technical report for ashram rare earth deposit

99
Respectfully submitted to: Commerce Resources Corporation By: André Laferrière M.Sc. P.Geo. SGS Canada Inc. – Geostat Date: April 15, 2011 Technical Report Mineral Resource Estimation Eldor Property – Ashram Deposit Nunavik, Quebec Commerce Resources Corporation Geostat 10 boul. de la Seigneurie Est, Suite 203, Blainville, Québec Canada t (450) 433 1050 f (450) 433 1048 www.geostat.com www.met.sgs.com Member of SGS Group (SGS SA) SGS Canada Inc.

Upload: commerce-resources-corp-tsxvcce-fsed7h

Post on 01-Sep-2014

1.117 views

Category:

Investor Relations


4 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Technical Report for Ashram Rare Earth Deposit

 

Respectfully submitted to: Commerce Resources Corporation 

 By: 

André Laferrière M.Sc. P.Geo. SGS Canada Inc. – Geostat 

 Date: 

April 15, 2011 

Technical Report Mineral Resource Estimation 

Eldor Property – Ashram Deposit Nunavik, Quebec 

Commerce Resources Corporation 

Geostat 10 boul. de la Seigneurie Est, Suite 203, Blainville, Québec Canada

t (450) 433 1050 f (450) 433 1048 www.geostat.com www.met.sgs.com

Member of SGS Group (SGS SA)

SGS Canada Inc.

Page 2: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page ii 

SGS Canada Inc. - Geostat

TABLE OF CONTENTS 

Table of Contents ............................................................................................................................ ii List of Tables ................................................................................................................................. iv List of Figures ................................................................................................................................ iv 1- Executive Summary .....................................................................................................................6 2- Introduction and Terms of Reference ..........................................................................................8 

2.1 General ................................................................................................................................................ 8 2.2 Terms of Reference ............................................................................................................................. 8 2.3 Units and Currency .............................................................................................................................. 9 2.4 Disclaimer ......................................................................................................................................... 10 

3- Reliance on Other Experts .........................................................................................................10 4- Property Description and Location ............................................................................................11 

4.1 Location ............................................................................................................................................. 11 4.2 Property Ownership and Agreements ................................................................................................ 12 4.3 Royalties Obligations ........................................................................................................................ 14 4.4 Permits and Environmental Liabilities .............................................................................................. 14 4.5 Mineralisation .................................................................................................................................... 14 

5- Accessibility, Physiography, Climate, Local Resources and Infrastructure ..............................15 5.1 Accessibility ...................................................................................................................................... 15 5.2 Physiography ..................................................................................................................................... 15 5.3 Climate .............................................................................................................................................. 15 5.4 Local Resources and Infrastructures ................................................................................................. 16 

6- History .......................................................................................................................................16 6.1 Regional Government Surveys .......................................................................................................... 16 6.2 Mineral Exploration Work ................................................................................................................ 16 

7- Geological Setting .....................................................................................................................18 7.1 Regional Geology .............................................................................................................................. 18 7.2 Property Geology .............................................................................................................................. 21 

8- Deposit Model ...........................................................................................................................23 9- Mineralisation ............................................................................................................................25 10- Exploration and Drilling ..........................................................................................................26 11- Sampling Method and Approach .............................................................................................28 12- Sample Preparation, Analysis and Security .............................................................................30 

12.1 Sample Preparation and Analyses ................................................................................................... 30 12.2 Quality Assurance and Quality Control Procedure ......................................................................... 31 

12.2.1 Analytical Standards ................................................................................................................. 31 12.2.2 Analytical Blanks ...................................................................................................................... 35 12.2.3 Drill Core Duplicates ................................................................................................................ 35 12.2.4 Pulp Duplicates ......................................................................................................................... 38 12.2.5 QA/QC Conclusion ................................................................................................................... 44 

12.3 Specific Gravity ............................................................................................................................... 45 12.4 Conclusions ..................................................................................................................................... 47 

13- Data Verification .....................................................................................................................47 14- Adjacent Properties ..................................................................................................................58 15- Mineral Processing and Metallurgical Testing ........................................................................59 16- Mineral Resource and Mineral Reserve Estimates ..................................................................60 

16.1 Introduction ..................................................................................................................................... 60 16.2 Exploratory Data Analysis .............................................................................................................. 60 

16.2.1 Analytical Data ......................................................................................................................... 60 

Page 3: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page iii 

SGS Canada Inc. - Geostat

16.2.2 Composite Data ........................................................................................................................ 63 16.2.3 Specific Gravity ........................................................................................................................ 65 

16.3 Geological Interpretation ................................................................................................................. 65 16.4 Spatial Analysis ............................................................................................................................... 67 16.5 Resource Block Modeling ............................................................................................................... 68 16.6 Grade Interpolation Methodology ................................................................................................... 69 16.7 Mineral Resource Classification ..................................................................................................... 71 16.8 Mineral Resource Estimation .......................................................................................................... 71 16.9 Mineral Resource Validation ........................................................................................................... 73 16.10 Comments about the Mineral Resource Estimate ......................................................................... 73 

17- Other Relevant Data and Information .....................................................................................74 18- Interpretation and Conclusions ................................................................................................74 19- Recommendations ...................................................................................................................76 20- References ...............................................................................................................................78 21- Signature Page .........................................................................................................................80 22- Certificate of Qualification ......................................................................................................81    

Page 4: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page iv 

SGS Canada Inc. - Geostat

LIST OF TABLES 

Table 2.1 – List of Abbreviations ................................................................................................................. 9 Table 2.2 – Conversion Factors .................................................................................................................. 10 Table 4.1 – Summary of Mineralisation Occurring on the Eldor Property ................................................. 15 Table 10.1 – Summary of Drilling Completed at Eldor by Commerce ...................................................... 27 Table 12.1 – Expected Values and QA/QC Ranges of SX18-01 and SX18-05 Analytical Standards for Y,

La, Ce, Nd and Nb2O5 .......................................................................................................................... 32 Table 12.2 - Summary Statistics of SX18-01 and SX18-05 Analytical Standards for Y, La, Ce, Nd and

Nb2O5 ................................................................................................................................................... 32 Table 12.3 – Comparative Statistics for the Drill Core Duplicates ............................................................. 36 Table 12.4 –Statistics for the Pulp Duplicates (Act Labs vs. Inspectorate) ................................................ 39 Table 12.5 –Specific Gravity Statistics from Independent Check Sampling Program ............................... 45 Table 12.6 –Specific Gravity Statistics from Commerce 2010 Exploration Program ................................ 46 Table 13.1 –Statistics for the Independent Check Samples (Act Labs vs. SGS Minerals) ......................... 48 Table 13.2 –Statistics for the Independent Check Samples (Act Labs vs. ALS Chemex) .......................... 53 Table 13.3 – Final Drill Hole Database ...................................................................................................... 58 Table 16.1 – Summary Statistics of Analytical Data Used in the Mineral Resource Estimate ................... 61 Table 16.2 – Summary Statistics for the 3 metre Composites .................................................................... 64 Table 16.3 – Variogram Model of TREO Grade for 3 m Composite ......................................................... 67 Table 16.4 – Resource Block Model Parameters ........................................................................................ 69 Table 16.5 – Eldor Property Mineral Resource Estimate ........................................................................... 72 Table 16.6 – Eldor Property Mineral Resource Estimate with Individual REO Values ............................. 73 Table 16.7 – Comparative Statistics of the Composite and Block Model Datasets .................................... 73 Table 18.1 – Final Mineral Resources for the Eldor Property .................................................................... 75 Table 19.1 – Proposed Budget for Recommended Exploration Work at Eldor .......................................... 77  LIST OF FIGURES 

Figure 4.1 – General Location Map ............................................................................................................ 11 Figure 4.2 – Map of the Property Mineral Titles ........................................................................................ 13 Figure 7.1 – Regional Geology Map ........................................................................................................... 20 Figure 7.2 – Local Geological Map ............................................................................................................ 22 Figure 8.1 – Schematic Representation of St-Honore Carbonatite ............................................................. 24 Figure 9.1 – Drill Core from Hole EC10-028 Showing the A, B, BD and Contact Zones ......................... 26 Figure 10.1 – Plan View of the Drilling in the Ashram REE zone at the Eldor Property ........................... 28 Figure 12.1 - Variation of Reported Values with Time for Analytical Standard SX18-01 ........................ 33 Figure 12.2 - Variation of Reported Values with Time for Analytical Standard SX18-05 ........................ 34 Figure 12.3 – Correlation Plot of the Drill Core Duplicates for TREE+Y ................................................. 37 Figure 12.4 – Correlation Plot of the Drill Core Duplicates for Nb2O5 ...................................................... 37 Figure 12.5 – Correlation Plot of the Drill Core Duplicates for F .............................................................. 38 Figure 12.6 - Correlation Plot of the Pulp Duplicates for TREE+Y, Y, La and Ce (ActLabs vs.

Inspectorate) ........................................................................................................................................ 40 Figure 12.7 - Correlation Plot of the Pulp Duplicates for Pr, Nd, Sm and Eu (ActLabs vs. Inspectorate) . 41 Figure 12.8 - Correlation Plot of the Pulp Duplicates for Gd, Tb, Dy and Ho (ActLabs vs. Inspectorate) 42 Figure 12.9 - Correlation Plot of the Pulp Duplicates for Er, Tm, Yb and Lu (ActLabs vs. Inspectorate). 43 Figure 12.10 – Histogram of Specific Gravity Measurements by Commerce at Ashram ........................... 46 Figure 13.1 - Correlation Plot of the Independent Checks Samples for TREE+Y, Y, La and Ce (ActLabs

vs. SGS Minerals) ................................................................................................................................ 49 Figure 13.2 - Correlation Plot of the Independent Checks Samples for Pr, Nd, Sm and Eu (ActLabs vs.

SGS Minerals) ..................................................................................................................................... 50 

Page 5: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page v 

SGS Canada Inc. - Geostat

Figure 13.3 - Correlation Plot of the Independent Checks Samples for Gd, Tb, Dy and Ho (ActLabs vs. SGS Minerals) ..................................................................................................................................... 51 

Figure 13.4 - Correlation Plot of the Independent Checks Samples for Er. Tm, Yb and Lu (ActLabs vs. SGS Minerals) ..................................................................................................................................... 52 

Figure 13.5 - Correlation Plot of the Independent Checks Samples for TREE+Y, Y, La and Ce (ActLabs vs. ALS Chemex)................................................................................................................................. 54 

Figure 13.6 - Correlation Plot of the Independent Checks Samples for Pr, Nd, Sm and Eu (ActLabs vs. ALS Chemex) ...................................................................................................................................... 55 

Figure 13.7 - Correlation Plot of the Independent Checks Samples for Gd, Tb, Dy and Ho (ActLabs vs. ALS Chemex) ...................................................................................................................................... 56 

Figure 13.8 - Correlation Plot of the Independent Checks Samples for Er. Tm, Yb and Lu (ActLabs vs. ALS Chemex) ...................................................................................................................................... 57 

Figure 14.1 – Map of Adjacent Properties in the Vicinity of Eldor Property ............................................. 59 Figure 16.1 – Histogram of Samples Length from Ashram Database ........................................................ 61 Figure 16.2 – Plan View of the Drill Holes at Ashram ............................................................................... 62 Figure 16.3 – Longitudinal View of the Drill Holes at Ashram (looking north) ........................................ 63 Figure 16.4 - Plan View Showing the Spatial Distribution of the Composites ........................................... 64 Figure 16.5 – Longitudinal View Showing the Distribution of the Composites (looking north) ............... 65 Figure 16.6 – Modeled 3D Wireframe Envelope in Plan View .................................................................. 66 Figure 16.7 – Modeled 3D Wireframe Envelope in Longitudinal View (looking south) ........................... 67 Figure 16.8 – Variograms of TREO Grade of 3 metre Composite ............................................................. 68 Figure 16.9 –Different Search Ellipsoids Used for the Interpolation Process in Plan View ...................... 70 Figure 16.10 – Plan View Showing Block Model Interpolation Results .................................................... 70 Figure 16.11 – Longitudinal View Showing Block Model Interpolation Results (looking south) ............. 71 Figure 19.1 – Plan View Showing Proposed Drilling Area ........................................................................ 77 

Page 6: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 6 

SGS Canada Inc. - Geostat

1­ EXECUTIVE SUMMARY 

SGS Canada Inc. – Geostat (“SGS Geostat”) was commissioned by Commerce Resources Corporation (“Commerce”) on September 28, 2010 to prepare an independent estimate of the mineral resources of the Ashram rare earth deposit for an open pit mining perspective. The mineral resource estimate was  completed  by  SGS  Geostat  based  on  data  available  from  recent  drilling  data  collected  by Commerce  during  the  2010  exploration  program.  The  mineral  resource  estimate  was  done  in accordance with National Instrument 43‐101 Standards and Disclosure for Mineral Projects. 

The  Eldor  Property  (“Property”)  is  located  in  the  Nunavik  Region  of  the  Province  of  Québec, approximately  130  km  south  of  the  community  of  Kuujjuaq  and,  due  to  it  remoteness,    is  only accessible  by  float  plane  or  helicopter.  The  Property  consists  in  one  block  totalling  404  claims covering 19,006.52 ha and extends 17.5 km in the east‐west direction and 24 km north‐south. From the  404  claims  comprising  the  Property,  8  claims  were  acquired  in  May  2007  by  a  purchase agreement  with  Virginia  Mines  Inc.  (“Virginia”),  and  396  claims  were  acquired  map  staking between May 2007 and October 2010. 

The  Eldor  Property  area  has  been  explored  since  in  the  1980’s  mainly  for  uranium  but mineralisation  in  niobium,  tantalum,  and  rare  earths  were  discovered  during  that  period.  The Property  was  re‐activated  in  2002  went  Virginia  acquired  8  claims  covering  the  main mineralisation occurrences then conducted a small reconnaissance exploration program. In 2007, Commerce  acquired  the  claims  owned  by  Virginia  through  a  purchase  agreement  and  staked  an additional  357  claims.  Since  2008,  Commerce  conducted  exploration  programs  on  the  Property using  prospecting,  soil  geochemistry,  airborne  and  ground  geophysics,  trenching  and  diamond drilling. In 2009, significant rare earth mineralisation was discovered in the Ashram area followed, in  2010,  by  a  significant  exploration  program  centered  at  Ashram  consisting  of mainly  diamond drilling. 

The  Property  is  situated  within  the  central  area  of  the  Proterozoic‐age  New  Quebec  Orogen, straddling  two  lithotectonic  zones  separated by  a major  thrust  fault.    The  eastern portion  of  the Property comprises paraschist, paragneiss, and amphibolites. To the west are mainly volcanic and sedimentary  rocks  along  with  the  Eldor  carbonatite  intrusive  complex.  The  Eldor  carbonatite comprises  several  lithological  subdivisions which can be  simplified  into early, mid and  late  stage carbonatite. The mid stage carbonatite is most closely related to tantalum‐niobium mineralisation while the late stage carbonatite hosts the REE mineralisation observed at the Ashram zone. 

As part of the independent verification program, the author of the report validated the exploration methodology which  includes  core  logging,  sampling,  analytical  procedures,  and  quality  analysis‐quality  control  protocol  implemented  by  Commerce.  SGS  Geostat  considers  the  samples representative and of good quality, and is confident that the system is appropriate for the collection of data suitable for the estimation of a NI 43‐101 compliant mineral resources. 

 The  author  visited  the  Property  between October  4  and  6,  2010  and  conducted  an  independent sampling  of mineralised  core  from  the  2010  exploration  program.  SGS  Geostat  also  completed  a verification  of  the  drill  hole  database  as  part  of  the  verification  program.  The  author  and  SGS Geostat are in the opinion that the data quality is acceptable and that the final drill hole database is adequate to support a mineral resource estimate. 

Page 7: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 7 

SGS Canada Inc. - Geostat

The mineral resource block model is derived from the geological interpretation and modeling of the mineralised carbonatite at Ashram. The resource model is defined by blocks 10 m (east‐west) by 10 m  (north‐south)  by  10  m  (elevation)  in  size,  located  below  the  bedrock/overburden  interface. Interpolation of the block grade was performed using ordinary kriging from composited analytical data  in multiple  successive passes using anisotropic  search ellipsoids  increasing  is  size  from one pass to another. Finally, a mineral resource was estimate based on the results of  the block model interpolation.  All  the mineral  resources were  classified  inferred  resource  categories.  An  average bulk density of 3.0 t/m3 was used to calculate the final tonnage of the mineral resources based on the volumetric estimates of the block model. 

The  final mineral  resource estimate  for  the Eldor Property  at  a base  case  cut‐off  grade of  1.25% TREO  totals  117,340,000  tonnes  grading 1.740% TREO and 5.56% CaF2  in  the  inferred  resource category. The final mineral resources for the Eldor Property are presented in the table below. 

 

 

 

SGS  Geostat  is  in  the  opinion  that  the  Company  successfully  confirmed  the  mineral  resource potential of the Ashram deposit located on the Eldor Property based on 2010 exploration program and considers the Project to be sufficiently robust to warrant the following work:  

Additional  drilling  to  a)  confirm  the western  and  eastern  extent  of  the mineralisation,  b)  test  the  northern,  southern,  and  depth  extensions  of  the mineralised  carbonatite,  and  c) confirm the existing inferred resources and upgrade the current resources to the indicated category; 

Proceed  to  preliminary  metallurgical  study  to  better  characterise  the  rare  earth mineralisation processing parameters; 

Complete a preliminary economic evaluation of the Project for a potential open pit mining operation. 

In  addition  to  the  work  recommendation  listed  above,  the  author  recommends  to  carry  out  a baseline  environmental  study  of  the  Property  and  to  conduct  discussions with  the  communities neighbouring the Eldor project about the impact of a potential open pit mining operation. 

1.25% Inferred 117,340,000 1.740 1.612 0.069 0.019 0.040 5.56

Mineral resources are not mineral reserves and do not have demonstrated economic viability. 

Effective date March 1, 2011. Bulk density of 3.0 t/m3 used. 

TREO includes La2O3, Ce2O3, Pr2O3 and Nd2O3, SM2O3, Eu2O3 and Gd2O3, Tb2O3, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3 and Lu2O3, and Y2O3. 

LREO includes La2O3, Ce2O3, Pr2O3 and Nd2O3. 

IREO includes SM2O3, Eu2O3 and Gd2O3. 

HREO includes Tb2O3, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3 and Lu2O3.

* Rounded to nearest 10,000. ** Rounded to nearest 0.001. *** Rounded to nearest 0.01

Mineral Resources Estimate ‐ Eldor Property ‐ Ashram REE Deposit

Cut‐off Grade 

TREO (%)

Resources 

CategoriesTonnes* TREO (%)** LREO (%)** IREO (%)** HREO (%)** Y2O3 (%)** CaF2 (%)***

Page 8: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 8 

SGS Canada Inc. - Geostat

2­ INTRODUCTION AND TERMS OF REFERENCE 

2.1 General 

This  technical  report was  prepared  by  SGS  Canada  Inc.  –  Geostat  (“SGS  Geostat”)  for  Commerce Resources Corporation (“Commerce” or “Company”) to support the disclosure of mineral resources for the Eldor Property (“Property” or “Project”).  

