Technical Site Survey ReportFor
Site Sharing
1. General Existing Site Sharing information
PO Site ID/ Number:OP Site ID/ Number: 163357
Principal Owner: PT. MitratelOther Party : PT. HCPT
Site SharingUse:
BTS UMTS HUB BSC others
GPS Coordinates:
Nominal: Latitude: 0.50587 Longitude: 117.5296
Candidate: Latitude: 0.50594 Longitude: 117.52969
Candidate Address:
Contact person: Contact Number/s:
Area/Location: SchoolcompoundHospital/Clinic
MilitaryCompound
Mountainarea
Residential Road side Others:
Existing Towertype:
3 Legged towerHeight . m
MD A/T HD A/T
4 Legged towerHeight 44. m
MD A/T HD A/T
Monopoleheight . m
Guyed poleHeight m
Physicalappearance of thetower:
GoodNot good
Describe:
Space availabilityon the tower
Height available for Installation of antennas: 30 Brackets required : yes no
EquipmentShelter:
Collocate with CKD shelterpossible: Yes No
If no, space for new outdoor unitAvailable: Yes No
Distance from proposedequipment location to the tower
m
Cable tray available for usage:Yes No
Other comments:
..
Proposed equipment : Outdoor unit CKD Shelter Indoor room
ExistingAccessroad:
YesNo
Describe the existing condition:
Dimension:Length m Width .m
Other important information / special requirement: (Re-Strengthening, Community, IMB, etc)
Revision number: 02 23 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
2/15
Technical Site Survey ReportFor
Site Sharing
2. Power Supply
Connect to PLN:
Installation of aerial cableallowed: Yes No Additional poles required to reach the 3 phase supply:Quantity pcs
Power cable required to beinstalled underground:
Yes No
Length of required undergroundinstallation m
Ground condition where cables willpass:
Concrete mSoil mOthers:
specify . length .. m
Distance from thenearest transformer:.. m
Capacity of the PLN Transformer: - KVA No. of poles required: - pcs.
Any private property which will be affected by pole location and Right of way for the PLN connection:Yes No (Please show in the drawing.)
Connect toBuilding:
Type of supply available:single phasethree phase
Spare breakers available for use:(capacity and qty)..
Length of power cable from the sourceto our proposed sub-meter: ..m
Length of cable from sub meter to ACPDB..m
Demolition necessary: Yes NoSpecify type and length : ..
Supply permanentGenerator:
Explain the need for permanent generator:..
Distance of the proposedlocation from site: .. m
Soundproof required:Yes No
Available spaceRooftopothers
Other important information / special requirement:
3. Grounding System
Grounding System Available: Yes NoReading of available grounding (Existing): .ohms
Possibility to connect with existing grounding (please discuss with owner): Yes No
Estimated length of exposed (yellow green) grounding cable required: .m
Demolition required for the installation of the copper rods:Yes (specify type and qty) . No
Other important information / special requirement:
Revision number: 02 24 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
3/15
Technical Site Survey ReportFor
Site Sharing
4. Existing Antenna Information
a. Radio Requirement
Technology DCS GSM
Antenna Type Number or Size*) see note 1
Number of Antennas 3 3
Antenna Pipe Mount(Diameter & Length)
Antenna Orientation (deg.) & Tower LegMounting Position(Leg 1,2,3,4)
30&1,90&2,210&3
30&1,90&2,210&3
Feeder Length (meters):
Feeder size/type(i.e. 7/8; 1 ; etc):
Antenna Height (meters)( Centre of ant. to ground level) 40 42
Other information: Antenna Height is always taken from center of antenna
b. Transmission Requirement
Proposed Microwave Antenna Information
No
Tower LegMountingPosition
(Leg 1,2,3,4)
Diameter(m)
Height(agl)
Azimuthto F.E.(Deg)
Typeof Antenna
(HP, Std, Grid, etc)
*) see note 2
Antenna PipeMounting
(Pipe Diameter & Length)
Feeder Cable(Type & Diameter)
1 Leg 1 0.6 31 7.81 HP - -
2
3
4
5
6
7
8
Other information : Antenna Height is always taken from center of antenna
Note:There is not microwave, it is flexy1. If Radio antenna type not known then measure the size of the antenna (length, width, depth) and take photograph of front and rear of the antenna.2. HP = High Performance Microwave Antenna.
