technical diary systems list

Upload: nallathambi

Post on 04-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Technical diary systems list

    1/16

    S.NO DESCRIPTIONRESPONSIBLE

    PERSON

    A Objective

    B Package identification

    C Identification of person for each package

    DImportant data collection parameter identification for each

    system

    E Completion of data collection for all the package

    1) Sea water /Raw water intake system for all projects

    2) CW system for all projects

    3) Compressed air system for all projects

    4) Fire protection, Detection and alarm system for all projects

    5) Water treatment system for all projects

    6) Cranes and Hoist for all projects7) Tanks for all projects

    8) Fuel oil system for all projects

    9) HVAC system for all projects

    10) Piping for all projects

    11) Ash handling system for all projects

    12) Mill reject system for all projects

    13) Miscellaneous system for all projects

    14) Coal handling system for all projects

    15) Other for all projects

    16) BTG for all projects

    F Final compilation of data collection Anand,Bheemsingh,Nallathambi

    G Review of compiled datas

    H Enhancement of compiled datas

    I Final review

    J Presentation

    SCHEDULE FOR TECHNICAL DIARY PREPARATION -MECHANICAL D

  • 7/30/2019 Technical diary systems list

    2/16

    TARGET DATE

    SIGN

  • 7/30/2019 Technical diary systems list

    3/16

    S.NO PACKAGES

    1 Sea water /Raw water intake system

    1.Sea water / Raw water Pumps -CT make up , Desalination pumps

    2.Raw water reservoir

    3.Stop log gate

    4.Coarse rack screen

    5.Trask rack

    6.Screen wash pumps

    7.Each projects problem we faced and their solution

    2 CW system

    1.Cw pumps

    2.Cw blowdown pumps

    4.ACW pumps

    5.CW Forebay & Channels

    6.Plate heat exchanger

    7.CW pit

    8.Coarse rack screen

    9.Trask rack

    10.Screen wash pump

    11.Each projects problem we faced and their solution

    Cooling tower

    1.NDCT

    2.IDCT

    3.Each projects problem we faced and their solution

    3 Compressed air system

    1.Compressor-Instrument , Service air

    2.Cooler

    3.Air dryer

    4.Air receiver

    5.Air filter

    6.Each projects problem we faced and their solution

    4 Fire protection, Detection and alarm system

    A)Fire water stroage tankB)Fire protection system

    1)Hydrant system

    I)Hydrant pumps-Motor , Diesel engine driven

    ii)Jockey pumps

    iii)Booster pumps

    iv)Water main network

    v)Hydrants-Landing valve,Internal and external hydrants, Water monitor

    TECHNICAL DIARY -MECHANICAL DESIGN

  • 7/30/2019 Technical diary systems list

    4/16

    vi)Hoses

    vii)Hydro pneumatic tank

    Viii)Aircompressor

    2)Automatic high velocity water (HVW) & medium velocity water (MVW)

    spray system

    i)Spray pumps-Motor , Diesel engine driven

    ii)QBD

    iii)Deluge valves

    iv)Isolation valve

    v)Y type strainer

    vi)Spray nozzle/projectors

    vii)Spray nozzle piping network

    viii)Detection and control system

    X)Piping

    x)Valves and Fittings

    3)Foam system

    i)Heat detectorsii)Foam concentrate stroage tank

    iii)Foam pumps

    iv)Balancing line

    v)Automatic controlling valves

    vi)Foam makers and dicharge outlets

    vii)Piping

    viii)Detection and control system

    x)Valves and Fittings

    4)Inert gas system

    i)Inert gas-Argon,Nitrogen,Argonite

    ii)Agent gasiii)Nozzle

    iv)Automatic operating device

    v)Piping

    vi)Nozzle

    5)Portable and mobile fire extinguishers

    C)Fire detection and alarm system

    i)Fire detectors

    D)Clean agent system

    E)Other

    i)Hume pipes

    F)Each projects problem we faced and their solution

    5 Water treatment system

    A.Water consumptive Requirement

    1.Cooling tower make up

    2.DM water

    3.Potable water

    4.Service water

    5.Loss in sludge

  • 7/30/2019 Technical diary systems list

    5/16

    6.Bottom ash system

    7.Evaporation

    B.Water pretreatment plant

    1.Water analysis

    2. Cascade Aerator

    3. Clarifiers

    4.Stilling chamber

    5.Parshall flume

    6.Rapid gravity filter

    7.Filter water stroage tank

    8.Chemical dosing -Alum ,Lime ,Polyelectrolyte

    9.Ro

    10.All water pretreatment pumps

    11.Each projects problem we faced and their solution

    C.Chlorination system

    1.Gas/Electrochlorine system2.Chlorine dosing pumps

    3)Each projects problem we faced and their solution

    D.DM plant

    1.DMF

    2.ACF

    3.Ion exchanger

    4.Mixed bed exchanger

    5.Degassifier tower and tanks

    8.Neutralisation pit

    9.Pumps used in DM plant10.Pressure vesels and stroage tank

    11.Each projects problem we faced and their solution

    E.ETP

    1)All ETP Pumps

    2)Sumps

    3)Lamella clarifier /tube settler

    4)Central monitoring basin (CMB)