The report describes the basis and methodology used for modeling and estimation of  the Ashram REE  deposit  located  on  the  Property  from  recent  holes  drilled  by  Commerce  during  the  2010 exploration  program.  The  report  also  presents  a  full  review  of  the  history,  geology,  sample preparation  and  analysis,  and  data  verification  of  the  Project.  The  report  also  provides recommendations for future work. 

SGS Geostat was commissioned by Commerce on September 28, 2010 to prepare an  independent estimate  of  the  mineral  resources  of  the  Ashram  deposit  for  an  open  pit  mining  perspective. Commerce supplied electronic format data from which SGS Geostat generate and validated a final database. 

 

2.2 Terms of Reference 

This  report  on  the  mineral  resource  estimation  at  the  Eldor  Property  was  prepared  by  André Laferrière M.Sc. P.Geo. The author, André Laferrière M.Sc. P.Geo, is responsible for all sections of the report. 

This  technical  report  was  prepared  according  to  the  guidelines  set  under  “Form  43‐101F1 Technical  Report”  of  National  Instrument  43‐101  Standards  and Disclosure  for Mineral  Projects. The  certificate  of  qualification  for  the  Qualified  Person  responsible  for  this  technical  report  has been supplied to the Company as a separate document and can also be found in section 22 of the report. 

The  author  visited  the  Property  between  October  4  and  6,  2010,  for  a  review  of  exploration methodology,  sampling  procedures  and  to  conduct  an  independent  check  sampling  of  selected mineralised drill intervals. 

Information  in  this  report  is  based  on  critical  review  of  the  documents,  information  and  maps provided  by  personnel  of  Commerce  and  Dahrouge  Geological  Consulting  Ltd  (“Dahrouge”),  in particular Mr.  Darren  Smith, M.Sc.  P.Geol.,  Project  Geologist  and Mr. Wayne McGuire,  Senior  GIS Technician. A complete list of the reports available to the author is found in the References section of this report. 

 

 

 

Page 9: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 9 

SGS Canada Inc. - Geostat

2.3 Units and Currency 

All measurements in this report are presented in Système International d’Unités (SI) metric units, including  metric  tonnes  (tonnes)  or  grams  (g)  for  weight,  metres  (m)  or  kilometres  (km)  for distance,  hectare  (ha)  for  area,  and  cubic  metres  (m3)  for  volume.  All  currency  amounts  are Canadian Dollars (C$) unless otherwise stated. Abbreviations used in this report are listed in Table 2.1. 

 

Table 2.1 – List of Abbreviations 

tonnes or t  Metric tonnes kg  Kilograms g  Grams km  Kilometres m  Metres µm  Micrometres ha  Hectares m3  Cubic metres km/h  Kilometre per hour %  Percent sign t/m3  Tonne per cubic metre $  Dollar sign °  Degree °C  Degree Celcius NSR  Net smelter return NPI  Net Profit Interest pH  Potential of hydrogen (acidity scale) ppm  Parts per million NQ  Drill core size (4.8 cm in diameter) SG  Specific Gravity NTS  National Topographic System UTM  Universal Transverse Mercator NAD  North America Datum Ga  Billion years REE  Rare Earth Elements REO  Rare Earth Oxides 

 

Page 10: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 10 

SGS Canada Inc. - Geostat

Table 2.2 – Conversion Factors 

 

 

2.4 Disclaimer 

It  should  be  understood  that  the mineral  resources which  are  not mineral  reserves  do  not  have demonstrated  economic  viability.  The  mineral  resources  presented  in  this  Technical  Report  are estimates based on available sampling and on assumptions and parameters available to the author. The  comments  in  this  Technical  Report  reflect  the  author’s  and  SGS  Canada  Inc.  –  Geostat  best judgement in light of the information available. 

 

3­ RELIANCE ON OTHER EXPERTS 

The author of this Technical Report, Mr. André Laferrière, M.Sc. P.Geo, is not qualified to comment on  issues  related  legal  agreements,  royalties,  permitting,  and  environmental matters.  The  author has  relied upon  the  representations  and documentations  supplied by  the Company management. The  author  has  reviewed  the  mining  titles,  their  status,  the  legal  agreement  and  technical  data supplied by Commerce, and any public sources of relevant technical information. 

Sections  4  to  6  of  this  report  has  been  modified  from  the  assessment  report  “2008  and  2009 Exploration of the Eldor Property, Northern Quebec” by Dahrouge for Commerce and dated June 23, 2010  (Smith  and  Peter‐Rennich,  2010)  and  includes  additional  information  from  the  recent exploration programs completed by Commerce on the Property. 

 

Conversion Factor

(Element to Oxide/Carbonate)

Lanthanum La 1.17276 La2O3

Cerium Ce 1.17127 Ce2O3

Praseodymium Pr 1.17031 Pr2O3

Neodymium Nd 1.16638 Nd2O3

Samarium Sm 1.15961 Sm2O3

Europium Eu 1.15793 Eu2O3

Gadolinium Gd 1.15261 Gd2O3

Terbium Tb 1.15100 Tb2O3

Dysprosium Dy 1.14768 Dy2O3

Holmium Ho 1.14551 Ho2O3

Erbium Er 1.14348 Er2O3

Thulium Tm 1.14206 Tm2O3

Ytterbium Yb 1.13868 Yb2O3

Lutetium Lu 1.13716 Lu2O3

Yttrium Y 1.26993 Y2O3

Niobium Nb 1.43050 Nb2O5

Fluorine F 2.05490 CaF2

Name Element Oxide/Carbonate

LREO

MREO (or IREO)

HREO

Definitions

TREO

Page 11: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 11 

SGS Canada Inc. - Geostat

4­ PROPERTY DESCRIPTION AND LOCATION 

4.1 Location 

The Eldor Property is located in the Nunavik Region of the Province of Québec, approximately 130 km  south  of  the  community  of  Kuujjuaq  (Figure  4.1).  The  Property  is  situated  about  longitude 68°24’0” west  and  latitude  56°56’0”  north  at  its  center  and  covers  portion  of  NTS  sheet  24C15, 24C16 and 24F01. The Property is only accessible by float plane or helicopter. 

 

Figure 4.1 – General Location Map 

 

 

 

Page 12: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 12 

SGS Canada Inc. - Geostat

4.2 Property Ownership and Agreements 

As of April 2011, the Property consists in one block totalling 404 claims covering 19,006.52 ha. The Property  area  extends  are 17.5  km  in  the  east‐west direction  and 24 km north‐south.  Figure  4.2 shows the claim map of the Property and a detailed listing of the Eldor Property claims is included in Appendix A. 

From the 404 claims comprising the Property, 8 claims were acquired in May 2007 by a purchase agreement with Virginia Mines  Inc  (“Virginia”). The other 396 claims were acquired map staking between May 2007 and October 2010. 

 

Page 13: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 13 

SGS Canada Inc. - Geostat

Figure 4.2 – Map of the Property Mineral Titles 

 

Page 14: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 14 

SGS Canada Inc. - Geostat

4.3 Royalties Obligations 

The original 8 claims acquired from Virginia are subject to a 1% NSR royalty in favour of Virginia and a 5% NPI royalty in favour of two individuals. Commerce has the right to buy back the 5% NPI royalty in consideration of $500,000. 

 

4.4 Permits and Environmental Liabilities 

Commerce is conducting exploration work under valid permits and authorisations delivered by the provincial  Ministère  des  Ressources  Naturelles  et  de  la  Faune  (“MRNF”)  and  the  Ministère  du Développement  Durable,  de  l’Environnement  et  des  Parcs  (“MDDEP”).  On  March  19,  2011,  the Company confirmed having the following work permits in good standing: 

Intervention permit (by the MRNF); 

Camp authorisation (by the MDDEP); 

Certificate of authorisation (by the MDDEP); 

Attestation of exemption (by the MDDEP). 

There  are  no  environmental  liabilities  pertaining  to  the  Property,  according  to  the  Company management. 

 

4.5 Mineralisation 

Different  type  of mineralisation  related  to  the  carbonatite  intrusive  complex  occurs  at  the  Eldor Property.  The main  commodities  include  rare  earth  elements  and  fluorine discovered  at Ashram zone  but  also  outlined  in  other  areas  on  the  property,  and  niobium,  tantalum  and  phosphate uncovered  mainly  at  Star  Trench,  Southeast  and  Northwest  areas.  Table  4.1  summarises  the mineralisation occurring on the Property. 

 

Page 15: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 15 

SGS Canada Inc. - Geostat

Table 4.1 – Summary of Mineralisation Occurring on the Eldor Property 

 

 

5­ ACCESSIBILITY, PHYSIOGRAPHY, CLIMATE, LOCAL RESOURCES AND INFRASTRUCTURE 

5.1 Accessibility 

Due to its remoteness, the Property is only accessible by float plane or helicopter. 

 

5.2 Physiography 

The  Property  is  characterised  by  a  rolling  hill  topography  generally  created  by  the  underlying glacial drumlins and eskers. Glacial sediments, mostly till, cover most of the Project area and can be up to ten metres thick. Outcrops are rare but boulders are abundant. The elevation above sea level ranges from 200 m to 320 m. 

Drainage in the area, typical of the transitional taiga to tundra regions, is northward toward Ungava Bay using small creeks and local poorly drained swampy area connecting to larger lakes and major rivers. The vegetation is generally forest‐covered in the central portion of the Property, populated mainly  by  black  spruce  and  tamarack  trees,  with  generally  barren  areas  occurring  in  the  more elevated southern area. Willow and alder shrubs, often densely populated, also occur in low‐lying areas throughout the Property. 

 

5.3 Climate 

The climate is sub‐arctic continental with average temperatures ranging from ‐25°C in February to +11°C in July for the nearest community of Kuujjuaq. The average annual precipitation for the last 10  years  in  the  region  is  41  cm of  rain  and 174  cm of  snow  (weatherbase website  2011).  Lakes freeze‐up  generally  begins  in  early October  and  ice  break‐up  usually  occurs  around  end  of May‐early June. 

UTM East UTM North

536300 6312100 Ashram REE's, FDDH EC10‐045: 1.99% TREO over 309.18 m, including 2.30% TREO 

over 172.89 m.Drill Core

538000 6311000 SoutheastNb, Ta, F, 

phosphate

DDH EC‐10‐032: 0.43% Nb2O5 over 155.95 m; DDH EC10‐033: 

0.58% Nb2O5 and 8.91% P2O5 over 74.25 m and 12.70% F over 

32.42 m; DDH EC08‐015: 9.96% P2O5 over 13.45 m and 3552 ppm 

Nb over 18.72 m and 353 ppm Ta over 5.73 m; 1.07% REE+Y in soils; 

0.51% REE+Y in rocks

Drill Core, Rocks, 

Soils

537300 6310100 Star TrenchTa, Nb, U, 

phosphate

DDH EC10‐034: 6.90% P2O5 over 6.13 m; DDH EC10‐035: 4.37% 

P2O5 and 396 ppm U over 5.34 m; 1.03% Nb2O5 in rocksDrill Core, Rocks

541400 6311700 MC Exposure REE's, F DDH EC10‐037: 1.73% TREO over 7.87 m; 2.32% TREO in rocks Drill Core, Rocks

537400 6313000Miranna

REE's, phosphate 15.9% P2O5 in rocks;  1.06% TREO in soils Rocks, Soils

537800 6313500 Triple‐D REE's 2.44% TREO in rocks; 0.68% TREO in soils Rocks, Soils

535900 6312700 Northwest Nb, phosphateDDH EC08‐008: 3189 ppm Nb over 46.88 m; 1.69% REE+Y in rocks; 

2.11% REE+Y in soils

Drill Core, Rocks, 

Soils

LocationArea Name Commodities Significant Results Sampling Type

Page 16: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 16 

SGS Canada Inc. - Geostat

 

5.4 Local Resources and Infrastructures 

The regional resources regarding labour force, supplies and equipment are challenging due to the remoteness  of  the  Project.  The  nearest  communities  are  Kuujjuaq  located  130  km  north  with  a population of more than 2,000 citizens and Schefferville (including the nearby native community) situated  approximately  275  km  southeast  with  a  population  of  just  above  800  citizens  (2006 census). Both communities are serviced by a regional airport and a float plane base. Kuujjuaq has a small  sea  port  and  Schefferville  is  the  northern  terminus  of  the  Tshiuetin  railway  (formerly operated by the Quebec North Shore & Labrador) which connects to Labrador City then Sept‐Iles to the south. 

Exploration work on the Property is done from a temporary base camp located nearby the Ashram REE  deposit.  The  camp  can  be  open  year‐round  and  has  the  capacity  to  accommodate  up  to  20 persons. The camp  is  equipped with  core  logging and sampling  facilities,  and hosts  the drill  core archive of the Project. No permanent access road has been built on the Property. 

 

6­ HISTORY 

6.1 Regional Government Surveys 

Several regional surveys have been conducted in the area of the Property by the Geological Survey of Canada  (“GSC”) and  the MRNF. Between  the 1950’s and  the 1970’s, different authors  from the GSC and the MRNF conducted regional geological surveys in New Quebec Orogen at scale varying from 4 miles per inch (1:253,440) and 1 mile per inch (1:63,360). In 1979, Dressler and Ciesielski completed  a  geological  compilation  of  the  different  geological  surveys  conducted  in  the  area (Dressler  and Ciesielski,  1979).  Since  the  end of  the 1970’s,  just  few  localised  geological  surveys collecting new information at more detailed scale were completed by the MRNF. 

The geological synthesises reported by the MRNF for the area since the 1990’s include a 1:250,000 scale  map  of  the  mineral  occurrences  of  the  New  Quebec  Orogen  (Avramtchez  et  al.,  1990),  a preliminary  lithotectonic and metallogical  synthesis at 1:500,000 scale  (Bandyayera et  al.,  2002), and more  recently  a  complete  lithological  and metallogical  synthesis  of  the New Quebec Orogen (Clark and Wares, 2005). 

In addition to regional geological surveys, a stream sediment geochemical survey was done in 1974 in  the  area  (Dressler,  1974)  followed  in  1987  by  a  regional  lake  sediment  geochemical  survey (Baumier 1987). 

 

6.2 Mineral Exploration Work 

The information reported  in this section  includes mainly mineral exploration work conducted for the mineralisation related to the carbonatite intrusive complex occurring on the Property. 

Page 17: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 17 

SGS Canada Inc. - Geostat

The  Eldor  carbonatite  intrusive  complex  was  first  discovered  in  1981  by  Eldor  Resources  Ltd (“Eldor  Res.”)  following  a  regional  lake water  and  sediment  sampling  program  completed  in  the northern  part  of  the  Labrador  Trough  for  uranium  exploration.  Carbonatitic  units were  outlined during a follow‐up of the geochemical uranium anomalies outlined by the survey.  

In  1982,  after  the  acquisition  of  an  exploration  permit  in  the  area  of  the  Property,  Eldor  Res. completed  a  982  line‐km  airborne  radiometric  survey  which  outlined  several  radiometric anomalies in the area. 

In  1983,  Eldor  Res.  followed  up  the  airborne  anomalies with  a  prospecting  program. During  the program, many of  the anomalies were explained using a scintillometer  in dug pits or  trenches by radioactive carbonatite outcrops or boulders. The samples collected returned anomalous thorium values  and  some  of  the  samples  returned  up  to  7%  Nb,  0.18%  Ta  and  4%  total  lanthanides.  A reconnaissance geological mapping survey was also conducted in the area of the newly discovered carbonatite (Meusy et al., 1984, Lafontaine, 1984). 

In 1985, Unocal Canada Ltd carried out a five day field program consisting of magnetic/radiometric geophysical and soil geochemical orientation surveys with prospecting. Samples were collected for geochemical analysis and petrographic study and confirmed the historical results by Eldor Res. and additional Nb‐Ta occurrences were outlined in the area (Knox, 1986). 

The  Eldor  carbonatite was  staked  in April  2002 by Virginia Gold Mines  Ltd  (now Virginia Mines Inc.) based on the historical Ta values reported by Eldor Res. They conducted a small program with the  re‐sampled  the historical Nb‐Ta  showings  and  confirmed  the historical  results. No additional work was performed in the area by Virginia. 

In April 2007, Commerce concluded a purchase agreement with Virgina on the 8 original claims and subsequently acquired an additional 357 claims covering  the  carbonatite  and  immediate vicinity. During  the  summer,  the  Company  mandated  Dahrouge  Geological  Consulting  Ltd  to  conduct  an exploration  program  consisting  of  prospecting  and  rock  sampling,  soil  sampling,  and  ground radiometric  (scintillometer)  and magnetic  surveys.  In  addition  to  the  field  program,  an  airborne magnetic‐electromagnetic‐radiometric survey was flown over the Property.  

During  2008,  Commerce  conducted  an  exploration  program  on  the  Property  consisting  of prospecting,  soil  sampling,  ground  geophysics,  trenching,  and  diamond  drilling.  A  total  of  5,482 metres of drilling was completed over 26 holes in three different areas of the Property. From these holes, 3,025 samples totalling 3,538 metres were collected and analysed. The best results returned the following: Star Trench area, 4.37 m grading 597 ppm Ta2O5, 3,058 ppm Nb2O5, 736 ppm U3O8, and 16.6% P2O5 (hole EC08‐025); Northwest area, 46.88 m grading 4,562 ppm Nb2O5 (hole EC08‐008);  Southeast  area,  26.10 m  grading  5,466  ppm Nb2O5  (hole  EC08‐015).  Fifteen  (15)  trenches were documented on  the Property with 71  samples  collected  from  them. The  ground geophysics consisted of magnetic and scintillometer surveys. The soil sampling program returned 685 samples collected at 50 m intervals along 1 km‐spaced lines. The prospecting work totalled 270 observation points and returned a total of 93 rock samples. 

In 2009, the Company completed a relatively small exploration program due to the negative global market conditions. The  field work consisted of prospecting and additional  sampling of 2008 drill 

Page 18: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 18 

SGS Canada Inc. - Geostat

core. Additional work was done  in  the  office which  consisted  of  air‐photo  interpretation  and  re‐analysis of the airborne geophysical survey. The most significant result from the 2009 exploration program  was  the  discovery  of  REE  mineralisation  in  outcrop  on  the  Ashram  peninsula  which highlighted  the  exploration  potential  for  rare  earth  elements  on  the  Property.  From  the  70  grab samples collected in the Ashram area, more than half returned TREE greater than 1% with the best sample grading 2.74% TREE. 

