technical evaluation for fuel oil system-sent 12th jan-2016
TRANSCRIPT
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
1/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
2/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
3/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
4/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
5/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
6/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
7/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
8/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
9/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
10/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
11/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
12/15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
13/15
Sr. NO. DESCRIPTION UNIT NPPL/KVK/MEIL/TPSC SPEC.XICON
offer no: 16/456/NB/RGK andfurther Email correspondences
THERMOSYSTEMSoffer no: T2004 and further Email
correspondences
SRI & SRI Engineersoffer no: SRI/MEIL/1907Aand further Email
correspondencesRemarks
PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu
Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications
TECHNICAL BID EVALUATION REPORT - Fuel Oil Syst em
1 INo .. x 250 KL LDO storagetank
Xicon thermosystems
2 INo. x 5 KL drain Oil tank. Xicon thermosystems
33 Nos. unloading points forunloading LDOfrom roadtankers (as per P& ID)
Xicon thermosystems
4LDO unloading system whichincluded pumps,strainers, valves, pipes, fittingsetc.
Xicon thermosystems
5
LDO forwarding system uptoBoiler which includedpumps, strainers, valves, pipes,fittings etc.
Xicon thermosystems
6 Drain oil system Xicon thermosystems
7 MCC for supplied equipments Client Client
8 Incoming cable to MCC Client Client9 Power cables Client thermosystems
10 Control cables from LPBS toMCC Client Client
11 Flameproof local push buttonstation
Client Client
12Instrumentation cable up to localcontrol panel
Client
Noted and considered relay based LCPin our revised offer.Further distribution from LCP to DCS,MCC is in purchaser's scope.
13Cable tray for control andinstrumentation cables
Client considered upto junction box
14Relay logic based LCP at pumphouse
Client
Noted and considered relay based LCPin our revised offer.Further distribution from LCP to DCS,MCC is in purchaser's scope.
15Interconnection betweenDDCIMS and bidder'sinstruments and panel
Client Client
16 Below ground earthing ofequipments
Client Client
17 Above ground earthing ofequipments
Client Client
18 Illumjnation Client Client19 Lightning protection Client Client20 Foundation bolts for tanks Xicon thermosystems
21 All civil works including insertplates,grouting etc
Client Client
This scope matrix is not given by bidder
22 Structural work likepiperack,trestles,bridges etc
Client Client
13 of 15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
14/15
Sr. NO. DESCRIPTION UNIT NPPL/KVK/MEIL/TPSC SPEC.XICON
offer no: 16/456/NB/RGK andfurther Email correspondences
THERMOSYSTEMSoffer no: T2004 and further Email
correspondences
SRI & SRI Engineersoffer no: SRI/MEIL/1907Aand further Email
correspondencesRemarks
PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu
Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications
TECHNICAL BID EVALUATION REPORT - Fuel Oil Syst em
23 Oil water collection sump Client Client
25 Waste water pump Client Client
26 Design and supply of OWS &mechanical components
Client Client
27 Effluent treatment Client Client28 Service water piping Client Client
29
Instrument air piping inside and
outside dyke area and pumphouse Client Client
30 Monorail hoist 2T capacity Xicon thermosystems31 Service air piping Client Client32 Construction water Client Client33 Construction power Client Client34 CCOE approval Xicon thermosystems
35 Local NOC for CCOE approval Client client
36 All other statutory approval client thermosystems
38 Recommended spares for 2years operation
Xicon Not applicable. As most of spares arecovered in Mandatory spares.
39 Commissioning spares Xicon,pls obtain the list of spares Fasteners and gaskets required forcommissioning is considered
40 Cathodic protection Client Client
41 Fire fighting system Client Client
H Ter mi nal Po in t
1 LDO inlet 1) At the outlet of Road Tanker 1) At the outlet of Road Tanker
2 LDO outlet2) At Terminal Point Near Boiler asper specification
LDO will be terminated near to boiler #1.Piping to Boiler #2 will be in the
purchasers scope.
3 Drain 3.All drains to drain oil tank3.Drain from fuel oil are to drain oil tankincluding piping,accessories are inbidders scope.
IPERFORMANCEGUARANTEES
1 LDO unloading pump cum/hr 25 25 25Guaranteed head of LDOunloading pump
m 30 25 10
Guaranteed auxiliary power
consumption of LDO unloadingpump
kw 7.5 7.5 15
2 LDO forwarding pump cum/hr 23 23 23Guaranteed head of LDO m 240 180 25 kg/cm 2
Terminal point details not furnished
14 of 15
-
8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016
15/15
Sr. NO. DESCRIPTION UNIT NPPL/KVK/MEIL/TPSC SPEC.XICON
offer no: 16/456/NB/RGK andfurther Email correspondences
THERMOSYSTEMSoffer no: T2004 and further Email
correspondences
SRI & SRI Engineersoffer no: SRI/MEIL/1907Aand further Email
correspondencesRemarks
PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu
Specification no.M-TNI1-527-11-0001,Rev-3
Ammendment dated 30th september-2015 and further replies on clarifications
TECHNICAL BID EVALUATION REPORT - Fuel Oil Syst em
Guaranteed auxiliary power
pump3 Drain oil pump cum/hr 5 5
Guaranteed head of drain oilpump
m 30 10 Drain sump pump not considered in scope bySSEC
Guaranteed auxiliary powerconsumption of drain oil pump
kw 2.2 2.2Drain sump pump not considered in scope bySSEC
J Tec hn ic al Ran ki ng 1 st -XICON 2nd -THERMOSYSTEMS 3 rd - SRI & SRI ENGINEERS
Thermosystem also supported but someof the technical datas are irrelevant and
K Tec hn ic al Co nc lu si on
XICON has given sufficienttechnical datas from the initial
stage and supporting us byproviding relevant information forour clarifications.
,are open and bidder mentioned thatthey will furnish during detailengineering.
LDO forwarding pump head shall besame as XICON.
Drain oil pump head shall be same asXICON
We suggest, not to consider SSEC offerconsidering the limited technical datas and limited
support by them.If they are commerciallysuitable,we need to get many technical itemsconfirmed from them.
15 of 15