techimp impianti s.p techimp impianti mar 2013 re… · piping prefab. thermal insulation ......

31
TECHIMP IMPIANTI s.p.A Company overview Mar 2013

Upload: ngocong

Post on 20-Aug-2018

222 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI s.p.A

Company overview Company overview

Mar 2013

Page 2: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI spA

• TECHIMP IMPIANTI is part of IREM Group, that was founded in 1979 by a groupof professionals with a solid experience in construction bu siness.

COMPANY HISTORY

The head-office is located in Siracusa, Italy.

• IREM Group construction activity covers civil, mechanical, E&I and ma intenanceworks, including storage tanks.

• TECHIMP IMPIANTI was founded in 1984 in order to perform the Electrical andInstrumentation works by a dedicated skilled company for th e industrial applications,as Oil & Gas, Chemical and Power Plants.

Page 3: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

CORPORATE STRUCTURETECHIMP IMPIANTI spA

TANKS TANKS TANKS TANKS NATIONALNATIONALNATIONALNATIONALMARKETMARKETMARKETMARKET

TANKS TANKS TANKS TANKS INTERNATIONAL INTERNATIONAL INTERNATIONAL INTERNATIONAL

MARKETMARKETMARKETMARKET

E & I E & I E & I E & I WORKSWORKSWORKSWORKS

CIVIL CIVIL CIVIL CIVIL WORKSWORKSWORKSWORKS

MECHANICAL MECHANICAL MECHANICAL MECHANICAL MAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCE

PIPING PIPING PIPING PIPING PREFAB.PREFAB.PREFAB.PREFAB.

THERMAL THERMAL THERMAL THERMAL INSULATION INSULATION INSULATION INSULATION

SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLDING

ICOS TANKOTECHIMP

IMPIANTISOLESISONIM

MECHANICAL WORKSMECHANICAL WORKSMECHANICAL WORKSMECHANICAL WORKS

I.P.F. IRTIS

Irem group

IREM

France

IREM

s.p.a

IREM

IGC uk

IREM

Saudi Arabia ltd

IREM

SeRVICII

IREM

SEM

IREM

Sur America

Page 4: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI sPA

Engineering, Procurement and Construction for Electrical and Instrumentation works

BUSINESS AREA

• Engineering, design/drawing up, as- built drawings

• Procurement of Bulk Material, components and Instru ments

• Electrical & Instrumentation assembly and installat ion

• Test alignments, commissioning and start-up

• Electric LV/MV/HV installations for power and signa ls

• Electrical heat tracing installation • Electrical heat tracing installation

• Grounding, cathodic protection system installation with current anodes

Page 5: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI spa

COMPANY ORGANIZATION CHART

BOARD OF DIRECTORS

EXECUTIVE MANAGER

PURCHASING DEPT.

QUALITY ASSURANCE QUALITY CONTROL

HSE HUMAN RESOURCESPRODUCTION MARKETINGADMINISTRATION

HSE COMMITTEE TASK COMMITTEE

ESTIMATINGINVOICE DEPT

ENGINEERING

WAREHOUSE

CONSTRUCTION

ESTIMATINGINVOICE DEPT

PROJECT MANAGERS

SITE 2SITE 1 SITE N

Page 6: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

FINANCETECHIMP IMPIANTI spa

Techimp Impianti sPA has a consolidated Turnover of over

32 million Euro per year

Bank References

• BNL – BNP Paribas

• Banca Intesa – San Paolo

26/03/2013 6

• Banca Intesa – San Paolo

• Unicredit corporate Banking

Page 7: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

PERSONNEL DETAILSTECHIMP IMPIANTI spa

TECHIMP IMPIANTI employs more than 450 European units on a permanent basis.Additional manpower is recruited from qualified sou rces to cover work peaks.