 

7­ GEOLOGICAL SETTING 

7.1 Regional Geology 

The Eldor property  is  located  in  the Paleoroterozoic‐age New Quebec Orogen (also known as  the Labrador  Trough)  which  is  interpreted  to  be  the  western  margin  of  the  Southeastern  Churchill Province  (“SECP”).  The  New  Quebec  Orogen  is  bounded  to  the  west  the  Archean‐age  Superior Province, by  the Proterozoic‐age Grenville Province  to  the south, and extent as  far as  the Ungava Bay to the north. To the east, the New Quebec Orogen is in contact with a composite terrane of the SECP named the Core Zone, composed of Archean and Paleoproterozoic‐age lithologies (James et al. 2003, Clark and Wares, 2005). 

The New Quebec Orogen is interpreted as an early Proterozoic‐age (Aphebian) fold and thrust belt with  and  geologic  age  ranging  between  2.17  and  1.87  Ga.  The  older  stratigraphic  and  structural subdivision of  the New Quebec Orogen outlined  three  supracrustal belts defined as 1)  a western foreland, parauthochthonous to allochthonous “miogeosynclinal” belt composed mainly of platform sediment  rocks;  2)  a  central  foreland,  allochthonous  “eugeosynclinal”  belt  composed  mainly  of greenschist facies, deep‐water, volcano‐sedimentary rocks intruded by numerous gabbro sills; and 3)  an  eastern  allochthonous  belt  marking  the  beginning  of  the  hinterland  and  composed  of amphibolitic facies rocks. 

The  recent  interpretation  defines  the  New Quebec  Orogen  by  three  cycles  of  sedimentation  and volcanism,  which  make  up  the  Kaniupiskau  Supergroup.  The  cycles  thicken  eastwards  and  are separated  from  each  other  by  erosional  unconformities.  The  first  two  cycles  are  volcano‐sedimentary  in  nature  with  emplacement  age  from  U‐Pb  dating  between  2.17  and  2.14  Ga  and between  1.88  and  1.87  Ga  respectively.  Overlying  this  sequence  is  a  syn‐orogenic  suite  of metasedimentary  rocks  forming  the  third  cycle.  The  belt  is  later  subdivided  into  eleven lithotectonic zones separated by major thrust faults. 

The  first  cycle  of  the  belt  was  prompted  by  continental  rifting,  followed  by  passive  continental margin  development,  then  additional  rifting,  and  finally  the  re‐establishment  of  the  platform.  A period of approximately 175 Ma characterised by relatively little tectonic activity followed the first cycle  of  the  orogen.  The  second  cycle  is  characterised  by  a  transgressive  sequence  composed  of platform sediments (sandstones and iron formations) and turbidites (sandstones and mudstones) later  intruded  in  the  central  part  of  the  belt  by  several  ultramafic  sills,  tholeiitic  in  composition, known  as  the Montagnais  Sills.  Near  the  end  of  the  second  cycle,  the  Le Moyne  intrusion  (Eldor Carbonatite)  was  emplaced  within  basaltic  to  rhyolitic  volcanic  units.  Finally,  the  third  cycle 

Page 19: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 19 

SGS Canada Inc. - Geostat

consisting of molasse type sedimentation at the margin of the Superior Province occurred between 1.82 and 1.77 Ga. 

Generally, the metamorphic grade increases from west to east across the New Quebec Orogen. The foreland  changes  from  sub‐greenschist  to  upper  greenschist  facies  and  the  hinterland  goes  from upper  greenschist  to  amphibolitic/granulite  facies.  The  Eldor  Carbonatitic  suite  of  rocks  has thought  to  have  undergone  greenschist  facies metamorphism  and was  deformed,  along with  the surrounding rocks, during the Hudsonian Orogen. 

 

Page 20: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 20 

SGS Canada Inc. - Geostat

Figure 7.1 – Regional Geology Map 

 

 

Page 21: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 21 

SGS Canada Inc. - Geostat

7.2 Property Geology 

The  Property  is  situated  within  the  central  area  of  the  New  Quebec  Orogen,  straddling  two lithotectonic  zones  separated  by  a major  thrust  fault.    To  the  east  is  the  SC  Zone,  comprised  of Proterozoic paraschist, paragneiss, and amphibolites; to the west is the Gerido Zone, comprised of the Le Moyne Group, Doublet Group and the Le Moyne Intrusion (Eldor Carbonatite). 

The  older  Doublet  Group  rocks  underlay  the  Le  Moyne  Group  rocks  and  consist  of  mafic pyroclastics,  basalts,  dolomites,  and  gabbros.    The  Le  Moyne  Group  consists  of  volcanic  and sedimentary rocks of the Douay Formation (rhyolites, rhyodacites, felsic tuffs, dolomites, shales and pelites),  and  the  sedimentary  Aulneau  Formation  (conglomerate,  mudstones,  dolomite,  and dolomite tuff) which includes mafic pyroclastics coeval with the Le Moyne Intrusion.  Finally, a sub‐volcanic carbonatite intrusion (Le Moyne Intrusion or Eldor Carbonatite) was emplaced within the Le Moyne Group.    Local  structure  and  geology  indicate  the  volcanism was  violent  and may have occurred in a shallow water environment. 

The carbonatite complex has been mapped by Clark and Wares (2005) as  intrusive (massive and brecciated  ultramafic)  with marginal  extrusive  equivalents  interpreted  to  be  a  possible  volcanic apron.  This notion of extrusive carbonatite components is still a matter of debate. 

Historic  exploration  of  the  Eldor  Carbonatite  has  shown  it  to  have  an  elliptical  shape  with approximate  dimensions  of  7.3  km  long  by  3  km wide  (Sherer,  1984).   More  recently  Clark  and Wares  (2005)  suggest  a  carbonatite  extent  of  almost  double  at  15  km  long  by  4  km  wide.  Emplacement occurred near the end of the second cycle of the belts formation, approximately 1.88 ‐ 1.87 Ga (U ‐ Pb dating).  

Multiple  carbonatite  intrusive  events  are  believed  to  have  occurred  during  emplacement  of  the Eldor  Complex with  both  calco‐carbonatite  and magnesio‐carbonatite  present  (Sherer,  1984  and Wright et al., 1998). 

The  Eldor  Carbonatite  geology  is  very  complex  with  several  lithological  subdivisions proposed/identified  (Wright  et  al.,  1998)  and  separate  eruptive  centres  postulated  (Demers  and Blanchet,  2002).    Simplistically,  the  Eldor  Complex  can  be  separated  into  three major  divisions; early, mid and late stage carbonatite. The mid stage carbonatite is most closely related to tantalum‐niobium mineralization  (pyrochlore).    The  late  stage  carbonatite  crosscuts  all  earlier  phases  and hosts the REE mineralisation observed at the Ashram zone. 

 

Page 22: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 22 

SGS Canada Inc. - Geostat

Figure 7.2 – Local Geological Map 

 

 

Page 23: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 23 

SGS Canada Inc. - Geostat

8­ DEPOSIT MODEL 

The deposit model at the Eldor Property is the carbonatite‐hosted REE‐Nb‐Ta deposit. Carbonatites are by definition igneous rocks, intrusive and extrusive, which contain more than 50% by volume of carbonate minerals like calcite, dolomite, ankerite and less often siderite and magnesite. Intrusive carbonatites  occur  commonly  within  alkalic  complexes  or  as  isolated  intrusions  (sills,  dikes, breccias  or  small  plugs)  that  may  not  be  genetically  related  with  other  alkaline  intrusions. Carbonatites can also be volcanic‐related and occur as flow or pyroclastic rocks like the well known active Oldoinyo Lengai volcano in Tanzania. Carbonatites are generally related to large‐scale, intra‐plate  fractures, grabens or rifts  that correlate with periods of extension,  typically Precambrian to recent in age. 

Carbonatite‐hosted deposits occur almost exclusively  in  intrusive  carbonatite and are  subdivided into magmatic, replacement/veins, and residual sub‐type. The Eldor carbonatite can be classified as a  magmatic  sub‐type,  which  is  the  same  category  as  the  St‐Honore  deposit  in  Quebec,  Canada (Niobec  niobium  mine,  Iamgold),  the  Mountain  Pass  deposit  in  California,  U.S.A.  (REE)  and  the Palabora deposit in South Africa (apatite). The pipe‐like carbonatites typically occur as sub‐circular or elliptical shape and can be up to 3‐4 km in diametre. Magmatic mineralisation within pipe‐like carbonatites  is  commonly  found  in  crescent‐shape,  steeply  dipping  zones.  Metasomatic mineralisation  occurs  as  irregular  forms,  breccias  or  veins.  Figure  8.1  illustrates  the  concentric, steeply dipping features of a pipe‐like shapes of the St‐Honore carbonatite. 

The  major  mineral  constituents  are  calcite,  dolomite,  siderite,  ferroan  calcite,  ankerite  as carbonates,  and hematite,  biotite,  titanite,  olivine  and quartz.  Economic minerals  include  fluorite (F),  apatite  (P),  pyrochlore  (Nb),  anatase  (Ti),  columbite  (Nb‐Ta),  monazite  (REE),  bastnaesite (REE),  parisite  (REE),  zircon  (Zr),  and  magnesite  (Mg),  among  others.  Mineralisation  within carbonatites  is  typically  syn‐  to  post‐intrusion.  The  mineralisation  is  controlled  primarily  by fractional crystallisation within the intrusion with tectonic and local structures influence the form of metasomatic mineralisation which  occurs  as  veins  and  breccia  textures  (Woolley  and  Kempe, 1989, Richardson and Birkett, 1996, Birkett and Simandl, 1999). 

 

Page 24: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 24 

SGS Canada Inc. - Geostat

Figure 8.1 – Schematic Representation of St­Honore Carbonatite 

  

Image from IAMGOLD website – March 2011 

 

In  addition  to  the  carbonatite deposit model mineralised  in REE‐Nb‐Ta,  other deposit  types with known mineralised occurrences are located in the vicinity of the Property. The other deposit types includes magmatic  Cu‐Ni  (Co‐PGE)  sulfides  in mafic  and  ultramafic  intrusive  units  and  vein‐type Au‐Cu (Ag) mineralisation hosted in fractured mafic intrusive. 

Known  occurrences  of magmatic  Cu‐Ni  (Co‐PGE) mineralisation  are  located  approximately  5  km west of the Property. The most significant occurrences include: Island deposit (historical resources of 1.09 Mt @ 2.02% Cu and 0.45% Ni), Lepage deposit (historical resources of 0.79 Mt @ 2.76% Cu and 0.66% Ni), Redcliff deposit (historical resources of 1.07 Mt @ 2.09% Cu and 0.51% Ni), and the Marymac II deposit (historical resources of 0.93 Mt @ 1.60% Cu and 0.43% Ni). 

Page 25: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 25 

SGS Canada Inc. - Geostat

The known occurrences for the vein‐type Au‐Cu (Ag) mineralisation, located between 10 km and 15 km west of the Property, include the Lac Terre Rouge showing (grab sample with 24.75 g/t Au), the Lac Daubancourt showing (grab sample with 14.3 g/t Au), and the Lac Deitrich‐Sud showing (grab sample with 1.86 g/t Au) (Clark and Wares, 2005). 

 

9­ MINERALISATION 

This section summarises the observations made during the site visit and information provided by the  Company  in  particular  two  internal  reports  on  the  mineralogy  of  the  Ashram  lithologies completed  in March 2010 and March 2011 by Patrik Schmidt and Roger H. Mitchell  respectively, both consultant petrologists. 

The preliminary macroscopic  and microscopic  observations made  of  the  F‐REE mineralisation  at the Ashram deposit suggests that three significantly complex zones of mineralisation intersected in drill  holes  occurs  in  the  carbonatite: A‐Zone, B‐Zone  and BD‐Zone.  Figure 9.1  shows  a picture of representative  samples of  the different mineralisation zones  from hole EC10‐028 selected by  the author  including  the  interpreted non‐carbonatite  contact unit  (an amphibole  and phlogopite‐rich lithology). The different zones have been described by the Company consultants as follow. 

A‐Zone carbonatite  is  the most mineralised unit of  the Ashram area (with the B‐Zone) and share similarities  in  composition  and  textures  with  the  B‐Zone.  The  units  observed  in  this  zone  are typically  light  to dark olive‐grey and composed of  clasts of breunnerite  (Mg‐siderite),  fluorite or fluorite plus monazite set in a complex matrix of several generations of ferrodolomite. The unit has been  geochemically  classified  as  magnesio‐  to  ferro‐carbonatite.  The  rocks  shows  textures described as cataclastic through‐fluorite “schlieren breccias” (referred as mafic minerals, typically apatite/biotite/REE  minerals,  having  a  preferential  orientation  creating  bands  during crystallisation  of  magma).  Colloform  textures  are  also  present.  The  breccias  which  occurred  in more  than  one  stage  (potentially  due  to  deformation  or  hydrothermal  events)  are  typically composed of fluorite, late stage Fe‐rich coarse‐grained carbonates, and quartz. The most significant economic  minerals  observed  in  the  A‐Zone  and  are  monazite  (La‐Ce),  REE‐F‐carbonates (bastnaesite‐La‐Ce),  REE‐phosphates  (xenotime‐Y‐Dy),  apatite,  fluorite,  pyrite  and  sphalerite. Accessory  minerals  are  niobium  minerals  (ferrocolumbite,  niobian  ilmenite  and  rutile),  barite, magnetite and galena, among others. 

B‐Zone carbonatite shows similar mineralogy as the A‐Zone but with fewer clasts of  fluorite plus monazite and less tectonic and hydrothermal‐related textures. The units are cream‐yellow to grey‐yellow  in  colour.  The  presence  of  patches  or  pools  of  quartz‐phlogopite  is  common  and  appear distinct  from  the  A‐Zone  material.  The  unit  has  been  geochemically  classified  as  a  magnesio‐carbonatite. 

BD‐Zone  carbonatite  occurs between  the B‐Zone  and  a poorly understood  contact  lithology best described  as  an  albite‐amphibole‐phlogopite‐rich  unit.  The BD‐Zone units  are  typically  cream  to white in colour with red‐orange pervasive shades from parisite‐baesnesite mineralisation. The BD‐Zone  shows  a  relatively  consistent  composition  but  significant  variation  in  texture  is  observed from one sample to another. The unit has been geochemically classified as a magnesio‐carbonatite. 

Page 26: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 26 

SGS Canada Inc. - Geostat

In  general,  the  BD‐Zone  is  less mineralised  than  the  A‐Zone  and  B‐Zone  but  contains  a  greater variety  of  REE‐F‐carbonates  consisting  of  intergrowths  of  bastnaesite  and  parisite  with  minor synchisite. A particularity of the BD‐Zone is the presence of microcline feldspar occurring as a late stage  anhedral  crystals.  Quartz  is  also  commonly  observed.  The BD‐Zone  is  observed  in  contact with  a  relatively un‐mineralised unit whose origin  is  enigmatic.  The  lithology  is  non‐carbonatite and  is  best  described  as  an  albite  amphibole  phlogopitite  interpreted  to  be  a  metasomatised megaxenolith or a discrete intrusion genetically‐related to the Eldor carbonatite complex. 

 

Figure 9.1 – Drill Core from Hole EC10­028 Showing the A, B, BD and Contact Zones 

 

 

10­ EXPLORATION AND DRILLING 

In 2010, the Company completed exploration work on the Property consisting of diamond drilling, trenching, prospecting, ground geophysics and additional sampling of the 2008 drill core. The areas of the Property that received exploration work in 2010 were Southeast, Star Trench, MC Exposure but specifically Ashram where significant REE mineralisation was discovered in 2009. In addition, other periphery targets received initial ground evaluations. 

The BTW size diamond drilling completed on the Property during 2010 totals 5,390 m with 4 holes drilled at Southeast, 3 at Star Trench, 2 at MC Exposure and  finally 12 holes  in  the Ashram area. 

Page 27: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 27 

SGS Canada Inc. - Geostat

From the drilling completed, a total of 5,882 samples were collected for analysis from which 3297 were sampled in the Ashram drill core. Table 10.1 summarises the drilling completed at Eldor by Commerce since 2008. Figure 10.1 shows a plan view of the drilling completed at Ashram in 2010. 

 

Table 10.1 – Summary of Drilling Completed at Eldor by Commerce 

 

 

Year Area of the Property Number of Holes Total Metres Drilled

Northwest 12 2466

Southeast 13 2846

Star Trench 1 170

Total (2008) 26 5482

Southeast 4 1392

Star Trench 3 494

MC Exposure 2 192

Ashram  12 3313

Total (2010) 21 5390

47 10872

2008

2010

Grand‐Total

Page 28: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 28 

SGS Canada Inc. - Geostat

Figure 10.1 – Plan View of the Drilling in the Ashram REE zone at the Eldor Property 

 

 

In  addition  to  the  diamond  drilling,  the  Company  conducted  additional  core  sampling  from  the 2008 drilling (469 samples for 479.96 m), ground magnetic surveying in the Star Trench area (<1.5 km  area),  trenching  (1  trench  near  Ashram  area,  2  trenches  near  Star  Trench  area  and  3  sub‐parallel trenches at Miranna), and prospecting. The 2010 Data regarding trenches, ground magnetic surveys, and prospecting samples is still being compiled and remains unvetted.  Therefore, the total number of  samples  collected  from  trenches  and prospecting  is not  confirmed as  several  samples were also collected from trenches excavated in 2008. 

 

11­ SAMPLING METHOD AND APPROACH 

This  section  is  based  on  information  supplied  by  Commerce  and  observations  made  during  the independent verification program conducted at  the Project  site by  the author between October 4 and 6, 2010. 

Page 29: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 29 

SGS Canada Inc. - Geostat

The  Company  contracted  Dahrouge  Geological  Consulting  Ltd  for  the  management  of  the exploration work for the Eldor Property. Exploration work at the Property is managed from a field camp which provides the office, core logging and core storage facilities for the Project. 

The evaluation of  the geological setting and mineralisation on the Property  includes observations and sampling from surface (through mapping, grab samples, and trenches) but is principally based on  information  and  sampling  from  diamond  drilling.  The  drill  core  logging  and  sampling  was conducted  at  the  Property.  All  samples  collected  by  Commerce  during  the  course  of  the  2010 exploration program were sent to Activation Laboratories Ltd (“Act Labs”) in Ancaster, Ontario, for preparation  and  analysis.  The  remaining  drill  core  is  currently  stored  at  the  storage  facilities located at the Eldor main camp. 

All  drill  core  handling  was  done  on  site  with  logging  and  sampling  processes  conducted  by employees  and  contractors  of  Commerce  or  Dahrouge.  The  observations  of  lithology,  structure, mineralisation, sample number and location were recorded by the geologists and geotechnicians in hard copy then compiled in MS Excel. Copies of the database are stored on external hard drive for security. 

Drill core of BTW size was placed in a wooden core boxes and collected twice a day at the drill site then  transported  to  the core  logging  facilities. The drill  core was  first aligned and measured by a technician  for  core  recovery.  After  a  summary  review  of  the  core,  it  was  logged  and  sampling intervals were defined by a geologist. Before sampling, the core was photographed using a digital camera in natural light and UV light (black light) to outline the florescent minerals. The core boxes were identified with Box Number, Hole ID, From and To using aluminum tags. 

