PUDLO: Waterproof, Durable Concrete

1. DBG Our Story

2. Introduction to PUDLO

3. Technical Data - PUDLO and Concrete Durability - BBA - CE Certification - WRAS - PUDLO CWP Data Sheet - ISO Certificates - PUDLO Independent Test Data Table - Technical Support

4. Drawings

- Typical 3D Joint Details

5. Mix Design - Plant Trials and Mix Design Statement

6. PUDLO Experience

- U.A.E Project list - Yas Marina - Dubai Fountains - Southwark Waste Management Facility - Maple Lodge Sewage Treatment Works - Arsenal Waste & Recycling Centre (London Borough of Islington) - In Good Company - What People Say About Us

7. Contact Us

- Address & Phone Number

Index

Page 3: Technical Submission of Pudlo

SECTION 1

Waterproof Concrete. Watertight Concrete

David Ball Group – Our Story

Page 4: Technical Submission of Pudlo

www.pudlo.com

Sustainable materials for the built environment.

David Ball Group plc embraces a 130 year legacy of materials innovation dedicated to the advancement of quality and performance in the challenging arenas of construction and industry.

Engineering materials are our business.

For almost half a century, David Ball Specialist Sands has set the bar in the preparation and supply of British standard and unique, ultra high quality sands for process testing and manufacturing. Quality that has travelled worldwide to meet the most exacting applications.

Durable construction is our strength.

Research & Development is at the heart of what the Group does, harnessing the power of chemistry to enhance the long-term performance of built structures with a dynamic brand portfolio.

Concrete innovation is our passion.

In the 1990s, the performance of integrally waterproof concrete was taken to a new level by David Ball Group plc as it reformulated PUDLO, the world’s first commercial concrete waterproofing admixture introduced a century before. Re-engineered around modern architectural needs, its enhanced capabilities came with the first – and still unmatched – guarantee of the completed concrete structure.

From PUDLO’s early use in the pioneering sanitation systems of Victorian London, its success story continues at the cutting edge in projects like London’s Crossrail and the celebrated Dubai Fountains.

Sustainable progress is our commitment.

While being the world’s most used building material, modern concrete is not recognised as one of the most sustainable. Today’s cement and concrete industries have a consistently impressive record for carbon reduction marshalled by a strong commitment to their environmental responsibilities.

A major milestone in this sustainable legacy is Cemfree, a totally cement free alternative to conventional concrete and a ground-breaking addition to David Ball Group plc’s portfolio. With the ability to produce structural concrete without the use of Portland cement, this revolutionary material is the result of years of dedicated development by the Group’s research scientists.

OUR STORY

Page 5: Technical Submission of Pudlo

www.pudlo.com

PUDLO Middle East

PUDLO Middle East Building Materials LLC is solely owned by David Ball Group PLC.

PUDLO Middle East is an innovation-led construction material manufacturer at the forefront of the quest for innovative products and construction techniques, committed to developing new products which will minimise the impact on the environment and improve working practices.

PUDLO Middle East’s vision is to be the leading manufacturer of innovative concrete products that will improve the way the construction industry works with a bespoke service and specialist products. Through its knowledge and the passion and commitment of its employees, PUDLO Middle East is able to offer outstanding service and expertise across the entire product range.

PUDLO has been used extensively throughout the Middle East for the last decade and is trusted as the most durable, waterproof concrete available.

Page 6: Technical Submission of Pudlo

SECTION 2

Waterproof Concrete. Watertight Concrete

Introduction

Page 7: Technical Submission of Pudlo

www.pudlo.com

PUDLO is the world’s most widely used concrete waterproofing system. From iconic desert towers and flagship waterside developments, to hospitals and homes, PUDLO admixture adapts concrete to meet tough performance criteria in challenging environments. Its commercial launch more than 130 years ago pioneered a dynamic engineering concept: integrally waterproof concrete. Decades of problem-free service from landmark buildings and vital infrastructure around the world are a telling testament to PUDLO’S integrity.

Today, as part of the David Ball Group, PUDLO continues to lead the field in concrete protection. The science is empowering. Architects and engineers have licence to design water-resistant (and water-retaining) structures fully compliant with codes and standards, and uncomplicated by the time, cost and vulnerability of external membranes. But PUDLO goes further. It provides overarching protection for the construction team, client, investor and building user with an unparalleled assurance: an industry-leading guarantee of structural performance.

INTRODUCTION

Page 8: Technical Submission of Pudlo

www.pudlo.com

Much more than a product, PUDLO is a partnering scheme. Product application is backed by technical consultation, from design concept to building handover.

PUDLO reduces the project team’s risk, inspiring ‘outside the box’ engineering in concrete that remains within safe, commercially underwritten bounds. More than a waterproofing and durability providing admixture, PUDLO safeguards business reputations and design legacies - true empowerment for today’s building professional.

PUDLO: CHANGING PERCEPTIONS OF WHAT CONCRETE CAN DO

Page 9: Technical Submission of Pudlo

SECTION 3

Waterproof Concrete. Watertight Concrete

PUDLO Technical Information & Certification

Page 10: Technical Submission of Pudlo

www.pudlo.com

Durability

Durability is the ability of concrete to resist weathering action, chemical attack, and abrasion

while maintaining its desired engineering properties. Different concretes require different

degrees of durability depending on the exposure environment and the properties desired.

Concrete ingredients, the proportioning, performance, placing and curing practices, and the

service environment determine the ultimate durability and life of the concrete.

The use of PUDLO CWP causes the reduction of the ingress of water within concrete through

flow under pressure as well as absorption.

The impermeability (waterproofing) is the single most important performance

characteristic with respect to preventing the ingress of the aggressive

substances within the concrete, and thus the biggest influence on long term

durability.

The benefits of using PUDLO CWP modified concrete thereof are discussed in more detail

below.

Permeability

Permeability is a flow property of concrete which quantitatively characterises the ease by

which a fluid will pass through it, under a pressure differential.

Capillary pore size and pore interconnections are important factors affecting permeability of

concrete. Pudlo modified durable concrete exhibits reduced capillary pore size and increase

the tortuosity of pore networks by densifying the microstructure and physically blocking the

pores to reduce the movement of moisture due to hydrostatic pressure.

The reduction in permeability and the associated decrease in the rate of the ingress of the

aggressive substances within concrete is one of the most important attributes in relation to

enhancement of the durability of concrete (Hewlett, 1998).

Absorption

Absorption is a process by which concrete takes in water by capillary action. Factors

affecting absorption are moisture gradient, capillary pore size and pore interconnection.

The hydrophobic properties of Pudlo significantly reduce the capillary suction. Thus modified

by the addition of Pudlo has very low water absorption values. -

PUDLO AND CONCRETE DURABILITY

Page 11: Technical Submission of Pudlo

www.pudlo.com

Diffusion & Chloride Induced Corrosion

Diffusion and Chloride Induced Corrosion is a process by which water, vapour gas or ions

can pass through concrete under the action of a concentration gradient. This, in the case of

for example chloride ions can cause corrosion of the reinforcing steel.

Pudlo modified durable concrete effectively protects the steel reinforcement from corrosion

induced by both chloride ingression and carbonation process by reducing the diffusion rate

of the aggressive substances by modifying the pore structure of the hardened concrete.

Sulphate Attack

Sulphate attack is characterised by the chemical reaction between sulphate ions from the

ground water with aluminate and calcium component of hardened Portland cement. The

reaction leads to the formation of expansive gypsum and ettringite. This causes expansion

leading to cracking, allows further ingress of sulphate and accelerates the degradation

process.

By reducing the permeation properties, Pudlo makes concrete water resistant, therefore

Pudlo treated concrete is more resistant to sulphate attack.

Pudlo to provide durability

The unique properties of Pudlo densify the cement paste by reducing the porosity and pore

sizes. This enhanced microstructure reduces the permeability and diffusion properties of

Pudlo modified concrete making into a high performance and durable concrete. It also

significantly reduces the absorption of concrete by providing hydrophobic lining in any

remaining micro pore walls, thus reducing capillary suction of pores.

By reducing the permeability, absorption and diffusion into concrete, Pudlo CWP makes the

concrete considerably more water resistant with a fivefold reduction in permeability relative

to the control concrete. Such attributes are key factors for minimising steel corrosion,

providing greater chloride and sulphate resistance and thus a more durable concrete and

resistance against other physical and chemical attack.

PUDLO to enhance compressive strength

Beside enhancing durability and water tightness of concrete, PUDLO CWP improves the

compressive strength of concrete significantly. Unlike other hydrophobic waterproofing

admixture where concrete normally lose compressive strength, the densified microstructure

of PUDLO modified concrete enhances its mechanical properties including compressive

strengths providing ease of mind to concrete producers and contractors alike. This additional

improvement of strengths eliminate any needs of the addition of extra cement which may

require for other type of admixtures.

Page 12: Technical Submission of Pudlo

www.pudlo.com

PUDLO to assist on slump and workability retention

One of the unique properties of PUDLO modified durable concrete is to help prolonging the

retention of slump which is extremely useful in extreme hot weather concreting condition in

the Middle East. This unique characteristics help both ready-mix concrete producers and

contractors to produce, deliver, place and consolidate concrete with right consistency

resulting into well compacted, homogeneous concrete matrix, a key requirement for durable

structure. As Pudlo modified concrete generally do not experience rapid loss of slump,

therefore the quality of delivered concrete remains assured as the risks of any deliberate

attempt to add unauthorized water are eliminated.

PUDLO to produce stable dense microstructure

PUDLO CWP produces additional hydrates and physically fills the interstitial spaces between

cement particles and capillary pores providing a dense microstructure. PUDLO produces the

first and final defence against any ingress of water which often carries dissolved salts to

attack hydrates and initiate steel corrosion. Pudlo CWP does not leach out under extreme

hydrostatic pressure as it has already been reacted to form stable hydrate structures. Pudlo

CWP is the best performing admixture on the market.

Page 13: Technical Submission of Pudlo

Page 1 of 8

TECHNICAL APPROVALS FOR CONSTRUCTION

APPROVAL

INSPECTION

TESTING

CERTIFICATION

David Ball Group plcWellington WayBourn AirfieldCambridge CB23 2TQTel: 01954 780687 Fax: 01954 782912e-mail: [email protected]: www.pudlo.com

British Board of Agrément tel: 01923 665300Bucknalls Lane fax: 01923 665301Watford e-mail: [email protected] WD25 9BA website: www.bbacerts.co.uk©2014

The BBA is a UKAS accredited certification body — Number 113. The schedule of the current scope of accreditation for product certification is available in pdf format via the UKAS link on the BBA website at www.bbacerts.co.uk

Readers are advised to check the validity and latest issue number of this Agrément Certificate by either referring to the BBA website or contacting the BBA direct.

PUDLO WATERTIGHT CONCRETE SYSTEM

PUDLO CWP (CEMENT WATERPROOFING POWDER)PUDLO CWP (CEMENT WATERPROOFING POWDER)

This Agrément Certificate Product Sheet(1) relates to Pudlo CWP (Cement Waterproofing Powder), a hydrophobic, pore-blocking admixture for use in concrete mixes or cementitious render to provide watertight concrete or render. The product is suitable for basements, roofs, swimming pools, tunnels and culverts without the requirement for additional applied protection.(1) Hereinafter referred to as ‘Certificate’.

CERTIFICATION INCLUDES:• factors relating to compliance with Building

Regulations where applicable• factors relating to additional non-regulatory

information where applicable• independently verified technical specification• assessment criteria and technical investigations• design considerations• installation guidance• regular surveillance of production• formal three-yearly review.

KEY FACTORS ASSESSEDResistance to water penetration — concrete and render containing the product has reduced permeability when compared with the equivalent plain concrete and render (see sections 6 and 7).Reinforcement protection — concrete containing the product has enhanced resistance to reinforcement corrosion when compared with the equivalent plain concrete (see section 8).Mechanical properties — the mechanical properties of the concrete and render are not adversely affected by the incorporation of the product (see section 9).Durability — concrete containing the product is more durable than the equivalent plain concrete owing to its reduced permeability (see section 18).

Agrément Certificate01/3843

Product Sheet 1

The BBA has awarded this Certificate to the company named above for the product described herein. This product has been assessed by the BBA as being fit for its intended use provided it is installed, used and maintained as set out in this Certificate.

On behalf of the British Board of Agrément

Date of Fifth issue: 4 February 2014 Simon Wroe Claire Curtis-ThomasOriginally certificated on 8 August 2001 Head of Approvals — Materials Chief ExecutiveCertificate amended on 12 March 2014 to include correction to section 6.2.

Page 14: Technical Submission of Pudlo

Page 2 of 8

In the opinion of the BBA, Pudlo CWP (Cement Waterproofing Powder) is not subject to the following Building Regulations:

The Building Regulations 2010 (England and Wales) (as amended)

The Building (Scotland) Regulations 2004 (as amended)

The Building Regulations (Northern Ireland) 2012

Construction (Design and Management) Regulations 2007Construction (Design and Management) Regulations (Northern Ireland) 2007

Information in this Certificate may assist the client, CDM co-ordinator, designer and contractors to address their obligations under these Regulations.See sections: 3 Delivery and site handling (3.1, 3.4 and 3.5) and 22 Placing (22.1) of this Certificate.

Additional Information

NHBC Standards 2014In the opinion of the BBA, the use of Pudlo CWP (Cemente Waterproofing Powder), in relation to this Certificate, is not subject to the requirements of these Standards.

CE markingThe Certificate holder has taken the responsibility of CE marking the product in accordance with harmonised European Standard BS EN 934-2 : 2009, Table 9. An asterisk (*) appearing in this Certificate indicates that data shown are given in the manufacturer’s Declaration of Performance.

Technical Specification

1 Description1.1 Pudlo CWP (Cement Waterproofing Powder) is a powder admixture which, when incorporated into concrete or render, enhances the water resistance and durability of the hardened product. The product does not contain Portland cement.

