Technical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering Great Lakes Dredge & Dock

Upload: phamdan

Post on 31-Jan-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Technical Inputs to Dredging Estimates

Robert RamsdellManager of Production Engineering

Great Lakes Dredge & Dock

Page 2: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Production Engineering

• Estimate the productivity of dredging equipment

• Work to improve productivity on ongoing projects

• Evaluate the design of new and upgraded equipment

Page 3: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Cost EstimatorHow much

money?

Production Estimator

How much time?

Project Estimate

TakeoffHow much work?

Page 4: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Cost Estimator

Answers the Question:How much will the project cost?

Page 5: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Cost Estimator

• Mobilization, subcontract & supply costs

• Daily cost for dredging plant

• Lays out estimate

Page 6: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Dredging Area Plan

Page 7: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Rock Contours

Page 8: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Takeoff

Answers the Question:How much work is there to do?

Page 9: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Takeoff – Dredge/Borrow Area

• Dredge & fill quantities (CY)• Material quantities/breakout (CY)• Area to be dredged or filled (SF)• Pipeline/Sail/Haul Distances (LF/NM)

Page 10: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Takeoff: Project Layout

Maps

Cross-Sections & Profiles

Page 11: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Production Estimator

Answers the Question:How long will the project take?

Page 12: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Production Estimator

• Adequacy of the information

• Material Types• Strength• Size

Evaluate Geotechnical Information:

Page 13: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Evaluating Materials

•Are there enough borings?

•Are there enough useful tests?

Page 14: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Production Estimator

Productivity of equipment– CSD vs Hopper vs

Mechanical– Digging versus pumping for

each section of the project– References to similar past

projects

Time = Qty/Production

Page 15: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Crucial Variables for Production

• Material Type– Strength– Grain Size– Extents/Distribution

• Face/Thickness• Pipeline Length

Page 16: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Material Classification

Page 17: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Material Strength•Standard Penetration Test

•Compressive, tensile or shear strength

Indicative or non-standard tests are no substitute for proper tests!

Page 18: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Grain Size Distribution

Important in determining how well the material can be pumped.

Page 19: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Material TypeThe Perils of Poor Information

Estimate: 1438 m3/WH

Estimate: 5 Teeth/Day

Page 20: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Material TypeThe Perils of Poor Information

Estimate: 1440 m3/WHActual: 605 m3/WH

Estimate: 5 Teeth/DayActual: 104 Teeth/Day

Page 21: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

SPT vs. CORING

Via boring & SPTVia coring

Page 22: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Bank Height – FaceThe thickness of material to be

dredged.

Page 23: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Layout of Face

Similar cross-sectional area, but layout requires two different digging methods.

Page 24: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Production vs Face

0

100

200

300

400

500

600

700

800

900

1000

0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0

Face (Ft)

Prod

uctio

n C

Y/W

H)

Estimate assumes: 24 CY Payload, 45 sec Cycle

CSD Theoretical Production Curve

0200400600800

1,0001,2001,4001,6001,8002,000

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Face (Ft)

Prio

duct

ion

(CY

/WH

)

Backhoe Dredge Production

0

2000

4000

6000

8000

0 1 2 3 4

Face (m)

Prod

uctio

n (C

M/W

H)

Page 25: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Bucket DredgeProduction Curve

0

100

200

300

400

500

600

700

800

900

1000

0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0

Face (Ft)

Prod

uctio

n C

Y/W

H)

Estimate assumes: 24 CY Payload, 45 sec Cycle

Page 26: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Backhoe DredgeProduction Curve

Backhoe Dredge Production

0

2000

4000

6000

8000

0 1 2 3 4

Face (m)

Prod

uctio

n (C

M/W

H)

Page 27: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Cutter Suction DredgeDigging Curve

CSD Theoretical Production Curve

0200400600800

1,0001,2001,4001,6001,8002,000

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Face (Ft)

Prio

duct

ion

(CY

/WH

)