STD = Standard Parabolic Antenna without Radome.STD+R = Standard Parabolic Antenna with Radome.Grid = Grid Antenna.
Revision number: 02 25 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
Existing 4 Leg
Hight 44 mAGL
Leg 1 Leg 2
Leg 3Leg 4
-
7/28/2019 Technical Site Survey Report 163357,,,
4/15
Technical Site Survey ReportFor
Site Sharing
ATTENDANCE:
TeamPO
(PrincipleOwner)
OP
(Other Party)Date Signature
Construction Supervisor
Acquisition Supervisor
TR/MW Planner
Radio Planner
Implementation Supervisor
Others attending
Survey result: Accepted Rejected
Comments (if rejected):
Construction Plan : .
Installation Plan : .
Position of Site sharing : 1st 2nd 3rd Others .
Revision number: 02 26 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
5/15
Technical Site Survey ReportFor
Site Sharing
5. Drawings and sketches
a. Access to site including the dimensions and distance of the road which is not accessible by car:b. Complete proposed layout (tower/pole position/equipment/ACPDB/cable route,etc. with all dimensions
including set back from property line on all sides)c. Reflect any overhead/underground utilities crossing the site (powerline, telephone line, pipesetc.)d. Reflect existing facilities/obstructions/trees.etc.e. Reflect any high tension Cables running outside the building which can affect delivery (approx. height)f. Sketch the proposed route for power connection; specify the distances as stated in above datag. SITE CONTOUR / ELEVATION (reflect approximate contour of site/elevation view; provide the elevation
reading per 3m)
Site Layout
Revision number: 02 27 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
SST
44M Propose
Hcpt
GensetBts Bts
Kwh
Kwh
Pintu 0 30
-
7/28/2019 Technical Site Survey Report 163357,,,
6/15
Technical Site Survey ReportFor
Site Sharing
Antenna Placement
Revision number: 02 28 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
DA
CB
EXISTINGANT
RF
SECTOR 1 30
EXISTINGANT
RF
SECTOR 2 90
EXISTINGANT
RF
SECTOR 3 210
A
CB
D
EXISTINGANT
RF
SECTOR 1 30
EXISTINGANT
RF
SECTOR 3 90
EXISTINGANT
RF
SECTOR 4 210
42M.A.G.L
40 M.A.G.L
EXISTING
MWANTENNA
0.6 90
DA
CB
EXISTINGANT
RF
SECTOR 2 180
EXISTINGANT
RFSECTOR 1 60
EXISTINGANT
RF
SECTOR 3 300
40M.A.G.L
DA
CB
EXISTING
MWANTENNA
0.6 78
-
7/28/2019 Technical Site Survey Report 163357,,,
7/15
Technical Site Survey ReportFor
Site Sharing
Note: Photo documentation should include but not limited to the following:a. Actual proposed site statusb. Panoramic Photos.c. Access information from the nearest road going to the actual site. Include information on the narrowest accessd. Power source. Including photo of the 3 Phase power source (i.e. 3 phase PLN pole) and nearest Transformere. Cable tray route and grounding route; including power route going to sourcef. Incase there is need to demolish existing structure, photo of which should also be presented
g. Other necessary information should have photo attachment.
Panoramic Photo
0 30
60 90
120 150
Revision number: 02 29 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
8/15
Technical Site Survey ReportFor
Site Sharing
180 210
240 270
Revision number: 02 30 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
9/15
Technical Site Survey ReportFor
Site Sharing
300 330
Existing Main Access Road Proposed EquipmentRevision number: 02 31 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
10/15
Technical Site Survey ReportFor
Site Sharing
Proposed Pole PLN/ KWH Meter Existing Access Road to Site
Existing Access Road to Site Existing Access Road to Site
Revision number: 02 32 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
11/15
Technical Site Survey ReportFor
Site Sharing
VERTICAL TRAY HORIZONTAL TRAY
TOP DOWN PICTURE TOWERRevision number: 02 33 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
12/15
Technical Site Survey ReportFor
Site Sharing
TOWER PICTURE 1 TOWER PICTURE 2
TOP DOWN 1 TOP DOWN 2
TOP DOWN 3 TOP DOWN 4
Revision number: 02 34 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
Propose antRF 30m
Propose antMW 30m
-
7/28/2019 Technical Site Survey Report 163357,,,
13/15
Technical Site Survey ReportFor
Site Sharing
5.A. Detailed Sketch of Transmission Cables and Transmission Cable Ladder System
a. Provide details of the type, size and number of existing transmission cables including relative positions andarrangement on the cable ladder system.