1.2 Pudlo Self-Compacting Admixture (SC) is a blend of Pudlo CWP and a superplasticising admixture, used to produce watertight flowing concrete. The self-compacting characteristic of the resultant concrete has not been assessed by the BBA and is outside the scope of this Certificate.

2 Manufacture2.1 The product is manufactured by a blending process.

2.2 As part of the assessment and ongoing surveillance of product quality, the BBA has:• agreed with the manufacturer the quality control procedures and product testing to be undertaken• assessed and agreed the quality control operated over batches of incoming materials• monitored the production process and verified that it is in accordance with the documented process• evaluated the process for management of nonconformities• checked that equipment has been properly tested and calibrated• undertaken to carry out the above measures on a regular basis through a surveillance process, to verify that the

specifications and quality control operated by the manufacturer are being maintained.

2.3 The management system of David Ball Group plc has been assessed and registered as meeting the requirements of BS EN ISO 9001 : 2008 by National Quality Assurance Ltd (Certificate 2899).

3 Delivery and site handling3.1 The product is packaged either in tubs weighing 1 kg, bags weighing 2 kg, 8 kg or 25 kg, or bulk bags weighing 1 tonne.

3.2 Each package bears the batch number and weight, and CE marking.

Regulations

Page 15: Technical Submission of Pudlo

Page 3 of 8

3.3 The product must be stored in sealed containers in a dry environment and protected from rain or other sources of moisture.

3.4 The product is classified as ‘irritant’ under The Chemicals (Hazard Information and Packaging for Supply) Regulations 2009 (CHIP4)/Classification, Labelling and Packaging of Substances and Mixtures (CLP Regulation) 2009.

3.5 When handling the product, the normal health and safety procedures associated with cementitious materials should be observed.

Assessment and Technical Investigations

The following is a summary of the assessment and technical investigations carried out on Pudlo CWP (Cement Waterproofing Powder).

Design Considerations

4 Use4.1 Pudlo CWP (Cement Waterproofing Powder) is satisfactory for use in concrete mixes at an addition rate of 2% by weight of cement, to provide watertight concrete for basements, roofs, swimming pools, tunnels and culverts without the requirement for additional applied protection. It is also used at an addition rate of 3% by weight of cement for sand/cement renders.

4.2 The effect of Pudlo CWP (Cement Waterproofing Powder) on the properties of concrete designed to the mix specification is given in Table 1.

Table 1 Test mix details and properties of fresh wet concrete (1)

Component/Property (unit) Control (plain) concrete Pudlo CWP/Admix 500 concrete

Portland cement (BS12, Class 42.5 N) 375(2) 375(2)

Slump (mm) 50 45

Water/cement ratio 0.45 0.35

Sand 720 725

Gravel (Thames Valley) 1090 1145

Pudlo CWP (kg) - 7.5

Admix 500 (kg) - 1.5

(1) The specific effect of the product on these properties for a particular mix and site conditions should be evaluated through site trial prior to use.(2) ±10 kg·m–3.

4.3 Concrete containing the product should be designed in accordance with BS EN 206-1 : 2000 and BS 8500-2 : 2006 for use as all normal types, including precast, pre-stressed, post-tensioned, ready-mixed, reinforced, slip-formed, sprayed and pumped concretes.

4.4 The product is compatible with cement blends containing pulverized-fuel ash, ground granulated blastfurnace slag and silica fume blends as defined in BS EN 197-1 : 2011.

4.5 The use of the product with an air-entraining agent is not covered by this Certificate.

4.6 The product is not intended for use with gypsum-based plasters.

4.7 The product is suitable for use in contact with potable water and has been approved by the Water Regulations Advisory Scheme for this purpose.

5 Practicability of installation Concrete mixes containing the product can be placed, compacted and cured by operatives with experience of using conventional concreting methods and equipment.

6 Water penetration and absorption6.1 Concrete containing the product has greater resistance to water penetration and water absorption than an equivalent plain concrete.

6.2 Tests conducted on a concrete containing the product at an addition rate of 2% by weight of cement or cementitious binder showed a water permeability(1) of 0.64 x 10–15 m·s–1 compared with 3.2 x 10–15 m·s–1 for the control concrete.

6.3 Tests conducted on a concrete containing the product at an addition rate of 2% by weight of cement or cementitious binder showed a capillary absorption(1) of 16% by mass of the control concrete at 7 days and 31% by mass of the control concrete at 90 days.(1) The specific effect of the product on these properties for a particular mix and site conditions should be evaluated through site trial prior to use.

Page 16: Technical Submission of Pudlo

Page 4 of 8

7 Water vapour permeability7.1 Concrete containing the product has a lower permeability to water vapour than an equivalent plain concrete.

7.2 Tests conducted on concrete containing the product at an addition rate of 2% by weight of cement or cementitious binder showed a water vapour permeability(1) of 490 x 10–12 g·m (N·s)–1 compared with 790 x 10–12 g·m (N·s)–1 for the control concrete.

7.3 Concrete made with a high water/cement ratio can have a water vapour permeability greater than 3000 by 10–12 g·m (N·s)–1. The permeability of concrete is strongly dependent on the exact mix design and the figures given in section 7.2 indicate the levels that can be obtained using the product.(1) The specific effect of the product on these properties for a particular mix and site conditions should be evaluated through site trial prior to use.

7.4 The appropriate thickness for concrete with a specific permeability to achieve a water vapour resistance of 200 MN·s·g–1 or 550 MN·s·g–1(1) (suitable for BS 8102 : 2009, Grade 3) is given by:

for 200 MN·s·g–1, t = 0.2 x 1012 x p

for 550 MN·s·g–1, t = 0.55 x 1012 x p

where t = concrete thickness in mm and p = water vapour permeability in g·m(N·s)–1 (from BS 3177 : 1959 test).(1) This figure may be used where a high resistance to water vapour is required.

8 Reinforcement protection8.1 The high level of alkalinity required to prevent corrosion of the reinforcement (pH>13) will not be adversely affected by the incorporation of the product into concrete.

8.2 Corrosion of reinforcement is normally caused by the ingress of chloride to the steel or by the reduction in alkalinity of the concrete by the diffusion of carbon dioxide. The reduced permeability of concrete containing the product will slow down diffusion of aggressive agents into the concrete and so provide improved protection against reinforcement corrosion.

9 Mechanical properties9.1 The compressive strength of concrete containing the product is higher than that of an equivalent plain concrete with the same consistency.

9.2 The flexural strength of concrete containing the product is similar to that of an equivalent plain concrete.

9.3 The static modulus of elasticity of concrete containing the product is similar to that of an equivalent plain concrete.

9.4 The use of the product in sand/cement renders will not affect the strength, stability or impact resistance of the hardened material.

9.5 The effect of the product on the mechanical properties of concrete designed to the mix specification given in Table 1 is shown in Table 2.

Table 2 Effects of the product on the mechanical properties of the concrete (1)

Property (unit) Control (plain) concrete Pudlo CWP/Admix 500 concrete

Compressive strength* (N·mm-–2) – 28 days 63 82

(1) The specific effect of the product on these properties for a particular mix and site conditions should be evaluated through site trial prior to use.

10 Drying shrinkage and wetting expansion10.1 The drying shrinkage and wetting expansion of concrete containing the product is reduced compared with that of an equivalent plain concrete.

10.2 The effect of the product on the shrinkage and expansion properties of concrete designed to the mix specification given in Table 1 is shown in Table 3.

Table 3 Effects of the product on the shrinkage and expansion properties of concrete (1)

Property (unit) Control (plain) concrete Pudlo CWP/Admix 500 concrete

Drying shrinkage (%) 0.035 0.032

Wetting expansion (%) 0.017 0.009

(1) The specific effect of the product on these properties for a particular mix and site conditions should be evaluated through site trial prior to use.

11 Setting characteristics11.1 The setting time of concrete or render mixes containing the product will be similar to equivalent plain concrete or render. The setting time will depend on the concrete mix design used and the ambient temperature during placing and curing.

11.2 The effect of the product for a specific mix and site conditions should be evaluated through site trials prior to use.

Page 17: Technical Submission of Pudlo

Page 5 of 8

12 Carbonation resistanceConcrete containing the product has greater resistance to carbon dioxide diffusion than an equivalent plain concrete.

13 Frost resistanceConcrete containing the product will not have a detrimental effect on the freeze/thaw resistance of the hardened concrete.

14 Sulfate resistanceThe lower permeability of the concrete containing the product will reduce the ingress of sulfates. However, if sulfate-resistant concrete is required, the advice of the Certificate holder should be sought.

15 Alkali silica reaction (ASR)15.1 Concrete containing the product should be designed in accordance with BS EN 206-1 : 2000, section 5.2.3.4, and BS 8500-2 : 2006, section 5.2.

15.2 The sodium oxide equivalent of the product when measured in accordance with BS EN 480-12 : 1998 was 1.76% by mass of admixture. This figure should be used when calculating the contribution of the product to the total alkali content of a given concrete mix. In turn, this can be used to assess the susceptibility of that concrete to alkali-silica reaction; for example, based on a cement content of 350 kg·m–3 the product will contribute 123 g per cubic metre of concrete.

16 Resistance to leachingUse of the product will reduce the leaching of lime from the hydrated cement in the concrete.

17 MaintenanceFor a specific installation, the maintenance regime should be considered to ensure that the required design life of the concrete is achieved.

18 Durability18.1 Under normal conditions of service, concrete containing the product is more durable than an equivalent plain concrete owing to its reduced permeability.

18.2 Where exposure to aggressive soil conditions or chemicals is anticipated, a full assessment of the site should be made. In these situations the Certificate holder should be consulted on the suitability of the concrete.

Installation

19 General19.1 When used in concrete mixes and render, Pudlo CWP (Cement Waterproofing Powder) enhances durability and improves protection against reinforcement corrosion by providing a hydrophobic, pore-blocking action, which protects the resulting concrete against water ingress via absorption and hydrostatic pressure.

19.2 The use of the product will produce a concrete or render with the following properties relative to a control:• reduced porosity • reduced permeability• increased water resistance • increased corrosion resistance.

19.3 The product has no known detrimental effect on the properties of the concrete or render.

19.4 Structures built incorporating the product should be designed to the relevant sections of BS 8007 : 1987, BS 8102 : 2009, BS 8110-1 : 1997, BS EN 1992-1-1 : 2004, BS EN 1992-1-2 : 2004, BS EN 1992-3 : 2006 and their respective UK National Annexes.

19.5 Concrete mixes containing the product are suitable for Type B constructions as defined in BS 8102 : 2009, and can meet the requirements for all grades defined in Table 2 of this Standard. For Grade 3 (where control of water vapour is required), it will be necessary to provide a mix with a sufficiently low vapour permeability in combination with an adequate section thickness (see sections 7.2 and 7.3). The use of suitable ventilation, dehumidification or air conditioning, appropriate to the intended use, must also be considered.

19.6 Basements for dwellings should be designed in accordance with the guidance given in the Approved Document Basements for dwellings, published by the British Cement Association, Document No. 48.062.

19.7 Rendering should be carried out in accordance with BS EN 13914-1 : 2005, the Certificate holder’s instructions and this Certificate.

20 Mix design20.1 Concrete containing the product must only be supplied as ready-mixed concrete from ready-mixed concrete companies accredited by QSRMC or equivalent schemes. Concrete must be prepared in accordance with the Certificate holder’s instructions and this Certificate.

Page 18: Technical Submission of Pudlo

Page 6 of 8

20.2 The concrete must have a minimum cement or cementitious binder content of 350 kg·m–3 and be batched with a maximum water/cement ratio of 0.4. Further details of suitable mixes can be obtained from the Certificate holder or their approved representatives.

20.3 Once the fresh concrete is mixed, further materials must not be added.

20.4 The workability of concrete can be adjusted using a suitable(1) water reducing or superplasticising admixture complying with BS EN 934-2 : 2009, Tables 3.1 and 3.2, to ensure the maximum water/cement ratio given in section 20.2 of this Certificate is not exceeded. Specific admixtures have not been considered and are outside the scope of this Certificate. (1) The Certificate holder’s advice should be sought regarding the suitability and compatibility of water-reducing or superplasticising admixtures.

Admixtures should be evaluated before use and site trials should be carried out to establish the appropriate dose required.

20.5 A water-reducing/superplasticising admixture is not used for renders.

21 Mixing21.1 The product is added at the correct dose (see section 4.1) and pre-mixed with dry concrete or render constituents.

21.2 When a superplasticiser is required, it must be added in accordance with the admixture supplier’s recommendations.

21.3 The resulting concrete is mixed in accordance with the Certificate holder’s instructions to ensure even distribution of the product throughout the concrete.

22 Placing22.1 Concrete mixes containing the product are placed in the same way as normal concrete, in accordance with BS 8000-2.2 : 1990, BS EN 13670 : 2009, the Certificate holder’s health and safety guidance and the normal routine precautions for handling concrete.

22.2 Concrete mixes containing the product should only be placed at temperatures of 5°C and rising. At temperatures below this, the concrete mixes containing the product can be placed in accordance with the Certificate holder’s instructions and BS 8110-1:1997, clause 6.2.4 Concreting in cold weather.

22.3 Concrete mixes containing the product should be fully compacted.

23 CuringThe concrete must be cured strictly in accordance with BS 8110-1 : 1997, BS EN 13670 : 2009, BS EN 1992-1-1 : 2004, its UK National Annex and the Certificate holder’s recommendations (where site specific information exists).

24 Joints24.1 Joints must be designed with waterstops as recommended in BS 8102 : 2009, to maintain the watertightness of the whole structure. The advice of the Certificate holder should be sought on particular applications.

24.2 Penetrations of the concrete, such as pipe entries or formwork ties, must also be securely sealed to maintain watertightness. The Certificate holder can advise on suitable systems.

