  ranging  from  complete  power  generating plants  to  system packages of plant  tailored  to  complement larger systems supplied by others 

– Electrical  System  across  Generation,  Transmission  & Distribution up to 765 KV 

– Tailored power  solutions  for  Industries  such  as Aluminium, Petrochemicals etc  

Renewable Power Generation – operates 110.45 MW of Wind Energy  assets  and  plans  to  expand  further.  Plans  to  enter  Bio Mass, Solar and Hydro based power generation 

Transmission  –  won  a  25  year  (extendable  by  10  years) Concession in consortium with Kalpataru Power for transmission link at Jhajjar, Haryana 

Experienced  team  of  over  150  engineers  backed  by  200  skilled professionals and 100 staff members 

Recognized as one of the leading Indian corporate: 

Forbes, 2008 (Best 200 Under Billion List in Asia) 

Business Standard, 2009 (Top 1000 Companies of India) 

Dalal Street , 2009 (Top 400 Large Cap Corporates in India) 

Mint, September 2010 (Top 100 Performing Companies in India) 

TECHNO – NOT JUST ANOTHER POWER SOLUTIONS COMPANY 

Revenue Growth CAGR ‐ 29% over last 4 years 

Key Milestones 

*FY10 and FY11 includes Wind generation business

1963* Incorporated 

2006* Private Equity Investment by CVCI 

2009* Company Enters power generation business with acquisition of Wind assets 

2010* Enters Transmission Management with award of a PPP contract in Jhajjar, Haryana 

* Calendar Year

 4,296    4,860    7,021    7,166  

12%  11% 

20% 23% 

14% 17% 

20% 18% 

0%

5%

10%

15%

20%

25%

 ‐

 2,000

 4,000

 6,000

8,000

 FY08  FY09  FY10 FY11

Revenue EBITDA Margin PBT Margin

Page 5: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

5

CORPORATE STRUCTURE 

Techno Electric & Engineering Company Ltd 

New Bio Mass SPVs* Jhajjar KT Transco Pvt Ltd* Simran Wind Project Private Ltd 

EPC Contracting  45 MW Wind Energy Generation 

6 Bio Mass Power Generation Plants in West Bengal (3), Orissa, MP and Rajasthan (1 each) 

Design, Build, Finance,        Operate and Transfer a 400 KV / 1500 MVA Transmission Network in Haryana 

65.45 MW Wind Energy Generation 

* Not yet operational 

100%  100% 49% 

Page 6: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

6

LED BY EXPERIENCED MANAGEMENT TEAM 

Name Details

Mr. P.P. Gupta (Managing Director)

Mr. P.P. Gupta took over Techno in 1980 and has led Techno to become one of the largest companies in the electro‐mechanical field in the power sector in India  

Actively  involved  in various power sector developmental activities on behalf of  industrial bodies and Ministry of Power,  India and well known in the Indian power sector. Has excellent relationships with various stakeholders in the industry 

Previous employers include Bharat Heavy Chemicals Limited (BHEL) and National Grindlays Bank (Merchant Banking Division) 

Education – Hons. Graduate in Industrial Engineering with post‐graduation in Management from IIM, Ahmedabad

Mr. A.K. Mitra (ED – Electricals Division, Kolkata)

Associated with Techno since 1977 and has been heading the Electrical Division at Kolkata since 1980  

He is leading the team to cover all the Electrical Power System 

Previously employed with WBSEB (a state utility responsible for Power) 

Mr. R.C. Agarwal (ED – Utility Division)

Joined Techno  in 1978 and has  independent charge of handling operations  (including Business Development and Execution). Has expertise in all aspects of Contracting, Project and Construction Management 

Member of Institution of Engineers , Indian Institute of Welding , Project Manager Associate and the CII 

Education qualifications include a degree in Mechanical Engineering from BITS Ranchi 

Mr. P.K. Lohia  (President ‐ Finance)

Associated with Techno since 2004 and has overall responsibility for Finance, Accounts and Taxation 

Previously employed with HNG as General Manager (Commercial) 

Chartered Accountant by qualification with 20 years of experience in this field 

Mr. R.K. Raina (ED – Electrical Division, New Delhi) 

Associated with Techno for the past 10 years 

Heading the organization's set up in North India. He has expertise in Procurement, Tendering & Project Execution. 

