GE. COMPANY OF HOMS REFINERY ص م ح اة ف ص م ل عامة ل ا ركة ش ل اSub.: Revamping control system of unit:510 وع ض و م ل ا: وحدة ل ا# م ب حك( ت لم ا ا+ ظ ون ة ز ه# ج2 ر ا4 ي و ط ن510 File No. : (/ ) By : Engineering Management / ( : ف مل ل م ا ق ر) ة4 ي س د ن ه ل ا ات اب4 ن ص ل ا ة4 ري4 ي مدTechnical Book of Conditions To Replace the control ,monitoring , alarm system and all of instrumentation in continuous catalyst regeneration unit / U510 / ة4 ي نO ف ل ا روط ش ل ا ر ت ف دT ان4 نV ب ل م وا حك( ت لم ا ا+ ظ دال ن# ن ب س لا4 ي ف ة4 ي ل ف ح ل ا ة ز ه# ج2 لا ا ة ر وكاف اO د بc لا وا ر م ت س م ل ط ا4 ي س و ل ط ا4 ي سO ن( ت وحدة/ U 510 / ) د4 ن ل ا# اح ب ن ف م( Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 1 of 13 ) P.O. Box:352/355 Homs-SyriaEmail:[email protected]

Upload: nguyenkhue

Post on 28-Mar-2019

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

Technical Book of Conditions

To Replace the control ,monitoring, alarm

system and all of instrumentation in continuous catalyst regeneration unit

/ U510/

(On Turn Key Basis)

دفتر الشروط الفنية

الستبدال نظام التحكم والبيان واإلنذار وكافة

األجهزة الحقلية في وحدة تنشيط الوسيط

المستمر / U 510/

)مفتاح باليد(

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 1 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 2: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

Subject :Replace the control ,monitoring, alarm system and all of instrumentation in continuous catalyst regeneration unit / U510/ .

Catalyst regeneration process description:

The regeneration unit continuously burns off the coke deposit on the catalyst and restores activity, selectivity and stability to essentially fresh catalyst levels.

The catalyst regeneration requires four basic operations: 1. burning off the coke at a high temperature and low oxygen concentration.

2. oxidizing the metal promoters at a high temperature and high oxygen concentration and adjusting the chloride balance. 3. removing excess moisture and .4. reducing the metal promoters.

The first three operations occur in the Regeneration tower and the forth in the reduction zone on top of reactors.In order to regenerate the catalyst , it must be transferred from the platforming reactors to the regenerator and back again . To accomplish this , a system of several interconnected pieces of equipment transfers the catalyst in small batches on a semi-continuous basis. The transfer operation is controlled by two logic systems, one for spent catalyst and one for regenerated catalyst . A simplified flow diagram of the catalyst regeneration section

التحكم: الموضوع نظام استبدالالحقلية األجهزة وكافة واإلنذار والبيان

المستمر الوسيط تنشيط وحدة في/U 510. /

الوسيط تنشيط عملية : وصف

مستمر بشكل يقوم التنشيط قسمو الوسيط على المتوضع الفحم بحرق

إلى ثباته و انتقائيته و نشاطه استعادةاألساسية . المستويات

عمليات أربع يتطلب الوسيط تنشيط إنأساسية :

حرارة. 1 درجات على الفحم حرق. منخفض أوكسجين وتركيز عالية

المعدن. 2 على التحفيز مراكز أكسدةدرجات في

و مرتفع أوكسجين تركيز و عالية حرارةالكلور . نسبة معايرة

الزائدة. .3 الرطوبة إزالةعلى ( ) .4 التحفيز مراكز هدرجة إرجاع. المعدن

برج في تتم األولى الثالث العملياتفي تتم الرابعة العملية و التنشيط

المفاعالت . أعلى في اإلرجاع منطقةنقل , يجب الوسيط تنشيط عملية إلجراءبرج إلى التحسين مفاعالت من الوسيط