25 FinishesWhen water-based products are used to coat the hardened concrete, a primer may be required. For specific cases, advice should be sought from the Certificate holder.

Technical Investigations

26 Tests 26.1 Tests were carried out and the results assessed to determine characteristics of the admixture, including:• specific gravity • particle sizing • pH of an aqueous solution.

26.2 Tests were carried out and the results assessed to determine characteristics of the fresh concrete, including:• workability • wet density.

26.3 Tests were carried out and the results assessed to determine characteristics of the hardened concrete, including:• compressive strength* • flexural strength • modulus of elasticity• bond to steel • freeze/thaw resistance • drying shrinkage• wetting expansion • water vapour permeability • liquid water permeability• initial surface absorption • water absorption • capillary absorption• efflorescence • surface bond of other materials render • leaching resistance of the render• water vapour permeability • impact resistance.

Page 19: Technical Submission of Pudlo

Page 7 of 8

26.4 An evaluation was made of independent test data relating to:• compressive strength • flexural strength • dynamic modulus• hardened density • sorptivity • liquid water permeability• oxygen diffusion • chloride diffusion • carbonation• freeze/thaw • drying shrinkage • water absorption• initial surface absorption • electrical conductance • capillary absorption*.

27 Investigations27.1 The manufacturing process and quality control procedures were evaluated, and details were obtained of the quality and composition of the materials used.

27.2 A user survey was conducted to investigate the performance of the product in service.

27.3 A visit was made to an existing site where the product had been used to establish performance in service.

27.4 Data on concrete made with the product were evaluated and the mix design and curing regime assessed.

27.5 An assessment was made of the product’s:• range of use • durability • requirements for surface finishes• maintenance and repair requirements • compatibility with concreting materials.

BibliographyBS 12 : 1996 Specification for Portland cement

BS 3177 : 1959 Method for determining the permeability to water vapour of flexible sheet materials used for packaging

BS 8000-2.2 : 1990 Workmanship on building sites — Code of practice for concrete work — Sitework with in-situ and precast concrete

BS 8007 : 1987 Code of practice for design of concrete structures for retaining aqueous liquids

BS 8102 : 2009 Code of practice for protection of below ground structures against water from the ground

BS 8110-1 : 1997 Structural use of concrete — Code of practice for design and construction

BS 8500-2 : 2006 Concrete — Complementary British Standard to BS EN 206-1 — Specification for constituent materials and concrete

BS EN 197-1 : 2011 Cement — Composition, specifications and conformity criteria for common cements

BS EN 206-1 : 2000 Concrete — Specification, performance, production and conformity

BS EN 480-12 : 1998 Admixtures for concrete, mortar and grout — Test methods — Determination of the alkali content of admixtures

BS EN 934-2 : 2009 Admixtures for concrete, mortar and grout — Concrete admixtures — Definitions and requirements, conformity, marking and labelling

BS EN 1992-1-1 : 2004 Eurocode 2 : Design of concrete structures — General rules and rules for buildingsNA to BS EN 1992-1-1 : 2004 UK National Annex to Eurocode 2 : Design of concrete structures — General rules and rules for buildingsBS EN 1992-1-2 : 2004 Eurocode 2 : Design of concrete structures — General rules — Structural fire designNA to BS EN 1992-1-2 : 2004 UK National Annex to Eurocode 2 : Design of concrete structures — Structural fire designBS EN 1992-3 : 2006 Eurocode 2 : Design of concrete structures — Liquid retaining and containing structuresNA to BS EN 1992-3 : 2006 UK National Annex to Eurocode 2 : Design of concrete structures — Liquid retaining and containing structures

BS EN 13670 : 2009 Execution of concrete structures.

BS EN 13914-1 : 2005 Design, preparation and application of external rendering and internal plastering — External rendering

BS EN ISO 9001 : 2008 Quality management systems — Requirements

Page 20: Technical Submission of Pudlo

Page 8 of 8

Conditions of Certification

28 Conditions28.1 This Certificate:• relates only to the product/system that is named and described on the front page• is issued only to the company, firm, organisation or person named on the front page — no other company, firm,

organisation or person may hold or claim that this Certificate has been issued to them• is valid only within the UK• has to be read, considered and used as a whole document — it may be misleading and will be incomplete to be

selective• is copyright of the BBA• is subject to English Law.

28.2 Publications, documents, specifications, legislation, regulations, standards and the like referenced in this Certificate are those that were current and/or deemed relevant by the BBA at the date of issue or reissue of this Certificate.

28.3 This Certificate will remain valid for an unlimited period provided that the product/system and its manufacture and/or fabrication, including all related and relevant parts and processes thereof:• are maintained at or above the levels which have been assessed and found to be satisfactory by the BBA• continue to be checked as and when deemed appropriate by the BBA under arrangements that it will determine• are reviewed by the BBA as and when it considers appropriate.

28.4 The BBA has used due skill, care and diligence in preparing this Certificate, but no warranty is provided.

28.5 In issuing this Certificate, the BBA is not responsible and is excluded from any liability to any company, firm, organisation or person, for any matters arising directly or indirectly from:• the presence or absence of any patent, intellectual property or similar rights subsisting in the product/system or any

other product/system• the right of the Certificate holder to manufacture, supply, install, maintain or market the product/system• actual installations of the product/system, including their nature, design, methods, performance, workmanship and

maintenance• any works and constructions in which the product/system is installed, including their nature, design, methods,

performance, workmanship and maintenance• any loss or damage, including personal injury, howsoever caused by the product/system, including its manufacture,

supply, installation, use, maintenance and removal• any claims by the manufacturer relating to CE marking.

28.6 Any information relating to the manufacture, supply, installation, use, maintenance and removal of this product/system which is contained or referred to in this Certificate is the minimum required to be met when the product/system is manufactured, supplied, installed, used, maintained and removed. It does not purport in any way to restate the requirements of the Health and Safety at Work etc. Act 1974, or of any other statutory, common law or other duty which may exist at the date of issue or reissue of this Certificate; nor is conformity with such information to be taken as satisfying the requirements of the 1974 Act or of any statutory, common law or other duty of care.

British Board of Agrément tel: 01923 665300Bucknalls Lane fax: 01923 665301Watford e-mail: [email protected] WD25 9BA website: www.bbacerts.co.uk©2014

Page 21: Technical Submission of Pudlo

TECHNICAL APPROVALS FOR CONSTRUCTION

APPROVAL

INSPECTION

TESTING

CERTIFICATION

Signed on behalf of the British Board of Agrément:

Martyn Reed Operations Director

Date of Third issue: 31 January 2013

Expiry date: 30 January 2016

EC CERTIFICATE OF FACTORY PRODUCTION CONTROL0836–CPD – 07/F008

In compliance with the Council Directive 89/106/EEC of 21 December 1988 on the approximation of laws, regulations and administrative provisions of the Member States relating to construction products (the Construction Products Directive or CPD), as amended, it has been stated that the construction product:

is submitted by the manufacturer to the initial type-testing of the product, a factory production control and that the notified body No 0836 (British Board of Agrément), has performed the initial inspection of the factory and of the factory production control and performs the continuous surveillance, assessment and of the factory production control.

This Certificate attests that all provisions concerning the attestation of factory production control described in Annex ZA of the standard(s) or in the ETA (resp. in)

BS EN 934-2 : 2009 + A1 : 2012were applied.

This Certificate was first issued on 22 January 2007 and remains valid for as long as the conditions laid down in the harmonised technical specification in reference or the manufacturing conditions in the factory or the FPC itself are not modified significantly.

David Ball Group PLCWellington WayBourn Airfield

Cambridge CB23 2TQ

placed on the market by

and produced in the factory

David Ball Group PLCWellington WayBourn Airfield

Cambridge CB23 2TQ

British Board of AgrémentBucknalls LaneWatford WD25 9BATelephone: 01923 665300Facsimile: 01923 665301

e-mail: [email protected]: www.bbacerts.co.uk

PUDLO CWP

Page 22: Technical Submission of Pudlo
Page 23: Technical Submission of Pudlo
Page 24: Technical Submission of Pudlo

PRODUCT DATA SHEET

DESCRIPTION A dual-purpose, multi-component powdered admixture comprising of a powerful

single dosage pack providing outstanding durability and waterproofing properties

to all concrete mixes. It also includes plasticising and corrosion-inhibiting benefits.

PUDLO outperforms any other admixture of its kind in both durability and

impermeability. Where long term durability is critical and / or exposure to aggressive

environments is present, PUDLO provides significant key solutions when added to the concrete mix.

BBA BBA certificate 01/3843 relates to PUDLO performance characteristics and provides accurate independent data on

durability and impermeability.

KEY BBA CERTIFICATE FACTORS ASSESSED Durability — concrete containing the product is more durable than the equivalent plain concrete due to its reduced

permeability (see section 17 of BBA certificate).

Resistance to water penetration — concrete and render containing the product has reduced permeability when

compared to the equivalent plain concrete and render (see sections 5 and 6 of BBA certificate).

Reinforcement protection — concrete containing the product has enhanced resistance to reinforcement corrosion

when compared to the equivalent plain concrete (see section 7 of BBA certificate).

Mechanical properties — the mechanical properties of the concrete and render are not adversely affected by the

incorporation of the product (see section 8 of BBA certificate).

POTABLE WATER APPLICATIONS The product is suitable for use in concrete mixes designed to be in contact with potable water and has been

approved by the Water Regulations Advisory Scheme for this purpose.

QUALITY CONTROL PUDLO powder is a Quality Controlled, dry powdered product produced in a BS EN ISO 9001 quality manufacturing

environment. PUDLO Powder is BBA accredited holding Certificate No 01 / 3843.

APPLICATIONS AND BENEFITS

Integral advantages in both high durability and waterproofing environments of all concrete mixes and

cementitious based systems

PUDLO is suitable for use with all CEM1 mixes (100% OPC) and cement replacement mix designs using GGBS,

PFA and micro silica

To increase durability and minimise permeability, absorption and efflorescence

To provide long-term (building lifetime) durability

Applicable in all types structural readymix concrete and precast concretes

PUDLO CWP Durability improver and waterproof powdered admixture

Page 25: Technical Submission of Pudlo

PRODUCT DATA SHEET

To reduce shrinkage

Provides permanent significant reduction in permeability

Reduction in carbonation of concrete

Improves resistance to sulphate, chloride and chemical attack including leachates

Enhances protection against frost attack

Provides sound concrete for protection of reinforcement steel

Increases ultimate compressive and tensile strengths without increase in cement content

Reduces bleed and segregation

Reduces efflorescence and staining

Ready to use, readily dispersed, single dose powder, supplied in convenient pre-weighed dissolvable paper

bags

Proven world-wide track record with over 130 year history

Concrete mixes containing the product can be placed, compacted and cured by operatives with experience

of using conventional concreting methods and equipment

Eliminates the need for any post-applied coating applications or sheet any membrane materials for

protection and durability

Typical performance characteristics of Pudlo modified concrete within the

GCC

Property

Test reference/s Typical result

Rapid Chloride Permeability AASHTO T277

ASTM C 1202 - 97

Max. 1000 coulombs

Water Permeability DIN 1048

BS EN 12390-8

Max. 10 mm

Initial Surface Absorption

BS 1881 Part 208 Max. 0.1 ml/m2/s @ 30 mins

30 minute Water Absorption

BS 1881 Part 122 Max. 1.0 %

Drying Shrinkage

BS 812 Part 120 Max. 0.04 %

Page 26: Technical Submission of Pudlo

PRODUCT DATA SHEET

DOSAGE AND MIXING INSTRUCTIONS

The optimum dosage of PUDLO Cement Waterproofing Powder to meet specific requirements should always be

determined by trials using materials and conditions that will be experienced in use.

As a guide, normal dosages of PUDLO Cement Waterproofing Powder should be in the range 2 – 3% by weight of

cement. For example, 1kg PUDLO CWP per 50kg of cement.

To obtain maximum benefit it is recommended that the water cement

ratio should not exceed 0.40.

With the correct dosage of PUDLO Cement Waterproofing Powder

determined, the required amount should be added to the mix,

preferably with or immediately after cement addition.

The concrete or mortar produced must be thoroughly mixed until

homogeneous.

APPLICATION AND USE

It is essential that good concreting practice is performed and maintained at every stage of the application process.

Concrete modified with PUDLO powder should be placed without segregation, fully compacted and correctly cured

in accordance with up to date industry guidelines. Failure to adhere to guidelines and methods of good concrete

practice can cause segregation and under compaction and may result in moisture or water ingress.

PACKAGING AND SHELF LIFE

PUDLO Cement Waterproofing Powder is packaged in 1kg or 8kg bags or 25kg tubs. Bulk options are available,

please contact us for details. The powder has an indefinite shelf life subject to storage in good dry conditions.

APPEARANCE

PUDLO CWP is an off white/pale grey powder.

HEALTH AND SAFETY

Use of substance/ preparation: PUDLO CWP (Concentrated Waterproofing Powder) is a cementitious powder

admixture that when incorporated in to concrete or render enhances the water resistance and durability of the

hardened product.

Company name: David Ball Group PLC, Wellington Way, Bourn Airfield, Cambridge CB23 2TQ.

Tel: 01954 780 687 Fax: 01954 782 912

HAZARDS IDENTIFICATION

Hazard designation: Xi Irritant

Information pertaining to particular dangers for man and environment: R 36/37/38 Irritating to respiratory system,

eyes and skin.

Composition/ information on ingredients: A blend of cementitious powders, aggregates and waterproofing agents.

PUDLO Cement Waterproofing Powder is non-toxic and safe to use. However, protective clothing and a dust mask

should be worn while mixing the material.

Handling: Avoid creating airborne dust wherever possible. Where dust is generated then engineering control

measures should be considered (ventilation/ extraction) to maintain the airborne dust concentration as low as is

reasonably practical.

