technical specificationsitem 101 – removal of existing structures and obstructions page 1...

21
CONSTRUCTION OF VIP/MEDIA LOUNGE & COMMAND CENTER TECHNICAL SPECIFICATIONS

Upload: others

Post on 09-Jan-2020

27 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

CONSTRUCTION OF VIP/MEDIA LOUNGE

& COMMAND CENTER

TECHNICAL

SPECIFICATIONS

Page 2: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 100 – Clearing and Grubbing

Item 100 – Clearing and Grubbing Page 1

ITEM 100 – CLEARING AND GRUBBING Refer to DPWH Bluebook & Standard Specifications 2004 Volume II 100.4 Basis of Payment The accepted quantities, measured as prescribed in Section 100.3, shall be paid for at the Contract unit price for each of the Pay Items listed below that is included in the Bill of Quantities, which price and payment shall be full compensation for furnishing all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 100 (1) Clearing and Grubbing Hectare

Page 3: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 101 – Removal of Existing Structures and Obstructions

Page 1

Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

101.4 Basis of Payment The accepted quantities, measured as prescribed in Section 101.3, shall be paid for at the Contract unit price or lump sum price bid for each of the Pay Items listed below that is included in the Bill of Quantities which price and payment shall be full compensation for removing and disposing of obstructions, including materials, labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. The price shall also include backfilling, salvage of materials removed, their custody, preservation, storage on the right-of-way and disposal as provided herein. Payment will be made under: Pay Item Number Description Unit of Measurement 101 (1) Removal of Existing Structures Linear meter

Page 4: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 103 – Structural Excavation

Item 103 – Structural Excavation Page 1

ITEM 103 – STRUCTURAL EXCAVATION Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

103.3.5 Basis of Payment The accepted quantities, measured as prescribed in Section 103.3, shall be paid for at the contract unit price for each of the particular pay items listed below that is included in the Bill of Quantities. The payment shall constitute full compensation for the removal and disposal of excavated materials including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Pay Item Number Description Unit of Measurement 103 (1) Structural Excavation Cubic Meter

Page 5: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 104 – Embankment

Item 104 - Embankment Page 1

Item 104 – Embankment Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

104.5 Basis of Payment The accepted quantities, measured as prescribed in Section 104.4, shall be paid for at the Contract unit price for each of the Pay Items listed below that is included in the Bill of Quantities. The payment shall continue full compensation for placing and compacting all materials including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 104 (1) Embankment Cubic Meter

Page 6: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 401 – Metalworks

Item 401 – Metalworks Page 1

Item 401 – Metalworks Refer to DPWH Bluebook & Standard Specifications 2004 Volume II Fabrication and installation of metal handrail for stairs and ramp and decorative panels for the lounge.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of metal rails for stairs which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 401 Hand Rail and Decorative Panels Lump Sum

Page 7: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 404 – Reinforcing Steel

Item 404 – Reinforcing Steel Page 1

ITEM 404 – REINFORCING STEEL Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

404.5 Basis of Payment The accepted quantity, measured as prescribed in Section 404.4, shall be paid for at the contract unit price for Reinforcing Steel which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 404 Reinforcing Steel Kilogram

Page 8: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 405 – Structural Concrete

Item 405 – Structural Concrete Page 1

Item 405 – Structural Concrete Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

The concrete strength which shall be use are the following: Super and Sub structure – 4000 psi at 28th day of curing Suspended Slab (2nd level) – 4000 psi at 7th day of curing Suspended slab (roof deck/3rd level) – 4000 psi at 28th day of curing Slab on-fill and other concrete works – 3000 psi at 28th days of curing 405.6 Basis of Payment The accepted quantities, measured as prescribed in Section 405.5, shall be paid for at the contract unit price for each of the Pay Item listed below that is included in the Bill of Quantities. Payment shall constitute full compensation for furnishing, placing and finishing concrete including all labor, equipment, tools and incidentals necessary to complete the work prescribed in the item. Payment will be made under: Pay Item Number Description Unit of Measurement 405 (1) Structural Concrete Cubic Meter

Page 9: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 804b – Gravel Bedding

Item 804(b) – Gravel Bedding Page 1

Item 804b – Gravel Bedding Refer to the plan on gravel bedding; should have a thickness of 75mm using ¾ sized gravel. Basis of Payment The accepted quantities, measured per cubic meter which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 804b Gravel Bedding Cubic Meter

Page 10: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1000 – Soil Poisoning

Item 1000 – Soil Poisoning Page 1

Item 1000 – Soil Poisoning Apply soil-poisoning solution for soil treatment.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for Soil Poisoning which price and payment shall be full compensation for application and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1000 Soil Poisoning Square meter

Page 11: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1002 – Plumbing and Sanitary