Page 7: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

7

BOARD OF DIRECTORS 

Name Details

Mr. P.P. Gupta  Mr. P.P. Gupta took over Techno in 1980 and has led Techno to become one of the largest companies in the electro‐mechanical field in the power sector in India  

Actively  involved  in various power sector developmental activities on behalf of  industrial bodies and Ministry of Power,  India and well known in the Indian power sector. Has excellent relationships with various stakeholders in the industry 

Previous employers include Bharat Heavy Chemicals Limited (BHEL) and National Grindlays Bank (Merchant Banking Division) 

Education – Hons. Graduate in Industrial Engineering with post‐graduation in Management from IIM, Ahmedabad

Mr. S.N. Roy (Independent Director )

Has been associated with Techno since 2003  

Previous employers include Indian Oil Corporation and BHEL, where he retired as Executive Director 

Bachelor of Engineering (Electrical) from Indian Institute of Technology (IIT), Kharagpur

Mr. V.D. Mohile (Independent Director ) 

50 years of varied experience and is associated with Techno for the last 10 years  

Previous appointments include General Manager, BHEL; CEO, Indal Power Company and Chairman OPTCL, Orissa 

B.E. (Electrical & Mechanical), Post Graduate Diploma in Industrial Management

K. M. Poddar (Independent Director )

Renowned industrialist with 41 years of experience in the field of accounting and finance

Bachelor of Commerce

K. Vasudevan (Independent Director )

Positions held presently include Chairman, Green Business Centre for the Southern region, Member, National Committee on Power of CII, Independent Director, Alstom Projects India Ltd.

Past associations include President, Indian Electrical and Electronics Manufacturers Association and Joint Managing Director, Alstom India Limited

Bachelor of Engineering (Electrical) and a fellow-member of the Institute of Engineers and Institute of Standard Engineers

K. K. Rai (Independent Director )

Retired banking professional, with 40 years of banking experience.

Past employments include Executive Director, Allahabad Bank from 2001 to 2004. At present he holds directorships in many reputed companies

Bachelor of Arts and member of C.A.I.I.B

Page 8: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

8

VISION TO GROW FROM ONLY A POWER EPC COMPANY TO A COMPREHENSIVE POWER PLAYER 

Historically been a Power EPC Company 

Provided solutions to nearly half of India’s installed thermal capacity and made it 

possible to build 50% of National Grid for Inter‐regional Transmission 

Growing vertically into a Power Generator (Renewable Energy) and Transmission Network 

operator 

Growing Focus towards Asset Ownership across the Value Chain and High Value EPC Contracting 

PAST FUTURE

Page 9: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

9

GROWTH STRATEGY – TWO FOLD APPROACH TO MAXIMISE VALUE 

The Indian Power sector continues to provide significant opportunities for EPC companies 

India  continues  to  be  a  power  deficit  country  and  the  Government  has  set  ambitious targets for capacity addition  

Almost half a  century of experience  in  the  Indian power EPC  sector and well poised  to capitalize on the growing market 

Growing the Existing Power EPC Business 

Long term strategy of entering asset heavy businesses requiring  lower running costs: 

Renewable Power Generation 

– Depletion of  finite  resources  to  increase  relevance  for  renewable energy  in  the long term 

– Aspire to be one of the largest Independent Renewable Power Producers in India concentrating  on  both  proven  technologies  (Wind  power,  Bio mass  and Hydro) and emerging technologies (Solar) 

Transmission Network  and Management 

– Growing priority to reduce transmission  losses through up gradation and building new capacities 

– Techno already a pioneer  in  this segment, bagging  the  first contract awarded  in the private sector under a state PPP model with viability gap funding 

 

Moving up the Value Chain: Entering new Businesses 

Company proposes to build upon its experience and proven expertise in bidding for larger projects and consolidate its presence across a lower number of high value projects 

Comprehensive pure play of the Growing Prospects of India’s Power Industry

Page 10: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

10

6,488 

9,736 

0

3,000

6,000

9,000

12,000

Existing ‐ FY11 Projected ‐ FY13

Revenue (INR mn)

EPC Business 

Transmission Network 

GROWTH ENVISAGED – ACROSS BUSINESS SEGMENTS 

Renewable Energy Generation  

CAGR – 23% CAGR –

101%

Capacity further expected to grow to 1,258 MW by the end of the Twelfth 5 year plan (FY17)

Company expects to add one transmission line to its portfolio annually Portfolio of 5 projects by the end of the

Twelfth 5 year plan (FY17)

110.5 

499 

0

150

300

450

600

Existing ‐ FY11 Projected ‐ FY 13

Capacity (MW)

Page 11: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

11

Overview 

EPC has been the core business of the Company and accounted for 90% of FY11 revenues 

Proven  Track  Record  with  focus  on  meeting  and  exceeding customer expectations 

BHEL awarded Techno as the best vendor for the year 2010  

Efficiently run business with low levels of working capital (contrary to industry norms) 

Clientele  includes major  Indian  and Global  companies  like Power Grid, GE, BHEL, Indian Oil, NTPC, Reliance, Vedanta, Hindalco, etc 

Currently multiple  EPC  projects  are  under  execution  across  India for  clients  including Bengal Energy,  IOC, MSEDCL, Vedanta, NTPC, Hindalco, etc 

Unexecuted order book of ` 14,000 million as at 31 March 2011 

Growth in business to continue going forward owing to: 

Growth in market with  increasing government focus on power sector and expansion of private sector capacities 

Expansion in product offering as Techno continues to expand its array of services 

In house EPC (for transmission and renewable projects) 

 