SITEHEAD QUARTER

Site manager 6

HSE 10

Quality 10

Planner 5

Electrical Supervisors 7

Instrument Supervisors 7

Foreman 35

Electricians 90

Conduit Fitters

SITE

Management 3

HSE 3

Project Managers 5

Marketing 5

Engineers - Planners 12

Administration 8

QA/QC 5

HEAD QUARTER

Conduit Fitters 40

Steel Fitters 70

Instrument technician 22

Pipe Fitters 25

Drivers 8

Total Personnel 486

Page 8: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI spa

MAIN EQUIPMENTS

Main Equipments q.ty

Lorries w/crane 5Excavators 3Excavators 3Dumpers 15Vans 10Cars 20Power generators 10Welding machines 50Motor welding sets 20Electric threading machines 8Insulation test and earth measurers 21Cable winches 5Cable Drums Lifting 35

All the construction facilities are owned, as box o ffices/cabins, toilette/showers, canteen,

Dressing-rooms, warehouse containers, cabins for ca libration, etc ...

Cable Drums Lifting 35Electro compressors 20Controls and Testing Instruments 150

Page 9: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI spa

POTENTIALITY

TECHIMP IMPIANTI has a total potential availability of around 1.000.000 working hours per year

POTENTIAL MANHOURS/YEAR 1.000.000

ENGINEERING 25.000

PROCUREMENT & SUBCONTRACTING 22.000

CONSTRUCTION 953.000Assembly & installation on-site 810.000Fabrication & assembly at workshop 53.000Fabrication & assembly at workshop 53.000Maintenance 37.000Technical service and testing 53.000

Page 10: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI spa

HEALTH SAFETY ENVIRONMENT

TECHIMP IMPIANTI sPA is certified SCC** by

KIWA NL.

On regular basis the workers attend to special

indoctrination session at work site managed

by qualified staff

Page 11: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI spa

HEALTH SAFETY ENVIROMENT

TECHIMP IMPIANTI SPA is currently certified

according to the standards OHSAS 18001.

Page 12: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI sPA

QUALITY

The Quality System is certified by

DET NORSKE VERITAS

following the rule of UNI EN ISO 9001:2008.

This Standard Quality System is implemented for all works without exception.

Page 13: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI sPA

ENVIRONMENT

The Environment System is certified by

DNV ITALY

following the rule of UNI EN ISO 14001:2004.

This Standard Environment System is implemented for all works without exception.

Page 14: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

CLIENTSTECHIMP IMPIANTI sPA

Page 15: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

MAIN WORKSTECHIMP IMPIANTI SPA

Client Project Scope of Work Location Start Date Finish Date Manhours P roject Amount Manpower Peak

SAIPEM S.p.A. TECHINT S.p.A. PBG S.A.

LNG TERMINAL Electrical, Instrumentation and Telecommunication works Swinoujscie - Poland Feb 2013 May 2014 360.000 € 6.200.000 180

FOSTER WHEELER ITALIANA srl -ESSO ITALIANA

COGEN PROJECT - COMBINED CYCLE POWER PLANT

Electrical and Instrumentation Works Augusta - Italy Dec 2012 Jul 2013 65.000 € 2.080.000 70

STAASTOLIE - SAIPEM STAATSOLIE REFINERY EXPANSION PROJECT Electrical and Instrumentation Works Paramaribo - Suriname nov-12 Aug 2014 413.000 2.100.000 USD 230

NYNAS- TECNIMONT KT SULPHUR RECOVERY UNIT Electrical and Instrumental works Nynashamn- Sweden Oct 2011 July 2012 137.000 € 5.600.000 90

NUON -MHINUON MAGNUM IGCC PROJECT COMBINATED

CYCLE 1200 MW POWER PLANT Electrical and Instrumental works Eemshaven- The Netherlands Dec 2010 Mar 2013 450.000 € 20.000.000 250

HELLENIC PETROLEUM S.A.-TECNICAS REUNIDAS

ELEFSIS REFINERY UPGRADE PROJECT-TECNICAS REUNIDAS

Electrical and Instrumentation Works Elefsina - Greece Dec 2010 Jun 2012 525.000 € 12.850.000 260