Swing Li

mit

Dig or Pump Limit

Page 28: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Hopper Dredge in Low Face“Hang Time”

Page 29: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Pumping Capacity

1000

1200

1400

1600

1800

2000

2200

2400

2600

2800

10000 15000 20000 25000 30000 35000

Line Length (Ft)

Prod

cutio

n (C

Y/W

H)

Page 30: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Pumping Production

PRODpump= f (L/Dpipeline, Ppumps, Material )

Page 31: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Hopper Dredge Pump Capacity

0.0

5.0

10.0

15.0

20.0

25.0

30.0

0 5,000 10,000 15,000 20,000 25,000

Pipeline Length (m)

Pum

pout

Rat

e (C

Y/m

in)

Booster Added

Dredge Alone

Page 32: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Other Important Variables

• Layout– Narrow or Odd Shaped Cuts– Slope Cuts

• Tow or Sail Distance• Water Depth

Page 33: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Layout of Face

Similar cross-sectional area, but layout requires two different digging methods.

Page 34: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Dredging Area Plan

Page 35: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Tow and Sail Distance

• For Clamshell, a matter of adding barges and tugs

• For hopper, another element of the overall cycle

• In both cases, consider the route when determining distance

Page 36: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Water Depth

• Can the dredge physically reach the material in deep water?

• Can the dredge float and dig in shallow water?

• For clam, cycle is directly dependent on depth.

• For backhoe, bucket size is dependent on depth.

Page 37: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Estimating Dredge Productivity

• By analysis of the capabilities of the dredge as compared to the conditions of the project.

• By reference to similar projects in the past

• By combining the two – Using analysis to ‘extend’ references

Page 38: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Clamshell Fill & Cycle Analysis

Page 39: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

CSD Production Limits• Pumping capacity• Dig limit – ability to excavate the material• Swing limit – How fast can the dredge

swing?

Page 40: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Production Engineering Tools

Pump / systemanalysis

Page 41: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

CSD Simulators

Page 42: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Hopper Load & Cycle Analysis

Page 43: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

ReferencesFlorida Beach 1995

Sub Job Booster Face Line Length Qty/Day1 No 11.6 11000 376002 Yes 11 18900 333003 No 11.6 9500 287004 Yes 17.3 24900 29000

Total 12.4 17900 33300

Page 44: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Reference ComparisonFlorida Beach 2005

Sub Job Booster Face Line Length Qty/Day1 9.6 142002 8.6 18800 T3 10.8 23300 B4 7.0 27800 A5 6.8 30900

Total 8.4 22800

Page 45: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

References – Comparing Projects

1995• 12.4’ Face• 17900’ Pipe• Dredge Alaska

2005• 8.4’ Face• 22800’ Pipe• Dredge Texas

Page 46: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

1995 Project – by Face

0

10000

20000

30000

40000

50000

60000

70000

0.0 5.0 10.0 15.0 20.0 25.0

Face (Ft)

Prod

uctio

n (C

YDay

)

Page 47: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

1995 Project – by Line Length

0

10000

20000

30000

40000

50000

60000

70000

0 5000 10000 15000 20000 25000 30000

Line Length (Ft)

Prod

uctio

n (C

Y/D

ay)

Work with Booster

Page 48: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

1995 Project – by Line Length

0

10000

20000

30000

40000

50000

60000

70000

0 5000 10000 15000 20000 25000 30000

Line Length (Ft)

Pro

du

ctio

n (C

Y/D

ay)

Work with Booster

Page 49: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

2005 Project - Results

0

10000

20000

30000

40000

50000

60000

0 5000 10000 15000 20000 25000 30000

Line Length (Ft)

Prod

uctio

n (C

Y/D

ay)

1995 Project

2005 Project

Page 50: Technical Inputs to Dredging Estimates - · PDF fileTechnical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering ... • For backhoe, bucket size is dependent

Robert RamsdellManager of Production

EngineeringGreat Lakes Dredge & Dock

[email protected]