EPC CONTRACTING BUSINESS – TECHNO IS A PIONEER 

Financial Performance 

Revenue CAGR – 16%

 4,860  

 6,318    6,488  

11.2% 12.2% 

15.2% 

0.0%

5.0%

10.0%

15.0%

20.0%

 ‐

 1,500

 3,000

 4,500

 6,000

 7,500

FY09A FY10A FY11A

Revenue EBITDA%

Page 12: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

12

EPC CONTRACTING BUSINESS – TECHNO IS A PIONEER 

Power Generation  Power T & D  Industrial 

EHV Substations

Distribution Systems Management (APDRP)

Rural Electrification (Rajiv Gandhi Gramin Vidyutikaran Yojna)

Fire Fighting Systems

Fuel Oil Systems

Off site piping systems

AC/DC substation for Aluminum plants

Power distribution systems

Plant Electrical

Illumination systems

High intensity power system for Aluminum smelter pots

EPC Business Segments 

Captive Power Plants up to 100 MW on a turnkey basis

Balance of Plant

Fuel oil System

Water intake/ Make Up Systems

Piping networks

Coal handling plant

HT/LT Switchgear

Cabling

Illumination Systems

Power Evacuation Systems

Page 13: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

13

PROVEN TRACK RECORD 

Project Type Description Air‐conditioning System 23 Projects for Power Industry

Balance of Plant 4 Projects for Power Industry

Balance of Plant 4 Projects for Power Industry

Captive Power Plants 5 Projects for Power Industry

Cabling Projects  28 Projects for Power Industry 

Distribution and Rural Electrification 

12 Projects for Power Industry 

DM Water / Condensate Storage Facility  

9 Projects for Power Industry 

Fire Fighting System 30 Projects for Power and other Core Industry

Fuel Oil System 45 Projects for Power Stations and Process Industries

Industrial Installation Projects  11 Projects for Aluminum and Petrochemical Industry out of which 8 Projects of Bus Bar System 

Naptha and Diesel System for Gas Turbine 

10 Projects for Power Industry 

Plant Electricals / Illumination 24 Projects for Power and Core Industries

Switchyard Projects 3 Projects of 765 KV / 36 Projects of 400 KV /24 Projects of 220 KV / 21 Projects of 132 KV rating 

Water and Allied System  14 Projects for Power and Core Industry 

Major Projects Undertaken 

Page 14: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

14

SOME MARQUEE PROJECTS ‐ Khandwa‐Seoni Transmission Line  

Installation of 40% fixed series compensation package for 400 KV double circuit D/C Khandwa‐Seoni transmission line in association with Nokian Capacitors Ltd, Finland for Power Grid Corporation of India Ltd 

The  FSC platform  to be managed was arguably  the  largest  in Asia  (each platform 23.6m x 9.5m), across 6 such platforms 

Both line bays were already constructed by another agency and owing to the large size of the banks it was difficult to accommodate them within the available space 

Techno  innovatively  restricted  the weight of  the platform and used special beams (parallel flange section) conforming to European specifications sourced specially for the project 

Used 110 MT telescopic cranes to assist with the work 

Layout and orientation were modified by incorporating middle gantry 

PROJECT 

CHALLENGES FACED 

TECHNO DELIVERY 

“It is great to have such an achievement with the scheduled 2 year time span. It is a matter of great pleasure for us that the power grid system is now able to provide additional power transfer capacity with the introduction of state of the art systems from India and Finland” – Client Endorsement 

Page 15: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

15

SOME MARQUEE PROJECTS ‐ Grid Stations at Bihar Sharif and Bari Pahari 

Modernisation of Grid  stations at Bihar  Sharif and Bari Pahari  for  the Bihar  State Electricity Board 

Legacy sub stations with no drawings or schemes in existence 

Need to  identify and categorize key action areas  in terms of outright replacement, overhauling  and  installation  of  new  systems  where  required  while  minimizing downtime 

Mapped the existing system and developed drawings 

Conducted  detailed  survey  with  operational  tests  on  individual  components  to assess quality of current system 

Circuits were taken out of service sequentially to minimize downtime. 

Apart  from  main  electrical  systems  and  circuit  controls,  all  other  sub  station auxiliaries  (like  LT  power  supply,  illumination  systems,  fire‐fighting  systems  etc) were newly installed or overhauled 

Complete renovation of control room building, landscaping, roads, drains etc 

PROJECT 

CHALLENGES FACED 

TECHNO DELIVERY 

“It is a pleasant surprise to note that a renovated sub station can be as good or better than a newly constructed one. This  project must  set  a  benchmark  in  our  sector  for  upcoming  renovation  packages  in  terms  of  qualitative  and quantitative value addition done in a renovation contract” – Client Endorsement 

Page 16: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

16

SOME MARQUEE PROJECTS ‐ Others 

Project Description 12 MW waste heat recovery based power plant at Haldia (Captive Power Plant) Techno provided full EPC services for the project:

Engineering  Conceptual Design  Preliminary & Detail Engineering  Preparation of BOQ Procurement  Floating of enquiries  Receipt of offers  Commercial evaluation & Placement of orders  Follow up & inspection  Dispatch of material to site Construction  Civil  construction  of  boiler  fdns,.  Power  house, 

cooling tower, DM plant bldg, pipe rack etc  Erection  of  equipment,  piping,  electricals, 

instrumentation, etc   Testing & Commissioning   Synchronization with grid 

Project Description Turbo Generator package for 1x30 MW TT12 (23 MW with air cooling) at Mithipur Plant of Tata chemicals on EPC basis Techno provided engineering, procurement, execution of all civil, structural, mechanical, electrical and instrumentation, hook up with existing system and commissioning of the TG set. Some of the specific work include:

Conversion  from   brushless excitation  system    to static excitation system 

Conversion of governing system  from hydraulic to electro‐ hydraulic system 

Techno was able to complete the project in 5 months (against scheduled time of 11 months), earning commendation from the client

Page 17: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

17

CLIENTELE INCLUDE SOME OF THE LARGEST PLAYERS IN THE INDUSTRY 

Page 18: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

18

EXCELLENT REVENUE VISIBILITY 

Unexecuted  Order  Book  of  ` 14,000 million as at 31 March 2011 including  orders for: 

Generation – ` 4,000 mn 

Transmission – `7,950 mn 

Distribution – ` 1,250 mn 

Industrial – ` 800 mn 

Order Book at 31 March 2011 – Top 10 Orders 

Customer  Project Value  (` mn) 

MP Power Transmission Company Ltd  2,320  

Jhajjar KT Transco Private Ltd  1,500  

Kalpataru Power Transmission Company Ltd.  1,370  

Bengal Energy Ltd  1,000  

Thyssenkrupp Ltd  910  

Maharashtra State Electricity Distribution Ltd  890  

Assam State Electricity Board  660  

HINDALCO  520  

NEEPCO  490  

TBEA Sheyang  330  

Page 19: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

19

Planned Expansion  

Plans to expand by more than 1000 MW by FY17 

Recently announced purchase of 202 MW of Wind assets from Suzlon: 

Turbines ranging from 1.5 to 2.1 MW each 

102 MW has been commissioned on September 2011 (Phase 1)  and remaining 12 MW (Phase 1) to be commissioned by October 2011 and the rest by March 2012 (Phase 2) 

Phase 1 is located in Tamil Nadu 

Further agreed to purchase additional 300 MW from Suzlon during FY13 – FY14 on mutually agreed terms 

Entered the power generation sector by acquiring two wind energy companies in 2009 

 

Current Operations 

WIND POWER – A SUSTAINABLE SOURCE OF ENERGY 

Pollution  free and environment friendly source of energy 

Zero fuel cost 

Lower  construction  time compared  to  conventional power projects 

Low  operations  and maintenance Cost 

 

 

Super Wind Project Ltd (now Techno) Capacity – 45 WM

Location – Karnataka (12 MW) & TN (33 MW)

30 turbines at 3 wind farms 

PLF – 24% to 29%

Contracted Tariff – ` 3.40 (Karnataka) and ` 3.39 (Tamil Nadu)

Simran Wind Project Pvt Ltd Capacity – 204.95 MW

Location – Karnataka (6 MW) & TN (146.45 MW)

103 turbines at 6 wind farms 

PLF – 23% to 32%

Preferential Tariff – ` 2.90 to ` 3.39 (Tamil Nadu) and ` 3.40 (Karnataka) for 50.45 MW APPC Tariff – 2.37 for 2010 - 11(Tamil Nadu) for 102 MW

Page 20: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

20

BIO MASS – AN EMERGING OPPORTUNITY 

No  new  technological development  required  given its  similarity  to  coal  based thermal power projects 

Operational  Flexibility  with the possibility of using variety of  biomass  materials  in  the same plant 

Improving  the  quality  of electricity  supply  in  rural areas 

 

 

As part of  its Renewable Power Generation strategy, Techno plans to foray  into Bio mass based power generation 

Salient features: 

Six Plants with capacity of 10 MW each 

3 Plants in West Bengal, 1 each in Orissa, Madhya Pradesh and Rajasthan 

Total estimated project capex  ‐ ` 3,000 million 

Currently in Land acquisition stage at all locations (completed for 3 sites and ongoing for remaining 3) 

Page 21: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

21

First of its kind Public Private Partnership (PPP) project in the country at the state level 

First ever transmission project to get VGF support  from central government 

First project in Haryana for which VGF has been sanctioned under the PPP mode 

In partnership with Kalpataru Power Transmission Ltd  (KPTL) – a  leading Power Transmission Company  in India 

Project to be carried out by an SPV (Jhajjar KT Transco  Pvt Ltd) – a 51:49 Joint Venture between KPTL and Techno 

Awarded Concession to design, build, finance, operate and transfer : 

400 KV, 100 Km long transmission link  

Connecting 2 sub‐stations at Rohtak & Sonepat  (24 bays each) 

To evacuate 1,320 MW  (2*660) of power  from the  Jhajjar Power Plant  (design capacity – 2,430 MW) built by China Light & Power, Hongkong 