Sampling intervals were determined by the geologist, marked and tagged based on observations of the  lithology  and  mineralisation.  The  geologists  also  use  a  portable  XRF  analyser,  a  handheld magnetic susceptibility/conductivity probe, a handheld gamma‐ray scintillometer, and a handheld spectrometer  to  help  identify  the  lithologies  and  define  the  mineralised  intervals.  The  typical sampling  length  is  1  m  but  can  vary  according  to  lithological  variation  within  the  mineralised carbonatite. The drill core samples were split in two halves with one half placed in a new plastic bag along with the sample tag; the other half was replaced in the core box. The author noted that the Company is not placing a duplicate sample tag in the core box. It has been recommended to change the procedure in order to place a sample tag in the core box for reference. The remaining duplicate sample tag was archived with the Project documents. The samples were then catalogued and placed in  sealed  pails  for  shipping.  The  sample  shipment  forms  were  prepared  on  site  with  one  copy inserted  in  one  of  the  shipment  bags  and  one  copy  kept  for  reference.  The  samples  were transported  on  a  regular  basis  by  Commerce  or  Dahrouge  employees  or  contractors  using  two preferred routes. The first shipping route consisted in sending the samples on chartered float plane to Kuujjuaq, using First Air Cargo to Montreal then ground transportation to Act Labs at Ancaster, Ontario.    The  second  route was  through Schefferville  using  float  plane,  by  train  to  Sept‐Iles  then ground  transportation  to  Ancaster.  The  remaining  core  samples  kept  for  reference  are  stored  in wooden racks or cross piled at the main camp. 

SGS Geostat validated the exploration processes and core sampling procedures used by Commerce as part of an independent verification program. SGS Geostat concluded that the drill core handling, 

Page 30: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 30 

SGS Canada Inc. - Geostat

logging  and  sampling  protocols  are  at  conventional  industry  standard  and  conform  to  generally accepted best practices. The author considers that the samples quality is good and that the samples are generally representative. Finally, SGS Geostat is confident that the system is appropriate for the collection of data suitable for the estimation of a NI 43‐101 compliant mineral resource estimate. 

12­ SAMPLE PREPARATION, ANALYSIS AND SECURITY 

12.1 Sample Preparation and Analyses 

Drill  core  samples  collected during  the 2010  exploration program are  transported by Commerce representatives  and  contracted  consultants  or  companies  to  Act  Labs  laboratory  facilities  in Ancaster, Ontario for sample preparation and analysis. 

All samples received at Act Labs are inventoried then weighted. Drying is done to samples having excess humidity. Sample material is crushed in a jaw and/or roll crusher to 70% passing 2 mm then split with a rifle splitter to obtain a sub‐sample which is then pulverised to 95% passing 200 mesh using a  single component  (flying disk) or a  two components  (ring and puck)  ring mills. The pulp material  is  then  analysed  using  lithium  metaborate/tetraborate  fusion  followed  by  Inductively Coupled Plasma (“ICP”) for the major oxides and by Inductively Coupled Plasma Mass Spectrometry (“ICP‐MS”)  for  a  series  of  45  elements which  include  the  REE  (Act  Labs  code  8‐REE  package  by fusion  ICP and  ICP/MS). When  the value of  the Nb2O5  returned higher  than 0.3%,  the  samples  is analysed by fusion X‐ray fluorescence (“XRF”). The element F is analysed using fusion ion selective electrode (“ISE”) (Act Labs code 4‐F‐ISE). Act Labs is an accredited laboratory under ISO/IEC 17025 standards. 

The re‐analysis of the pulp materials were conducted at Inspectorate Exploration & Mining Services Ltd  –  Analytical  Division  Facilities  (“Inspectorate”)  in  Richmond,  B.C.  and  ALS  Canada  Ltd laboratories  in  North  Vancouver,  B.C.  (“ALS  Chemex”),  although  none  of  the  analytical  results returned from ALS Chemex were compiled and available at the time of writing the report. The pulp samples sent to Inspectorate were directly analysed by lithium metaborate fusion followed by ICP‐MS.  Inspectorate  is  an accredited  laboratory under  ISO 9001:2008 and  is  in  the process of being accredited for ISO/IEC 17025. 

The  independent  check  samples  were  analysed  at  the  SGS  Canada  Inc.  –  Minerals  Services laboratory  located  in  Toronto,  Ontario  (“SGS Minerals”).  The  samples  were  crushed,  split  riffled then pulverised  to 200 mesh. The pulps  are  then analysed using  lithium metaborate  followed by ICP‐MS (SGS Minerals code IMS95A). SGS Minerals is an accredited laboratory under ISO/IEC 17025 standards.  The  pulps  of  the  independent  check  samples  were  re‐analysed  at  ALS  Chemex laboratories  in  North  Vancouver,  B.C.  (“ALS  Chemex”).  The  pulps  were  analysed  using  lithium metaborate fusion followed by ICP‐MS (ALS Chemex code ME‐MS81). ALS Chemex is an accredited laboratory under ISO/IEC 17025 standards. 

The analytical protocols  for Act Labs,  Inspectorate, SGS Minerals and ALS Chemex are detailed  in Appendix D. 

 

Page 31: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 31 

SGS Canada Inc. - Geostat

12.2 Quality Assurance and Quality Control Procedure 

Above the laboratory quality assurance quality control protocol (“QA/QC”) routinely conducted by Act  Labs  using  pulp  duplicate  analysis,  Commerce  implemented  an  internal  QA/QC  protocol consisting  in  the  insertion  of  reference  material,  analytical  standards  and  blanks,  and  core duplicates on a systematic basis with the samples shipped to Act Labs. The company also sent pulps from selected mineralised intersection to Inspectorate for re‐analysis. SGS Geostat did not visit the Act Labs facilities, or conduct an audit of the laboratories. 

 

12.2.1 Analytical Standards 

The  Company  used  two  different  certified  analytical  standards  in  their  internal  QA/QC  protocol. The  analytical  standards  are  certified  reference  materials  number  SX18‐01  and  SX18‐05  from Dillinger Hutte Laboratory, Germany. The standards are  inserted  in  the sample series at a rate of one for every 25 samples. 

Expected values are provided with each certified reference materials. Unfortunately,  the expected variance,  also  known  as  performance  gates,  is  not  readily  available  with  the  certified  reference materials and the information could not be retrieved from the manufacturer or reseller at the time of writing the report. In order to evaluate the results of the two analytical standards of the Project, the  QA/QC warning  threshold  has  been  set  to  plus  or minus  10%  difference  from  the  expected values  and  the  QA/QC  failure  to  plus  or  minus  15%  difference  from  the  expected  values.  The selected  QA/QC  warning  and  failure  thresholds  could  be  considered  conservative  based  on comparison  with  other  similar  certified  reference  materials  available  from  Ore  Research  & Exploration Pty Ltd, Australia. For the OREAS certified reference materials 101A, 101B, and 100A, which included the element Y, La, Ce, Nd of comparable quantities, the reported performance gates for  2  standard  deviation  (QA/QC  warning)  ranges  between  8%  and  20%  and  for  3  standard deviation (QA/QC failure) ranges between 12% and 30%. Table 12.1 shows the expected values and QA/QC  failure  and warning  thresholds  and  Table  12.2  summarises  the  reported  results  for  each analytical  standards.  Figures  12.1  and  12.2  are  graphs  showing  the  variation  of  the  reported analytical results with time for analytical standards SX18‐01 and SX18‐05 respectively. 

 

Page 32: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 32 

SGS Canada Inc. - Geostat

Table 12.1 – Expected Values and QA/QC Ranges of SX18­01 and SX18­05 Analytical Standards for Y, La, Ce, Nd and Nb2O5 

 

 

Table 12.2 ­ Summary Statistics of SX18­01 and SX18­05 Analytical Standards for Y, La, Ce, Nd and Nb2O5 

 

 

Failure (-15%) Warning (-10%) Mean Warning (+10%) Failure (+15%)

Y (ppm) 114 120 134 147 154

La (ppm) 304 322 358 394 412

Ce (ppm) 689 730 811 892 933

Nd (ppm) 372 394 437 481 503

Nb2O5 (%) 0.591 0.626 0.695 0.765 0.799

Y (ppm) 197 209 232 256 267

La (ppm) 426 451 501 552 577

Ce (ppm) 929 984 1093 1202 1257

Nd (ppm) 434 460 511 562 588

Nb2O5 (%) 0.827 0.876 0.973 1.070 1.119

Standard ElementExpected Values and QAQC Ranges

SX18-01

SX18-05

From To Mean Std Dev Min Max Count % Count %

Y (ppm) 94 124 5 106 136 21 22% 1 1%

La (ppm) 94 364 16 332 407 7 7% 0 0%

Ce (ppm) 94 800 26 729 868 1 1% 0 0%

Nd (ppm) 94 393 15 354 425 43 46% 6 6%

Nb2O5 (%) 71 0.685 0.017 0.639 0.731 0 0% 0 0%

Y (ppm) 89 232 9 208 249 1 1% 0 0%

La (ppm) 89 468 16 430 508 14 16% 0 0%

Ce (ppm) 89 993 33 890 1090 30 34% 2 2%

Nd (ppm) 89 460 18 426 518 42 47% 5 6%

Nb2O5 (%) 65 0.973 0.011 0.94 0.997 0 0% 0 0%

QAQC Warning Range QAQC Failure Range

17-Jan-11

StandardPeriod

Element CountObserved

SX18-01

SX18-05

27-Jul-10 17-Jan-11

27-Jul-10

Page 33: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 33 

SGS Canada Inc. - Geostat

Figure 12.1 ­ Variation of Reported Values with Time for Analytical Standard SX18­01 

 

 

100

110

120

130

140

150

160

Y (ppm)

Eldor Property ‐ SX18‐01 Standard ‐ Y (ppm)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

300

320

340

360

380

400

420

La (ppm)

Eldor Property ‐ SX18‐01 Standard ‐ La (ppm)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

600

650

700

750

800

850

900

950

1000

Ce (ppm)

Eldor Property ‐ SX18‐01 Standard ‐ Ce (ppm)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

350

370

390

410

430

450

470

490

510

Nd(ppm)

Eldor Property ‐ SX18‐01 Standard ‐ Nd (ppm)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

0.58

0.63

0.68

0.73

0.78

Nb2O5 (%

)

Eldor Property ‐ SX18‐01 Standard ‐ Nb2O5 (%)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

Page 34: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 34 

SGS Canada Inc. - Geostat

Figure 12.2 ­ Variation of Reported Values with Time for Analytical Standard SX18­05 

 

 

Reported  values  for  analytical  standard  SX18‐01  show  good  correspondence  for  elements  La,  Ce and Nb2O5 compared with the expected value. But elements Y and Nd suggest some analytical issue with  average  values  7.5%  and  10%  lower  respectively  than  the  expected  values.  The  values reported  for Y are all within  the defined QA/QC  thresholds except  for one  failure which  shows a difference of 20.9%. The values for Nd are within the defined QA/QC threshold except for 6 failures showing differences up to 19%.  

Reported  values  for  analytical  standard  SX18‐05  show  good  correspondence  for  elements  Y  and Nb2O5 compared with the expected value. But elements La, Ce and Nd suggest some analytical issue 

190

200

210

220

230

240

250

260

270

280

Y (ppm)

Eldor Property ‐ SX18‐05 Standard ‐ Y (ppm)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

400

420

440

460

480

500

520

540

560

580

600

La (ppm)

Eldor Property ‐ SX18‐05 Standard ‐ La (ppm)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

800

850

900

950

1000

1050

1100

1150

1200

1250

1300

Ce (ppm)

Eldor Property ‐ SX18‐05 Standard ‐ Ce (ppm)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

400

420

440

460

480

500

520

540

560

580

600

Nd(ppm)

Eldor Property ‐ SX18‐05 Standard ‐ Nd (ppm)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

0.7

0.75

0.8

0.85

0.9

0.95

1

1.05

1.1

1.15

1.2

Nb2O5 (%

)

Eldor Property ‐ SX18‐05 Standard ‐ Nb2O5 (%)

Failure (+15%)

Failure (‐15%)

Warning (‐10%)

Warning (+10%)

Expected Value

Page 35: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 35 

SGS Canada Inc. - Geostat

with  average  values  6.5%, 9% and 10%  lower  respectively  than  the  expected values. The  values reported  for  La  are  all  within  the  defined  QA/QC  thresholds.  The  values  for  Nd  are  within  the defined QA/QC threshold except for 2 failures showing differences up to 18.5%. The values for Nd are within the defined QA/QC threshold except for 5 failures showing differences up to 16.5%. 

After  a  review  of  the  QA/QC  failures  for  SX18‐01  and  SX18‐05,  the  differences  observed  are considered acceptable based on the variance typically returned for REE analytical data which can be in the order of 25% to 30%. 

We  can note  that  the  analytical  standards  used  by  the Company during  the  2010 work program have  certified  values  reported  for  La,  Ce  and  Nd  which  are  LREE.  Unfortunately,  the  analytical standards  do  not  report  certified  value  for  IREE  or  HREE.  The  author  recommends  inserting additional analytical standards which include certified values for IREE and HREE. 

12.2.2 Analytical Blanks 

Commerce  implemented  the  insertion  of  analytical  blanks  in  the  sample  series  as  part  of  their internal  QA/QC  protocol.  The  material  use  for  the  blanks  is  coming  from  a  nearby  quartz  vein located approximately 2‐3 km from the Ashram deposit. Blanks are inserted at a rate of one blank for every 25 samples in the sample series. 

A  total  of  199  blanks were  inserted  in  the  sample  series  corresponding  to  5.6%  of  the  samples analysed.  A  review  of  the  analytical  data  for  the  blanks  showed  that  all  the  blanks  analysed returned  a  low  and  variable  amount  of  REE  (but  also  other  elements  related  to  typical  felsic intrusive systems like Ba, Sr and Th) sometime orders of magnitude above the detection limit of the analytical method. 

After  a  more  detailed  examination  of  the  blanks  data  and  discussion  with  the  Company representatives, it was concluded that the quartz vein use as analytical blank in the QA/QC protocol was  indeed  mineralised  in  REE  and  could  not  be  considered  a  proper  analytical  blank.  The geochemical  values  returned  from  the  quartz  veins  could  suggest  that  the  material  could  be genetically related to the carbonatite system or other felsic intrusion in the area. 

As  part  of  the  laboratory  QA/QC  protocol,  Act  Labs  is  inserting  analytical  blanks  in  the  samples series. A review of the results from the laboratory blanks inserted by Act Labs shows that all blanks returned values below detection limit suggesting that there is no systematic contamination of the samples. 

The author recommends modifying the Project QA/QC protocol with the use of certified analytical blanks instead of the currently used analytical blanks collected from a nearby quartz vein. 

 

12.2.3 Drill Core Duplicates 

As  part  of  the  Company  QA/QC  protocol,  quarter  core  duplicates  from  196  core  samples  were included in the Project sample series sent to Act Labs. The drill core duplicates are inserted in the sample  series  at  an  average  rate  of  one  duplicate  for  every  25  samples.  For  the  196  duplicates 

Page 36: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 36 

SGS Canada Inc. - Geostat

analysed, 53% returned  a TREE+Y values  greater  for  the original  sample, 60% returned a Nb2O5 

values greater for the original sample, and 51% returned a F values greater for the original sample  compare  to  the  duplicate.  The  relative  percent  difference  (“RPD”)  between  the  original  and duplicate analytical values averages 7% for TREE+Y with a range between 0% and 77%, averages 20% for Nb2O5 with a range between 0% and 184%, and averages 26% for F with a range between 0% and 181%. In general, the drill core duplicate samples show a fair to good correlation with the original  samples.  The  variability  between  the  original  and  duplicate  samples  can  be  considered acceptable  for  the  REE  with  the  average  RPD  for  all  individual  elements  falling  within  10%, although  some  individual  elements  present  a  greater  variability  than  others.  The  variability  is significantly higher  for Nb2O5 and F with  the average RPD of 20% and 26% respectively, but can still  be  considerate  in  the  acceptable  range  for  drill  core  duplicate.  Table  12.3  summarises  the comparatives statistics of the drill core duplicates for the individual REE including TREE+Y, Nb2O5 and F. Figures 12.3, 12.4, 12.5 show correlation plots of the drill core duplicates for TREE+Y, Nb2O5 and F respectively. 

 

Table 12.3 – Comparative Statistics for the Drill Core Duplicates 

 

 

Count % Count % Mean Min MaxLa 195 88 45.1% 107 54.9% 8% 0% 77%Ce 195 92 47.2% 103 52.8% 7% 0% 80%Pr 195 96 49.2% 99 50.8% 7% 0% 78%Nd 195 98 50.3% 97 49.7% 7% 0% 74%Sm 195 88 45.1% 107 54.9% 7% 0% 61%Eu 195 87 44.6% 108 55.4% 7% 0% 56%Gd 195 85 43.6% 110 56.4% 8% 0% 49%Tb 195 79 40.5% 116 59.5% 8% 0% 35%Dy 195 85 43.6% 110 56.4% 8% 0% 39%Ho 195 79 40.5% 116 59.5% 9% 0% 44%Er 195 82 42.1% 113 57.9% 10% 0% 45%Tm 195 84 43.1% 111 56.9% 9% 0% 49%Yb 195 78 40.0% 117 60.0% 9% 0% 45%Lu 195 82 42.1% 113 57.9% 2% 0% 10%Y 195 88 45.1% 107 54.9% 8% 0% 40%

TREE+Y 195 92 47.2% 103 52.8% 7% 0% 77%Nb2O5 111 44 39.6% 67 60.4% 20% 0% 184%

F 195 95 48.7% 100 51.3% 26% 0% 181%

Original ≥ Duplicate Relative Percentage DifferenceTotal samples

Original < Duplicate

Page 37: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 37 

SGS Canada Inc. - Geostat

Figure 12.3 – Correlation Plot of the Drill Core Duplicates for TREE+Y 

 

 

Figure 12.4 – Correlation Plot of the Drill Core Duplicates for Nb2O5 

 

 

0

5000

10000

15000

20000

25000

30000

35000

0 5000 10000 15000 20000 25000 30000 35000

Duplicate  ‐TREE+Y  (ppm)

Original  ‐ TREE+Y (ppm)

Core Duplicate ‐ Eldor Project

+20%

‐20%

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

Duplicate  ‐Nb2O5  (%)

Original  ‐ Nb2O5 (%)

Core Duplicate ‐ Eldor Project

+20%

‐20%

Page 38: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 38 

SGS Canada Inc. - Geostat

Figure 12.5 – Correlation Plot of the Drill Core Duplicates for F 

 

 

12.2.4 Pulp Duplicates 

Commerce conducted some re‐analysis of pulp material of mineralised samples selected from hole EC10‐28.  The  re‐analysis  were  completed  by  Inspectorate  A  total  of  15  pulps  were  sent  to Inspectorate for a duplicate analysis using a similar analytical protocol. Table 12.4 summarises the comparative statistics of the pulp duplicates for the individual REE including TREE+Y. Figures 12.6 to 12.9 shows correlation plots of TREE+Y, Y, and the individual REE. 