Item 1002 – Plumbing and Sanitary Page 1

Item 1002 - Plumbing and Sanitary Refer to the plan for the installation of plumbing and sanitary and for bathroom fixtures. Provide air vent and clean out for every unit. Use materials of premium brand of quality. Includes connection to the nearest tapping point. Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of plumbing, sanitary and bathroom fixtures and accessories which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1002 Plumbing/Sanitary/Fixtures Lump Sum

Page 12: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1003 – Carpentry

Item 1003 – Carpentry Page 1

Item 1003 – Carpentry

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of metal rails for stairs which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1003 Ceiling Lump Sum

Page 13: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1008 – Windows

Item 1000 – Windows Page 1

Item 1008(1) – Windows Refer to the plan for the Installation glass window for the lounge.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of windows which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1008 Windows Lump Sum

Page 14: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1010 – Doors Frames and Accessories

Item 1010 – Doors Frames and Accessories Page 1

Item 1010(a) – Door Frames and Accessories

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of doors which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1010(a) Doors Lump Sum

Page 15: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1013 – Banawe Roofing

Item 1013 – Banawe Roofing Page 1

Item 1013 – Roofing (Banawe)

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation/fabrication of steel trusses and roofing materials which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1013 Roofing Lump Sum

Page 16: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1018 – Tileworks

Item 1018 - Tileworks Page 1

Item 1018 – Tileworks

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation and setting of tiles which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1008 Tiles Square meter

Page 17: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1027 – Cement Plaster Finish

Item 1027 – Cement Plaster Finish Page 1

Item 1027 – Cement Plaster Finish Use Plaster mixture proportion of class A w/ a thickness of 20mm.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for plastering of wall which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1027 Plastering Square meter

Page 18: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1032 – Painting Works

Item 1032 – Painting Works Page 1

Item 1032 – Painting Works Apply 2 base coats. Internal wall – Base paint white Ceiling (Straight to Finish) and Wall Partition – Semi Gloss External wall – Semi gloss Latex Woven Thatch – Painted Varnish Roof Deck – w/ Waterproofing Finish

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for painting works for each area and furniture which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1032 Painting Square meter

Page 19: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1046 – Masonry Works

Item 1046 – Masonry Works Page 1

ITEM 1046 – MASONRY WORKS

Refer to DPWH DO No. 230, DPWH Standard Specifications for Item 1046 – Masonry works

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation masonry units which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 506 Masonry Units Square meter

Page 20: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Item 1100/1/2 – Electrical Works

Item 1100/1/2 - Electrical Works Page 1

Item 1100/1/2 – Electrical Works Refer to the plan for the installation of electrical wirings devices and switches. Use materials of premium brand of quality. Entrance of line is underground.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of electrical devices, switches and utilities which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1100/1/2 Electrical switches/devices/utilities Lump Sum

Page 21: TECHNICAL SPECIFICATIONSItem 101 – Removal of Existing Structures and Obstructions Page 1 Removal/Demolition of Existing Structures Refer to DPWH Bluebook & Standard Specifications

Part B: Other General Requirements

Part B: Other General Requirements Page 1

PART B: OTHER GENERAL REQUIREMENTS B.1 OFFICES, SHOPS, STORES AND WORKMENS ACCOMMODATION FOR CONTRACTOR The contractor shall provide and maintain such offices, stores, workshops latrines, housing and messing accommodations as are necessary. These should be located in the Contractor’s compound, distinct and separate from the Engineer’s compound (BCDA Clark PMO). The location dimensions and layout of such buildings and places shall be subject to the approval of the Engineer. The Contractor shall not be permitted to erect temporary buildings or structures on the site without the specific permission in writing of the Engineer including approval of the dimensions of such buildings or structures. Before the commencement of the period of Warranty, the Contractor shall fence of the Contractor’s store area from the rest of the Site. By the end of the Period of Warranty, the Contractor shall remove this fence, all buildings shall be cleared, and the area shall be graded as required by the Engineer. B.2 MEDICAL ROOM AND FIRST AID FACILITIES 1. The Contractor shall provide and maintain throughout the duration of the Contract, a medical room together with all necessary supplies to be sited in the Contractor’s main area. The medical room shall be waterproof; it could be a building or room designated and used exclusively for the purpose and has a floor area of at least 15 square meters and a glazed window area of at least two square meters. 2. The Contractor shall employ permanently on the site a fully trained Medical Aide who shall be engaged solely from medical duties. 3. The location of the medical room and any other arrangements shall be made known to all employees by posting on prominent locations suitable notices in the Site. 4. The Contractor’s arrangement to comply with this Section shall be subject to the approval of the Engineer and to the approval of any qualified Medical Officer designated by the Government to supervise medical arrangements on the Site.