Page 27: Technical Submission of Pudlo

PRODUCT DATA SHEET

Storage: Store between +5° C and +50° C protected from frost, sunlight and moisture. Treat as standard Portland

cement.

Occupational Limits: Total inhalable dust, 10mgm/m³ 8 hour time weighted average.

Exposure Standards: Respirable dust, 5mg/m³ 8 hour time weighted average.

General protective and hygienic measures: Keep away from foodstuffs, beverages and food. Instantly remove any

soiled and impregnated garments. Wash hands during breaks and at the end of the work. Avoid contact with eyes

and skin.

PERSONAL PROTECTIVE EQUIPMENT (PPE)

Breathing equipment: P3 dust mask or similar respirator rated for fine dust. In case of intensive or longer exposure,

use breathing apparatus that are independent of circulating air.

Protection of hands: Protective gloves. Suitable gloves for the handling of cementitious materials.

Eye protection: Eye protection recommended.

Body protection: Protective work clothing recommended.

The above health and safety information is abbreviated from the PUDLO CWP MSDS/ COSHH data sheet available on

request.

The PUDLO System is a division of David Ball Group PLC.

Page 28: Technical Submission of Pudlo
Page 29: Technical Submission of Pudlo

This Certificate is to verify that:

David Ball Group Plc Wellington Way, Bourn Airfield, Cambridge. CB23 2TQ

Have been audited by:

And has been assessed for conformance to the requirements of:

ISO 14001:2004

Environmental Management System.

Scope of Registration

Manufacture, grading and supply of specialist sands, waterproof admixtures and cementitious products at their site

Registration Number

4021193

Signed on Behalf of The Audit People Ltd. Certification Manager; Elaine Hanaghan……………………

Initial Certification Date: 22nd November 2013 Certificate Issue Date: 22nd November 2013 Certificate Expiry Date: 21st November 2016 Issue No. 01 Although certification is granted for 3 years, this is subject to annual surveillance audits to ensure compliance with the above standard. This Certificate was issued electronically by The Audit People Ltd and Remains the Property of The Audit People Ltd and is bound by Conditions of Contract. This is an accredited certificate Authorised for issue by Accreditation Services for Certifying Bodies (Europe) Limited who have fully assessed The Audit People Ltd as an impartial Conformity Assessment Body for Compliance with ISO 17021:2011 Conformity Assessment –Requirements for bodies providing audit and certification of management systems. The Audit People Ltd, Accreditation Reg. No.201011-1, Archer House, Northbourne Road Eastbourne East Sussex BN22 8PW Reg: 7026068 United Kingdom Part 1 of Companies Act.

Certificate of Registration

Page 30: Technical Submission of Pudlo

Table 1- Pudlo CWP Historic Middle East Test data

An expanse of this historic test data is available upon request and inline with our plant trials/mix design section, for up to date/current test requirements. Pudlo will work with the nominated RMC to ensure the appropriate plant trials are carried out inline with the specification of the project/project requirements. Pudlo will provide comment on the proposed mix design from the engineer/consultant/RMC prior to plant trials being carried out to ensure that it will comply with the specification.

Date

Test Test House Result

17th January 2001 Compressive Strength BS 1881 Part 116: 1983

Al Futtaim Tarmac 28 day 79 N/mm2

23rd February 2007 Rapid Chloride Permeability to AASHTO T277

Al Futtaim Bodycote 28 day 664 Coulombs

29th April 2001 Water Absorption BS 1881 Part 122: 1983

Fugro Middle East 28 day 0.67%

25th September 2005 Water Permeability DIN 1048

Al Futtaim Bodycote 28 day 0 mm

14th February 2000 Initial Surface absorption BS 1881 Part 208:1996

Fugro Middle East After 10 mins 0.02 ml/m2.sec After 30 mins 0.01 ml/m2.sec After 1 hour 0.01 ml/m2.sec

23rd February 2007 Drying Shrinkage to BS 812 Part 120

Al Futtaim Bodycote 28 day 0.0189%

Independent Test Data

Page 31: Technical Submission of Pudlo

www.pudlo.com

Dr Abu Saleh – General Manager Dr Abu Saleh is a concrete technologist with 21 years of techno-commercial experience in concrete and construction industries in the Middle East, Asia and

Europe. Civil Engineer by training, he has obtained his PhD from the University of Bath UK on low carbon concrete for the Gulf region. He has also an MSc with

distinction in Concrete Design and Environment from the University of Dundee,

UK.

Dr Abu Saleh is a Corporate Member of the Institute of Concrete Technology, UK. Worked with different multinational companies like BASF, Fosroc and Elkem, he is now playing a

vital role as the General Manager of Pudlo Middle East Building Materials L.L.C to promote durable and

watertight concrete throughout the region

Dr Martin Liska – Research and Development Manager

Martin’s career in cement technology started with his PhD at the Department of Engineering at the University of Cambridge, where he studied the fundamental

properties of reactive magnesia cements. He then continued as a post-doctoral Research Associate at the same institution, focusing on the use of a range of

conventional and novel binders in geotechnical and geoenvironmental applications.

Martin joined David Ball Group as a Research and Development Manager in 2011. His primary role within the group is to develop further generations of existing products as well as new

ones; addressing engineering performance, economics and sustainability criteria. He also provides technical support to our commercial department.

Martin is the author/co-author of 13 journal papers, 11 conference papers and 4 patents (lists available

on request). He is a graduate member of the Institution of Civil Engineers, and both associate member and member of the Technical & Education Committee at the Institute of Concrete Technology.

Professor Peter Hewlett – Director of Research and Development

A Chartered Chemist by qualification and a Chartered Scientist, Peter has been involved in materials research within the construction industry for 50 years,

specialising in concrete, geotechnical materials and advanced adhesives. He was awarded an honorary Doctor of Laws degree for his work on admixtures and

concrete durability at the University of Dundee, where he is also a visiting

Industrial Professor in the Division of Civil Engineering.

Peter is regarded as a global figure in construction materials, with several hundred publications and patents to his name. In 2006 he was awarded the U.K. Concrete Society Gold Medal, and in 2000 was

given the Polish honour “Officer’s Cross of Merits” for excellence in Science and Technical Cooperation.

Technical Support

Page 32: Technical Submission of Pudlo

www.pudlo.com

He is a three times President of the U.K. Concrete Society, and Past President of the European Union

of Agrément, the European Organisation for Technical Approvals, the U.K. Research and Development Society and the Cement and Admixtures Association.

Peter joined David Ball Group in 2011 as Director of Research and Development, and is responsible for managing our on-site laboratory, overseeing the improvement of existing products and the

development of new ones. He is currently Chairman of the Editorial Board of the Magazine of Concrete

Research, President of the Institute of Concrete Technology, and a Fellow of the Royal Society of Chemistry and the Institute of Materials

Alan Sleigh – Commercial Manager Alan joined David Ball Group as technical manager in 2009, where he soon moved into the role of commercial manager. He is responsible for the technical and commercial sides of all products within the PUDLO range. Alan’s experience spans over 20 years in the concrete industry having previously worked in a commercial role within ARC (now part of Hanson) and more recently with Tarmac as Special Products Manager.

Outside of the office, Alan is Regional Chairman of the Concrete Society, and regularly delivers presentations about such issues as watertight projects or high performance concrete solutions.

Oliver Minett– Procurement Director Oliver began his career with David Ball Group in 1997 as a factory charge-hand. He progressed through a series of roles including Factory Manager, Production Executive and Production Manager before January 2005, when he became a Director of the Board. Since then, his position has evolved into the current title of Procurement Director. In this role, Oliver is responsible for the integration of sustainable procurement into our company working practices. He oversees the sourcing of equipment and materials as well as international export and importing of products. Furthermore, Oliver is head of the Specialist Sands division of David Ball Group and involved

in product development. He oversaw the planning and execution of the company’s transition from offices in Bar Hill to its new site in Bourn – which involved managing stock on both sites – without any disruption.

Oliver has an FdA Diploma in Management from Anglia Ruskin University and a BA Hons in

Management. He is also IOSH qualified for managing safely.

Page 33: Technical Submission of Pudlo

SECTION 4

Waterproof Concrete. Watertight Concrete

Typical Drawings

Page 34: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

Web: www.Pudlo.Com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmedby structural engineers / contractor.

LLNTSAug 14PUDLO-ME-009

Capping Beam Kwickastrip Detail

Pour Two - Lining wall to

be cast in Pudlo CWP

modified concrete

Pour One - Capping Beam to be

cast in Pudlo CWP modified

concrete

Note:- Concrete for Wall

Concrete should not be allowed to fall more

than a maximum 2.5m from the end of the

static line pump or skip hopper hose.

Birds mouth shutter must be fixed between

each cast in sleeve for good compaction of

concrete. Once Shutter is removed break off

concrete so it runs flush with wall and make

good

Concrete piling

retaining wall

90mm

Cast in 100-125mm dia sleeve

(dependent upon wall width) for

pouring concrete through pipe.

Placed at 1m centres

X2 20mm continuous beads of Hydrophilic

Mastic applied to underside of capping beam. 1

bead applied on back plate prior to capping

beam being poured. 2nd bead applied front

plate prior to liner wall cast. Waterbar is then

pushed on top of mastic. May require nailing at

200mm centres

Cast in pipes at

1m centres

Hydrophilic Mastic

continuously applied

around the entire

perimeter of the pipe

Refer to engineers details for dims /

Pudlo min thickness requirements 200mm

Page 35: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2 Plot No 97-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

www.Pudlo.Com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmedby structural engineers / contractor

LLNTSAug 14

PUDLO-ME-008

Capping Beam Detail 1

Pour Two - Lining wall to

be cast in Pudlo CWP

modified concrete

Pour One - Capping Beam to be

cast in Pudlo CWP modified

concrete or standard concrete

Refer to engineers details for dims /

Pudlo min thickness requirements 200mm

Note:-

Concrete should not be allowed to

fall more than a maximum 2.5m

from the end of the static line pump

or skip hopper hose

Concrete piling retaining

wall

Page 36: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

Web: www.Pudlo.Com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how PUDLO System accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified

concrete is used must be confirmed by structural engineers / contractor.

LLNTSAug 14PUDLO-ME-007

Deep Slab Alternatives

Bottom Section Slab to be

cast in standard concrete

Waterbar fixed onto concrete

surface prior to next pour

200m

m m

in

Both top and bottom sections of

stop end to be retarded with

Retarder and jet wshed off prior to

adjacent pour to leave clean

exposed aggregate

ALTERNATIVE 2 - BOTTOM

SECTIONS OF SLAB CAST PRIOR

TO TOP SECTION

ALTERNATIVE 1 - TOP & BOTTOM SECTIONS

OF SLAB CAST IN THE SAME POUR

Construction joint as

alternative 1

opposite

Top surface of bottom section of slab

to be retarded with Retarder

and jet washed off the next

day to leave clean exposed

aggregate

Top section of slab to

be cast in Pudlo CWP

modified concrete

300m

m m

in

Page 37: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

www.Pudlo.com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Pour One - Lift Pit Base

to be cast in Pudlo CWP

modified concrete

200m

m

min

Waterbar fixed onto surface of

concrete prior to next pour

Top of kicker to be retarded with

Retarder and jet washed off the

next day to leave clean exposed

aggregate

Pour Two - Lift Pit walls to be

cast in Pudlo CWP modified

concrete

Joint prepared as per same

process as kicker joint

Pour Three - Slab to be cast in

Pudlo CWP modified concrete

Note:-

Kickers to be cast monolithic

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-ME-006

Lift Pit Detail Type 1

Refer to engineers details

for dim

s / P

udlo m

in thickness requirem

ents

200m

m

Page 38: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse 10

Box 474495

Dubai, UAE

Tel: 00971 4 8877023

Web: www.Pudlo.Com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55137 7992 / 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements

accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is used

must be confirmedby structural engineers / contractor.

LLNTSAug 14PUDLO-ME-005

Wall Head Detail

Pour One - Capping Beam

to be cast in Pudlo CWP

modified concrete

Refer to engineers

details for dim

s / P

udlo

min thickness

requirem

ents 200m

m

Waterbar fixed onto

concrete surface prior to

next pour

Top of wall to be retarded and jet

washed off the next day to leave

clean exposed aggregate

Pour Two - Slab to be cast

in Pudlo CWP modified

concrete

Rebate formed in top

wallusing HDBR

Voidformer

Refer to engineers details for dims / Pudlo

min thickness requirements 200mm

Page 39: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

Web: www.Pudlo.Com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Waterbar wrapped

around pipe and secred

with tie wire

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-ME-004

Slab - Pipe Penetration Cast In

70m

m m

in

Pipework

Slab cast in Pudlo CWP

modified concrete

Refer to engineers details for dim

s /

Pudlo m

in thickness requirem

ents 200m

m

Page 40: Technical Submission of Pudlo

Pudlo Middle East Building Materails L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

www.Pudlo.com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-3D-TJD-003

Slab / Kicker Joint Detail 2

Pour One - Slab to be

cast in Pudlo CWP

modified concrete

Note:-

Kicker to be cast

monolithic with slab

150m

m

Refer to enineers

details for dim

s /

Pudlo m

in thickness

requirem

ents 200m

m

Pour Two - Wall to be

cast in Pudlo CWP

modified concrete

Top of Kicker to be retarded

with Retarder and jet washed

off the next day to leave a

clean exposed aggregate

Refer to engineers details for dims /

Pudlo min thickness requirements 200mm

Stop end to be retarded with Pudlo

Retarder and jet washed off the

next day to leave a clean exposed

aggregate

Waterbar to be fixed to

surface of concrete prior to

next pour

Waterbar to be fixed to

surface of concrete prior to

next pour

Page 41: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

www.Pudlo.com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of his detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-ME-002

Slab / Kicker Joint Detail 1

Pour One - Slab to be

cast in Pudlo CWP

modified concrete

Note:-

Kicker to be cast

monolithic with slab

Waterbar to be fixed onto

surface of concrete

prior to next pour

Top of kicker to be retarded with

Retarder and jet washed off the

next day to leave a clean

exposed aggregate

150m

m

Refer to engineers

details for dim

s.