 

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.0011.0012.00

Duplicate  ‐F  (%)

Original  ‐ F (%)

Core Duplicate ‐ Eldor Project

+20%

‐20%

Page 39: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 39 

SGS Canada Inc. - Geostat

Table 12.4 –Statistics for the Pulp Duplicates (Act Labs vs. Inspectorate) 

 

 

Count % Count % Mean Min MaxLa 15 6 40.0% 9 60.0% 10% 2% 20%Ce 15 3 20.0% 12 80.0% 16% 0% 30%Pr 15 7 46.7% 8 53.3% 8% 0% 21%Nd 15 4 26.7% 11 73.3% 11% 0% 35%Sm 15 3 20.0% 12 80.0% 11% 3% 26%Eu 15 14 93.3% 1 6.7% 9% 1% 28%Gd 15 15 100.0% 0 0.0% 18% 3% 64%Tb 15 6 40.0% 9 60.0% 6% 0% 15%Dy 15 15 100.0% 0 0.0% 14% 3% 27%Ho 15 14 93.3% 1 6.7% 8% 1% 22%Er 15 15 100.0% 0 0.0% 10% 2% 24%Tm 15 14 93.3% 1 6.7% 12% 0% 25%Yb 15 12 80.0% 3 20.0% 7% 0% 25%Lu 15 4 26.7% 11 73.3% 13% 2% 32%Y 15 15 100.0% 0 0.0% 10% 2% 22%

TREE+Y 15 3 20.0% 12 80.0% 12% 1% 33%

CountOriginal < Duplicate Original ≥ Duplicate Relative Percentage Difference

Page 40: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 40 

SGS Canada Inc. - Geostat

Figure 12.6 ­ Correlation Plot of the Pulp Duplicates for TREE+Y, Y, La and Ce (ActLabs vs. Inspectorate) 

 

 

0

5000

10000

15000

20000

25000

30000

35000

40000

0 5000 10000 15000 20000 25000 30000 35000 40000

TREE+Y (ppm) ‐ActLabs

TREE+Y (ppm) ‐ Inspectorate

Pulp Duplicates  (TREE+Y)  ‐ Eldor Project

+20%

‐20%

0

100

200

300

400

500

600

0 100 200 300 400 500 600Y (ppm) ‐ActLabs

Y (ppm) ‐ Inspectorate

Pulp Duplicates (Y) ‐ Eldor Project

+20%

‐20%

0

2000

4000

6000

8000

10000

12000

0 2000 4000 6000 8000 10000 12000

La (ppm) ‐ActLabs

La (ppm) ‐ Inspectorate

Pulp Duplicates (La) ‐ Eldor Project

+20%

‐20%

0

5000

10000

15000

20000

0 5000 10000 15000 20000

Ce (ppm) ‐ActLabs

Ce (ppm) ‐ Inspectorate

Pulp Duplicates (Ce) ‐ Eldor Project

+20%

‐20%

Page 41: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 41 

SGS Canada Inc. - Geostat

Figure 12.7 ­ Correlation Plot of the Pulp Duplicates for Pr, Nd, Sm and Eu (ActLabs vs. Inspectorate) 

 

 

0

300

600

900

1200

1500

1800

0 300 600 900 1200 1500 1800

Pr (ppm) ‐ActLabs

Pr (ppm) ‐ Inspectorate

Pulp Duplicates (Pr) ‐ Eldor Project

+20%

‐20%

0

1000

2000

3000

4000

5000

0 1000 2000 3000 4000 5000

Nd (ppm) ‐ActLabs

Nd (ppm) ‐ Inspectorate

Pulp Duplicates (Nd) ‐ Eldor Project

+20%

‐20%

0

100

200

300

400

500

0 100 200 300 400 500

Sm (ppm) ‐ActLabs

Sm (ppm)  ‐ Inspectorate

Pulp Duplicates (Sm) ‐ Eldor Project

+20%

‐20%

0

20

40

60

80

100

120

0 20 40 60 80 100 120

Eu (ppm) ‐ActLabs

Eu (ppm) ‐ Inspectorate

Pulp Duplicates (Eu) ‐ Eldor Project

+20%

‐20%

Page 42: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 42 

SGS Canada Inc. - Geostat

Figure 12.8 ­ Correlation Plot of the Pulp Duplicates for Gd, Tb, Dy and Ho (ActLabs vs. Inspectorate) 

 

 

0

50

100

150

200

250

300

350

0 50 100 150 200 250 300 350

Gd (ppm) ‐ActLabs

Gd (ppm) ‐ Inspectorate

Pulp Duplicates (Gd) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

25

30

35

0 5 10 15 20 25 30 35

Tb (ppm) ‐ActLabs

Tb (ppm) ‐ Inspectorate

Pulp Duplicates (Tb) ‐ Eldor Project

+20%

‐20%

0

20

40

60

80

100

120

140

0 20 40 60 80 100 120 140

Dy (ppm) ‐ActLabs

Dy (ppm) ‐ Inspectorate

Pulp Duplicates (Dy) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

25

0 5 10 15 20 25

Ho (ppm) ‐ActLabs

Ho (ppm) ‐ Inspectorate

Pulp Duplicates (Ho) ‐ Eldor Project

+20%

‐20%

Page 43: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 43 

SGS Canada Inc. - Geostat

Figure 12.9 ­ Correlation Plot of the Pulp Duplicates for Er, Tm, Yb and Lu (ActLabs vs. Inspectorate) 

 

 

A  review  of  the  results  for  the  pulp  duplicates  analysed  at  Inspectorate  shows  a  correlation between  the  two  laboratories  but  outlined  some  issues  with  the  pulp  duplicates  results.  As observed  with  the  independent  check  samples  (please  refer  to  section  13  for  details  on  the independent check samples program), potential analytical bias can be observed for some elements. The sign test conducted on the Act Labs vs. the Inspectorate analytical dataset suggests a potential positive bias toward Act Labs for Ce, Nd, Sm, and Lu but shows a potential negative bias for Eu, Gd, Dy, Ho, Er, Tm, Yb and Y. Elements La, Pr and Tb does not show any significant analytical bias. The variability  in the data  is significant with average RPD between Act Labs and Inspectorate ranging 

0

10

20

30

40

50

60

0 10 20 30 40 50 60

Er (ppm) ‐ActLabs

Er (ppm)  ‐ Inspectorate

Pulp Duplicates (Er) ‐ Eldor Project

+20%

‐20%

0

1

2

3

4

5

6

7

0 1 2 3 4 5 6 7

Tm (ppm) ‐ActLabs

Tm (ppm)  ‐ Inspectorate

Pulp Duplicates (Tm) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

25

30

35

0 5 10 15 20 25 30 35

Yb (ppm) ‐ActLabs

Yb (ppm)  ‐ Inspectorate

Pulp Duplicates (Yb) ‐ Eldor Project

+20%

‐20%

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5

Lu (ppm) ‐ActLabs

Lu (ppm) ‐ Inspectorate

Pulp Duplicates (Lu) ‐ Eldor Project

+20%

‐20%

Page 44: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 44 

SGS Canada Inc. - Geostat

from 6% up to 16% for the different REE. This variation in the analytical data is also observed in the results of the core duplicates and the independent check samples. 

The  results  of  the  pulp  duplicates  outline  potential  analytical  bias  between  Act  Labs  and Inspectorate, although the number of samples re‐analysed is not significant enough to confirm the trend. Additional re‐analysis of pulp materials  from mineralised samples should be carried out to increase  the  confidence  level  of  the  analysis.  Potential  analytical  biases  are  also  observed  in  the results of the independent check samples. But as with the data returned from SGS Minerals and ALS Chemex,  some  elements  show  contradictory  results.  The  pulp  duplicates  data  correlation  for elements Eu, Tb,  Yb  and Y  show differences  compare  to Act  Labs  –  SGS Minerals  results.  Similar observations  are  outlined  for  elements  La,  Pr,  Eu,  Gd,  Er  and  Y  where  contradictory  potential analytical biases are shown in the Act Labs – ALS Chemex results versus the correlations observed for  the  pulp  duplicates.  Based  on  the  pulp  duplicates  results  and  considering  the  contradictory behaviour observed in some elements compared to the results of the independent check sampling program,  we  can  conclude  that  the  outlined  biases  are  not  systematic  for  all  REE  and  could principally be due to the  imprecision of the analytical methods currently available on the market. The author recommends including systematic re‐analysis of pulp materials for mineralised samples in the internal QA/QC protocol of the company in order to help monitor the quality of the analytical data of the Project. 

 

12.2.5 QA/QC Conclusion 

As part of the 2010 work program at Ashram, Commerce implemented an internal QA/QC protocol consisting  in  the  insertion  of  reference  materials  in  the  samples  series  (certified  analytical standards  and  blanks).  The  QA/QC  program  also  included  analysis  of  core  duplicates  on  a systematic  basis  and  the  re‐analysis  of  selected  sample  pulp  duplicates  in  a  second  analytical laboratory for verification. 

Reported  results  for  the  certified  analytical  standards  for  the  2010  drill  program  show  a  good correlation  with  expected  mean  values  except  for  some  elements  where  lower  average  values ranging  between  6.5%  and  10%  are  reported  compared  to  the  expected  values  of  the  analytical standards which includes some QA/QC failures. After a review of the QA/QC failures, the differences in value observed are  in  the  range of variance  typically  returned  for REE analytical data  and are considered acceptable. The author recommends adding certified analytical standards with reported values for IREE and HREE. 

A review of  the analytical data  for the blanks showed that all  the blanks analysed returned a  low and variable amount of mineralisation. A more detailed examination of the blanks data concluded that the material use as analytical blank in the QA/QC protocol was indeed mineralised in REE and could not be considered a proper analytical blank. After reviewing the  laboratory blanks  inserted Act  Labs  in  the  samples  series,  the  author does  not  suspect  any  systematic  contamination of  the samples but recommends replacing the current blanks with certified analytical blanks.  

The results for the drill core duplicates show a good correlation with the original analytical values and acceptable data variance. The re‐analysis of pulp duplicate from selected mineralised samples 

Page 45: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 45 

SGS Canada Inc. - Geostat

outlined potential analytical bias for some elements. The observed potential biases, which are also observed in the independent check samples results, are positive for some elements and negative for others. The author suggests that the observed potential analytical biases could be due principally to the imprecision of the analytical methods. 

It  is  the  author’s  and  SGS  Geostat’s  opinion  that  Commerce  is  operating  according  to  industry standard QA/QC protocol for the insertion of control certified reference materials into the stream of samples for the Project. The data is considered of sufficient quality to be used for mineral resource estimation. 

 

12.3 Specific Gravity 

As part of the independent data verification program, SGS Geostat conducted specific gravity (“SG”) measurements on 40 mineralised core samples collected from drill holes EC10‐027 and EC10‐028. The measurements were performed using the water displacement method (weight in air / volume of water displaced) on representative half core pieces weighting between 0.57 kg and 1.32 kg with an  average  of  0.97 kg. The  results  from  the measurements  reported  an  average  SG value of  3.02 t/m3 (Table 12.5). 

 

Table 12.5 –Specific Gravity Statistics from Independent Check Sampling Program 

 

 

As part of their exploration protocol, Commerce is conducting systematic measurement of the SG on drill core samples at an average rate of one SG measurement for approximately every 6 samples. A total  of  449  SG  readings  were  collected  from  the  Ashram  drill  core  representing  approximately 12.7% of  the overall  samples collected during  the 2010 drill program. The SG measurements are conducted at  the Project’s core  logging  facilities using  the water displacement method (weight  in air / (weight in air‐weight in water)) on representative core pieces before the sampling procedure. Table 12.6 summarises the statistics of the SG measurements collected by Commerce at Ashram in 2010. Figure 12.10 shows a histogram of  the SG measurements done by Commerce at Ashram  in 2010. 

 

Count 40

Mean 3.02

Std Dev 0.09

Relative Std Dev 3.1%

Minimum 2.87

Median 3.00

Maximum 3.25

Eldor Project ‐ Ashram Carbonatite S.G. (t/m3)

Page 46: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 46 

SGS Canada Inc. - Geostat

Table 12.6 –Specific Gravity Statistics from Commerce 2010 Exploration Program 

 

 

Figure 12.10 – Histogram of Specific Gravity Measurements by Commerce at Ashram 

 

 

The SG values returned by Commerce from the 2010 exploration program at Ashram are consistent with the independent SG measurements completed by SGS Geostat as part of the data verification program. Based on SG values dataset, a value of 3.0  t/m3 was set as  the average SG value  for  the Ashram mineralised  carbonatite.  This  average  SG  value  is  use  to  calculate  the mineral  resource tonnage from the volumetric estimates of the resource block model. 

 

Count 449

Mean 3.03

Std Dev 0.16

Relative Std Dev 5.2%

Minimum 1.74

Median 3.02

Maximum 4.28

Eldor Project ‐ Ashram Carbonatite S.G. (t/m3)

0

20

40

60

80

100

120

140

160

180

1.7 1.9 2.1 2.3 2.5 2.7 2.9 3.1 3.3 3.5 3.7 3.9 4.1 4.3

Frequency

SG (t/m3)

Eldor Project ‐ Ashram Specific Gravity Data

Page 47: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 47 

SGS Canada Inc. - Geostat

12.4 Conclusions 

SGS  Geostat  completed  a  review  of  the  sample  preparation  and  analysis  including  the  QA/QC analytical protocol implemented by Commerce for the Project. The Author visited the Company on‐site  core  logging  facilities  between  October  4  and  6,  2010  to  review  the  Company  sample preparation procedures. A statistical analysis of the QA/QC data for the Project outlined only minor issues.  The  author  recommends  replacing  the  current  analytical  blanks  with  certified  analytical blanks and adding certified analytical standards with reported values for IREE and HREE. 

The  author  and SGS Geostat  are of  the opinion  that  the  sample preparation,  analysis  and QA/QC protocol used by Commerce for the Eldor project follow generally accepted industry standards and that the Project data is of quality sufficient to be used for mineral resource estimation. 

 

13­ DATA VERIFICATION 

As part of  the data verification program, SGS Geostat completed  independent analytical checks of drill core duplicate samples taken from Commerce’s 2010 diamond drilling program.  SGS Geostat also  verification  of  the  laboratories  analytical  certificates  and  validation  of  the  project  digital database supplied by Commerce were verified for errors or discrepancies.  

During a  site visit  conducted between October 4 and 6, 2010,  a  total of 40 mineralised drill  core duplicates  were  collected  from  holes  EC10‐027  and  EC10‐028  by  the  author  and  submitted  for analysis at the SGS Minerals laboratory in Toronto. Certified reference materials were included in the sample series.   The core duplicates were processed using the 31 elements lithium metaborate fusion with ICP‐MS finish analytical protocol described in section 12.1. Table 13.1 summarises the comparatives statistics of the independent check samples for the individual REE including TREE+Y. Figures 13.1 to 13.4 shows correlation plots of the TREE+Y, Y and the individual REE. 

 

Page 48: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 48 

SGS Canada Inc. - Geostat

Table 13.1 –Statistics for the Independent Check Samples (Act Labs vs. SGS Minerals) 

 

 

Count % Count % Mean Min MaxLa 40 10 25.0% 30 75.0% 11% 0% 29%Ce 40 4 10.0% 36 90.0% 13% 0% 29%Pr 40 11 27.5% 29 72.5% 9% 0% 24%Nd 40 2 5.0% 38 95.0% 16% 2% 38%Sm 40 2 5.0% 38 95.0% 14% 0% 32%Eu 40 10 25.0% 30 75.0% 6% 0% 16%Gd 40 0 0.0% 40 100.0% 24% 3% 51%Tb 40 40 100.0% 0 0.0% 34% 5% 70%Dy 40 36 90.0% 4 10.0% 9% 0% 22%Ho 40 38 95.0% 2 5.0% 14% 1% 30%Er 40 32 80.0% 8 20.0% 11% 0% 36%Tm 40 33 82.5% 7 17.5% 11% 1% 31%Yb 40 14 35.0% 26 65.0% 8% 0% 21%Lu 40 0 0.0% 40 100.0% 31% 6% 69%Y 40 7 17.5% 33 82.5% 8% 0% 17%

TREE+Y 40 6 15.0% 34 85.0% 12% 0% 26%

Original < DuplicateCount

Relative Percentage DifferenceOriginal ≥ Duplicate

Page 49: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 49 

SGS Canada Inc. - Geostat

Figure 13.1 ­ Correlation Plot of the Independent Checks Samples for TREE+Y, Y, La and Ce (ActLabs vs. SGS Minerals) 

 

 

0

5000

10000

15000

20000

25000

30000

0 5000 10000 15000 20000 25000 30000

TREE+Y (ppm) ‐ActLabs

TREE+Y (ppm) ‐ SGS Minerals

Check Samples  (TREE+Y) ‐ Eldor Project

+20%

‐20%

0

100

200

300

400

500

0 100 200 300 400 500

Y (ppm) ‐ActLabs

Y (ppm) ‐ SGS

Check Samples (Y) ‐ Eldor Project

+20%

‐20%

0

2000

4000

6000

8000

10000

0 2000 4000 6000 8000 10000

La (ppm) ‐ActLabs

La (ppm)  ‐ SGS

Check Samples (La) ‐ Eldor Project

+20%

‐20%

0

2000

4000

6000

8000

10000

12000

14000

0 2000 4000 6000 8000 10000 12000 14000

Ce (ppm) ‐ActLabs

Ce (ppm) ‐ SGS

Check Samples (Ce) ‐ Eldor Project

+20%

‐20%

Page 50: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 50 

SGS Canada Inc. - Geostat

Figure 13.2 ­ Correlation Plot of the Independent Checks Samples for Pr, Nd, Sm and Eu (ActLabs vs. SGS Minerals) 

 

 

0

200

400

600

800

1000

1200

1400

0 200 400 600 800 1000 1200 1400

Pr (ppm) ‐ActLabs

Pr (ppm) ‐ SGS

Check Samples (Pr) ‐ Eldor Project

+20%

‐20%

0

1000

2000

3000

4000

5000

0 1000 2000 3000 4000 5000

Nd (ppm) ‐ActLabs

Nd (ppm) ‐ SGS

Check Samples (Nd) ‐ Eldor Project

+20%

‐20%

0

100

200

300

400

500

0 100 200 300 400 500

Sm (ppm) ‐ActLabs

Sm (ppm)  ‐ SGS

Check Samples (Sm) ‐ Eldor Project

+20%

‐20%

0

20

40

60

80

100

120

0 20 40 60 80 100 120

Eu (ppm) ‐ActLabs

Eu (ppm) ‐ SGS

Check Samples (Eu) ‐ Eldor Project

+20%

‐20%

Page 51: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 51 

SGS Canada Inc. - Geostat

Figure 13.3 ­ Correlation Plot of the Independent Checks Samples for Gd, Tb, Dy and Ho (ActLabs vs. SGS Minerals) 