GATE LNG-TECHINT SENER LNG Terminal Electrical and Instrumentation Works Rotterdam - The Netherlands Feb 2010 Aug 2011 180.000 € 19.000.000 200

NESTE OIL - TECHNIP ITALY Bio-Diesel Terminal Electrical and Instrumentation Works and

Electrical Heat TracingRotterdam - The Netherlands Oct 2009 Jun 2011 1.025.000 € 31.000.000 450

ELECTRABEL BV- ALSTOM POWER

2x435 MW Combined Cycle Power Plant Electrical and Instrumentation Works Lelystad - The Netherlands Apr 2010 Jun 2010 215.000 € 7.900.000 160

ADRIATIC LNG - AKER SOLUTION

OFF-SHORE Lng Terminal Electrical and Instrumentation Works Porto Viro, Ravenna - Italy Sept 2008 Oct 2009 90.000 € 5.435.000 100

EXXON MOBIL/ FOSTER WHEELER

90 MW Combined Cycle Power Plant inside Refinery Complex

Electrical and Instrumentation Works Antwerpen - Belgium Oct 2007 Dec 2008 120.000 € 5.804.000 80

OMV Gas Compression Station Electrical and Instrumentation Works Eggendorf - Austria Oct 2007 Oct 2008 100.000 € 5.228.000 55

SNAM RETE GAS Gas Compression Station Electrical and Instrumentation Works Enna -Italy May 2007 Feb 2008 20.000 € 800.000 16

ENEL SpA 2x400 MW Combined Cycle Power Plant Electrical and Instrumentation Works Escatron - Spain Sept 2006 Dec 2008 230.000 € 9.700.000 135

FLUXYS - TECHNIGAZ LNG Terminal Electrical and Instrumentation Works Zeebrugge - Belgium Apr 2006 May 2007 91.000 € 3.500.000 50

FOSTER WHEELER 400 MW Combined Cycle Power Plant Electrical and Instrumentation Works Teverola - Italy July 2005 Sept 2006 95.000 € 2.500.000 100

ABB LUMMUS -PREEMRAFF

Hydrocracker and Hydrogen Unit Electrical and Instrumentation Works Lysekil - Sweden Jan 2005 Feb 2006 200.000 € 11.000.000 160

Page 16: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

FWCE - TRC 2000 Project - TAMOIL Collombey – Switzerland

Client: Foster Wheeler – Tamoil

Location: Collombey – Switzerland - Project: TRC 2000

Scope of Works: Supply and Installation of E&I Syst ems

TECHIMP IMPIANTI SPA

Scope of Works: Supply and Installation of E&I Syst ems

Contract Price: 5.200.000 Euro

Working Hours: 150.000

Manpower Peak: 95

Scheduling: July 2002 – Dec 2003

Key figuresElectrical Works details Instrument Works details

Cables m 206.000 Cables m 145.000Conduit m 27.000 Conduit m 8.000 Conduit m 27.000 Conduit m 8.000 Cable Tray m 1.500 Cable Tray m 32.000 Lighting Poles item 1.050 Junction Box item 210Grounding m 15.000 Instruments item 2.650Panel / Transf. kg 68.000 Control Valve item 285

Panel DCS kg 18.500

Page 17: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

FWCE - TRC 2000 Project - TAMOIL Collombey – Switzerland

TECHIMP IMPIANTI SPA

Page 18: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

ABB - Gas Oil Project - PREEMRAFF Lysekil – Sweden

Client: ABB Lummus – Preemraff

Location: Lysekil – Sweden - Project: Gas Oil Project

Scope of Works: Supply and Installation of E&I Syst ems

TECHIMP IMPIANTI SPA

Scope of Works: Supply and Installation of E&I Syst ems

Contract Price: 11.000.000 Euro

Working Hours: 200.000

Manpower Peak: 160

Schedule: January 2005 – December 2006

Key figuresElectrical Works details Instrument Works details

Cables m 266.000 Cables m 275.000Conduit m 11.000 Conduit m 11.000 Conduit m 11.000 Conduit m 11.000 Cable Tray m 9.500 Cable Tray m 22.000 Lighting Fixtures item 830 Junction Box item 400Grounding m 16.000 Instruments item 1.135Panel / Transf. kg 60.000 Control Valve item 350

Panel DCS kg 17.000

Page 19: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI SPA

ABB - Gas Oil Project - PREEMRAFF Lysekil – Sweden

Page 20: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

Client: Enel S.p.A.