Concession period – 25 years (extendable by 10 years) 

Project commercials: 

Sustainable revenue ‐ Company to be paid a monthly unitary charge (`45 million per month) by Haryana Vidyut Prasaran Nigam (HVPN), besides enjoying incentives and rebates 

Bid under viability gap funding where Haryana Government has given grant of  ` 939 million 

Techno to do EPC and  Operations & Maintenance work for the sub‐station part of the project 

Commissioning of the sub stations scheduled for December 2011 

Jhajjar KT Transco Pvt  Ltd 

TRANSMISSION NETWORK MANAGEMENT 

Pioneering  Contract  to  set  up and operate a Transmission link 

Being  a  design‐build‐finance‐operate‐transfer  contract,  it offers  wider  revenue  streams for Techno 

 

 

Page 22: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

FINANCIAL PERFORMANCE 

Section 2 

Page 23: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

23

8.8 11.05 

19.94  17.35 

0

6

12

18

24

FY08 FY09 FY10 FY11

 3,526   4,296  

 4,860  

 6,680   6,811  

369  505  545 1,118  1,308 

 ‐

 2,000

 4,000

 6,000

 8,000

FY07 FY08 FY09 FY10 FY11

Revenues EBITDA

Standalone Revenues & EBITDA# 

Earning Per Share (` ) 

GROWING REVENUES AND EARNINGS (STANDALONE*) 

Standalone Profits 

Profitability Ratios 

* Standalone financials for FY10 and FY11 include 45 MW of wind assets acquired during FY10

Revenue CAGR – 18%

` millions ` millions

# Revenue and EBITDA figures above do not include Other Income

 415  

 613  

 844  

 1,368   1,260  

 280   491  

 631  

 1,138   1,009  

 ‐

 400

 800

 1,200

 1,600

FY07 FY08 FY09 FY10 FY11

PBT PAT

12% 11% 

17% 

19% 14% 

17% 20% 

19% 

11% 

13% 

17% 15% 

0%

6%

12%

18%

24%

FY08 FY09 FY10 FY11

EBITDA Margin PBT Margin PAT Margin

Page 24: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

24

SUMMARY INCOME STATEMENT 

Improvement  in  EBITDA margins in FY 11 is on account of   higher margins  in  the EPC business 

Other  income  includes interest and dividend received from  market  investments made by  the company due  to surplus cash balance 

High interest and Depreciation during  FY10  and  FY11  is  due to  capitalization  of  Wind assets  which  were  partly financed by debt 

Standalone Income Statement

` million FY 08 FY 09 FY10* FY11*

Revenues 4,295 4,860 6,680 6,811 

Growth %  22% 13% 37% 2% 

Operating expenses  3,791 4,315 5,561  5,503 

EBITDA  504 545 1,118 1,309 

EBITDA %  12% 11% 17% 19% 

Other income  117 312 525 285 

Depreciation  6 6 147  151 

Interest  3 6 128  183 

PBT  612 844 1,368  1,260 

PBT %  14% 17% 20% 19% 

Taxes  122 214 230 251.1 

PAT  491 631 1,138  1,009 

PAT%  11% 13% 17% 15% 

* Standalone financials for FY10 and FY11 include 45 MW of wind assets acquired during the year

Page 25: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

25

SUMMARY BALANCE SHEET  

Company has historically been almost a debt free Company 

Debt  was  taken  during  FY10 and FY11  to  finance purchase of Wind assets 

Investments  includes investment  in  Wind  power subsidiary  (Simran  Wind Project Pvt Ltd) 

Low  levels  of  operating working capital 

 Standalone Balance Sheet

`million 31‐Mar‐08  31‐Mar‐09 31‐Mar‐10*  31‐Mar‐11* 

 Sources of funds

Shareholders' funds  1,714  2,278  3,701  4,577 

Loan funds  1  420  1,667  2,387 

Deferred tax liability  6  6  7  76

 Total 1,722  2,705  5,375  6,971 

 Application of funds

Net fixed assets  48  47  2,605  2,487 

Investments  1,545  1,514  1,865  3,551 

Current Assets  973  2,620  3,116  3,423 

Current Liabilities  845  1,477  2,212  2,491 

Net Current Assets  129  1,143  905  932

 Total 1,722  2,705  5,375  6,971 

* Standalone financials for FY10 & FY11 include 45 MW of wind assets acquired during the year

Page 26: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

26

SUMMARY INCOME STATEMENT 

Consolidated  results  include financials  of  Simran  Wind Project  Pvt  Ltd  in  FY10  and FY11 

High  PBT  levels  due  to  other income  from  interest  earned on deposits & investments 