Pudlo m

in thickness

requirem

ents 200m

m

Page 42: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

Web: www.Pudlo.Com

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Pour One - Slab to be

cast in Pudlo CWP

modified concrete

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-ME-001

Slab Construction Joint Detail

Waterbar Fixed onto

concrete surface prior to

next pour

Stopend to be of pour one to be

retarded with Retarder and jet

washed off prior to pour two to

leave clean exposed aggregate

Refer to engineers details for dim

s /

Pudlo m

in thickness requirem

ents 200m

m

Page 43: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

Web: www.Pudlo.Com

Project :

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how PUDLO System accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified

concrete is used must be confirmed by structural engineers / contractor.

LLNTSAug 14PUDLO-ME-007

Deep Slab Alternatives

Bottom Section Slab to be

cast in standard concrete

Waterbar fixed onto concrete

surface prior to next pour

200m

m m

in

Both top and bottom sections of

stop end to be retarded with

Retarder and jet wshed off prior to

adjacent pour to leave clean

exposed aggregate

ALTERNATIVE 2 - BOTTOM

SECTIONS OF SLAB CAST PRIOR

TO TOP SECTION

ALTERNATIVE 1 - TOP & BOTTOM SECTIONS

OF SLAB CAST IN THE SAME POUR

Construction joint as

alternative 1

opposite

Top surface of bottom section of slab

to be retarded with Retarder

and jet washed off the next

day to leave clean exposed

aggregate

Top section of slab to

be cast in Pudlo CWP

modified concrete

300m

m m

in

Page 44: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

www.Pudlo.com

Project :

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of his detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-ME-002

Slab / Kicker Joint Detail 1

Pour One - Slab to be

cast in Pudlo CWP

modified concrete

Note:-

Kicker to be cast

monolithic with slab

Waterbar to be fixed onto

surface of concrete

prior to next pour

Top of kicker to be retarded with

Retarder and jet washed off the

next day to leave a clean

exposed aggregate

150m

m

Refer to engineers

details for dim

s.

Pudlo m

in thickness

requirem

ents 200m

m

Page 45: Technical Submission of Pudlo

Pudlo Middle East Building Materails L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

www.Pudlo.com

Project :

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-3D-TJD-003

Slab / Kicker Joint Detail 2

Pour One - Slab to be

cast in Pudlo CWP

modified concrete

Note:-

Kicker to be cast

monolithic with slab

150m

m

Refer to enineers

details for dim

s /

Pudlo m

in thickness

requirem

ents 200m

m

Pour Two - Wall to be

cast in Pudlo CWP

modified concrete

Top of Kicker to be retarded

with Retarder and jet washed

off the next day to leave a

clean exposed aggregate

Refer to engineers details for dims /

Pudlo min thickness requirements 200mm

Stop end to be retarded with Pudlo

Retarder and jet washed off the

next day to leave a clean exposed

aggregate

Waterbar to be fixed to

surface of concrete prior to

next pour

Waterbar to be fixed to

surface of concrete prior to

next pour

Page 46: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

www.Pudlo.com

Project :

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Pour One - Lift Pit Base

to be cast in Pudlo CWP

modified concrete

200m

m

min

Waterbar fixed onto surface of

concrete prior to next pour

Top of kicker to be retarded with

Retarder and jet washed off the

next day to leave clean exposed

aggregate

Pour Two - Lift Pit walls to be

cast in Pudlo CWP modified

concrete

Joint prepared as per same

process as kicker joint

Pour Three - Slab to be cast in

Pudlo CWP modified concrete

Note:-

Kickers to be cast monolithic

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-ME-006

Lift Pit Detail Type 1

Refer to engineers details

for dim

s / P

udlo m

in thickness requirem

ents

200m

m

Page 47: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

Web: www.Pudlo.Com

Project :

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Waterbar wrapped

around pipe and secred

with tie wire

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmed by structural engineers / contractor.

LLNTSMay 14PUDLO-ME-004

Slab - Pipe Penetration Cast In

70m

m m

in

Pipework

Slab cast in Pudlo CWP

modified concrete

Refer to engineers details for dim

s /

Pudlo m

in thickness requirem

ents 200m

m

Page 48: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2 Plot No 97-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

www.Pudlo.Com

Project :

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmedby structural engineers / contractor

LLNTSAug 14

PUDLO-ME-008

Capping Beam Detail 1

Pour Two - Lining wall to

be cast in Pudlo CWP

modified concrete

Pour One - Capping Beam to be

cast in Pudlo CWP modified

concrete or standard concrete

Refer to engineers details for dims /

Pudlo min thickness requirements 200mm

Note:-

Concrete should not be allowed to

fall more than a maximum 2.5m

from the end of the static line pump

or skip hopper hose

Concrete piling retaining

wall

Page 49: Technical Submission of Pudlo

Pudlo Middle East Building Materials L.L.C

Dubai Investment Park 2, Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 4 8877023

Web: www.Pudlo.Com

Project :

Drawing Title:

Drawing No:

Scale:Drawn:Date:

For clarification on any aspect of this detail please call Abu Saleh Mohammod on +971 55 137 7992 or 00971 4 8877023

Note:-

This PUDLO drawing detail is to be read for illustration purposes only. The drawing shows our minimum thickness requirements and

how accessories are to be installed. For site specific details and confirmation on extent of where PUDLO CWP modified concrete is

used must be confirmedby structural engineers / contractor.

LLNTSAug 14PUDLO-ME-009

Capping Beam Kwickastrip Detail

Pour Two - Lining wall to

be cast in Pudlo CWP

modified concrete

Pour One - Capping Beam to be

cast in Pudlo CWP modified

concrete

Note:- Concrete for Wall

Concrete should not be allowed to fall more

than a maximum 2.5m from the end of the

static line pump or skip hopper hose.

Birds mouth shutter must be fixed between

each cast in sleeve for good compaction of

concrete. Once Shutter is removed break off

concrete so it runs flush with wall and make

good

Concrete piling

retaining wall

90mm

Cast in 100-125mm dia sleeve

(dependent upon wall width) for

pouring concrete through pipe.

Placed at 1m centres

X2 20mm continuous beads of Hydrophilic

Mastic applied to underside of capping beam. 1

bead applied on back plate prior to capping

beam being poured. 2nd bead applied front

plate prior to liner wall cast. Waterbar is then

pushed on top of mastic. May require nailing at

200mm centres

Cast in pipes at

1m centres

Hydrophilic Mastic

continuously applied

around the entire

perimeter of the pipe

Refer to engineers details for dims /

Pudlo min thickness requirements 200mm

Page 50: Technical Submission of Pudlo

SECTION 5

Waterproof Concrete. Watertight Concrete

Mix Design

Page 51: Technical Submission of Pudlo

www.pudlo.com

Plant Trials / Mix Design

Pudlo will work with the nominated RMC to ensure the appropriate plant trials are carried out in line with the specification of the project / project requirements. Pudlo will provide comment on the proposed mix design from the engineers / consultant / RMC prior to plant trials being carried out to ensure that it will comply with the specification.

Mix Design

Page 52: Technical Submission of Pudlo

SECTION 6

Waterproof Concrete. Watertight Concrete

PUDLO Experience

Page 53: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Burj Al Arab Hotel, Jumeirah. Dubai

W.S.Atkins Partners Overseas

Kvaerner Const. & United Pools Contg.

Used in shell of swimming pools on 18th level.

Atlantis Night Club Sheikh Zayed Rd. Dubai

Test Waterman Used in artificial waterfalls.

Town Centre Mall, Jumeirah. Dubai

Mecon TransEmirates Contracting

Used in waterfalls, pools.

Al Habtoor Motor Showroom, Sheikh Zayed Rd.

Holford Associates Al Habtoor Engineering Used in water tanks.

All Metals & Galvanising Factory, Al Qoze. Dubai

M.D.Bhatia Bros. Best Home Contracting

Used in large chemical holding tanks.

Millenium School, Al Ghusais. Dubai

Fraser Nag Partnership/ Crockers

Al Arif Contracting

Used in drinking water tanks.

Private Residence Helipad, Dubai Dubai Contracting Company.

Used in concrete for Helipad.

Page 54: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Bin Hendi 4 Villas, Jumeirah. Dubai

Fraser Nag Partnership & A.J.Crockers Partnership

Al Arif Contracting

Used in footings, foundations & slabs.

Al Owais Cultural Centre, Al Rigga Road, Deira, Dubai.

Fraser Nag Partnership & A.J. Crockers Partnership

Al Nekhreh Contracting LLC

Used in raft, basement walls & swimming pools

All Metals & Alloys Factory, Jebel Ali Industrial Area. Dubai

M.D.Bhatia Bros. System Construct. Used in water tanks, pits.

Water features in luxury villa, Dubai

ASCON Leisure Used in all wet areas and

Residential Complex in Jumeirah, Dubai. For Mr. Abdul Jalil Darwish. CONTACT; Mr. Tilakawardane U.A.E. Enterprises Dubai, U.A.E.

Holford Associates & A.J.Crocker Partnership

Al Basti & Muktha LLC

‘Membrane-free’ construction where used in raft, footings, retaining walls, all exposed columns, beams, etc, watertanks , swimming pools.

Page 55: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Waterfeature in Dubai Internet City Phase II for Microsoft Offices

Dar Consult Transemirates Contracting Co LLC

Used in render

Sheika Latifa Towers (2B+G+8 Building, Baniyas Square, Dubai. Client: Dubai Intnl. Real Estate.

M. Shaikh Al Mubarak Consultants

Bu Haleeba Contracting

Used in the raft and all retaining walls

The Tower (Union Properties) Sh. Zayed Road, Dubai.

Khatib & Alami Nasa Multiplex LLC

Used in roof slab, swimming pool slab, walls/shell.

Hillside Development 208 Villas, Jebel Ali.

Khatib & Alami Al Naboodah Contg. Al Sahel Contg. Const.Re Const. (CRC)

Used in all base concrete due to very aggressive soil conditions.

‘MERCATO’ Mall in Jumeirah Client: M/s. Al Zarooni

Trans Emirates Contracting Co.

Used in a certain section of the retaining walls to resolve a potential problem.

Capricorn Towers Sh. Zayed Road, Dubai

Schuster Pechtold & Partners.

Dubai Contracting Co.

Used in water tank structure and swimming pool shell on 45th level.

B+G+4 Commercial. Building. In Al Mina, Dubai

Arenco Dubai Civil Engineering

Used in roof slab, swimming pool walls and pool deck.

Page 56: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Emirates Aviation Training Centre, Dubai Client: Dept. of Civil Aviation

Fraser Nag Partnership & A.J. Crockers Partnership

Al Nekhreh Contg.

Used in all elements of external elevation of all buildings i.e. columns, walls, beams, upstand, downstand and parapet.

TRADERS HOTEL 3 Basement Project in Deira

Badri & Bensouda Consultants

Engg. Contracting Co.

Used in raft foundation, retaining walls and swimming pool.

FNC building on Sh.Zayed Road. Fujairah National Construction – Dubai

Used in the entire screed for additional waterproofing of basement floor.

Poultry Farm in Ras Al Khaimah Architectural Design Unit

Fujairah National Construction – Dubai

State of the art poultry farm and allied projects.

‘The Village’ - 2 Basement Commercial Development – Jumeirah. Client: Dubai Intnl. Real Estate.

Hill International and Holford Associates

Al Shafar Transport & Contracting Co. LLC

Used in the raft, basement walls, columns, slabs and all sub-structure concrete including water tanks.

Page 57: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Health Club – in Al Dhadnah Fujairah. Client : Govt. of Dubai Real Estate

New Arch Consultants for RULERS OFFICE

Fujairah National Construction – Dubai

Used in water tanks

G+M+2 building in Hor – Al – Anz

New Arch Consultants

Al Bakhit General Contracting.

Used in water tanks & lift pits

Emirates Technopak – Jebel Ali Indl Area.

F.A.Baker Consultants

System Construct Used in concrete for water tank

B+G+1 villas in Emirates Hill Badri & Bensouda Consultants

Ayoubco General Contracting Co LLC

Used in all substructure concrete

Zulekha Hospital Project at Al Nahda II

New Arch Consultant

Vali Contracting Co.

Used in all substructure concrete

H.H. Shaikh Mohammed ‘s Staff Accomodation – Al Qoze

Fraser Nag Partnership

Al Nekhreh Contg Co. Information needs to be verified

Hamriya Free Zone SYSTEM Construct

Used in concrete for all tanks and machine pits in factory.

Page 58: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Procter & Gamble Operations Office – Jebel Ali Free Zone

Fraser Nag Partnership

Jasaf Building Technologies

Information needs to be verified

Commercial & Residential Building Client: HH Sheikha Sheikha in Satwa

Khatib & Alami Al Sahel Contracting

Used in all Waterproof concrete including critical areas in basements, water tanks, etc

40 villas project – Mankool Fraser Nag Partnership

Al Amar Engineering

Information needs to be verified

Wafi City Refurbishment John R Harris Partners.

Khansaheb Civil Engg.

Used in shear walls.

Private Residence-Emirates Hills. Holford Associates Al Sahel Contracting

Used in slab/dome concrete

‘AL MARSA’–3B+G+45 Tower Client: HH Sh. Ahmed Bin Saeed Al Maktoum

ARCHON Nasa Multiplex

Used in concrete for all water tanks and lift pits.

‘GATE’ Dubai International Financial Centre – Dubai

HYDER Consulting & GENSLER

Nasa Multiplex

Used in all waterproof concrete – about 25,000m3.