Location: Escatron – Spain – Project: 800 MW Combined Cycle Power Plant

Scope of Works: Supply and Installation of E&I Syst ems

TECHIMP IMPIANTI SPA

800 MW Combined Cycle Power Plant - ENEL Escatron – Spain

Scope of Works: Supply and Installation of E&I Syst ems

Contract Price: 9.700.000 Euro

Working Hours: 230.000

Manpower Peak: 135

Schedule: September 2006 – December 2008

Key figuresCables m 420.000Conduit m 18.000Cable Tray m 22.000Cable Tray m 22.000Lighting Poles item 3.000Grounding m 6.500Instruments item 640Control Valve item 80

Page 21: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI SPA

800 MW Combined Cycle Power Plant - ENEL Escatron – Spain

Page 22: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

Technip Italy- Neste Oil Bio Diesel Plant

Rotterdam- The Netherlands

Client: Neste Oil

Location: Maasvlakte- The Netherlands - Project: Rott erdam Biodiesel

Scope of Works: Supply and Installation of E&I Syst ems

TECHIMP IMPIANTI SPA

Scope of Works: Supply and Installation of E&I Syst ems

Contract Price: 31.000.000 Euro

Working Hours: 1.025.000

Manpower Peak: 450

Scheduling: Nov 2009- Jun 2011

Key figuresElectrical Works details Instrument Works details

MV/LV/CC Cables m 950.000 Instr. Cables m 400.000Conduit m 90.000 Conduit m 12.000 Conduit m 90.000 Conduit m 12.000 Cable Tray m 45.000 Cable Tray m 22.000 Lighting Poles item 2.900 Junction Box item 350Grounding cables m 95.000 Instruments item 5.000Equipment item 280 Control Valve item 900

Telecom system item 800

Page 23: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI SPA

Technip Italy- Neste OilBio Diesel Plant

Rotterdam- The Netherlands

Page 24: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

Techint- SenerLng Terminal

Rotterdam- The Netherlands

Client: JV Techint- Sener

Location: Maasvlakte- Netherlands- Project: LNG Termi nal

Scope of Works: Supply and Installation of E&I Syst ems

TECHIMP IMPIANTI SPA

Scope of Works: Supply and Installation of E&I Syst ems

Contract Price: 19.000.000 Euro

Working Hours: 180.000

Manpower Peak: 170

Scheduling: Feb 2010 – Ago 2011

Key figuresElectrical Works details Instrument Works details

MV/LV/CC Cables m 300.000 Cables m 460.000Conduit m 10.000 Conduit m 2.000 Conduit m 10.000 Conduit m 2.000 Cable Tray m 7.500 Cable Tray m 20.000 Lighting Poles item 245 Junction Box item 450Grounding cables m 15.000 Instruments item 1.500Equipment item 86 Control Valve item 200

Equipment item 80

Page 25: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI SPA

Techint- Sener Lng Terminal

Rotterdam- The Netherlands

Page 26: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

Nynas – Tecnimont ktSulphur Recovery UnitNynashamn – Sweden

Client: Nynas

Location: Nynashamn - Sweden

Scope of Works: Sulphur Recovery Unit

TECHIMP IMPIANTI SPA

Scope of Works: Sulphur Recovery Unit

Contract Price: 4.000.000,00 Euro

Working Hours: 90,000

Manpower Peak: 90

Scheduling: Oct 2011- Jul 2012

Key figuresElectrical Works details Instrument Works details

MV/LV/CC Cables m 350.00 Cables m 40.000 Conduit &Cable Tray m 10.000 Conduit & Cable Tray m 3.000 Tracing Cables m 22.000 Junction Box item 160Lighting & sockets item 400 Instruments item 900Grounding cables m 5.000Equipment and JB item 1000