Consolidated Income Statement

` million FY 08 FY 09 FY10 FY11

Revenues 4,295 4,860 7,021  7,166 

Growth %  22% 13% 44% 44%

Operating expenses  3,791 4,315 5,598  5,531 

EBITDA  504 545 1,423  1,635 

EBITDA %  12% 11% 20% 23%

Other income  117 312 503  285

Depreciation  6 6 303  308 

Interest  3 6 210  238

PBT  612 844 1,414  1,380 

PBT % 14% 17% 20% 19%

Taxes 122 214 231  252 

PAT 491 631 1,183  1,128

PAT% 11% 13% 17% 16%

Page 27: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

27

SUMMARY BALANCE SHEET  

Consolidated  results  include financials  of  Simran  Wind Project Pvt Ltd  in FY10 and FY 11 

 

 Consolidated Balance Sheet

` million 31‐Mar‐08  31‐Mar‐09  31‐Mar‐10  31‐Mar‐11

 Sources of funds

 Shareholders' funds  1,714  2,278  4,626  5,622 

 Loan funds  1  420  2,467  2,896 

 Deferred tax liability  6  6  7  6 

 Total 1,722  2,705  7,100  8,524

 Application of funds

 Net fixed assets  48  47  5,530  9,715 

 Investments  1,545  1,514  500  386 

 Current Assets  973  2,620  3,289  3,197 

 Current Liabilities  845  1,477  2,219  4,773 

 Net Current Assets  129  1,143  1,070  (1,577) 

 Total 1,722  2,705  7,100  8,524 

Page 28: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

INDUSTRY OUTLOOK 

Section 3 

Page 29: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

29

India is far below other countries in electricity consumption  

542 

2,171 

2,332 

6,317 

13,652 

India

Brazil

China

Russia

US

Demand to grow at 9% over next 20 years (GW) 

 215   331  

 510  

 785  

 1,207  

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

FY12E FY17E FY22E FY27E FY32E

INDIAN POWER SCENARIO: INDIA CONTINUES TO BE POWER DEFICIT  

Peak Load Shortage due to Capacity Shortfall (%) 

12.4  13 11.8  12.2 

11.2  11.7  12.3 13.8 

16.6 

11.9 13.3 

0

5

10

15

20

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10

Industry Dynamics 

The government plans to add 95 GW of generating capacity during the next 5 years to meet the growing demand Development  of  National  grid with  a  capacity  of  200,000 MW  and inter‐regional  transmission  capacity  of  37,000 MW  estimated  to  be completed by 2012 Government initiatives  Sector outlay ~ ` 9.3 trillion over next 5 years  Increasing  role of private players  in generation,  transmission and 

distribution – Faster  approvals  and  facilitation  for  projects  under  private 

sector 

Per capita consumption expected to increase to 1000 kWh pa over next 5 years 

Growing domestic consumption and increased government thrust to fuel power sector growth

Source: CEA

KWh per capita per annum

%

Source: CEA Source: CEA

Page 30: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

30

POWER CAPACITY TO WITNESS DOUBLE DIGIT GROWTH 

`  9.3  trillion  to  be  spent  on Power  sector  over  next  5 years as follows: 

Generation – ` 5.8 trillion 

Transmission  and Distribution – ` 3.4 trillion 

 1,379   1,589  

 1,812  

 2,082  

 2,397  

13.5 

17.6 18.8 

21.5 23.7 

0

5

10

15

20

25

 ‐

 500

 1,000

 1,500

 2,000

 2,500

 3,000

FY11P FY12P FY13P FY14P FY15P

Yearly Investment (INR bn) Capacity Addition for the year (GW)

Capacity of 95 GW to be added over next 5 years

` 9.3 Trillion to be spent on capacity expansion

Capacity Expansion in the Power sector presents huge opportunity for Power EPC players

Source: CRISIL Report, 2010

India’s Power Capacity set to grow at CAGR of 10.8% over next 5 years

Page 31: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

31

Pursuant  to  the Electricity Act of 2003  and  the National Tariff Policy of 2006,  SERC’s  are encouraged  to  set preferential  tariffs  for power produced from renewable energy 

Renewable Energy Companies are entitled to various tax incentives like: 

Accelerated depreciation @ 80% on assets employed in renewable energy generation 

Tax holiday  for 10 years (within first 15 years of operations) 

Excise duty relief on certain capital goods 

“Must Run” Status – Per CERC Regulations, all  renewable energy power plants  (except certain biomass plants)  treated as must  run power plants and are not subject to merit order dispatch principles 

Other incentives like RPOs, GBI, REC etc 

 

 3.3   9.3  

 15.5   23.3  

 53.0  

FY03 FY07 FY10 FY12P FY22P

Strong Regulatory Thrust Towards Renewable Energy

Renewable  energy  principally  comprises  wind  power,  hydro power, solar power and  biomass energy 

Sector has experienced rapid growth in India, with the 15.5 GW of installed capacity (excluding large hydro) accounting for ~10% of India’s overall power capacity 

Capacity expected to grow at a CAGR of 11% by the end of 13th 5 year plan 

Good execution track record – 6.7 GW added  in the 10th 5 year plan against a planned addition of 3.5 GW 

 