. ثانيًة إعادته ثم التنشيط

, من عدد من نظام المهمة هذه إلتمامالوسيط تنقل ً داخليا الموصولة المعدات

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 2 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 3: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

is shown in figure No.2 .The circulation is as follows : spent catalyst flows by gravity from the bottom of the last stacked reactor through the catalyst collector and Lock Hopper No.1 to lift engager No.1 where circulation nitrogen lift the catalyst to the Disengaging Hopper above the Regeneration Tower . Catalyst fines and nitrogen leave the top of the Disengaging Hopper. The fines are removed in the Dust Collector and the nitrogen is recycled to the lift engager. The catalyst flows by gravity from the bottom of the Disengaging Hopper into and through the Regeneration Tower . Exiting from the tower , the oxidized catalyst passes through the Flow Control Hopper to the Surge Hopper . catalyst from the Surge Hopper is transferred back to the reactors via Lock Hopper No.2 and Lift Engager No.2 through the reduction Zone into the bed of the reactor No.1. The lift gas for this transfer is hydrogen rich platformer net gas. The catalyst flows by gravity through the first reactor and out the bottom to the top of the next reactor .Catalyst continues to flow through each reactor until it again reaches the bottom of the last reactor , completing the transfer circuit . Catalyst flow between and from the reactors is through eight or more equally spaced transfer lines designed to ensure even catalyst flow throughout the catalyst bed .The Regeneration Tower is similar to a platforming reactor , that the catalyst flows downward through an annulus with gas

عملية شكل على صغيرة دفعات علىمستمرة . شبه

بواسطة بها التحكم يتم النقل عملية , أجل من واحد منطقيين نظامين

أجل من واحد و المستهلك الوسيطلقسم . توضيحي رسم المنشط الوسيط

رقم الشكل في الوسيط .2تنشيط

: التسلسل حسب يتم الوسيط تدويرالجاذبية بفعل يتدفق المستهلك الوسيطمجمع عبر مفاعل أخر أسفل من

رقم اإلحكام وعاء و وعاء 1الوسيط إلىرقم الوسيط 1الرفع رفع يتم حيث

الغبار فصل وعاء إلى النتروجين بواسطة . غبار التنشيط برج فوق المتوضعأعلى من يخرجان النتروجين و الوسيط

. إلى إزالته تتم الغبار الغبار فصل وعاءإلى تدويره يعاد النتروجين و الغبار مجمع

. بفعل يتدفق الوسيط الرفع وعاءإلى الغبار فصل وعاء أسفل من الجاذبية , برج أسفل وفي التنشيط برج خالل وعبر المؤكسد الوسيط يتدفق التنشيط

. الترقيد وعاء إلى الوعاء تدفق متحكمإلى إعادته يتم الترقيد وعاء من الوسيطرقم اإلحكام وعاء عبر و 2المفاعالت

رقم الرفع اإلرجاع 2وعاء منطقة عبر و. األول المفاعل في الوسيط سرير إلى

هي العملية لهذه الرفع غازاتالتحسين . غازات من الغني الهيدروجين

عبر الجاذبية بفعل يتدفق الوسيطأعلى إلى أسفله من األول المفاعل

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 3 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 4: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

flowing from the outside to the inside of the annulus . Figure No. 1 shows a simplified diagram of the Regeneration Tower. Entering the top of the tower , spent catalyst comes to the Regeneration Zone. In this zone, the cock is burned off at a high temperature and low oxygen concentration. The catalyst then passes into the Chlorination Zone . In this zone , the catalyst is oxidized at a high temperature and a high oxygen concentration ( 18-20 mol % ) . Ethylene dichloride is injected into the circulation gas of this zone to adjust the catalyst chloride balance. From the Chlorination Zone , catalyst passes into the Drying Zone .

Dried, filtered instrument air heated to a high temperature is injected near the bottom of this zone to dry off excess moisture on the catalyst. Catalyst then leaves the Regeneration Tower and is transported to the top of the reactors where it is reduced with hydrogen rich recycle gas at a high temperature in the Reduction Zone before reaching the rector bed.

BASIS OF DESIGN:

Catalyst Continuous Regeneration operation

Maximum catalyst circulation rate 200 Lb/Hr (91.7 kg/Hr)Max. Regeneration Gas mole

التالي . المفاعل

مفاعل كل عبر بالتدفق الوسيط يستمرالمفاعل أسفل إلى ثانية يصل حتىالنقل , . دارة بذلك ً متما األخير