b. A new sketch for (a) above is required whenever there is a change in the number of cables and the sketchshould indicate the top and bottom tower elevations where the cable arrangement is applicable.
c. Provide details of the cable ladder system including width, type and size of ladder rails, type size and spacingof cable support brackets.
d. If the transmission cable ladder system is integral with the climbing ladder system then this sketch must
include details of the climbing ladder system including the following :- Width, type and size of climbing ladder rails.- Diameter, type and spacing of ladder rungs.- Safety cage vertical flat bar size and arrangement.- Safety cage horizontal flat bar size and spacing.
e. Provide measurement of vacant space available on the cable ladder system.f. If the transmission cable ladder system is isolated from the climbing ladder system then show the position on
the tower.
Revision number: 02 35 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number:163357/Mega/Batch 3G/
References: M4. TSS Approved 38 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
14/15
Technical Site Survey ReportFor
Site Sharing
Proposed Antenna Sector 1 Proposed Antenna Sector 2
Proposed Antenna Sector 3 GPS Coordinate View
Revision number: 00 36 Document title: Site Sharing TSSR
Date of issue: November 03, 2008 of Document number: 2056
References: M4. TSS Approved 37 Release status: Released
-
7/28/2019 Technical Site Survey Report 163357,,,
15/15
Technical Site Survey ReportFor
Site Sharing
4.A. HCPT Propose Antenna Information
a. Radio RequirementTechnology 2G 3G
Sector 1 2 3 1 2 3
Antenna Type NumberDX-1710-
2170-65-
19.5i-M
DX-1710-2170-
65-19.5i-M
DX-1710-2170-
65-19.5i-M
DX-1710-2170-
65-19.5i-M
DX-1710-
2170-65-
19.5i-M
DX-1710-
2170-65-
19.5i-M
Number of Antennas 1 1 1 1 1 1
Antenna Orientation (deg.) &Tower Leg Mounting Position(Leg 1,2,3,4)
60/Leg 1 180/Leg 2 240/Leg 3 60/Leg 1 180/Leg 2 240/Leg 3
Feeder Length (meters): 30 x 2 30 x 2 30 x 2 30 x 2 30 x 2 30 x 2
Feeder size/type
(i.e. 7/8; 1 ; etc):
7/8" 7/8" 7/8" 7/8" 7/8" 7/8"
Antenna Height (meters)( Center of ant. to ground level)
30 m 30 m 30 m 30 m 30 m 30 m
Other information: Antenna Height is always taken from center of antenna
b. Transmission Requirement
Proposed Microwave Antenna Information
NoNearEndSite
TowerLeg
MountingPosition
(Leg1,2,3,4)
Diameter(m)
Height
(M.Agl)
Azimuth
to F.E.(Deg)
Type ofAntenna(HP, Std,Grid, etc)
FeederCable(Type &
Diameter)
Far EndSite
Diameter(m)
Height
(M.Agl)
Azimuthto N.E.(Deg)
1 163357 1 0.6 31 7.81 HP 1/4 161059 0.6 30 187.81
2
3
4
5
6
Other information : Antenna Height is always taken from center of antenna
Note:HP = High Performance Microwave Antenna.STD = Standard Parabolic Antenna without Radome.
STD+R = Standard Parabolic Antenna with Radome.Grid = Grid Antenna.
Revision number: 00 37 Document title: Site Sharing TSSR
Date of issue: November 03, 2008 of Document number: 2056
References: M4. TSS Approved 37 Release status: Released
Existing 4 Leg
Hight 44 mAGL
Leg 1 Leg 2
Leg 3Leg 4