 

 

0

50

100

150

200

250

300

0 50 100 150 200 250 300

Gd (ppm) ‐ActLabs

Gd (ppm) ‐ SGS

Check Samples (Gd) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

25

30

35

0 5 10 15 20 25 30 35

Tb (ppm) ‐ActLabs

Tb (ppm) ‐ SGS

Check Samples (Tb) ‐ Eldor Project

+20%

‐20%

0

20

40

60

80

100

120

140

0 20 40 60 80 100 120 140

Dy (ppm) ‐ActLabs

Dy (ppm) ‐ SGS

Check Samples (Dy) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

0 5 10 15 20

Ho (ppm) ‐ActLabs

Ho (ppm) ‐ SGS

Check Samples (Ho) ‐ Eldor Project

+20%

‐20%

Page 52: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 52 

SGS Canada Inc. - Geostat

Figure 13.4 ­ Correlation Plot of the Independent Checks Samples for Er. Tm, Yb and Lu (ActLabs vs. SGS Minerals) 

 

 

A  review of  the  independent  check  sample  results  confirmed a  correlation between  the Act Labs and  SGS  Minerals  data  but  outlined  some  issues  in  particular  potential  analytical  bias  and significant  variability  in  the  data.  The  sign  test  conducted  on  the  Act  Labs  vs.  the  SGS Minerals analytical dataset suggests a potential positive bias toward Act Labs for LREE, IREE, Lu and Y but outlined a potential negative bias for Tb, Dy, Ho, Er and Tm. Only Yb does not shows any significant analytical bias between Act Labs and SGS Minerals. The most problematic elements are Nd, Gd, Tb and  Lu  where  the  observed  average  RPD  is  higher  than  15%,  although  as  seen  with  drill  core duplicates done by Commerce (section 12.2.4) a variation of 7% to 10% is common for the REE. The analytical  issues  outlined  for  the  independent  check  samples  analysed  at  SGS  Minerals  were 

0

10

20

30

40

50

0 10 20 30 40 50

Er (ppm) ‐ActLabs

Er (ppm)  ‐ SGS

Check Samples (Er) ‐ Eldor Project

+20%

‐20%

0

1

2

3

4

5

6

0 1 2 3 4 5 6

Tm (ppm) ‐ActLabs

Tm (ppm)  ‐ SGS

Check Samples (Tm) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

25

30

0 5 10 15 20 25 30

Yb (ppm) ‐ActLabs

Yb (ppm)  ‐ SGS

Check Samples (Yb) ‐ Eldor Project

+20%

‐20%

0

0.5

1

1.5

2

2.5

3

3.5

4

0 0.5 1 1.5 2 2.5 3 3.5 4

Lu (ppm) ‐ActLabs

Lu (ppm) ‐ SGS

Check Samples (Lu) ‐ Eldor Project

+20%

‐20%

Page 53: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 53 

SGS Canada Inc. - Geostat

considered  significant  enough  to  conduct  a  third  party  validation  and  the  pulps  from  the  check samples were sent to ALS Chemex for a re‐analysis using a comparable methodology; 38 elements lithium borate fusion with ICP‐MS finish. Table 13.2 summarises the comparatives statistics of the pulp re‐analysis of the independent check samples at ALS Chemex for the individual REE including TREE+Y.  Figures  13.5  to  13.8  shows  correlation  plots  of  the  TREE+Y,  Y  and  the  individual  REE returned from pulp re‐analysis at ALS Chemex. 

 

Table 13.2 –Statistics for the Independent Check Samples (Act Labs vs. ALS Chemex) 

 

 

Count % Count % Mean Min MaxLa 40 7 17.5% 33 82.5% 12% 0% 30%Ce 40 7 17.5% 33 82.5% 10% 0% 25%Pr 40 4 10.0% 36 90.0% 12% 1% 26%Nd 40 0 0.0% 40 100.0% 23% 0% 46%Sm 40 6 15.0% 34 85.0% 10% 1% 23%Eu 40 9 22.5% 31 77.5% 8% 0% 22%Gd 40 0 0.0% 40 100.0% 36% 9% 75%Tb 40 19 47.5% 21 52.5% 7% 0% 21%Dy 40 36 90.0% 4 10.0% 10% 0% 25%Ho 40 36 90.0% 4 10.0% 12% 0% 29%Er 40 25 62.5% 15 37.5% 8% 0% 36%Tm 40 32 80.0% 8 20.0% 9% 1% 33%Yb 40 17 42.5% 23 57.5% 7% 0% 26%Lu 40 7 17.5% 33 82.5% 14% 1% 32%Y 40 32 80.0% 8 20.0% 9% 0% 25%

TREE+Y 40 4 10.0% 36 90.0% 12% 1% 27%

Relative Percentage DifferenceCount

Original < Duplicate Original ≥ Duplicate

Page 54: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 54 

SGS Canada Inc. - Geostat

Figure 13.5 ­ Correlation Plot of the Independent Checks Samples for TREE+Y, Y, La and Ce (ActLabs vs. ALS Chemex) 

 

 

0

5000

10000

15000

20000

25000

30000

0 5000 10000 15000 20000 25000 30000

TREE+Y (ppm) ‐ActLabs

TREE+Y (ppm) ‐ ALS

Check Samples  (TREE+Y) ‐ Eldor Project

+20%

‐20%

0

100

200

300

400

500

0 100 200 300 400 500Y (ppm) ‐ActLabs

Y (ppm) ‐ ALS

Check Samples (Y) ‐ Eldor Project

+20%

‐20%

0

2000

4000

6000

8000

10000

0 2000 4000 6000 8000 10000

La (ppm) ‐ActLabs

La (ppm)  ‐ ALS

Check Samples (La) ‐ Eldor Project

+20%

‐20%

0

2000

4000

6000

8000

10000

12000

14000

0 2000 4000 6000 8000 10000 12000 14000

Ce (ppm) ‐ActLabs

Ce (ppm) ‐ ALS

Check Samples (Ce) ‐ Eldor Project

+20%

‐20%

Page 55: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 55 

SGS Canada Inc. - Geostat

Figure 13.6 ­ Correlation Plot of the Independent Checks Samples for Pr, Nd, Sm and Eu (ActLabs vs. ALS Chemex) 

 

 

0

200

400

600

800

1000

1200

1400

0 200 400 600 800 1000 1200 1400

Pr (ppm) ‐ActLabs

Pr (ppm) ‐ ALS

Check Samples (Pr) ‐ Eldor Project

+20%

‐20%

0

1000

2000

3000

4000

5000

0 1000 2000 3000 4000 5000Nd (ppm) ‐ActLabs

Nd (ppm) ‐ ALS

Check Samples (Nd) ‐ Eldor Project

+20%

‐20%

0

100

200

300

400

500

0 100 200 300 400 500

Sm (ppm) ‐ActLabs

Sm (ppm)  ‐ ALS

Check Samples (Sm) ‐ Eldor Project

+20%

‐20%

0

20

40

60

80

100

120

0 20 40 60 80 100 120

Eu (ppm) ‐ActLabs

Eu (ppm) ‐ ALS

Check Samples (Eu) ‐ Eldor Project

+20%

‐20%

Page 56: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 56 

SGS Canada Inc. - Geostat

Figure 13.7 ­ Correlation Plot of the Independent Checks Samples for Gd, Tb, Dy and Ho (ActLabs vs. ALS Chemex) 

 

 

0

50

100

150

200

250

300

0 50 100 150 200 250 300

Gd (ppm) ‐ActLabs

Gd (ppm) ‐ ALS

Check Samples (Gd) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

25

30

35

0 5 10 15 20 25 30 35Tb

 (ppm) ‐ActLabs

Tb (ppm) ‐ ALS

Check Samples (Tb) ‐ Eldor Project

+20%

‐20%

0

20

40

60

80

100

120

140

0 20 40 60 80 100 120 140

Dy (ppm) ‐ActLabs

Dy (ppm) ‐ ALS

Check Samples (Dy) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

0 5 10 15 20

Ho (ppm) ‐ActLabs

Ho (ppm) ‐ SGS

Check Samples (Ho) ‐ Eldor Project

+20%

‐20%

Page 57: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 57 

SGS Canada Inc. - Geostat

Figure 13.8 ­ Correlation Plot of the Independent Checks Samples for Er. Tm, Yb and Lu (ActLabs vs. ALS Chemex) 

 

 

The  results  for  the  re‐analysis  of  the  independent  check  sample  pulps  at  ALS  Chemex  generally confirm the results returned from SGS Minerals but with a few notable exceptions. The elements Tb and  Yb  show  a  good  correlation  against  Act  Labs  without  any  significant  bias,  and  Er  also demonstrate a better correlation. Element Y is interesting as it now has a negative bias versus Act Labs.  The  RPD  is  generally  less  for  the  ALS  Chemex  data,  with  Tb  and  Lu  showing  a  significant improvement compare to SGS Minerals. 

The  results  of  the  independent  check  sampling  program highlight  the  difficulty  of  analysing REE and  demonstrate  the  limitations  of  the  current  analytical  methods  in  providing  reliable  and 

0

10

20

30

40

50

0 10 20 30 40 50

Er (ppm) ‐ActLabs

Er (ppm)  ‐ ALS

Check Samples (Er) ‐ Eldor Project

+20%

‐20%

0

1

2

3

4

5

6

0 1 2 3 4 5 6Tm

 (ppm) ‐ActLabs

Tm (ppm)  ‐ ALS

Check Samples (Tm) ‐ Eldor Project

+20%

‐20%

0

5

10

15

20

25

30

0 5 10 15 20 25 30

Yb (ppm) ‐ActLabs

Yb (ppm)  ‐ ALS

Check Samples (Yb) ‐ Eldor Project

+20%

‐20%

0

0.5

1

1.5

2

2.5

3

3.5

4

0 0.5 1 1.5 2 2.5 3 3.5 4

Lu (ppm) ‐ActLabs

Lu (ppm) ‐ ALS

Check Samples (Lu) ‐ Eldor Project

+20%

‐20%

Page 58: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 58 

SGS Canada Inc. - Geostat

repeatable  analytical  results.  The  variance  in  the  check  samples  results,  although  significant compare  to  other  types  of  commodity,  demonstrate  the  significant  heterogeneity  in  the  REE mineralisation  occurring  at  small  scale  but  also  outline  the  precision  limits  of  the  analytical protocols developed for REE. As far as the analytical bias observed in the results, the fact that SGS Minerals  and  ALS  Chemex  returned  some  contradictory  results  compare  to  Act  Labs,  it  can  be concluded that the outlined biases are mainly due to the difficulty of analysing REE. The analytical issues observed in the data verification program could be related to the unequal conditions during the fusion process (difficulty to have all the REE minerals in solution prior to the analysis using ICP) or  the  difficulty  to  calibrate  the  equipments  used  for  the  analysis.  The  author  recommends  to perform sample duplicates at more than one  laboratory on a systematic basis and to monitor the QA/QC  data  for  any  significant  variation  in  the  analytical  data.  Based  on  the  results  of  the  data verification  program,  SGS  Geostat  considered  the  analytical  data  to  be  of  sufficient  quality  to support a mineral resource estimate.  

The  digital  drill  hole  database  supplied  by  Commerce  has  been  validated  for  the  following  data field:  collar  location,  azimuth,  dip,  hole  length,  survey  data,  lithology  and  analytical  values.  The validation of the database did not return any significant issues. As part of the data verification of the project,  selected  analytical  data  from  the  database  has  been  validated  with  the  values  from  the laboratories analytical certificates. No errors were noted during the validation. 

The final database includes the recent drilling data completed by the Company in 2010. Table 13.3 lists the data contained in the final drill hole database. SGS Geostat is  in the opinion that the final drill hole database is adequate to support mineral resource estimation. 

 

Table 13.3 – Final Drill Hole Database 

 

 

14­ ADJACENT PROPERTIES 

Other companies or individuals own mineral titles in the vicinity of the Eldor Property. Other than rare  earths,  the  area  is  explored  for  a  variety  of  commodities  including  precious  metals,  base metals,  iron‐ore and uranium. Figure 14.1 shows a map of  the mineral  titles  in  the vicinity of  the Eldor Property. The map has been provided by the Nunavik Mineral Exploration Fund. 

 

Number of 

Holes

Metres 

Drilled

Number of 

Survey 

Record

Number of 

Lithological 

Record

Number of 

Assays 

Record

% Assayed 

Metres

12 3313 59 3531 3531 98%

Page 59: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 59 

SGS Canada Inc. - Geostat

Figure 14.1 – Map of Adjacent Properties in the Vicinity of Eldor Property 

 

Map provided by the Jean‐Marc Seguin, technical director of the Nunavik Mineral Exploration Fund 

 

15­ MINERAL PROCESSING AND METALLURGICAL TESTING 

No mineral processing or metallurgical testing has been conducted on the Property. 

 

Page 60: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 60 

SGS Canada Inc. - Geostat

16­ MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES 

16.1 Introduction 

No previous mineral resource estimate was reported for the Eldor property. The mineral resource has been estimated by SGS Geostat using recent drilling data completed by the Company in 2010. The final database used to produce the mineral resource estimate totals 12 diamond drill holes and contains  information  for collar,  survey,  lithology and analytical  results. Please refer  to Table 13.3 for a summary of the records in the database used for the mineral resource estimate. 

The  mineral  resource  has  been  estimated  by  the  author,  André  Laferrière,  M.Sc.  P.Geo.,  Senior Geologist  for SGS Geostat. Mr. Laferriere  is a professional geologist registered with  the Ordre des Géologues du Québec and has worked  in exploration and development stage projects  for metallic and  non‐metallic mineral  deposits  including magmatic  Ni‐Cu‐PGE,  volcanogenic  Zn‐Pb‐Cu‐Ag‐Au, porphyry Cu‐Au,  intrusive Li‐REE‐Nb‐Ta, and diamonds. The author has been involved  in mineral resource  estimation  work  on  a  continuous  basis  since  joining  SGS  Canada  Inc.  in  2009,  which includes participation in the data verification and mineral resource estimation of the Kipawa rare earth  deposit  located  near  the  community  of  Témiscaming,  Québec.  Mr.  Laferriere  is  an independent  Qualified  Person  as  per  section  1.4  of  the  NI  43‐101  Standards  of  Disclosure  for Mineral Projects. 

The  mineral  resource  estimate  is  derived  from  a  computerised  resource  block  model.  The construction of the block model starts with the modeling of 3D wireframe envelopes or solids of the mineralisation using drill hole REE analytical data and lithological information. Once the modeling is  complete,  the  analytical  data  contained within  the wireframe  solids  is  normalised  to  generate fixed  length  composites.  The  composite  data  is  use  to  interpolate  the  grade  of  blocks  regularly spaced on a defined grid that fills the 3D wireframe solids. The interpolated blocks located below the  bedrock/overburden  interface  and  outside  the  modeled  waste  solids  comprise  the  mineral resources. The blocks are then classified based on confidence level using proximity to composites, composite  grade  variance  and  mineralised  solids  geometry.  The  3D  wireframe  modeling  was interpreted  by  Commerce  under  the  supervision  of  SGS  Geostat.  The  block  model  and  mineral resource estimation were conducted by SGS Geostat based on information provided by Commerce. 

 

16.2 Exploratory Data Analysis 

Exploratory  data  analysis  for REE was  completed  on  original  analytical  data  and  composite  data contained within the 3D mineralised envelopes. 

 

16.2.1 Analytical Data 

There  are  a  total  of  2944  assay  intervals  in  the  database  used  for  the  current mineral  resource estimate.  The  drill  hole  intervals  defining  the  mineralised  envelopes  have  been  sampled continuously. Sample  length averages 0.94 m and ranges between 0.18 m and 2.04 m. Table 16.1 

Page 61: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 61 

SGS Canada Inc. - Geostat

summaries the statistics of the analytical data used for the resource estimate. Figure 16.1 shows the histogram of the samples length. 

 

Table 16.1 – Summary Statistics of Analytical Data Used in the Mineral Resource Estimate 

 

 

Figure 16.1 – Histogram of Samples Length from Ashram Database 

 

 

Variable Mean Std. dev. Min Median Max

La (ppm) 3314.3 1831.3 28.0 3090.0 13800.0

Ce (ppm) 6195.8 2672.2 56.5 6110.0 20700.0

Pr (ppm) 656.5 232.2 6.2 665.0 1710.0

Nd (ppm) 2409.4 729.3 27.0 2480.0 4810.0

Sm (ppm) 313.8 97.4 5.0 312.0 733.0

Eu (ppm) 75.7 26.3 1.4 72.8 228.0

Gd (ppm) 185.2 73.5 4.7 176.5 622.0

Tb  (ppm) 20.2 9.9 0.7 18.2 91.0

Dy (ppm) 84.7 44.4 4.0 74.9 400.0

Ho (ppm) 12.2 6.6 0.8 10.9 55.9

Er (ppm) 26.3 13.8 1.6 24.0 113.0

Tm (ppm) 3.0 1.5 0.2 2.8 13.2

Yb (ppm) 16.1 7.6 1.1 14.8 57.3

Lu (ppm) 2.2 1.0 0.2 2.0 7.7

Y (ppm) 317.8 170.6 18.0 284.0 1491.0

Nb2O5 (%) 0.08 0.06 0.00 0.07 0.92

F (%) 2.58 2.09 0.02 2.14 19.00

0

100

200

300

400

500

600

700

0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1

Frequency

Sample Length (m) 

Ashram Database ‐ Samples Length

Page 62: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 62 

SGS Canada Inc. - Geostat

The drill pattern at Ashram is fairly irregular with 3 holes near vertical, 8 holes oriented between N226° and N240° azimuth and dipping between 39° and 73°, and one hole oriented N050° azimuth an dipping 44°. Figure 16.2 and 16.3 show a plan view and a longitudinal view looking north of the drill holes at Ashram. 

 

Figure 16.2 – Plan View of the Drill Holes at Ashram 

 

 

Page 63: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 63 

SGS Canada Inc. - Geostat

Figure 16.3 – Longitudinal View of the Drill Holes at Ashram (looking north) 

 

16.2.2 Composite Data 

Block model grade interpolation is conducted on composited analytical data. A composite length of 3 m has been selected based on the length of the samples and the thickness of the 10 m by 10 m by 10 m block size defined for the resource block model. The minimum length of composite kept for the interpolation process is 1.5 m. Compositing is conducted at the start of the defined mineralised intervals.  No  capping was  applied  to  the  assays  before  compositing.  Table  16.2  shows  summary statistics of the composites used for the interpolation of the resource block model. Figure 16.4 and 16.5  displays  the  spatial  distribution  of  the  composites  along  drill  holes  axis  in  plan  and longitudinal view looking north respectively. 