عبر المفاعالت وبين من يتدفق الوسيطالوسيط نقل أنابيب من أكثر أو ثمانية

تدفق لضمان المصممة و المتساويةالوسيط . أسرة طول على الوسيط

, التحسين لمفاعل مشابه التنشيط برجو الشبك بين الفراغ عبر يتدفق الوسيط

من تتدفق الغازات و المفاعل جسمالمذكور . الفراغ داخل إلى الشبك خارج

رقم التوضيحي مخطط 1الرسم يوضحالتنشيط . برج

, الوسيط البرج أعلى إلى بالذهاب, التنشيط منطقة إلى يأتي المستهلك

, الكربون حرق يتم المنطقة هذه فيأوكسجين تركيز و عالية حرارة على

. منطقة إلى يمر الوسيط ثم منخفض . . أكسدة تتم المنطقة هذه في الكلورةتركيز و عالية حرارة على الوسيط

مرتفع مول % .20-18أوكسجين

غازات في حقنه يتم اإليثلين كلور ثنائيمستوى لمعايرة المنطقة لهذه التقليب . منطقة من الوسيط في الكلور , منطقة إلى الوسيط يمر الكلورة

التجفيف .

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 4 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 5: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

% O2 1.3Chlorination Gas mole % O2 18 – 20

Drying Air mole % O2 20

Regeneration Gas Temp. (Max. Regeneration Heater Outlet) 477 ºC (890 ºF)Chlorination Gas Temp. (Max. Chlorination Heater Outlet) 510 ºC (950 ºF) Max. Air Heater Outlet

538 ºC (1000 ºF)Max. Regeneration Gas Δ T

71 ºC (160 ºF) Max. Regeneration Catalyst Bed

649 ºC (1200 ºF) Chlorination Catalyst Bed

538 ºC (1000 ºF) Max

1-Scope of Work :.1-1- Replace all old control ,monitoring,

and alarm instruments located in control room by modern updated ones ( PLCs + industrial P.C ) .

1-2- replace all of field devices (elements, sensors, transmitters, control valves, local indicators, vibration and temperature sensors& transmitters on blowers ….. etc) 1-3- Replace the two hydrocarbons analyzers .1-4- Replace the special control system of electrical heaters with heaters .1-5-Replace all of thermocouples (elements & transmitters) . 1-6- Replace the O2 analyzer.

تسخينه يتم المفلتر و المجفف الهواءفي يحقن و عالية حرارة درجة إلى

الرطوبة لتجفيف المنطقة هذه أسفل . يترك ذلك بعد الوسيط على الزائدةأعلى إلى ينقل و التنشيط برج الوسيط

بواسطة إرجاعه يتم حيث المفاعالتوعند بالهيدروجين الغنية التقليب غازات

سرير إلى الوصول قبل عالية حرارةالوسيط .

التصميم : أساسيات

المستمرة الوسيط تنشيط عملية

للوسيط تدوير معدل أعلىسا/ ( 200 / )91.7ليبرة سا كغ

التنشيط ألوكسجين نسبة أعلى% O2 مول 1.3

الكلورة غازات في األوكسجين نسبةO2 % 18- 20 مول

مول التجفيف هواءO2 % 20

أعلى ( التنشيط غازات حرارة درجةالتنشيط ) مسخن من للخارج حرارة

ف )890م ( 477 أعلى ( الكلورة غازات حرارة درجة

الكلورة ) مسخن من للخارج حرارةف )950م ( 510

الهواء مسخن من للخارج حرارة أعلىف )1000م ( 538

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 5 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 6: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

1-7- replace all cables ( signals & command) .1-8- replace shutdown system.

2-The Components of Old Measuring System:

2-1- /PLC/ system made by /Texas/ an American company , the logic program is designed and licensed by / UOP /.

2 -2-loops for alarm and monitoring temperature.

2-3-loops for alarm and monitoringpressure .

2-4-loops for alarm and level monitoring by gamma rays.2-5- loop for alarm and monitoring catalyst level By using capacitance instrument .

2-6- Control valves made by Mason élan Co

2-7- Ball valves made by Rockwell

2-8-V. Notch valves made by Fisher

2-9- Operating , starting & stopping systems .

2-10- Measuring and control loops adopt single electronic type principle.

2-11- Input/output signals are 4-20mA.