B+G+4 Residential Building Client: Mr. Ibrahim Bel Saleh in Hor-Al-Anz East

Fraser Nag Partnership

Team Engineering Enterprises Ltd

Used in raft, retaining walls, and water tanks.

Page 59: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

B+G+7 Residential & Commercial . Building in Al Raffa for Mr. Essa Abdulla Muhammed Bu Humaid

ARCHON Al Shafar Transport & Contracting.

Used in raft, retaining walls, and water tanks.

ETISALAT Tower in Al Kifaf ( opp Dubai Immigration Dept ).

Shankland & Cox / Atkins

Dhabi Contracting

Used in raft, retaining walls and other areas.

‘EMIRATES’ New Engg. Centre – Dubai Intnl. Airport

Fraser Nag Partnership

ASCON

Used in waterproof / durable concrete in all exposed faces.

UPTOWN DEVELOPMENT – Mirdif – PACKAGE B& D (Commercial & Residential)

Khatib & Alami Al Hamed Development

Used in all water retaining structures and swimming pools.

‘PRECINTS’ Building – GATE Dubai International Financial Centre, Dubai.

HYDER Consulting & GENSLER

Nasa Multiplex

Used in all waterproof concrete – about 40,000 m3.

‘Aujan Oasis’ -Soft Drinks Factory – Dubai Investment Park

Fraser Nag Partnership

Arabian Construction Company.

Used in all waterproof concrete.

Gulf District Cooling – Garden’s Chiller Plant Room

Hyder Consulting, John R Harris Partners & RJ Crocker Partners.

Ghantoot Gulf Contracting

Used in all waterproof concrete.

Page 60: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Commercial Bank of Dubai Building - Ajman

Fraser Nag Partnership

Al Arif Contracting Co. LLC

Used in all waterproof concrete.

Commercial & Residential Tower for HH Sh. Ahmed Bin Saeed Al Maktoum, Sh. Zayed Road.

Fraser Nag Partnership

ASCON

Used in all waterproof concrete for vertical elements upto 12th floor.

B+G+M+7 Residential & Commercial Building. Souq Al Kabeer. Client: Mr. Butti Obaid Buti Al Mulla.

Fraser Nag Partnership

AYOUBCO

Used in all waterproof concrete for Raft and Retaining walls of basement.

‘2n TOWER’ – plot # 392-247, Dubai Marina for EMAAR

Khatib & Alami UNEC

Used in watertanks and water-retaining structures.

2B+G+4 Al Karama Building on Plot # 310-1210 in Karama, Dubai for Dubai Intnl Real Estate

Khatib & Alami AL Kharbash Contracting LLC.

Used for waterproof & high durability concrete in 2 basements, piles, & retaining walls.

Twin Tower Building for First Gulf Bank on Plot # C64/C65, Sector E25 - Abu Dhabi

Dewan Architects & Engineers

Al Meraikhi General Contg. Abu Dhabi

Used in all waterproof and high durability concrete.

Page 61: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Villa in Emirates Hills Fraser Nag Partnership

Information needs to be verified

Wafi Hotels & Mall Extension Project – Wafi City, Dubai – PHASE - I CLIENT: MKM Group

Arif & Bintoak & R.J.Crocker Partnership

Khansaheb Civil Engineering.

Used in all waterproof and high durability concrete.

Emirates Flight Catering Facility CLIENT: Dept. of Civil Aviation

Fraser Nag Partnership & R.J.Crocker Partnership

Engg. Contracting Company.

Used in high durability and waterproof concrete for watertanks.

The ‘Paladium’ – Jumeira Lake Towers - Dubai

DAR Consult ASCON

Information needs to be verified

‘Gymnasium Block’ in Dadhna Beach Resort, Fujairah. CLIENT: HH Sheikh Maktoum Bin Rashid Al Maktoum.

New Arch Consultants

Modern Design Contg. Co. LLC

Information needs to be verified

‘Al Kazim Tower – TECOM, Dubai. National Engineering Bureau

Al Shafar General Contracting Co.

Information needs to be verified

Page 62: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

‘Dubai Heritage Vision’ DUBAILAND PROJECT

Edifice & R.J.Crocker Partnership

Dutco Balfour Beatty Group

Used in all waterproof and high durability concrete for water features, Amphitheatre raft and retaining walls.

‘Al Sahel Towers’ – Abu Dhabi. Commercial Complex CLIENT: Shk. Hamda Bint Md. Bin Khaled AL Nahyan & Sons

Golden Planners Architects and Consultants

Square General Contracting Est, ADH.

Used in all waterproof and high durability concrete for raft and retaining walls in basement structure

G+2 Staff Accomodation. Client: Golf & Creek Club Hotel

Fraser Nag Partnership & R.J.Crocker Partnership

Herald Contracting Co. LLC

Used in all waterproof and high durability concrete for water tank and Sewerage Tanks

Raffles Hotels & Mall Extension Project – Wafi City, Dubai – PHASE – II CLIENT: MKM Group

Arif & Bintoak & R.J.Crocker Partnership

Khansaheb Civil Engineering.

Used in all waterproof and high durability concrete.

Marinascape Development for TRIDENT INTNL. HOLDINGS

ARCHON L&T (Larsen & Toubro) Constructions.

Used in all waterproof and high durability concrete for large water tanks.

Commercial & Residential Development Project for Green Coast Real Estate at Port Saeed Plot 129-170, Dubai

Fraser Nag Partnership & R.J.Crocker Partnership

ASCON

Details not provided

Page 63: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

‘BLUE TOWER’ – Sharjah Client: Engg. Enterprises Co.

Rashid Al Owais Engg. COnsultants

Darwish Engineering Emirates.

Used in waterproof and high durability concrete for large water tanks.

2B+G+M+4 – Residential & Commercial Building–Al Muteena

ARCHON Al Tamir Contracting Used in waterproof and high durability concrete for large water tanks.

‘KHAN MURJAN’ – Wafi City, Dubai – CLIENT: MKM Group (14th century underground souq)

Arif & Bintoak & R.J.Crocker Partnership

Khansaheb Civil Engineering.

Used in all waterproof and high durability concrete.

‘Waterfront Villas’ – Jumeirah Client: Dubai Real Estate

DEWAN Architects & Consultants

Al Ahamadiah Contg.

Used in waterproof and high durability concrete in basement and water tanks.

Sheraton Staff Accomodation – Al Ghusais

Fraser Nag Partnership & R.J.Crocker Partnership

AL Nekhreh Contracting

Used in all waterproof and high durability concrete for raft, retaining walls, water tanks and swimming pool in basement structure.

256 Villas in Officers City – Abu Dhabi

KEO Consultants Al Habtoor Engineering

Used in waterproof and high durability concrete for large water tanks.

JUMEIRAH VILLAGE II Infrastructure Development

Dar Al Handassah Ghantoot Gulf Contracting Co.

Information needs to be verified

Page 64: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

‘HOTEL’ in Dubai Mall at Burj Dubai Complex.

Meinhardt CHSK

Information needs to be verified

DIFC – Truck Tunnel Package IP047IP705 – Dubai.

Maunsell Consultancy Services

ARABTEC

Information needs to be verified

Al Qarisna Island Development – Challets – Abu Dhabi.

Holford Associates Al Husam Gen. Contg.

Details not made available

Gulaya Mosque – Sharjah Client: Govt. of Sharjah & Dept. of Islamic Affairs & Awkaf

Rashid AL Owais Engg. Consultants

Globe Constructors Engineers & Contractors

Used in water tanks

B+G+14 Commercial & Residential Building for AL Tayer Real Estate - AL Barsha, Dubai.

Fraser Nag Partnership

Bu Haleeba Contracting Used in the raft, internal columns and retaining walls of basement.

B+G+M+5 Commercial & Residential Building at Al Souk Al

Hegazy Engineering Consultancy

Al Ashram Contracting Used in the raft and retaining walls – complete sub-structure concrete is with Pudlo

Page 65: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

Kabeer, Bur Dubai, Dubai. Client: HH Shaikh Hamdan Bin Rashid Al Maktoum.

for about 10,000m3.

Shopping Centre (Old Oasis Centre) Sh. Zayed Road

Archgroup Al Basti & Muktha Used in watertanks.

Residential & Commercial Building – GREEN COAST II – Al Nahda

Fraser Nag Partnership

Darwish Engineering Used in the raft and retaining walls – complete sub-structure concrete with Pudlo

‘Palladium’ Multi-purpose Hall Client: International Communications & Entertainment TECOM, Media City, Dubai

Elite Architects, Designers & Planners

Al Hosnei Contracting LLC

Used in the raft and retaining walls.

‘HHHR Tower’ – G+M+70 Commercial & Residential Tower for DIRE on Sheikh Zayed Road.

Al Hashemi Consultants

Al Ahmadiah Contracting.

Used in the raft and retaining walls for 13,500m3 concrete

2B+G+24 storeyed commercial & residential building at DHC in Al Barsha

Archgroup

Ascon Used in watertanks

Page 66: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

‘JULFAR Twin Towers’ – for RAK Properties Ras AL Khaimah

ARENCO Al Hamad Contracting Co Used in watertanks

‘Trident Grand Residence’ – Dubai Marina

RMJM CSHK Dubai Contracting Used in raft, walls, tanks and other areas. About 15,000m3 concrete with PUDLO

‘THE SQUARE’ for Omniyat Properties – Al Memzar, Dubai Mix Use Development

RJ Crocker Partners & ARKIPLAN Architects & Engrs.

Engineering Contracting Company

Used in raft, walls, tanks and other areas. About 35,000m3 concrete with Pudlo

Yacht Club Dubai Holford Associates Shobha Contracting Co. LLC

Information needs to be verified

3B+G+14 Building in Silicon Oasis Dubai

National Engineering Bureau

Shobha Contracting Co. LLC

Used in watertanks.

Emirates Staff Accommodation, Ras AL Khor, Dubai

Fraser Nag Partnership

Herald Contracting Co. Information needs to be verified

Bachelors Apartments for Dubai International Real Estate

Dewan AL Emara Consultants & Architects – ADH

Al Oroba Contracting Co. LLC

Used in raft, walls, tanks and other areas.

Page 67: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

JUMEIRAH AL KHOR – Hotel & Residential Towers for DUBAI HEALTH CARE CITY. 4B+Podium + 34 storey Hotel Tower & 43 storey Apartment Tower

RMJM Al Basti & Muktha LLC Used in water tanks and other water retaining structures.

Al Mamzar Towers 4B+G+55 for M/s. Al Itqan Real Estate

Al Rostamani Associates & Engg. Consultants

Darwish Engg. Emirates Used in retaining walls and water tanks.

‘MARINA HOTEL’ – Yas Islands, Abu Dhabi

ASYMPTOTE Architects, New York & Dewan Architects

Al Futtaim Carillion, Abu Dhabi

Used in Raft and retaining walls.

‘Crescent Towers’ Dubai Sports City

Archon Architectural Consultants

Intermass Engg & Contg. Used in swimming pools, & water tanks.

‘MERCURE HOTEL’ – Jumeirah Lake Towers, Dubai. CLIENT: HH Sheikh Ahmed Saif Al Nahyan

RJ Crockers

CIVILCo. Used in the raft, retaining walls, water tanks and swimming pools.

Page 68: Technical Submission of Pudlo

REFERENCE LIST - Middle-East Projects

www.pudlo.com

PROJECT

CONSULTANT

CONTRACTOR

PUDLO APPLICATION AREA

‘BAY SQUARE’ in Business Bay.

Khatib & Alami Al Shafar General Contracting LLC.

Used in water tanks for 14 towers.

Maktoum Hospital Redevelopment Project Phase II, Dubai

Kling Consult Shapoorji Poolonji Basement slab and wall

Mansoori Tower Lusail Marina, Doha, Qatar

- Commodore Qatar Basement slab and wall

Page 69: Technical Submission of Pudlo

PUDLO Waterproof Concrete www.pudlo.com E: [email protected]

PUDLO CASE STUDY – YAS MARINA VICEROY HOTEL

PUDLO waterproofs Yas Island Abu Dhabi premier hotel The Yas Marina Viceroy Hotel is the perfect combination of style and function. The construction of this iconic five star hotel straddles Abu Dhabi’s Formula 1 racetrack and is cloaked with an illuminated ‘gridshell’ to provide energy efficiency and create a striking landmark. The development is a five star signature hotel built alongside and over the Yas Marina Racing Circuit, developed by Aldar, designed by New York's Asymptote and built by Al Futtaim Carillion LLC with the support of more than 70 specialist subcontractors from around the world.

Page 70: Technical Submission of Pudlo

PUDLO Waterproof Concrete www.pudlo.com E: [email protected]

The jewel-like design includes the gridshell as an atmospheric-like veil over the two towers and a link bridge that passes above the Formula 1 track. The breathtaking architecture 'performs' as both an environmentally responsive solution and a visual spectacle and event. The gridshell contains 5,096 individually sized panes of glass and 2,100 tonnes of support steel. The 5,389 custom-made LED lights can be programmed to provide stunning illumination & optical effects. Over 15,000m3 PUDLO modified waterproof concrete has been used in the pile-caps, basement raft, retaining walls, tie-beams, bridge columns, slabs, tunnel base and tunnel walls of both Tower A & Tower B. PUDLO was also used in the basement car park water tanks. The project was completed in just 89 weeks; working 7 days a week and 24 hours a day. The total floor area is 105,000m2, delivered through a frame of 68,000 m3 of concrete, with 17,500 tonnes of reinforcement used in the concrete frame.

Designers: Asymptote Architecture.

Contractors: M/s. Al Futtaim Carillion.