 

Page 64: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 64 

SGS Canada Inc. - Geostat

Table 16.2 – Summary Statistics for the 3 metre Composites 

 

 

Figure 16.4 ­ Plan View Showing the Spatial Distribution of the Composites 

 

 

Variable Mean Std. dev. Min Median Max

La (ppm) 3383.4 1613.4 29.5 3283.9 9440.4

Ce (ppm) 6301.8 2368.0 58.6 6453.0 13375.5

Pr (ppm) 665.9 207.3 6.5 687.6 1207.1

Nd (ppm) 2436.9 654.0 28.5 2537.8 4060.7

Sm (ppm) 316.8 88.2 5.3 315.0 661.5

Eu (ppm) 76.2 24.2 1.4 73.0 198.4

Gd (ppm) 187.0 67.7 5.1 179.9 534.5

Tb  (ppm) 20.3 9.0 0.8 18.4 70.7

Dy (ppm) 85.2 39.9 4.4 76.9 294.0

Ho (ppm) 12.3 5.8 0.9 11.3 41.8

Er (ppm) 26.4 11.9 2.3 24.7 86.0

Tm (ppm) 3.0 1.3 0.4 2.9 10.0

Yb (ppm) 16.2 6.4 2.2 15.5 45.6

Lu (ppm) 2.2 0.8 0.3 2.1 5.9

Y (ppm) 319.7 151.3 18.8 291.5 1063.8

Nb2O5 (%) 0.09 0.05 0.01 0.08 0.52

F (%) 2.60 1.69 0.07 2.47 8.89

Page 65: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 65 

SGS Canada Inc. - Geostat

Figure 16.5 – Longitudinal View Showing the Distribution of the Composites (looking north) 

 

 

16.2.3 Specific Gravity 

Section 12.3 summarises the SG determination in details. A value of 3.0 t/m3 was set as the average SG value for the Ashram mineralised carbonatite. This average SG is used for the calculation of the tonnages from the volumetric estimates of the resource block model. 

16.3 Geological Interpretation 

Commerce  completed  the  interpretation  and  modeling  of  the  3D  wireframe  envelopes  of  the mineralisation  based  on  drill  hole  data.  The  work  was  conducted  under  the  supervision  of  SGS Geostat. The 3D wireframe envelop was defined with the following guidelines:  

Extrapolation of the wireframe was limited to 50 m away from the nearest drill hole along the outer perimeter; 

The  wireframe  envelop  was  filled  where  reasonable  confidence  of  the  continuity  of  the TREO grade between drill holes; 

The eastern side was constrained by the 50 m extrapolation pass the nearest drill hole and by an interpreted surface representing the end of the mineralisation (interpreted to be the end of the BD‐Zone); 

The western  side was  constrained by an  interpreted  surface  representing  the base of  the BD‐Zone; 

Page 66: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 66 

SGS Canada Inc. - Geostat

Topography was used to constrain the top of the wireframe envelope. 

Figures 16.6 and 16.7 illustrate the 3D wireframe envelopes with east and west surface in plan view and longitudinal view looking south. 

 

Figure 16.6 – Modeled 3D Wireframe Envelope in Plan View 

 

 

Page 67: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 67 

SGS Canada Inc. - Geostat

Figure 16.7 – Modeled 3D Wireframe Envelope in Longitudinal View (looking south) 

 

 

16.4 Spatial Analysis 

The spatial continuity of  the TREO grade of composites was assessed by variography. Variograms were  computed  and  modeled  for  the  3  m  composite.  Variograms  in  a  series  of  directions  were analysed  in  order  to  identified potential  anisotropies  in  the  grade  continuity within  the modeled mineralised envelop. Table 16.3 presents the variogram model of TREO and Figure 16.8 shows the variogram graph of TREO. 

 

Table 16.3 – Variogram Model of TREO Grade for 3 m Composite 

 

 

Max Interm. Min Azimuth Dip Spin Max Interm. Min Azimuth Dip Spin

0.04 0.1 0.18

(12%) (31%) (57%)300 300 300 320 0 45

Second Spherical Variogram Component

Sill (C)Ranges (in metre) Orientation (in degrees)

80 80 10 320 0 90

First Spherical Variogram Component

Ranges (in metre) Orientation (in degrees)Sill (C)

Nugget 

effect

Page 68: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 68 

SGS Canada Inc. - Geostat

Figure 16.8 – Variograms of TREO Grade of 3 metre Composite 

 

 

Generally, the variography is suggesting some anisotropy at relatively short distance (less than 50‐75 m) but with fairly good isotropy and continuity at longer distances (up to 250‐300 m). The best continuity in the analytical data is observed on a vertical plane more or less parallel to the western contact wall (azimuth N320° and dip between 45° and 90°) while the direction of worst continuity is perpendicular to the plane of best continuity (azimuth N230° and dip between 0° and 45°). The nugget effect is relatively low (12%). 

 

16.5 Resource Block Modeling 

A block size of 10 m (E‐W) by 10 m (N‐S) by 10 m (vertical) was selected for the mineral resource block  model  of  the  Project  based  on  drill  hole  spacing,  width  and  general  geometry  of mineralisation. The 10 m vertical dimension corresponds to an approximation for the bench height of a potential medium‐size open pit mining operation. The resource block model contains 49,345 blocks  located  below  the  overburden/bedrock  surface  for  a  total  of  49,243,280  m3.  The  blocks located  at  the  interface  with  the  overburden/bedrock  surface  have  been  calculated  with  block fraction. Table 16.4 summarizes the parameters of the block model limits. 

 

SILL

0.0 35.0 70.0 105.0 140.0 175.0 210.0 245.0 280.0 315.0 350.00.000

0.040

0.080

0.120

0.160

0.200

0.240

0.280

0.320

0.360

0.400

ABS,TREO

Distance

Ashram Deposit - 3 m Composite (TREO%)

Variable : TREO Date : 04-04-2011Variogram : Absolute File : Ashram_TREO_3mComp.gsd

Direction :Azimuth :Dip :Tolerance :Lag Dist :

Gamma = N(0.0400) + S(0.1000, 80.0/80.0/10.0, 320.0/0.0/90.0) + S(0.1828, 300.0/300.0/300.0, 320.0/0.0

average 0.00 0.00 180.00 3.00

DH_verti 0.00 -90.00 10.00 3.00

H_360 0.00 0.00 30.00 30.00

H_90 90.00 0.00 30.00 30.00

V 0.00 -90.00 30.00 20.00

H320 320.00 0.00 30.00 20.00

Dip45_23 230.00 -45.00 30.00 20.00

Page 69: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 69 

SGS Canada Inc. - Geostat

Table 16.4 – Resource Block Model Parameters 

 

 

16.6 Grade Interpolation Methodology 

The  grade  interpolation  for  the  Ashram mineral  resource  block  model  was  estimated  using  the Ordinary  Kriging  (“OK”)  methodology.  Anisotropic  search  ellispoids  were  selected  for  the  grade interpolation  process  based  on  the  analysis  of  the  spatial  continuity  of  TREO  grade  using variography and on the general geometry of the modeled mineralised envelop. Limits are set for the minimum  and  maximum  number  of  composites  used  per  interpolation  pass  and  restriction  are applied on the maximum number of composites used from each hole. 

The interpolation process was conducted using 3 successive passes with relaxed search conditions from one pass to the next until all blocks are interpolated. The orientation of the search ellipsoids, which is identical for each interpolation pass, is N320° azimuth, 0° dip and 0° spin. 

In the first pass, the search ellipsoid distance was 100 m (long axis) by 100 m (intermediate axis) by  50  m  (short  axis).  Search  conditions  were  defined  with  a  minimum  of  5  composites  and  a maximum  of  25  composites  with  a  maximum  of  3  composites  selected  from  each  hole.  Thirty‐percent  (30%)  of  the  blocks  were  estimated  in  the  first  pass.  For  the  second  pass,  the  search distance was increased to 200 m (long axis) by 200 m (intermediate axis) by 100 m (short axis) and composites selection criteria were kept the same as the first pass. The second pass resulted in the interpolation of 78% of  the blocks. Finally,  the search distance of  the third pass was  increased to 400  m  (long  axis)  by  400  m  (intermediate  axis)  by  200  m  (short  axis)  and  again  the  same composites selection criteria were applied. Figure 16.9 shows the three search ellipsoids used for the  different  interpolation  passes.  Figures  16.10  and  16.11  present  the  interpolation  results  on representative sections and plan levels respectively. 

 

Minimum Maximum

East-West 10 m 81 536,000 mE 536,800 mE

North-South 10 m 51 6,311,800 mN 6,312,300 mN

Direction Block Size Number of BlocksCoordinates (m)

10 m 46 -150 mZ (a.s.l.) 300 mZ (a.s.l.)Vertical

(Elevation)

Page 70: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 70 

SGS Canada Inc. - Geostat

Figure 16.9 –Different Search Ellipsoids Used for the Interpolation Process in Plan View 

 

 

Figure 16.10 – Plan View Showing Block Model Interpolation Results 

 

 

Page 71: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 71 

SGS Canada Inc. - Geostat

Figure 16.11 – Longitudinal View Showing Block Model Interpolation Results (looking south) 

 

 

16.7 Mineral Resource Classification 

The mineral resources at Ashram have all been classified as inferred category. The parameters used to determine the mineral resource classification is the current drill density, which is fairly sparse, and the fact that no metallurgical testing has been conducted so far on the Ashram mineralisation.  

 

16.8 Mineral Resource Estimation 

The base case cut‐off TREO grade for the reporting of the mineral resource estimate of the Project, which must reflect a potential for reasonable economic extraction, was defined using a conceptual economic  model.  The  conceptual  economic  model  is  based  on  a  25  years  life‐of‐mine  open‐pit mining  operation  feeding  a  7,500  tonnes  per  day  concentrator  located  at  the  Project  site.  The concentrator produces by floatation a bulk concentrate which is transported and processed at the nearby  community  of  Kuujjuaq  in  a  hydrometallurgical  plant.  The  final  products  are  high  purity rare earth oxides. The conceptual model does not take into account the value of the other potential by‐products like CaF2. 

The  modeled  costs  for  the  conceptual  model  were  estimated  using  information  compiled  from different sources including Mining Cost Services (CostMine – InfoMine USA Inc., 2009), Quest Rare Minerals Ltd ‐ Strange Lake Project Preliminary Economic Assessment study dated September 24, 2010 (Wardrop, 2010), and Avalon Rare Metals Inc. ‐ Thor Lake Project Pre‐Feasibility study dated September 21, 2010 (Scott Wilson RPA, 2010). The revenues where estimated using a trailing three 

Page 72: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 72 

SGS Canada Inc. - Geostat

years average  for  the REO and Y2O3 (Technology Metals Research LLC, 2011), except  for Ho2O3, Er2O3, Tm2O3, Yb2O3, and Lu2O3 where 2007 pricing was used (Wardrop, 2010). 

The  conceptual  total  production  costs  were  estimated  at  $168.58  per  tonne  milled  and  include mining (0.25:1 waste to ore ratio), processing, infrastructures, freight, contingencies, and general & administration costs. The conceptual net metal value per tonne milled was estimated at $193.85 per unit  of  TREO  (based  on  the  average  analytical  composition  of  the  composite  dataset)  using  an average  process  recovery  of  75%.  Using  the  conceptual  cost  and  net  metal  value  estimates,  the calculated breakeven TREO grade returns 1.16% TREO. A base case 1.25% TREO cut‐off grade was selected for the mineral resource estimate of the Ashram deposit. 

The  final mineral  resource estimate  for  the Eldor property  at  a  base  case  cut‐off  grade of 1.25% TREO  totals  117,340,000  tonnes  grading 1.740% TREO and 5.56% CaF2  in  the  inferred  resource category. The mineral resource tonnage has been calculated  from the volumetric estimates of  the resource  block  model  using  an  average  bulk  density  of  3.0  t/m3  which  was  defined  based  on measurements  from  449  mineralised  core  samples  (refer  to  section  12.3  for  details  on  specific gravity). The mineral  resource estimation  for  the Ashram deposit  is  tabulated  in Tables 16.5 and 16.6 using 1.00%, 1.25% (base case), 1.50%, and 1.75% TREO cut‐off grade. 

 

Table 16.5 – Eldor Property Mineral Resource Estimate 

 

 

1.00% Inferred 134,970,000 1.663 1.538 0.067 0.018 0.040 5.30

1.25%           

(base case)Inferred 117,340,000 1.740 1.612 0.069 0.019 0.040 5.56

1.50% Inferred 95,000,000 1.818 1.687 0.071 0.019 0.041 5.78

1.75% Inferred 50,950,000 1.966 1.831 0.074 0.020 0.042 6.15

Mineral resources are not mineral reserves and do not have demonstrated economic viability. 

Effective date March 1, 2011. Bulk density of 3.0 t/m3 used. 

TREO includes La2O3, Ce2O3, Pr2O3 and Nd2O3, SM2O3, Eu2O3 and Gd2O3, Tb2O3, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3 and Lu2O3, and Y2O3. 

LREO includes La2O3, Ce2O3, Pr2O3 and Nd2O3. 

IREO includes SM2O3, Eu2O3 and Gd2O3. 

HREO includes Tb2O3, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3 and Lu2O3.

* Rounded to nearest 10,000. ** Rounded to nearest 0.001. *** Rounded to nearest 0.01

IREO (%)** HREO (%)** Y2O3 (%)**Cut‐off Grade 

TREO (%)

Resources 

CategoriesTonnes* TREO (%)** LREO (%)**

Mineral Resources Estimate ‐ Eldor Property ‐ Ashram REE Deposit

CaF2 (%)***

Page 73: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 73 

SGS Canada Inc. - Geostat

Table 16.6 – Eldor Property Mineral Resource Estimate with Individual REO Values 

 

 

16.9 Mineral Resource Validation 

A validation of the mineral resource TREO grade was conducted as part of the verification process. The  validation  includes:  1)  a  visual  comparison  of  the  color‐coded  block  values  versus  the composites data in the vicinity of the interpolated blocks, and 2) a comparison of the grade average and  standard deviation  parameters  for  the  composite  data  and  the  block model  data.  Table  16.7 summarises the comparative statistics of the composite and block model datasets without any cut‐off grade.  

 

Table 16.7 – Comparative Statistics of the Composite and Block Model Datasets 

 

 

In addition to the grade validation, a verification of  the mineral resource tonnage was conducted. The tonnage validation consists in the comparison of the tonnage calculated from the volume of the 3D wireframe envelop of the mineralised pegmatite compared to the tonnage calculated from the volumetric  estimate  of  the  block model  using  identical  average  bulk  density  value.  The  tonnage calculated from the mineralised envelop is 148,093,854 tonnes and the tonnage calculated for the block model at no cut‐off grade totals 147,729,840 tonnes for a net difference of 0.25% between the two datasets. The difference can be explained by the fact that the individual blocks at  the edge of the  3D  wireframe  envelop  were  not  estimated  using  a  block  fraction  parameter  except  at  the bedrock/overburden interface. 

 

16.10 Comments about the Mineral Resource Estimate 

There  are  no  known  factors  or  issues  related  to  permitting,  legal,  mineral  title,  taxation,  socio‐economic or political relationships that could materially affect the mineral resource estimate. 

1.00% Inferred 134,970,000 0.411 0.759 0.080 0.288 0.037 0.009 0.021 0.002 0.010 0.001 0.003 0.000 0.002 0.000

1.25%           

(base case)Inferred 117,340,000 0.435 0.796 0.083 0.298 0.038 0.009 0.022 0.002 0.010 0.001 0.003 0.000 0.002 0.000

1.50% Inferred 95,000,000 0.459 0.834 0.086 0.308 0.039 0.009 0.023 0.002 0.010 0.001 0.003 0.000 0.002 0.000

1.75% Inferred 50,950,000 0.506 0.905 0.093 0.328 0.041 0.010 0.023 0.002 0.010 0.001 0.003 0.000 0.002 0.000

Effective date March 1, 2011. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Bulk density of 3.0 t/m3 used.

* Rounded to nearest 10,000. ** Rounded to nearest 0.001.

La2O3 

(%)**

Ce2O3 

(%)**

Pr2O3 

(%)**

Nd2O3 

(%)**

Sm2O3 

(%)**

Tm2O3 

(%)**

Yb2O3 

(%)**

Lu2O3 

(%)**

Mineral Resources Estimate ‐ Eldor Property ‐ Ashram REE Deposit

Eu2O3 

(%)**

Gd2O3 

(%)**

Tb2O3 

(%)**

Dy2O3 

(%)**

Ho2O3 

(%)**

Er2O3 

(%)**

Cut‐off Grade 

TREO (%)

Resources 

CategoriesTonnes*

Dataset Count Average TREO (%) Std. Dev.

Composites 929 1.623 0.568

Block Model 49345 1.585 0.381

Page 74: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 74 

SGS Canada Inc. - Geostat

Even  if  the  continuity  of  the  TREO  grade  data  can  be  considered  relatively  good  for  the  Project, significant distance away from the drill hole data at depth and to the north can be observed for the eastern portion of the 3D wireframe envelop (sometime up to 200 m away from composite data). Although this represent significant extrapolation of the analytical data, it has been decided to model the Ashram deposit  that way  to  keep  it  fairly  regular  and  consistent,  and  to  avoid  long  legs‐like shapes  in  the 3D wireframe envelop.    In order  to decrease  the uncertainties  related  to  the grade interpolation  in  the  areas  located  away  from  analytical  data,  additional  in‐fill  drilling  will  be necessary to confirm the presence of mineralisation. 

The metallurgical characteristics of the mineralised carbonatite material are unknown at this stage. But  the  preliminary  mineralogical  studies  outline  the  presence  of  fairly  common  REE‐bearing minerals  which  suggest  that  the  recovery  of  the  rare  earths  could  be  completed  using  known metallurgical  processes  already  tested  in  other  projects  currently  in  operation  or  under development. The natural next step for the Project is to complete preliminary metallurgical testing of the mineralised material at Ashram. 

 

17­ OTHER RELEVANT DATA AND INFORMATION 

No other relevant data and information is reported for the Project 

 

18­ INTERPRETATION AND CONCLUSIONS 

SGS  Geostat  validated  the  exploration  processes  and  drill  core  sampling  procedures  used  by Commerce as part of an independent verification program. SGS Geostat concluded that the drill core handling,  logging  and  sampling  protocols  are  at  conventional  industry  standard  and  conform  to generally accepted best practices. 

The  author  completed  a  review  of  the  sample  preparation  and  analysis  including  the  QA/QC analytical  protocol  implemented  by  Commerce  for  the  Project.  The  author  visited  the  Eldor property between October 4 and 6, 2010 to review the Company sample preparation procedures. SGS  Geostat  considers  that  the  samples  quality  is  good  and  that  the  samples  are  generally representative. The author noticed that the analytical blanks used in the QA/QC protocol contains small  amount  of  mineralisation  and  recommends  replacing  them  by  certified  analytical  blanks.  Finally, the author is confident that the system is appropriate for the collection of data suitable for the estimation of a NI 43‐101 compliant mineral resource. 