التنشيط لغازات حراري فرق أعلىف )160م ( 71

في الوسيط لسرير حرارة أعلىالتنشيط

ف )1200م ( 649 الكلورة في الوسيط لسرير حرارة أعلى

ف )1000م ( 538

العمل :-1 حجم

1-1 - التحكم أجهزة تبديلكاملواإلنذارالقديمة والبيان والمراقبة

التحكم غرف في المتوضعة ) متطورة حديثة PLCsبأجهزة

صناعي+ ). كمبيوتر

الحقلية 1-2 األجهزة كامل استبدالمرسالت( - – – حساسات قياس عناصر– – محلية مبينات تحكم صمامات.... للنوافخ حرارة و اهتزاز حساسات

الخ)

تحليل- 1-3 جهازي استبدالالهيدروكربونات.

التحكم- 1-4 نظام استبدالالكهربائية بالمسخنات الخاص

المسخنات معمزدوجات- 1-5 كافة استبدال

الحرارة ( قياس و عناصر.مرسالت)

األوكسجين- 1-6 محلل استبدالو- 1-7 اإلشارة كابالت كافة استبدال

التحكم .التوقف- 1-8 نظام استبدال

االضطراري.

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 6 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 7: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

2-12- hydrocarbon analyzers ( qt 2).

2-13- oxygen analyzer (qt 1).

2-14- vibration devices for blowers (qt 4) with temperature sensors (qt 4) . display must be local and on monitoring in control room . 2-15- air dryer system.2-16- reverse jet system3-The Specifications of the Required System :3-1The unit should be controlled by dependable updated control systems (P L C For Monirex part) , according to up to date techniques , without any technical modification .3-2- To operate and monitor the technological process on two industrial PC each of them in operation supplied with 23" LCD monitor , at least And each of them a substitute for the other and separately in addition to monitor should be fixed on the wall (as mimic panel)3-3- In PLC system , the central processing units and related power supply units should be ( Hot redundant ) . 3-4- The logic program of continuous catalyst regeneration and transfer should offer safety situation when failed according to UOP instructions.3-5- The offered system should be provided by diagnostic faults system. 3-6- The system should be provided

القياس - 2 نظام مكوناتالقديم :

شركة/ PLCنظام- /2-1 صنع من

/Texas , / / والبرنامج األمريكية

شركة وترخيص تصميم المنطقي

/UOP/

وبيان- 2-2 إلنذار حلقات. الحرارة درجات

وبيان- 2-3 إلنذار حلقاتالضغط .

وبيان- 2-4 إنذار حلقاتغاما . أشعة بواسطة المستوى

مستوى- 2-5 وبيان إنذار حلقةسعوي . جهاز الوسيطباستخدام

شركة- 2-6 صناعة تحكم صماماتنيالن / / . ماسو

صناعة- 2-7 كروية صماماتشركةروكويل .

صناعة- 2-8 كرة نصف صمامات . فيشر شركة

2- 9 - إقالع و تشغيل أنظمة

وتوقف .

القياس- 2-10 حلقاتالحلقات تعتمدنظام والتحكم

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 7 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 8: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

by pass word of three levels.3-7- The system should be granted to work in real time environment. 3-8- Hard ware should be manufactured by special companies in this field and should comply with the international standard.

اإللكترونية . المفردة

2-11- : / خرج الدخل 20-4إشارات. أمبير ميلي

عدد /-2-12 كربونات هيدرو /2محلالت.

عدد /-2-13 أكسجين / .1محلل2-14-/ عدد للنوافخ اهتزاز /4أجهزة

/ عدد حرارة حساسات /4معاالهتزاز قيم اظهار يتم أن على

على و الموقع في الحرارة وغرفة في المراقبة شاشات

التحكم.

2-15- . الهواء تجفيف نظامتعطيس -2-16 .نظام

النظام -3 مواصفاتالمطلوب:

بواسطة- 3-1 الوحدة تقاد أن يجب) متطورة تحكم Pأنظمة L C For

Monirex part (التحكم تقنيات آخر وفقتعديل أي إجراء دون المعتمدة

تكنولوجي.