Page 71: Technical Submission of Pudlo

PUDLO Waterproof Concrete www.pudlo.com E: [email protected]

PUDLO CASE STUDY – DUBAI FOUNTAINS

World’s longest serving water-proofing admixture completes concrete formula for world class Dubai Fountain When Emaar unveiled the Dubai Fountain, it had created yet another visually dynamic feat of engineering to enrich Dubai’s iconic landscape. The world's tallest performing fountain, it is a dazzling fusion of water, light and music designed by California-based WET, the creators of the Fountains of Bellagio in Las Vegas. Powerful mechanisms shoot jets as high as 500 ft (150 metres), equivalent to a 50-storey building, keeping 22,000 gallons of water airborne at any one time. Over 6,600 lights and 50 colour projectors create a palette of over 1,000 different light displays synchronized with classical, Arabic and world music. Set on the 30-acre Burj Khalifa Lake in downtown Dubai, the fountain sits alongside Burj Khalifa, the world's tallest building, and The Dubai Mall, one of the world's largest shopping and entertainment destinations.

Page 72: Technical Submission of Pudlo

PUDLO Waterproof Concrete www.pudlo.com E: [email protected]

Like its illustrious neighbours, the fountain is the product of world class engineering and the spirit of innovation and excellence which have made Dubai one of the world’s leading tourism destinations. An important part of the technical achievement that sustains the fountain’s dazzling displays, day after day, is hidden well below the water. Structurally, Dubai’s masterpiece consists of five circular fountains and two arcs contained by a 275 m (900 ft) artificial lake. Below the bed of the lake are fully submerged, interconnected tunnels containing critical fountain operating equipment, control rooms, and miles and miles of cable. The concrete formulation for the tunnels, including the all-important water-proofing specification, was a particular challenge of the project. Intended as an enduring attraction for Dubai’s retail heart, longevity and reliability were paramount in the materials engineering and casting of the concrete. The concrete mix for the tunnel structures, cast using some 22,000 m3 of concrete, included integral water-proofing provided by PUDLO admixture. PUDLO Inspectors from both the UK and UAE visited the site during the initial stages to consult with members of the project team from Hyder Consulting and Al Futtaim Carillion. Technical aspects of the final concrete formulation were resolved as well as the ‘design’ of the pour - aspect ratios, layouts and reinforcement - for the best outcome. PUDLO’s local Inspectors supervised the project on site throughout, from quality checking the concrete batching plants to overseeing all the pours. This level of technical support and inspection was one of the reasons why PUDLO was used to meet this prestigious project’s rigorous performance demands. The lake fountains were inaugurated in May 2009 by His Highness Sheikh Mohammed Bin Rashid Al Maktoum, Vice President and Prime Minister of UAE and Ruler of Dubai. Client: Emaar Properties PJSC. Consultants: Turner International & Hyder Consulting M.E. Ltd Contractors: Al Futtaim Carillion.

Page 73: Technical Submission of Pudlo

PUDLO concrete has been used inthe construction of mechanicalbiological reactors at Southwark’sIntegrated Waste ManagementFacility (IWMF) which have beendesigned to withstand chemicalleachate and high processtemperatures.

Veolia Environmental Services wasawarded the 25-year £60M PFIcontract to deliver and operate thegroundbreaking facility for LondonBorough of Southwark. Maincontractor, VolkerFitzpatrick, undertookthe project as a design and buildworking closely with consultingengineers, Royal Haskoning.

Located on a former gasworks on theOld Kent Road, the site also includes amaterials recovery facility, householdwaste, reuse and recycling centre, andwaste transfer station. It handles upto 200,000 tonnes of material peryear, processing all of Southwark’shousehold waste as close to sourceas possible and reducing the amountsent to landfill.

The mechanical biological treatment(MBT) plant, with 87,500 tonnes perannum capacity, is Veolia’s first in theUK.

Composting takes place in two sets ofsix reinforced concrete tunnels, eachstructure measuring 36m by 6m by6m high. One set bio-dries the wasteto reduce moisture content; the othercarries out bio-stabilisation to producea final residue suitable for fuelrecovery.

Process vapour is extracted via fourconcrete bio-filter chambers, castinsitu in strategic locations on thetunnel roofs. Chemical leachate isconveyed to a substantial concreteunderground tank, measuringapproximately 10m by 20m by 5mdeep.

The concrete for the tunnels, bio-filters and storage tank needed specialformulation to cope with the effectsof chemical leachate and condensateaggravated by temperaturespotentially as high as 85°C.

The presence of slot drains in thespigot floor slab of the compostingtunnels ruled out the use of a coatingto achieve chemical resistance, so thisneeded to be built into the concrete.Although the addition of microsilica tothe concrete would have providedsome of the required chemicalresistance, it would not havewaterproofed the structures.

Highly resistant to the corrosiveeffects of chemicals, PUDLO concretewaterproofing system was specifiedfor concrete in all of the critical areasof chemical exposure within the MBTplant. BBA approved, it promotes theintegral development of importantperformance characteristics inconcrete, including water- andchemical-resistance, without the needfor supplementary membranes orcoatings.

The bottom slab and kicker of theprocess tunnels were constructed innormal concrete. PUDLO wasincluded in the C40 concrete usedabove for the movement joint andspigot floor, as well as for the wallsand roof.

Royal Haskoning used a finite elementsoftware package to model thestructure in three dimensions with thetemperature gradients applied. Thisallowed them to calculate stressesdue to thermal effects, and to predictthe expansion and contraction of theconcrete to help design an effectivesolution.

PUDLO modified

concrete meets

the challenge of

London’s first

inner-city

Integrated

Waste

Management

Facility

David Ball BuildingWellington Way, Bourn AirfieldCambridge CB23 2TQTel ++44 (0)1954 780687 Fax ++44 (0)1954 782912www.davidballgroup.com

CERTIFICATE No 01/3843BBABRITISH

BOARD OFAGRÉMENT

Client

London Borough of Southwark/Veolia Environmental

Main contractor

VolkerFitzpatrick

MBT/MRF technology

contractor

WTT/OKLM

Architects

Artica/Thorpe Wheatley

Civil and structural designer

Royal Haskoning

Artist’s impression of completed waste management facility

Page 74: Technical Submission of Pudlo

CERTIFICATE No 01/3843BBABRITISH

BOARD OFAGRÉMENT

The altered microstructure of PUDLO

concrete, with its greatly reducedcapillary network, offered benefitshere, too. By minimising the ingress ofair/fluid, it is dimensionally very stableand tolerant of heat extremes, helpingto inhibit stress cracking.

Naturally increased strength gainsprovided when adding PUDLO to theconcrete without the need foradditional cement were anotheradvantage providing up to 30%additional compressive strength gain.

The type of mix used (DC-4m) had ahigh cement replacement content,around 66-80% ggbs. This slows downthe rate of strength gain especially inthe early age of the concrete.PUDLO test results at 7 days werewell above 30 MPa where figures ofaround 15 to 20 MPa would have beenexpected using the DC-4m mix with noadmixture. At 28 days, tests were upto 50-60 MPa for C40 concrete.

With replacement content as high as75%, the hydration process in

concrete will be slower, making earlystrike of falsework and formworkpotentially problematic. The use ofPUDLO in the concrete mix did notimpede striking of formwork andallowed tunnel formwork to be struckat the earliest opportunity helping withspeedy progression to follow-on works

Inspection played an important role inensuring PUDLO elements werecorrectly prepped, poured, compacted,cured and struck in line with qualityprocedures. Given the high operatingtemperatures within the tunnels,supervision of compaction wasparticularly important to ensurethorough removal of air bubbles.

PUDLO inspector, Helen Morgan, said:“The VolkerFitzpatrick team paid greatattention to quality and workmanship,following our guidance at every stageon the best practice for installingPUDLO concrete, such as making sureshuttering was properly insulated.”

See also Arsenal Waste TransferStation case study.

David Ball BuildingWellington Way, Bourn AirfieldCambridge CB23 2TQTel ++44 (0)1954 780687 Fax ++44 (0)1954 782912www.davidballgroup.com

David Ball Group products

PUDLO Cement Waterproofing Powder A multi-component, single pack, waterproofing, plasticising,permeability reducing, corrosion inhibiting additive. Outperformsany other additive of its kind.

PUDLO SCCWaterproofing AdditiveAn extended Additivespecifically designed andmanufactured to produceexceptionally flowing concretes,without segregation in Self Compacting Concrete.

HDBR WaterbarA Hydrophilic Polyacrylate Elastomeric (swellable rubber) typewaterstop. Designed for the integral sealing of constructionjoints in cast-in place concrete. HDBR Waterbar expands uponcontact with water to form a positive seal even in salineconditions.

HDBR Adhesive Mastic A high performance polyurethane single pack, multipurposesealant. It is a one part, moisture curing, non-sag elastomericsealant formulated to provide low skin formation and fast cure.

PS Swell MasticPS Swell Mastic is a one component, polyurethane based,solvent free, hydro swelling mastic, supplied in cartridges andaluminium sausages, for the sealing of construction joints.

PS Tie Bolt Hole PlugA specially formulated, pre-mixed cementitious concretepowder. The material mixes readily with water to produce anon-shrink, water-resistant repair material that hardens to givea high strength product.

PS Primer Latex A blend of acrylic polymer resins. The latex is applied topreviously prepared substrate concrete, blockwork, brickwork,masonry or render before the application of PUDLO SystemAccessories.

PS Rapid 3min Mortar A natural, additive-free, quick-setting, rapid-hardening, ready-mixed mortar, specially designed for civil engineeringapplications.

PS Hi-Flow GroutA non-shrink, very high strength cementitious grout comprisingof low alkali high specific area Portland cements and othercementitious binders and a system of compatible additives toachieve high, in-service performance.

PS Gel RetardarAn aqueous gel designed for application to complex concreteshapes, formwork, moulds and vertical surfaces. It provides auniform coating, that once washed off, produces an exposedaggregate finish suitable for keying construction joints at stopends or for subsequent plastering or coating operations.

PS Liquid RetardarAn aqueous liquid designed to be spray-applied as a temporarymembrane to retain moisture in freshly placed concrete. It isformulated to prevent evaporation of the gauging water andprovides an economical and efficient method for curingconcrete.

PS Cure 90An aqueous liquid designed to be spray-applied on horizontalconcrete surfaces. It provides a uniform coating, that oncewashed off, produces an exposed aggregate finish suitable forkeying construction joints at stop ends or for subsequentplastering or coating operations.

Page 75: Technical Submission of Pudlo

David Ball BuildingWellington Way, Bourn AirfieldCambridge CB23 2TQTel ++44 (0)1954 780687 Fax ++44 (0)1954 782912www.davidballgroup.com

CERTIFICATE No 01/3843BBABRITISH

BOARD OFAGRÉMENT

A Case Of

Long-Term

Treatment

PUDLO still at work

under the harshest

conditions since 1938.

Maple Lodge Sewage

Treatment Works in

Hertfordshire has been in

operation since the 1930s. The

initial designs were proposed in

1933 to deal with London’s

growing sewerage disposal

problem. It was planned to

replace most of the existing

sewage disposal works and

pumping stations with trunk

sewers and a centralised

Sewage Treatment Works. The

design was finalised in 1937

and the new treatment plant

began construction in 1938.

Aerial Photo of Maple Lodge SewageTreatment Works Plant 1952

Aeration Tanks 2007

Sedimentation Tanks 2007

Storm Weir 2007

Settlement Tanks 2007

Page 76: Technical Submission of Pudlo

In its day, Maple Lodge was the

largest and most complete

installation outside the United

States. The works is a fully nitrifying

diffused-air activated sludge plant

with heated anaerobic sludge

digestion. It was imperative that the

design encompassed products that

would withstand the harsh chemical

environment, maintain its watertight

integrity, and cope with a constant

wet-dry cycle.

The design incorporated the use of

PUDLO as it is the world's first

integral waterproofing additive for

use with concrete. PUDLO has been

in continuous use since Victorian

times for waterproofing both steel

reinforced, non-reinforced concrete,

water retaining and water resisting

structures.

The waterproofing characteristics of

PUDLO inhibit the major corrosion

mechanisms in concrete and as a

result increases structural durability.

PUDLO has an unmatched global

record of product performance in

service spanning over 130 years,

providing protection against water

ingress and corrosion, even in high

exposure class environments.

The construction of Maple Lodge

Sewage Treatment Works site was

seen as a triumph of mechanisation

with many innovative features. New

technology meant a single 26 acre

site replaced local disposal works

with an aggregate footprint of 500

acres. To this day, apart from the

updating of the plant and control

systems, the treatment process

initially employed at Maple Lodge

Sewage Treatment Works remains

essentially unchanged.

Primary treatment was through four

grit channels, each capable of

passing 22MG/d. After the grit

channels, sewage passed through

storm weirs, a measuring flume and

into the comminutors. The automatic

control of grit channels and

comminutors was seen as very

advanced in its day, as flow

increased additional channels or

comminutors were brought into

action, motorised pen stocks and the

comminutors’ motors were governed

by the sewage levels in the

measuring flume.

Sedimentation took place in 900,00G

tanks, sewage then entered one of

eight 750,000G aeration lanes.

Average aeration time was about 12

hours. Final settlement was

undertaken in 12, 250,000G tanks.

The central photograph overleaf is an

aerial shot of the operational plant

taken in 1952. The surrounding

photographs show the original

• Storm Weir

• Settlement Tanks

• Sedimentation Tanks

• Aeration Tanks

In service in 2007 as a critical part of

the ongoing sewerage treatment

process for this plant since its

construction began in 1938.

CERTIFICATE No 01/3843BBABRITISH

BOARD OFAGRÉMENT

David Ball BuildingWellington Way, Bourn AirfieldCambridge CB23 2TQTel ++44 (0)1954 780687 Fax ++44 (0)1954 782912www.davidballgroup.com

David Ball Group products

PUDLO Cement Waterproofing Powder A multi-component, single pack, waterproofing, plasticising,permeability reducing, corrosion inhibiting additive. Outperformsany other additive of its kind.

PUDLO SCCWaterproofing AdditiveAn extended Additivespecifically designed andmanufactured to produceexceptionally flowing concretes,without segregation in Self Compacting Concrete.