Page 27: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

NUON – MHINuon Magnum IGCC Project

Eemshaven – The Netherlands

Client: MHI

Location: Eemshaven – The Netherlands

Scope of Works: Electrical and Instrumentation wor ks

TECHIMP IMPIANTI SPA

Scope of Works: Electrical and Instrumentation wor ks

Contract Price: 19.000.000,00

Working Hours: 450.000

Manpower Peak: 250

Scheduling: Dec 2010- Sept 2012

Key figuresElectrical Works details Instrument Works details

MV/LV/CC Cables m 430.000 Cables m 260.000 Conduit m 3000 Conduit m 700 Conduit m 3000 Conduit m 700 Cable Tray m 56.000 Cable Tray m 29.000Lighting Poles item 1500 Junction Box item 507 Grounding cables m 58.000 Instruments item 7200 Equipment item 500 Control Valve item 1178

Equipment item 387

Page 28: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

Hellenic-Petroleum S.A.Elefsis Refinery Upgrade Project- Tecnicas Reunidas

Elefsina- Greece

Client: Tecnicas Reunidas

Location: Elefsis Refinery Upgrade Project – Tecnica s Reunidas

Scope of Works: Electrical and Instrumentation Wor ks

TECHIMP IMPIANTI SPA

Scope of Works: Electrical and Instrumentation Wor ks

Contract Price: 12.300.000

Working Hours: 500.000

Manpower Peak: 260

Scheduling: Dec 2010- Jun 2012

Key figuresElectrical Works details Instrument Works details

MV/LV/CC Cables m 415.000 Cables m 625.000 Conduit m 12.000 Conduit & Cable Tray m 42.000Conduit m 12.000 Conduit & Cable Tray m 42.000Cable Tray m 20.000 Junction Box items 372 Lighting Poles items 2.800 Instruments items 5.500 Grounding cables m 60.000 Control Valve items 726Equipment items 367 Equipment items 327

I/O Signal items 9.730

Page 29: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

Hellenic-Petroleum S.A.Elefsis Refinery Upgrade Project- Tecnicas Reunidas

Elefsina- Greece

TECHIMP IMPIANTI SPA

Page 30: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

Staatsolie – Saipem Staatsolie Refinery Expansion Project

Paramaribo – Suriname

Client:Staatsolie – Saipem

Location: Staatsolie Refinery – Paramaribo, Suriname

Scope of Works: Electrical and Instrumentation Wor ks

TECHIMP IMPIANTI srl

Scope of Works: Electrical and Instrumentation Wor ks

Contract Price: 12,1 Million USD

Working Hours: 413.000

Manpower Peak: 230

Scheduling: Nov 2012- Aug 2014

Key figures

Electrical Works details Instrument Works detailsMV/LV/CC Cables m 310.000 Cables m 260.000 Conduit m 19.000 Conduit m 43.000 Conduit m 19.000 Conduit m 43.000 Cable Tray m 11.000 Cable Tray m 26.000 Lighting fixures items 700 Junction Box items 300 Grounding cables m 60.000 Instruments items 7.000Equipment items 314 Control Valve items 1180

I/O Signal items 11.300

Page 31: TECHIMP IMPIANTI s.p TECHIMP IMPIANTI MAR 2013 RE… · PIPING PREFAB. THERMAL INSULATION ... design/drawing up, ... TECHIMP IMPIANTIemploys more than 450 European units on a permanent

TECHIMP IMPIANTI SPA

CONTACT POINTS

TECHIMP IMPIANTI SPA

HEAD OFFICES:Via Stentinello 9 – C.da TargiaVia Stentinello 9 – C.da Targia96100 Siracusa ITALY Tel. +39.0931.787111Fax. [email protected]

WAREHOUSE:Via Bari 1796010 Priolo Gargallo (Siracusa)96010 Priolo Gargallo (Siracusa)ITALYTel/Fax.:+39.0931.769210