العملية- 3-2 سير إظهار و تشغيلكمبيوترين بواسطة التكنولوجية

إظهار بشاشة مزود منهما ً كال صناعيينLCD األقل 23قياس على إنش

وبشكل لآلخر كبديل منهما كل ويعملمراقبة لشاشة باالضافة انش 62منفصل

تثبت الوحدة معدات تحاكي كشاشةالجدار 0على

ال- 3-3 نظام تكون PLCفي أن يجب + وحدات المركزية المعالجة وحدات

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 8 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 9: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

) فائضة بها الخاصة HotالتغذيةRedundant.(

3- البرنامج- 4 يحقق أن يجبلتكنولوجية المنطقي

األمان حالة نقلوتنشيطالوسيط/ شركة تعليمات يتوافقمع بما عندفشله

UOP./

المقدم- 3-5 النظام يزود أن يجب. األعطال تشخيص بنظام

سر- 3-6 بكلمة النظام يزود أن يجبمستويات وبثالث

بيئة- 3-7 في يعمل النظام أن ضمان. الحقيقي الزمن

الصلبة- 3-8 التجهيزات تكون أن يجبمن مصنعة

هذا في متخصصة شركات قبلالدولية. المقاييس مع وتتوافق 0المجال

4- General Requirement4-1- The contractor should adhere to provide all soft wares related to control , monitoring and alarm system on DVD ( three copies ) + one copy on CD .4-2- The contractor should adhere to provide all soft wares related to operation systems on DVD ( one original copy+ three copies ).

4-3- The contractor should adhere to provide maintenance and operation manuals for all components of system ( three copies ) in English .4-4- The contractor should adhere to provide

-المتطلبات العامة:4 -على المتعاقد االلتزام بتقديم جميع4-1

البرمجيــــات الخاصــــة بنظــــام التحكموالبيان واإلنذار على أقراص مدمجة

)ثالث نســخ (+نســخة على قــرص صــلب)واحد فقط(.

-على المتعاقد االلتزام بتقديم جميع4-2ــغيل ــة التش ــة بأنظم ــات الخاص البرمجي على أقـــــــراص مدمجـــــــة )نســـــــخة

أصلية+ثالث نسخ منسوخة (.ــديم كتب4-3 -على المتعاقد االلتزام بتق

ــع مكونـــات ــيانة لجميـ ــغيل والصـ التشـالنظام )ثالثة نسخ (باللغة اإلنكليزية.

-على المتعاقـــد االلـــتزام بتقـــديم4-4 شهادات اختبــار أصــلية لجميــع مكونــات

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 9 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 10: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

original test certifications for all components of system authorized from international specialized companies .4-5- The contractor should adhere to provide all the necessary tools and equipment required to prepare , test and putting up the system of controlling and monitoring .4-6- The contractor should adhere to provide all connecting diagrams ( three copies ) .4-7- The bidder should adhere to provide all technical bulletins required to illustrate the technical specifications and for all apparatuses .4-8- The contractor should adhere to provide the required protections to protect the system and the equipment from sudden changes of electrical power supply .4-9- The contractor should adhere to provide the required protections between control system and field instruments .4-10 - The contractor should adhere the Americanstandard ISA concerning identification and indication .4-11-The bidder should submit spare parts lists ,for ten years operation, un priced within the technical offer and another priced ones within the financial offer , H.R.C. keeps the right to choose suitable items during the technical study.include at least :1- oxygen analyzer (qt 1).2- 20% from whole devices produced (control valves, transmitters, etc.)

4-12- The contractor should adhere to provide technical and programming support from the manufacturer or from the supplier directly or by internet in case of happening any technical faults out of control .

4-13- The contractor should adhere to guarantee all offered apparatuses for one calendar year at least starting from the date of issuing provisional acceptance certificate .

4-14- The bidder companies should be specialized in design and execution control systems

النظـــام معتمـــدة من شـــركات عالميـــةمتخصصة

-على المتعاقد االلتزام بتقديم جميع4-5العدد واألدوات

الالزمــة إلعــداد وفحص وتهيئــة نظــامالتحكم والمراقبة.

-على المتعاقد االلتزام بتقديم جميع4-6مخططات التوصيل) ثالثة نسخ( .

ــع4-7 -على العارض االلتزام بتقديم جمي النشــــرات الفنيــــة الالزمــــة لبيــــان

المواصفات الفنية ولجميع التجهيزات. -على المتعاقـــد االلـــتزام بتقـــديم4-8

الحمايـــــات الالزمـــــة لحمايـــــةالنظام والمعــدات من التغــيرات المفاجئــة على

التغذية الكهربائية. -على المتعاقد االلتزام بتقديم جميع4-9

الحمايات الالزمة بين نظام التحكم وبين األجهزة

الحقلية.ــتزام الســتاندر4-10 -على المتعاقــد االل

ISAاألمريكي للتعريف والتأشير.