As part of  the data verification program, SGS Geostat completed  independent analytical checks of drill  core  duplicate  samples  taken  from Commerce  recent  diamond drilling  program.  The  author also  conducted  verification  of  selected  laboratories  analytical  certificates  and  validation  of  the project digital database supplied by Commerce for errors or discrepancies. The bulk density of the carbonatite  material  was  estimated  by  SG  measurements  on  mineralised  drill  core  sample  and appears to be consistent with expected values from the rock type. SGS Geostat is in the opinion that the final drill hole database is adequate to support a mineral resource estimate. 

Page 75: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 75 

SGS Canada Inc. - Geostat

Geological interpretation and modeling of the mineralised carbonatite at Ashram was completed by Commerce  following  the  guidelines  defined by  SGS Geostat.  The  resource model  contains 49,345 blocks,  10  m  (east‐west)  by  10  m  (north‐south)  by  10  m  (elevation)  in  size,  located  below  the bedrock/overburden interface. The block grade was estimated using 929 analytical values from 3 m long  drill  holes  composites.  Interpolation  was  performed  using  OK  in  3  successive  passes. Anisotropic search ellipsoids were used starting with a dimension of 100 m (long axis) by 100 m (intermediate  axis)  by  50  m  (short  axis)  oriented  vertically  in  the  N320°  azimuth  direction, doubling in size for the second pass, and ending with a dimension of 400 m (long axis) by 400 m (intermediate  axis)  by  200  m  (short  axis).  Search  conditions  were  set  for  a  minimum  of  5 composites and a maximum of 25 composites with a maximum of 3 composites selected from each hole required to estimate each block.  

Finally, a mineral resource was estimate based on the results of the block model interpolation. All the mineral resources were classified inferred resource categories. The final mineral resources are presented in Table 18.1. 

 

Table 18.1 – Final Mineral Resources for the Eldor Property 

 

 

SGS  Geostat  is  in  the  opinion  that  the  Company  successfully  confirmed  the  mineral  resource potential of the Ashram deposit located on the Eldor property based on 2010 exploration program. The  author  considers  the  Project  to  be  sufficiently  robust  to  warrant:  1)  conducting  additional drilling to potentially increase the quantity and augment the confidence level of the current mineral resource,  2)  proceeding  to  preliminary metallurgical  study  to  better  characterise  the  rare  earth mineralisation processing parameters, and 3) completing a preliminary economic evaluation of the Project for a potential open pit mining operation. 

 

1.25% Inferred 117,340,000 1.740 1.612 0.069 0.019 0.040 5.56

Mineral resources are not mineral reserves and do not have demonstrated economic viability. 

Effective date March 1, 2011. Bulk density of 3.0 t/m3 used. 

TREO includes La2O3, Ce2O3, Pr2O3 and Nd2O3, SM2O3, Eu2O3 and Gd2O3, Tb2O3, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3 and Lu2O3, and Y2O3. 

LREO includes La2O3, Ce2O3, Pr2O3 and Nd2O3. 

IREO includes SM2O3, Eu2O3 and Gd2O3. 

HREO includes Tb2O3, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3 and Lu2O3.

* Rounded to nearest 10,000. ** Rounded to nearest 0.001. *** Rounded to nearest 0.01

Mineral Resources Estimate ‐ Eldor Property ‐ Ashram REE Deposit

Cut‐off Grade 

TREO (%)

Resources 

CategoriesTonnes* TREO (%)** LREO (%)** IREO (%)** HREO (%)** Y2O3 (%)** CaF2 (%)***

Page 76: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 76 

SGS Canada Inc. - Geostat

19­ RECOMMENDATIONS 

The  author  considers  that  there  is  very  good  potential  to  increase  the mineral  resources  of  the Ashram  deposit  and  to  define  mineral  reserves  for  a  potential  open  pit  mining  operation.  The author recommends that Commerce carry out all necessary work to secure the mining rights. 

The QA/QC protocol implemented by Commerce should be modified to include certified analytical blanks  instead of quartz‐rich material collected  in  the vicinity of  the Project. The protocol should also  include  a  systematic  verification  of  the  REE  analytical  values  using more  than  one  certified laboratory in order to monitor the quality of the analysis completed at the Project. 

A  quantitative  mineralogical  study  of  representative  mineralised  carbonatite  samples  should  be completed in order to characterise and quantify the different rare earth‐bearing minerals. 

Preliminary metallurgical testing should be undertaken on representative mineralised samples.  

Additional drilling should be conducted at the Ashram deposit on the Property with the objectives of: 1) testing the north and south extensions of the deposit, 2) confirming the east and west extent of  the mineralised  carbonatite,  3)  testing  the  depth  extension  of  the  deposit  pass  300 m  below surface,  and  4)  increasing  the  resource  confidence  level  by  converting  the  outlined  inferred resources  into  indicated resources using  infill drilling. The proposed exploration program should target the following area of the Ashram deposit (see Figure 19.1): 

a) Test the northern extension of the deposit with an emphasis in the high grade sector; 

b) Test the southern extension of the deposit with the objective of closing the deposit; 

c) Confirm the western contact of the mineralisation; 

d) Confirm the eastern contact of the mineralisation; 

e) Testing the depth extension pass 300 m with a focus in the north‐western area where high grade has been localised; 

f) Infill drilling to confirm existing inferred resources where analytical grade extrapolation is the most significant; 

g) Infill  drilling  to  upgrade  the  inferred  resources  to  the  indicated  category  where  current drilling was completed. 

 

Page 77: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 77 

SGS Canada Inc. - Geostat

Figure 19.1 – Plan View Showing Proposed Drilling Area 

 

A preliminary economic assessment of the Project is recommended using the current or a potential updated  NI  43‐101  compliant  mineral  resource  estimate  and  the  results  from  a  preliminary metallurgical study in order to evaluate the economics of a potential open pit mining operation. 

Significant exploration work should also be considered outside the Ashram area with the objective to better define the known REE and Nb‐Ta occurrences on the Property and follow‐up on un‐tested exploration  targets.  Recommended  exploration  work  includes  desktop  data  compilation, prospecting and reconnaissance drilling. 

In  addition  to  the  work  recommendation  listed  above,  the  author  recommends  to  carry  out  a baseline  environmental  study  of  the  Property  and  to  conduct  discussions with  the  communities neighbouring  the  Eldor  project  about  the  impact  of  a  potential  open  pit mining  operation.  Table 19.1  summarises  the  proposed  budget  for  the  recommended  exploration  work  on  the  Eldor Property. 

 

Table 19.1 – Proposed Budget for Recommended Exploration Work at Eldor 

 

A

B

C

DFG

Target Type Details Budget

Drilling 10,000 m @ $200/m 2,000,000$                  

Mineralogy 100,000$                     

Metallurgy 150,000$                     

Environment Baseline study 150,000$                     

Preliminary Economic Assessment 150,000$                     

Regional Work Prospecting, sampling, drilling 2,500,000$                  

General Camp logistics and Salaries 2,500,000$                  

Contingencies 250,000$                     

Total 7,800,000$                  

Ashram Area

Proposed Budget Estimate for Eldor Property

Page 78: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 78 

SGS Canada Inc. - Geostat

20­ REFERENCES 

Property Description and Location

Smith, D.L. and Peter‐Rennich, A., 2010: 2008 and 2009 Exploration of the Eldor Property, Northern Quebec; Assessment Report, 48 pages plus figures and appendices. 

 

Accessibility, Physiography, Climate, Local Resources and Infrastructure 

Smith, D.L. and Peter‐Rennich, A., 2010: 2008 and 2009 Exploration of the Eldor Property, Northern Quebec; Assessment Report, 48 pages plus figures and appendices.Weatherbase website, 2011: http://www.weatherbase.com/ data for Kuujjuaq, Quebec, Canada 

 

History 

Avramtchev et al., 1990: Carte des Gites Mineraux du Quebec – Region de la Fosse du Labrador, DV 84‐01, Publication du M.E.R., 42 pages with maps. 

Bandyayera et al., 2002: Cartes Preliminaires en Couleur des Travaux de Cartographie et des Etudes 2002‐2003, DV 2002‐11, Publication de M.E.R., 28 maps. 

Beaumier,  M,  1987:  Geochimie  des  Sediments  de  Lac  –  Region  du  Lac  Otelnuk,  DP  87‐14, Publication du M.E.R., 35 maps. 

Clark, T and Wares, R, 2006: Lithotectonic and Metallogenic Synthesis of the New Quebec Orogen (Labrador Trough), MM 2005‐01, Publication du M.E.R., 175 pages with map. 

Smith, D.L. and Peter‐Rennich, A., 2010: 2008 and 2009 Exploration of the Eldor Property, Northern Quebec; Assessment Report, 48 pages plus figures and appendices. 

Demers, M.  and Blanchet,  C.,  2001:  Propriete  Lac  Erlandson‐Ta Reconnaissance  Geologique Aout 2001, for Mines d’Or Virginia, 101 pages with maps. 

Dressler,  B,  1974:  Geochimie  des  Sediments  de  Ruisseau  –  Region  du  Lac  Nachikapau  (Nouveau Quebec), DP 422, Publication du M.E.R., 15 pages with maps. 

Dressler, B. And Ciesielski, A,  1979: Region de  la Fosse du Labrador,  rapport  geologique RG‐195, MRN Quebec, 130 pages with maps. 

Knox,  A.W.,  1986:  1985  Field  Examination  Eldor  Carbonatite,  Quebec,  for  Unocal  Canada  Ltd,  75 pages with maps. 

Lafontaine, M., 1984: Permis 669 Prospection et Cartographie, for Eldor Resources Ltd, GM40910, 19 pages with maps. 

Meusy et al., 1984: The Carbonatite Complex of Permit 669, New Quebec, for Eldor Resources Ltd, 10 pages with map. 

 

Page 79: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 79 

SGS Canada Inc. - Geostat

Geological Settings 

Clark, T and Wares, R, 2006: Lithotectonic and Metallogenic Synthesis of the New Quebec Orogen (Labrador Trough), MM 2005‐01, Publication du M.E.R., 175 pages with map. 

James  et  al.,  2003: The  Southeastern Churchill  Province Revisited: U‐Pb Geochronology, Regional Correlations, and Enigmatic Orma Domain, Current Research, Newfoundland Department of Mines and Energy Geological Survey, Report 03‐1, p.35‐45. 

 

Deposit Model 

Birkett, T.C.  and Simandl, G.J.,  1999: Carbonatite  associatedDeposits: Magmatic, Replacement  and Residual;  in Selected British Columbia Mineral Deposit Profiles, Volume 3, Industrial Minerals, G.J. Simandl, Z.D. Hora and D.V. Lefebure, Editors, British Columbia Ministry of Energy and Mines. 

Clark, T and Wares, R, 2006: Lithotectonic and Metallogenic Synthesis of the New Quebec Orogen (Labrador Trough), MM 2005‐01, Publication du M.E.R., 175 pages with map. 

Richardson, D.G.,  and Birkett,  T.C.,  1996: Carbonatite‐associated deposits,  in Geology of  Canadian Mineral  Deposit  Types,  (ed.)  O.R.  Eckstrand, W.D.  Sinclair,  and  R.I.  Thorpe;  Geological  Survey  of Canada,  Geology  of  Canada,  no.  8,  p.541‐558  (also  Geological  society  of  America,  The  Geology  of North America, v. P‐1). 

Wolley, A.R. and Kempe, D.R.C.,1989: Carbonatites: nomenclature, average chemical  compositions and element distribution.  In Carbonatites, Genesis and Evolution, Keith Bell  (ed.), London, Unwin Hyman Ltd., pp. 1‐14. 

 

Mineralisation 

Mitchell,  H.R.,  2011:  Mineralogy  of  the  Ashram  Rare  Earth  Element  Occurrence,  Commerce Resources Corporation ‐ internal report, 24 pages with plates. 

Schmidt, P., 2011: Ashram Zone, Commerce Resources Corporation ‐ internal report, 30 pages. 

 

Adjacent Properties 

Nunavik Mineral Exploration Fund, 2011: Mineral Titles Compilation Map. 

 

Mineral Resource and Mineral Reserve Estimates 

Cost Mine – InfoMine USA Inc., 2009: Mining Cost Services, Electronic Edition, January 2009. 

Scott Wilsom RPA, 2010: Technical Report on the Thor Lake Project, Northwest Territories, Canada. For Avalon Rare Metals Inc., 314 pages. 

Technology Metals Research LLC, 2011: Rare‐Earth‐Oxide Princing Data Compilation. 

Wardrop, 2010: Preliminary Economic Assessment on the Strange Lake B Zone, Quebec. For Quest Rare Minerals Ltd, 178 pages.   

Page 80: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 80 

SGS Canada Inc. - Geostat

21­ SIGNATURE PAGE 

 

Technical Report ­ Mineral Resource Estimation Eldor Property – Ashram Deposit, Nunavik, Quebec 

(According to National Instrument 43­101 and Form 43­101F1)   

Prepared for 

 Commerce Resources Corporation 

789 West Pender Street, Suite 1450 Vancouver, BC V6C 1H2, Canada 

Tel: (604) 484‐2700 Fax: (604) 681‐8240 

 

 

 

 

 

 

 

(signed and sealed) ″André Laferrière″ ____________________________________    Signed in Blainville, Québec, on April 15, 2011 

André Laferrière, M.Sc. P.Geo 

Senior Geologist – SGS Canada Inc. (Geostat) 

Page 81: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 81 

SGS Canada Inc. - Geostat

22­ CERTIFICATE OF QUALIFICATION 

CERTIFICATE OF AUTHOR

André Laferrière M.Sc. P.Geo

To Accompany the Report entitled

“Technical  Report  ‐  Mineral  Resource  Estimation  Eldor  Property  –  Ashram  Deposit, Nunavik, Quebec” 

Commerce Resources Corporation” dated April 15, 2011

I, André Laferrière, M.Sc. P.Geo., do hereby certify that:

1) I am senior geologist with SGS Canada Inc. - Geostat with an office at 10 Blvd Seigneurie Est, Suite 203, Blainville, Quebec, Canada, J7C 3V5;

2) I am a graduate from Université de Montréal in 1995 and 1999;

3) I am a registered member of the Ordre Géologue du Quebec (#557);

4) I have worked as a geologist continuously since my graduation from university;

5) I have worked in exploration and development stage projects for metallic and non-metallic mineral deposits including magmatic Ni-Cu-PGE, volcanogenic Zn-Pb-Cu-Ag-Au, porphyry Cu-Au, intrusive Li-REE-Nb-Ta, and diamonds. I have been involved in mineral resource estimation work on a continuous basis since I joined SGS Canada Inc. in 2009, which includes participation in the data verification and mineral resource estimation of the Kipawa rare earth deposit located near the community of Témiscaming, Québec;

6) I have read the definition of “Qualified Person” set out in the National Instrument 43-101 and certify that by reason of my education, affiliation with a professional association and past relevant work experience, I fulfil the requirements to be an independent qualified person for the purposes of NI 43-101;

7) I have participated in the preparation of all sections of this technical report;

8) I have visited the site between October 4 and 6, 2010;

9) I have no personal knowledge as of the date of this certificate of any material fact or change, which is not reflected in this report;

10) Neither I, nor any affiliated entity of mine, is at present, under an agreement, arrangement or understanding or expects to become, an insider, associate, affiliated entity or employee of Commerce Resources Corp., or any associated or affiliated entities;

11) Neither I, nor any affiliated entity of mine, own, directly or indirectly, nor expect to receive, any interest in the properties or securities of Commerce Resources Corp., or any associated or affiliated companies;

Page 82: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 82 

SGS Canada Inc. - Geostat

12) Neither I, nor any affiliated entity of mine, have earned the majority of our income during the preceding three years from Commerce Resources Corp., or any associated or affiliated companies

13) I have read NI 43-101 and Form 43-101F1 and have prepared the technical report in compliance with NI 43-101 and Form 43-101F1; and have prepared the report in conformity with generally accepted Canadian mining industry practice, and as of the date of the certificate, to the best of my knowledge, information and belief, the technical report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.

Signed at Blainville, Quebec this 15th day of April 2011

(signed and sealed) ″André Laferrière″ _______________________________ André Laferrière, M.Sc. P.Geo, Senior geologist SGS Canada Inc. - Geostat

 

 

Page 83: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 83 

SGS Canada Inc. - Geostat

 

 

 

 

 

 

 

 

 

 

 

 

Appendix A: List of Mineral Titles 

Page 84: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 84 

SGS Canada Inc. - Geostat

Page 85: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 85 

SGS Canada Inc. - Geostat

Page 86: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 86 

SGS Canada Inc. - Geostat

Page 87: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 87 

SGS Canada Inc. - Geostat

Page 88: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 88 

SGS Canada Inc. - Geostat

Page 89: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 89 

SGS Canada Inc. - Geostat

 

 

 

 

 

 

 

 

 

 

 

 

Appendix B: Pictures from Site Visit 

Page 90: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 90 

SGS Canada Inc. - Geostat

 Eldor base camp 

 

 Drill setup at hole EC10‐046 

Page 91: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 91 

SGS Canada Inc. - Geostat

 Core shack 

 

 Core logging facilities 

 

Page 92: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 92 

SGS Canada Inc. - Geostat

 Specific gravity measurement facilities 

 

 Core cutting and sampling facilities 

Page 93: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 93 

SGS Canada Inc. - Geostat

 Core storage facilities 

  

 General view of the camp 

Page 94: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 94 

SGS Canada Inc. - Geostat

 

 

 

 

 

 

 

 

 

 

 

 

Appendix C: Analytical Protocols 

Page 95: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 95 

SGS Canada Inc. - Geostat

 

Page 96: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 96 

SGS Canada Inc. - Geostat

 

 

Inspectorate Analytical Methodology 

Sample Preparation Parameters: - Up to 2kg of sample is dried for up to 24hrs, crushed and riffle split to ~250g sample weight. The split sample is then pulverized to >85% passing -200 mesh. Please keep in mind that for this particular job we were the check laboratory and did not prep core or rock from this client. Whole Rock: - Lithium Metaborate Fusion, followed by nitric acid leach and ICP-MS scan. LOI was included. Detection limits for each element were: Al2O3, BaO, CaO, Cr2O3, MgO, Na2O, P2O5, Fe2O3, K2O, SiO2, TiO2 - 0.01 - 100% Ce, Dy, Er, Eu, Ho, La, Lu, Nd, Pr, Sm, Tb, Tm, Yb - 0.1 - 10,000ppm Gd, Hf - 0.1 - 1,000 ppm

Page 97: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 97 

SGS Canada Inc. - Geostat

Page 98: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 98 

SGS Canada Inc. - Geostat

 

Page 99: Technical Report for Ashram Rare Earth Deposit

Technical Report – Mineral Resource Estimation – Eldor Property – Ashram Deposit  Page 99 

SGS Canada Inc. - Geostat