Main Technical Concerns
1. Machine Specifications and Tolerances
•Magnetic field quality•Alignment of the SR magnets•Vibration and thermal stability
2. Damping Wigglers
• High power density beam with a large fan
3. Cryogenic Permanent Magnet Undulators (CPMUs)
• Field measurement• Precise gap separation and thermal stability• Vacuum and impedance issues
1. Machine Specifications and Tolerances
SR sextupole alignment tolerance: 30 - 40 μm (2-σ cut)
BPM position stability (thermal): ± 1 μm
Magnet position stability (thermal + vibration): 100 nm (rms, 4 – 50 Hz)
NSLS-II SR Magnet
Magnet Gap
Max. Field (@ 3.6 GeV)
Field Homogeneity
Good Field Region
Dipole 35 mm 0.393 T 2 x10-4 20mm x 10mm
Quadrupole 55 mm 25.0 T/m 2 x10-4 40mm x 20mm
Sextupole 60 mm 800 T/m2 5 x10-4 40mm x 20mm
Magnetic Field Quality
Preliminary designs of the magnets are underway. Magnet vendors will be consulted about the final designs and tolerances.
Magnet Alignment
Very stiff girder with precisely machined slots for the magnet’s support frame.
Adjustable magnet support frame to precisely align magnetic axis to a fixed height. Magnets are directly bolted to the girder without shims or alignment hardware.
Six or more support points for the girder to minimize static deflection
Australian Girder-Magnet Assembly
SPring-8 Girder-Magnet Assembly
Magnet Vibration due to Ambient Ground Motion
Ambient ground motion drops steeply as 1/ω4
No significant vibration amplification for ω/ωn << 1
First natural frequency of the girder-magnet assembly should be above 30 Hz.
Magnet Vibration
Low profile girder beam height of ~ 1m
No pedestals under the girder.
Several (6 or more) girder support points
Simple girder alignment mechanism
No alignment mechanisms between the girder and magnets.
ALBA Girder-Magnet Assembly
Support Concept
f1 = 57 Hz
APS Girder
NSLS-II SR and Booster Rings
Low profile booster and SR rings. The floor drops in the experimental hall by 0.4m to provide a beam height of 1.4 m.
Deep commercial anchors are cast in concrete eliminating the need for pedestals or grouting.
Thermal Stability
• Air and process water temperature regulation: ± 0.1 ºC
• If necessary SR girders can be insulated and sand-filled.
Thermally-Insulated NSRRC Girder
Thermal Insulation
Sand
NSLS-II Damping WigglersNSLS-II Damping Wiggler
Period (mm) 100
Length (m) 6
No. of Periods 60
Field (T) 1.8
Ptotal (kW) 79.7
Pd (kW/mrad2) 98.3
Pv (kW/mrad) 18.8
Horizontal Fan ± K/ γ (mrad)
± 2.45
At 7m from the center of the wiggler, the fan is ~ 34 mm.Incidence power density at 0.6 mrad incidence = ~ 1.6 W/mm
Aluminum chamber will require additional cooling channels.
Dipole Chamber
7m
Cooling Channel
Beam position interlock will be required to protect the chamber.
Incidence power density at 10 m and at 1.5 degree incidence = ~ 50 W/mm. A Glidcop fixed mask can handle this power density.
10 GPM water flow ΔT ~ 30 ºC
NSLS-II Damping Wigglers – Fixed Mask
APS quad with exit port
Wiggler
Gildcop Mask ~ 25 cm long
Thermal FatigueTests at APS (26-ID Beamline)
Beam
StepperMotor
GlidcopSamples
Cooling Tubes
Beam
StepperMotor
GlidcopSamples
Cooling Tubes
Realistic design criteria will be established based on thermal fatigue tests at APS.
Designs of high-heat-load absorbers and photon shutters will be optimized.
NSLS-II CPMU – Technical Challenges
Magnetic Measurements of long small gap, UHV compatible undulators
Precision control of the Undulator gap
Effects of external environmental conditions on undulator gap control, energy and pointing stability.
Temperature/Magnetic uniformity along magnet arrays
Vacuum, Impedance, and beam dynamics issues associated with variable magnet gap to beam tube transitions and large chambers.
3-Meter In-vacuum CPMU based on X-25 Undulator Design
NSLS X-25 Undulator
We can extend experience gained from the Cryo-ready in-vacuum Undulator recently installed at X-25 to design the NSLSII CPMU’s.
A long modern measurements bench and pulsed wire system in temperature-controlled clean room environment will be used for measurements and shimming.
Concept for NSLS-II
Concept of an In-vacuum Cold Mapper for NSLSII CPMU’s
In-vacuum Mapper with Hall probe in fully opened magnet gap
Mapper mounted on custom flange cover.
• Optical Micrometers will directly measure the Cold Magnet Gap to sub-micron accuracy
Precision Gap Control in CPMU
• Measurement accuracy of ±1μm and resolution of ±0.1μm.
• Studies are currently underway to study the effects of environmental factors.
• Temperature feedback control may be implemented to the external Undulator structure
Undulator Impedance Issues
• Detailed modeling of the X-25 and NSLS II undulator cavities will be performed.
• If problems are observed during commissioning a feed back system will be implemented.
• Undulator transition impedances will be studied and low impedance transition designs will be implemented