RENEWABLE ENERGY (RE) IN GREATER FOCUS 

Sector to Continue on Growth Path (GW) Renewable Energy in India 

Source: MNRE, Planning commission, CRISIL

39 

7.5 6.5 

FY22P

MiniHydro

Biomass

Wind

India plans to raise the share of renewable energy in national power output to 10% by 2015 

Page 32: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

32

Renewable Portfolio Obligation (RPO) specified by the State Electricity Regulatory Commissions* 

Many  states  have  instituted penal  mechanism  for  not meeting  RPO  requirements (Maharashtra  SERC  has  already levied  financial penalty on state utilities  for  not  meeting  RPO obligations) 

NAPCC (National Action Plan on Climate  Change)  targets  15% share  of  renewable  energy  by 2020; Most SERCs are expected to  increase  RPO  obligations  to meet national target gradually 

REC mechanism will  encourage inter‐state  transmission  of renewable  power,  enabling states  to  meet  their  RPO  by trading RECs on power exchange 

States  are  offering  increasing preferential  tariffs  for  power generated  from    renewable energy sources 

 

 

 

INCENTIVES FOR RENEWABLE ENERGY 

State  FY11  FY12  FY13  FY14  FY15  FY16 

1  Gujarat  5%  6%  7% 

2  Maharashtra  6%  7%  8%  9%  9%  9% 

3  Uttaranchal  4%  5%  6% 

4  Manipur  2%  3%  5% 

5  Mizoram  5%  6%  7% 

6  Jammu & Kashmir  1%  3%  5% 

7  Uttar Pradesh  4%  5%  6% 

8  Tripura  1%  1%  2% 

9  Jharkhand  2%  3%  4% 

10  Himachal Pradesh  10.10%  11.10  12.10% 

11  Orissa  4.5%  5%  5.5%  6%  6.5%  7% 

12  Assam Draft  1.4%  2.8%  4.25  5.6%  7% 

13  Tamil Nadu  14% 

14  Delhi  1% 

15  Andhra Pradesh  5% 

16  Karnataka  11% 

17  West Bengal  10% 

18  Rajasthan  9.5%  9.5% 

19  Madhya Pradesh  10% 

20  Punjab  4% 

21  Haryana  10% *Source: MNRE

Page 33: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

33

Renewable Energy Certificates (REC) 

REC is a mechanism to enforce RPO across the country 

The  trading  REC’s,  one  of  the  key  growth  drivers  for  the renewable energy industry successfully started in India 

Indian Energy Exchange (IEX) based  in New Delhi started the REC trading on 23rd February 2011 

Power Exchange  India Limited  (PXIL)  in Mumbai also  started the trading on 30th March 2011  

This mechanism is governed by CERC and the key stakeholders in REC framework are: 

NLDC [Central Agency] : Responsible for registration, issuance of  RECs,  maintaining  accounts,  settlements,  repository, monitoring  and  such  other  functions  incidental  to  the implementation of REC mechanism 

Accreditation Body  (AB)  : Checks RE generators against their eligibility  criteria  and  the  norms  specified  by  MNRE,  An approving Authority [State Nodal Agency (SNA)] 

Monitoring  Body  :  Verifies  electricity  generation  from  RE sources  and  notifies  the  Central  Agency  [Load  Dispatch Centres (LDCs)] 

Compliance  Auditors: Monitors  effective  compliance  by  RE producers (To be selected by CERC) 

INCENTIVES FOR RENEWABLE ENERGY 

Option 1: Preferential Tariffs 

Option 2:  RECs 

Renewable Energy Generator 

• Sale of power at weighted average power purchase cost** of distribution company 

• Sale of electricity at market price in open market 

Sale of RECs at market determined prices  at Power Exchange  (With Floor & Forbearance Prices* for non‐solar of  `1.5 & `3.9 and of `12.0 & `17.0 for solar ) 

States with low renewable energy generation will be able to purchase RECs to offset their respective Renewable Purchase Obligations 

•Per KWh ** Weighted average pooled price at which distribution company has purchased electricity (including cost of self generation, long term and short term purchase) in the previous year, but excluding cost of RE power purchase 

Page 34: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

34

Generation Based Incentive (GBI) 

A GBI pilot scheme was  introduced in July 2008 to provide benefit to wind  power producers 

Current GBI scheme was introduced in December 2009 as an optional benefit  available  for Wind  power  producers  in  lieu  of  Accelerated Depreciation Benefit 

GBI is a Generation based benefit available to Wind Power  producers over and above the base tariff  

Benefit of ` 0.5 / kWh  of power produced 

Incentive available for a maximum period of 10 years from date of commercial  operation  (subject  to  maximum  of  ` 6.20  mn  per MW) 

Incentive is limited to wind farms with a maximum aggregate installed capacity of 4,000 MW 

Only  available  for  power  producers  whose  capacities  are commissioned  for  sale  to  the  grid  (i.e.  ‐  not  available  for  captive power projects and merchant  plants) 

IREDA  appointed  as  the  nodal  agency  for  monitoring  GBI implementation, project registration and disbursement of GBI  

Entire funding for GBI to be met by Central Government 

INCENTIVES FOR RENEWABLE ENERGY 

Clean Development Mechanism (CDM) 

Under the Kyoto Protocol, the CDM allows for projects  in developing countries that result  in reduction of GHG emissions to earn Certified Emission Reduction credits (CERs) 

CERs are tradable carbon credits that can be purchased by developed countries to meet their emission reduction targets 

To qualify to receive CERs, a project must satisfy the following criteria: 

Approval from Designated National Authorities of host country 

Public registration and issuance process with the UNFCCC 

The  additional  funds  thus  generated  to  go  towards  improving  the financial viability of clean energy projects 

Indian scenario: 

Indian  projects  comprised  about  24%  of  all  projects  registered globally till 2009.  