- على العـــارض االلـــتزام بتقـــديم4-11 قوائم بقطع الغيار الالزمــة لمــدة عشــرــمن ــعرة ض ــير مس ــغيل غ ــنوات تش س العرض المالي , تحتفظ شــركة مصــفاةــراه ــا ت ــار م ــق اختي ــها بح حمص لنفس مناســبا أثنــاء الدراســة الفنيــة .على ان

تتضمن على األقل:/. 1- محلل أكسجين كامل عدد /1ــ 2 ــة20%- ــزة المقدم ــة األجه من كاف

) صمامات تحكم مرسالت ...الخ( .ــأمين4-12 ــتزام بتـ ــد االلـ -على المتعاقـ

ــل ــبرمجي من قبـ ــني والـ ــدعم الفـ الـ الشركات المصنعة أو المــوردة مباشــرة أوعن طريــق االنــترنت في حــال حــدوث

أي خلل فني خارج عن السيطرة.

-على المتعاقـــد االلـــتزام بضـــمان4-13جميع التجهيزات

ــدءً المقدمة لمدةعام ميالديعلى األقــل بمن تاريخ

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 10 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 11: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

(companies who design and execute CCR units are preferable) . ( to submit a certificate approving that ) .

4-15- The bidder should provide a certificate which illustrates his execution similar control systems to UOP/CCR units

.4-16-The contractor should adhere to test the system (hardware and software) in simulation type before importing with presence of specialized engineers from Homs Refinery company

4-17-the contractor must train technical staff on operating and maintenance works in HRC for one week at least.

4-18- Period of execution : six months for supplying and three months for execution including remove all of existed system and instrumentation .installation and Operation. Execution of revamping will be started during the annual over haul.

4-19- the bidder should pay a visit to H.R.C to Check the actual situation . And gathering all of (data and parameters) . must be offered in technical offer.

إصدار شهادة االستالم األولي. -يجب على الشركات المتقدمــة أن4-14

تكون متخصصة في تصـــــميم وتنفيـــــذ أنظمـــــة

التحكم)تفضل من لها خبرة(CCR بتنفيذ وتصــميم وحــدات ال

) تقديم وثيقة تثبت ذلك(.

-على العارض تقديم وثيقة تبين4-15تنفيذه لمنظومات

تحكم مماثلة لوحداتUOP/CCR.

-على المتعاقد االلتزام باختيار4-16 النظام )ماديا وبرمجيا( بطريقة

المحاكاة قبل توريده وبحضور مهندسين0اختصاصين من شركة مصفاة حمص

- على المتعاقدتدريب كادر فني4-17 على أعمال التشغيل والصيانة في

.شركة مصفاة حمص ال تقل عن أسبوع مدة التنفيذ ستة أشهر-4-18

توريد وثالث أشهر تنفيذ وتتضمن أعمال فك كامل

المنظومة القديمة والتركيب والتشغيل وأن يتم البدء

باألعمال خالل العمرة.السنوية

- على العارض زيارة الموقع4-19 لإلطالع على واقع التشغيل الحالي و

تجميع كافة المعطيات الالزم والبارامترات على ان تقدم الحقا مع

0العرض الفني

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 11 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 12: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

في / / 2018حمص

اللجنة عضو عضو عضو عضو رئيسمحرز. م

موسى فراس. م

علي بربر. محمد وديع. م م

السبعة سعد. م

شحود

مدير يعتمد الدقيقة األجهزة قسم رئيس يعتمدالهندسية الصيانات

. ابراهيم كاسر م

العام المدير يعتمد

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 12 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 13: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 13 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 14: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 14 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]

Page 15: Technical Specifications For Horizontal Centrifugal ...homsrefinery.sy/uploaded/file/tenders_technical_156.docx  · Web viewThe lift gas for this transfer is hydrogen rich platformer

GE. COMPANY OF HOMS REFINERY الـشـركـة الـعـامـةلـمـصـفـاة حـمـص

Sub.: Revamping control system of unit:510 التحكم :الموضوع ونظام أجهزة تطوير510بالوحدة

File No. : (/ )

By : Engineering Management

(رقم الملف : ) / مديرية الصيانات الهندسية

Tel:+963 31 2470101(1-2-3)/516401 Fax:+963 31 2516410/516411 Page ( 15 of 13 ) P.O. Box:352/355 Homs-Syria Email:[email protected]