DESCRIPTION
Solar Technical Work Group Three issues discussed Enphase inverter presentation Shade impact, operations of product, and PVWATTS derate impact Wiley shade tool presentation System operations, advantages/disadvantages, General consensus is that it is not ready for deployment RE Committee meeting April 21, 2010TRANSCRIPT
![Page 1: Technical Updates Inspections, Solar Technical Workgroup and Training Mark Loeser Training and Technical Field Manager RE Committee meeting April 21, 2010](https://reader036.vdocuments.us/reader036/viewer/2022082600/5a4d1b257f8b9ab059996d6e/html5/thumbnails/1.jpg)
Technical Updates
Inspections, Solar Technical Workgroup and Training
Mark LoeserTraining and Technical Field Manager
RE Committee meeting
April 21, 2010
![Page 2: Technical Updates Inspections, Solar Technical Workgroup and Training Mark Loeser Training and Technical Field Manager RE Committee meeting April 21, 2010](https://reader036.vdocuments.us/reader036/viewer/2022082600/5a4d1b257f8b9ab059996d6e/html5/thumbnails/2.jpg)
Inspections• Number of inspection requests has not abated• Currently scheduling out 3 – 4 weeks
• Matrix designed for 2 weeks• The primary causes are the increased number of
QC installers and higher number of residential projects then originally planned for and QA Eligible Installers failing inspections.
RE Committee meeting
April 21, 2010
![Page 3: Technical Updates Inspections, Solar Technical Workgroup and Training Mark Loeser Training and Technical Field Manager RE Committee meeting April 21, 2010](https://reader036.vdocuments.us/reader036/viewer/2022082600/5a4d1b257f8b9ab059996d6e/html5/thumbnails/3.jpg)
Solar Technical Work Group• Three issues discussed
• Enphase inverter presentation• Shade impact, operations of product, and PVWATTS
derate impact
• Wiley shade tool presentation• System operations, advantages/disadvantages, • General consensus is that it is not ready for
deployment
RE Committee meeting
April 21, 2010
![Page 4: Technical Updates Inspections, Solar Technical Workgroup and Training Mark Loeser Training and Technical Field Manager RE Committee meeting April 21, 2010](https://reader036.vdocuments.us/reader036/viewer/2022082600/5a4d1b257f8b9ab059996d6e/html5/thumbnails/4.jpg)
Solar Technical Work Group• Solyndra module presentation
• Comparison of the Solyndra production tool to PVWATTS.
• Conservative approach of reducing model performance by 4%, but later reduced to 3% with a 6 month reevaluation of the performance tool to PVWATTS and actual production.
RE Committee meeting
April 21, 2010
![Page 5: Technical Updates Inspections, Solar Technical Workgroup and Training Mark Loeser Training and Technical Field Manager RE Committee meeting April 21, 2010](https://reader036.vdocuments.us/reader036/viewer/2022082600/5a4d1b257f8b9ab059996d6e/html5/thumbnails/5.jpg)
Training• All QA Eligible Installers have completed the
required training.• May 12 New installer training at Eco-Complex is
full, and May 27 is more than 30% filled.• Begun training financial institutions with more to
come• Full training schedule will be posted on the
NJCEP website by the end of April.
RE Committee meeting
April 21, 2010