As of September 2010,  India had 532  registered projects  (426 of which were in the energy sector) 

Page 35: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

35

Source: Global Wind Energy Council (Moderate Scenario)

Historical CAGR – 28% 

Projected CAGR – 22% 

Indian Wind Energy ‐ Historical Growth to Continue 

Only 25% of potential currently utilized 

 48,561  

 12,966*  

 ‐

 25,000

 50,000

 75,000

Power Potential Installed Capacity

WIND ENERGY – LONG TERM GROWTH MARKET 

Industry potential could be much higher than the 48 GW estimate due to offshore wind resources – Global Wind Energy Council 

Wind is expected to account for 12 – 14% of India’s power generation by 2030 

 

* As at 31.12.2010 

1,077 1,167 1,407 1,702 2,125 3,000 4,430

6,270 7,845

9,645 10,827 12,966

15,966

19,966

24,466

29,466

34,966

-

8,000

16,000

24,000

32,000

40,000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011P 2012P 2013P 2014P 2015P

Page 36: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

36

Power Generation through Biomass 

Biomass is a resource for deriving renewable energy using agricultural wastes  like  straw,  husk  and  bagasse  and  other  forms  of waste  like animal dung, municipal waste and sewage 

Biomass is collected from farmers and transported to the power plant, where the material is processed and readied for burning 

Fuel is burnt in a high pressure boiler to generate steam and operate a turbine to produce power  

Some of the common technologies used in biomass power generation include    direct  combustion,  biomass  gasification,  co‐generation  and biogas production 

BIO MASS BASED POWER – EMERGING MARKET WITH HUGE POTENTIAL 

Biomass in India: The Story is Just Beginning 

Total  installed capacity of biomass plants  in  India as at October 2009 was 2,125 MW 

Estimated potential of  25,000 MW means  just  8.5% of  the biomass potential has currently been realized 

Number  of  policy  initiatives  have  been  introduced  since  1993  for supporting  the  commercial  exploitation  of  India’s  biomass  power potential  

Climate  change  legislation  is  further  expected  to  incentivize  low carbon options such as bio power 

Biomass Potential of 25,000 MW Largely Untapped 

1,241  817  67 

5,000 

16,881 

2,700 

24% 

5% 3% 

0%

5%

10%

15%

20%

25%

30%

0

3,000

6,000

9,000

12,000

15,000

18,000

Cogeneration‐bagasse Agro‐residue Waste to energy

Actual Potential % Achievement (RHS)

Source: MNRE

Biomass Power Generation Technologies 

Technologies

Co Generation

Combustion Gasification Biogas

Biomass used as fuel by partial combustion and conversion to fuel gas

Utilizing a byproduct to generate electricity (such as bagasse based power generation in sugar sector)

Anaerobic bacterial fermentation of biomass in a closed space

Direct burning of biomass to produce energy

Page 37: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

37

IMPORTANT NOTICE 

No representation or warranty, express or implied is made as to, and no reliance should be placed on, the fairness, accuracy, 

completeness or correctness of such information or opinions contained herein. The information contained in this presentation 

is only current as of its date. Certain statements made in this presentation may not be based on historical information or facts 

and may be “forward looking statements”, including those relating to the Company’s general business plans and strategy, its 

future  financial condition and growth prospects, and  future developments  in  its  industry and  its competitive and regulatory 

environment. Actual results may differ materially from these forward‐looking statements due to a number of factors, including 

future  changes or developments  in  the Company’s business,  its  competitive environment and political, economic,  legal and 

social conditions  in  India. This communication  is  for general  information purpose only, without regard to specific objectives, 

financial situations and needs of any particular person. This presentation does not constitute an offer or invitation to purchase 

or subscribe for any shares  in the Company and neither any part of  it shall form the basis of or be relied upon  in connection 

with any contract or commitment whatsoever. The Company may alter, modify or otherwise change in any manner the content 

of this presentation, without obligation to notify any person of such revision or changes. This presentation can not be copied 

and/or disseminated in any manner. 

Page 38: TECHNO ELECTRIC AND ENGINEERING COMPANY LIMITED Meet/220869_20110831.pdf · TECHNO ELECTRIC AND ENGINEERING COMPANY ... Alstom Projects India Ltd. ... and a fellow-member of the Institute

THANK YOU