HDBR WaterbarA Hydrophilic Polyacrylate Elastomeric (swellable rubber) typewaterstop. Designed for the integral sealing of constructionjoints in cast-in place concrete. HDBR Waterbar expands uponcontact with water to form a positive seal even in salineconditions.

HDBR Adhesive Mastic A high performance polyurethane single pack, multipurposesealant. It is a one part, moisture curing, non-sag elastomericsealant formulated to provide low skin formation and fast cure.

PS Swell MasticPS Swell Mastic is a one component, polyurethane based,solvent free, hydro swelling mastic, supplied in cartridges andaluminium sausages, for the sealing of construction joints.

PS Tie Bolt Hole PlugA specially formulated, pre-mixed cementitious concretepowder. The material mixes readily with water to produce anon-shrink, water-resistant repair material that hardens to givea high strength product.

PS Primer Latex A blend of acrylic polymer resins. The latex is applied topreviously prepared substrate concrete, blockwork, brickwork,masonry or render before the application of PUDLO SystemAccessories.

PS Rapid 3min Mortar A natural, additive-free, quick-setting, rapid-hardening, ready-mixed mortar, specially designed for civil engineeringapplications.

PS Hi-Flow GroutA non-shrink, very high strength cementitious grout comprisingof low alkali high specific area Portland cements and othercementitious binders and a system of compatible additives toachieve high, in-service performance.

PS Gel RetardarAn aqueous gel designed for application to complex concreteshapes, formwork, moulds and vertical surfaces. It provides auniform coating, that once washed off, produces an exposedaggregate finish suitable for keying construction joints at stopends or for subsequent plastering or coating operations.

PS Liquid RetardarAn aqueous liquid designed to be spray-applied as a temporarymembrane to retain moisture in freshly placed concrete. It isformulated to prevent evaporation of the gauging water andprovides an economical and efficient method for curingconcrete.

PS Cure 90An aqueous liquid designed to be spray-applied on horizontalconcrete surfaces. It provides a uniform coating, that oncewashed off, produces an exposed aggregate finish suitable forkeying construction joints at stop ends or for subsequentplastering or coating operations.

Page 77: Technical Submission of Pudlo

David Ball BuildingWellington Way, Bourn AirfieldCambridge CB23 2TQTel ++44 (0)1954 780687 Fax ++44 (0)1954 782912www.davidballgroup.com

CERTIFICATE No 01/3843BBABRITISH

BOARD OFAGRÉMENT

Home to Arsenal Football Club since2005, the 60,000-seat Emirates Stadiumset a tough engineering challenge withits imposing 27,000m2 roof andsubstantial trusses.

While not quite on the same scale,relocation of the local waste and recyclingcentre to make way for the £357 millionnew stadium at Ashburton Grove posedtechnical challenges, too. Opened in 2004, the three-storey £60mfacility provided a brand new, multi-purpose waste transfer and recycling hubfor the London borough of Islington andthe North London Waste Authority(NWLA). Run by the NWLA's waste contractor,London Waste Ltd, the centre in HornseyStreet has a 401,500 tonnes capacity andis licensed to process 275 tonnes ofwaste per hour. It was built to handle allhousehold waste from Islington as well asa proportion from neighbouring boroughs,Camden and Haringey, and has scope toprocess 50,000 tonnes a year ofrecyclable waste.Multi-functional

The multi-functional centreaccommodates a range of facilities overthree levels.The ground floor and inner basementhouse a transport depot for IslingtonCouncil with workshops, vehicle washarea, paint spray facility as well as carparking. The basement service yardincludes compactors receiving waste viachutes from the main waste hall above,as well as a weighbridge and containeddisposal of street cleansing debris.A control room, canteen and furtherweighbridge office are located on the firstfloor, alongside the main waste transferhall which is split into three distinct areas.The first is a large tipping apron with sixcompactor chutes for conventional,compactable waste, alongside tippingbays for other domestic waste. A secondarea accommodates tipping and bulking ofrecyclable waste, including glass, paper,cans and textiles as well as bulky items.The third is a segregated civic amenityand recycling areas for householders to

deposit materials and items they cannotrecycle through kerbside collection. With a large proportion of waste handlinglocated in the tipping hall on the first floor,the concrete slab faced toughperformance demands of exceptionalcharacteristics.The floor needed to withstand substantialwear and tear from heavy vehicles andplant as they tip and shovel waste, andoff-load and shunt laden skips andcontainers. The project team also requiredgood resistance not just to water but alsoto the chemical residues - mostly acidic -leached by the waste.Concern

The tipping hall presented three particularareas of concern, as Ian Flewitt, a partnerat the consulting engineers, Price &Myers, explains: “While no waste isloaded or stored directly on the floor ofthe tipping apron, we had to protectagainst spills which potentially mighthave chemical content from, forexample, car batteries.

Project:

Islington waste and recyclingcentre for the London borough ofIslington and the North LondonWaste Authority (NWLA)

Construction client:

Arsenal FC

Concept architects:

Sheppard Robson; detaileddesign: Robinson Architects

Project managers:

ARCADIS AYH

Consulting engineers:

Price & Myers

Construction contractors:

Sir Robert McAlpine

PUDLO’s special

concrete formula

meets waste

facility challenge

Impact, abrasion and

chemical resistant, as

well as water

resistant, PUDLO-

modified concrete

floors mark 9 years of

problem-free service

at London borough

waste and recycling

centre.

Page 78: Technical Submission of Pudlo

“PUDLO were the only peoplewho came back with ideas for asolution.”Ian Flewitt, Price & Myers

“In the tipping area for glass, cardboardand other recyclable waste, the floor issubject to heavy loads, abrasion andimpact from plant scooping and movingmaterial between pens.

“The third area, the domestic wastetransfer centre, includes a deposit forbatteries, so again, there was thepossibility of the floor being exposed toacid residues. There is also a physicalelement with skips being loaded on andoff lorries, and scraping the floor asthey are pushed into place.”

As well as being engineered for use by alltypes of waste vehicle, including bulkarticulated vehicles, floor performancecriteria also needed to account for futureflexibility. The facility is designed toaccommodate different recyclable fractionsand recycling bays are moveable to adaptto future collection systems, incurringadditional wear and tear.Sound waterproofing of the first floor slabwas also essential to protect theworkshops, plant room and parking areasbelow from wash-down water used toclean the first floor slab.Ian Flewitt said: “PUDLO were the onlypeople who came back with ideas for asolution and who were keen to spendtime working on a mix that wouldprovide all the performancecharacteristics we required.”

He added: “They provided us with verygood upfront technical service indeveloping and refining a design for themix. This was followed by furtherservice support inspecting the mix, thebatching and attending site to overseethat it was placed correctly.”

Final mix

The final mix included fine steel fibres toimprove abrasion resistance, polypropylenereinforced fibres for impact resistance, andthe addition of a pozzolanic compound foracid resistance. These were carefullyformulated and tested to ensure theresulting gains added to the water-proofingperformance of the PUDLO additive.Since the application was unique andcharted new territory in terms of concreteadditive formulation, there were no setcriteria for performance. The project teamneeded to see as much gain as possible inthe characteristics required so that theycould confidently validate the engineeringand adopt the innovative mix.PUDLO carried out painstaking formulationand testing of the mix design at micro-structure level, looking at the potentialproblems of acid leachate penetration andarriving at a pozzolan content that wouldprovide effective defence. The sampledemonstrated high resilience to chemicalattack, proven by ensuring the free lime(calcium hydroxide) was physically boundand converted to calcium silicate.The use of fibres to create impactresistance is well-known, but enhancing

concrete to counter abrasion is far lesscommon.A sample of the special formula was castand evaluated for abrasion by assessingthe rate of loss of thickness subject to alaboratory scrape test (using Taberanalysis). Testing showed a three-foldincrease in abrasion resistance overordinary C40 concrete.Alternatives, such as a traditionalwaterproof mix with an applied powder ontop as used for warehouse floors, wouldnot have addressed all of the performanceissues as neatly as the PUDLO solution.

“There was a limit on headroom,”points out Ian Flewitt. “So it was anadvantage to incorporate the water-proofing and other protective propertiesinto the structural slab. A conventionalslab with screeded protection on topwould have involved extra costs andtime, and a build-up of finished levelthat would have lost us headroom.”

World famous

The application was also a first in PUDLO’s130 years history. The world-famousadditive has risen to challenges of water-proofing and durability in environments asextreme as the Middle East, andstructures as high profile as the RoyalAlbert Hall and the 2012 Olympicvelodrome. Islington’s waste transferproject provided a new landmark inPUDLO’s evolution, pushing the envelopeof its chemistry to bolt-on new andunprecedented performance attributes. In 9 years of operation, the floors arestanding the test of time and meeting allexpectations. Ian Flewitt comments: “The concretefloors are performing well, and there isno evidence of any serious abrasion orany evolving problems.”

Among other things, the technical successof the design has done much to reassurethe local community who had beenconcerned about how well the slab andmulti-storey design would work in whatwas a progressive solution not seenbefore.The project underlines how resourcefuldesign, which is bold enough to push theenvelope of materials engineering, canovercome tough construction and planningconstraints in urban redevelopment.

David Ball BuildingWellington Way, Bourn AirfieldCambridge CB23 2TQTel ++44 (0)1954 780687 Fax ++44 (0)1954 782912www.davidballgroup.com

CERTIFICATE No 01/3843BBABRITISH

BOARD OFAGRÉMENT

David Ball Group products

PUDLO Cement Waterproofing Powder A multi-component, single pack, waterproofing, plasticising,permeability reducing, corrosion inhibiting additive. Outperformsany other additive of its kind.

PUDLO SCCWaterproofing AdditiveAn extended Additivespecifically designed andmanufactured to produceexceptionally flowing concretes,without segregation in Self Compacting Concrete.

HDBR WaterstopA Hydrophilic Polyacrylate Elastomeric (swellable rubber) typewaterstop. Designed for the integral sealing of constructionjoints in cast-in place concrete. HDBR Waterstop expands uponcontact with water to form a positive seal even in salineconditions.

INSTAFLEX PU25 Mastic A high performance polyurethane single pack, multipurposesealant. It is a one part, moisture curing, non-sag elastomericsealant formulated to provide low skin formation and fast cure.

INSTASWELL MasticInstaswell Mastic is a one component, polyurethane based,solvent free, hydro swelling mastic, supplied in cartridges andaluminium sausages, for the sealing of construction joints.

INSTACEM Concrete Repair System A specially formulated, pre-mixed cementitious concretepowder. The material mixes readily with water to produce anon-shrink, water-resistant repair material that hardens to givea high strength product.

INSTACEM Primer Latex A blend of acrylic polymer resins. The latex is applied topreviously prepared substrate concrete, blockwork, brickwork,masonry or render before the application of INSTACEM SpecialConcrete Products.

INSTALASTICA liquid-applied,seamless,waterproofcoating for waterretaining structures, submerged tunnels, diaphragm walls,bridge deck waterproofing and a wide variety of extreme serviceclass concrete structures to provide long service life, anti-carbonation, waterproof construction.

INSTAPRUF Self-Smoothing Floor Topping A two pack polymer modified, cementitious based,waterresistant, hard-wearing, self-smoothing seamless floortopping.

INSTASET Rapid Mortar A natural, additive-free, quick-setting, rapid-hardening, ready-mixed mortar, specially designed for civil engineeringapplications.

DB 7 STAR High Flow GroutA non-shrink, very high strength cementitious grout comprisingof low alkali high specific area Portland cements and othercementitious binders and a system of compatible additives toachieve high, in-service performance.

Page 79: Technical Submission of Pudlo

www.pudlo.com

IN GOOD COMPANY

Page 80: Technical Submission of Pudlo

PUDLO: Waterproof, Durable Concrete

Christopher Stanley, Technical Director of Unibeton Readymix said: “Unibeton is the largest producer of concrete in the Middle East. Our reputation depends very much on the quality of concrete we supply. Pudlo is without a doubt the best and most reliable concrete waterproofer in the market place, and we always recommend its use to our clients for waterproof concrete work. Its high quality and reliability is the reason why it has now been in use for more than a hundred years, and none of the many other available waterproofing products that we have tested can in any way match its performance. “

“A PUDLO inspector attended both the preparation phase, concrete pours and post-pour curing operations to make sure they were carried out in line with its on-site quality system,” says Conor Hanlon of McGee Construction. “It also offered us technical assistance when details needed reworking to suit in-situ conditions. Incorporating waterproofing in the concrete eliminated the labour, logistical complexities and health and safety challenges of installing sheeting,”. Project: Newcastle INTO Building

John Doyle Construction’s Technical Director, Peter Goring says: “Very close attention is always given to the construction materials in use and the test procedures that prove their reliability and performance. But when you are working on a national monument like the Royal Albert Hall the sense of responsibility becomes more acute. We were also assured by the presence of the PUDLO site inspectors during and after installation.” Project: Royal Albert Hall

Ian Flewitt of Price Myers said: “PUDLO were the only people who came back with ideas for a solution and who were keen to spend time working on a mix that would provide all the performance characteristics we required.” He added: “They provided us with very good upfront technical service in developing and refining a design for the mix. This was followed by further service support inspecting the mix, the batching and attending site to oversee that it was placed correctly.” Project: Arsenal Waste Transfer Station

WHAT PEOPLE SAY ABOUT US?

Page 81: Technical Submission of Pudlo

SECTION 7

Waterproof Concrete. Watertight Concrete

Contact Us

Page 82: Technical Submission of Pudlo

www.pudlo.com

Address

PUDLO Middle East Building Materials L.L.C

Dubai Investment Park 2,

Plot No 597-237

Warehouse No 10

P.O. Box 474495

Dubai, UAE

Tel: 00971 55 137 7992

Web: www.pudlo.com

CONTACT US