    5)Coal settling pond

    6)ETP stroage tank

    7) OWS-CPI/TPI8)Each projects problem we faced and their solution

    F.STP

    1)All STP pumps

    2) Sumps

    3)Each projects problem we faced and their solution

    6 Cranes and Hoist

  • 7/30/2019 Technical diary systems list

    6/16

    A)EOT crane

    1)Sea water /Raw water intake pump house

    2) Cw pump house

    B)Under slung crane

    1)Compressor house

    2)Fuel oil pump house

    3)CW pump house

    C) Semi gantry crane

    D) Hoists

    E)Each projects problem we faced and their solution

    7 Tanks

    A) Fuel oil tanks

    1)HFO

    2)LDO/HSD

    3)Auxilary boiler stroage tank

    4)Drain oil tank

    5)Condensate flash tankB)Water tanks

    1)DM tanks

    2)CST tanks

    3)Service water tanks

    4)Potable water tanks

    5)Product water stroage tanks

    C)Each projects problem we faced and their solution

    8 Fuel oil system

    1.Unloading type and arrangement

    2.Fuel oil unloading ,Forwarding ,drain,Auxiliary boiler transfer pumps3.Floor coil heater

    4.Forwarding heater

    5.Suction coil heater

    6.Drain oil tank heater

    7.Fuel oil dyke area size

    8.Heat tracer-Steam/Electrical

    9.Each projects problem we faced and their solution

    9 HVAC system

    A)Ventilation system

    1)Wet ventilation systemESP Building

    TG Building

    2)Dry ventilation system

    3)Roof exhauster

    B) Air conditioning system

    1)Central air conditioning system

    2)Split/Packaged air contioning system

    C)Ducting and dampers

  • 7/30/2019 Technical diary systems list

    7/16

    D)Each projects problem we faced and their solution

    10 Piping

    A)Sea water intake system

    1)Pipes

    2)Flange

    3)Valves

    4)Fittings

    5)Hume pipes

    B)CW system

    1)Pipes

    2)Flange

    3)Valves

    4)Fittings

    5)CW Rubber expansion joint

    C) Compressed air system

    1)Pipes

    2)Flange3)Valves

    4)Fittings

    D)Fuel oil system

    1)Pipes-Fuel oil ,Steam and condensate

    2)Flange-Fuel oil ,Steam and condensate

    3)Valves-Fuel oil ,Steam and condensate

    4)Fittings-Fuel oil ,Steam and condensate

    5)Strainer

    6)Steam trap

    7)Flexible Hoses

    8)Insulation and claddingE)Miscellaneous system

    1)Pipes

    2)Flange

    3)Valves

    4)Fittings

    5)REJ

    F)Each projects problem we faced and their solution

    11 Ash handling system

    A)Bottom/Coarse ash handling system

    1)Hoppers2)Clinker grinder

    3)HP/LP seal water pumps

    4)Pipes

    5)Flange

    6)Valves

    7)Fittings

    B)Fly ash handling system

  • 7/30/2019 Technical diary systems list

    8/16

    1)ESP hoppers

    2)Buffer hoppers

    3)Stack hoppers

    4)Vacuum pumps

    5)Conveying air compressor

    6)Instrument air compressor

    7)Bag filter

    8)D pump/Air lock vessel

    9)Fly ash silo

    10)Pipes

    11)Flange

    12)Valves

    13)Fittings

    C)Ash slurry sump

    D)Jet pumps/Ash slurry pumps

    E)Ash water recover system1) Ash water recovery pumps

    D)Ash pond

    E)Pipes

    F)Flange

    G)Valves

    H)Fittings

    HCSD system

    1.HCSD stream

    2.HCSD pumps

    3.Ash slurry disposal pumps4.HCSD Mixing tank

    12 Mill reject system

    1.Pyrite hopper

    2.Pipes

    3.Flange

    4.Valves

    5.Fittings

    13 Miscellaneous system

    1.Service water pumps2.Potable water pumps

    3.Dm transfer pumps

    4.Boiler initial filling pumps

    5.ACW booster pumps

    6.BOP ACW cooling tower

    7.AHP seal water pumps

    8.Fire water pumps

    9.Each projects problem we faced and their solution

  • 7/30/2019 Technical diary systems list

    9/16

    14 Coal handling system

    1)Coal sampling and capacity of CHP

    2)Wagon tipplers/Apron feeders/Dribble feeder

    3)Crushers

    4)Vibrating grizzzly feeder

    5)Stacker reclaimer

    6)Conveyors

    7)Reversible belt feeder

    8)Flap gate

    9)Emergency reclaim hopper

    10)Scoop coupling

    11)Metal detector/Inline magnetic seperator

    12)Stockpiles

    13)Dust control(Extraction and suppression system

    14)Track hopper/ Paddle feeder or

    15)Coal and mill bunker

    15 Other

    1.Painting

    16 BTG

    1.Boiler and its auxiliaries

    2.Turbine and its auxiliares

    3.ESP

    4.Air preheater

  • 7/30/2019 Technical diary systems list

    10/16

    RESPONSIBLE

    PERSON

  • 7/30/2019 Technical diary systems list

    11/16

  • 7/30/2019 Technical diary systems list

    12/16

  • 7/30/2019 Technical diary systems list

    13/16

  • 7/30/2019 Technical diary systems list

    14/16

  • 7/30/2019 Technical diary systems list

    15/16

  • 7/30/2019 Technical diary systems list

    16/16