Team HazardHawk
Team HazardHawk 2008
Last Week
Concept FinalizationComplete
Preliminary CAD of ConceptComplete
Budgetary EstimatesParts Selection
○ CompleteMaterial Selection
○ Complete
Team HazardHawk 2008
Last Week
GPS and Infrared TestingComplete
Select Trade Study TopicsComplete
Complete Concept MemoIncomplete
Team HazardHawk 2008
Concept Status Body: 2.5’ x 1.3’ x 1’ Arm: Two 30” segments
Retractable Equiped with two infared
sensors Can swivel 180o
Powered by 12-V DC Motors
Tank Drive Each side powered by a
24-V DC Motor LCD Display w/Keypad
Team HazardHawk 2008
CAD
Preliminary Budget Team HazardHawk Budget
Item Comments QTY PriceL-Bracket Home Depot - For Body 8 $4.64
Hinge Home Depot - For Body 2 $2.43HDPE McMaster-Carr #9785T162 1 $115.38Motor Merkle - Korff 24V Gear Motor 2 $40.00Motor Bi-Polar 2 Phase Motor 2 $20.00
Drive Shaft McMaster-Carr #8632T9 1 $22.27Sprocket McMaster-Carr #6280K321 2 $15.24Sprocket McMaster-Carr #6280K384 4 $50.32
RodHobby Lobby Carbon Fiber .5x10x1000mm 1 $21.00
Screws/Bolts Bolts+Nuts 100 $15.00Hinge For Arm 2 $8.50
BatteryFrom Mr. Brownell - 24V Borrowed 2 $0.00
Gear 15 Tooth 1 in. 2 $23.30Chain McMaster-Carr #6261K297 - 7 ft. 1 $19.18
ChainMcMaster-Carr #6261K261 - Connector 1 $1.34
Rings McMaster-Carr #98430A138 100 $8.00Wheels McMaster-Carr #2331T18 4 $46.16
Bearings McMaster-Carr #2705T24 8 $25.92
TOTAL $438.68
GPS Test Results Data taken on 1/30/2008
Test 1: Start at an arbitrary location, move away from the location for 5 minutes and then return to the location and determine whether coordinates are the same.○ Start: N 41.7825, W 14.340○ End: N 41.7808 W 14.330
Test 2: Start at an arbitrary location, move a great distance away from the location, and looking only at the GPS, return to the starting coordinates.○ Start: N 41.41.7600, W 86.14175○ End: ~Six feet from target
Trade Study Topics Infrared Sensor Sensitivity
Kerry Kalman Filtering Techniques for Improving GPS
Precision Tim
Kinematic Analysis of the Arm Mechanism Andy
GPS: Accuracy, Optimal Usage, etc. Dave
Feasibility of Using Wheel Encoders to Improve Navigation Guillermo
Action Items Complete Concept Memo
We will initiate this today (2/5/08) during our group meeting and divide the memo into parts
Individual Assignments will be completed by Thursday (2/7/08)
The memo will be compiled during the group meeting on Thursday (2/7/08)
Trim Budget Investigate Different or Scrap Material for body Look into used wheels Talk to Mr. Brownell about less expensive motors
Team HazardHawk 2008
Action Items
Order PartsWe will put in our online McMaster -Carr order on
Friday (2/8/08) after double checking our B.O.M and consulting with Mr. Brownell and Prof. Strebinger on our arm material selection
Complete Trade Study ProposalsIndividuals will complete their assigned
proposals by 2/12/08
Team HazardHawk 2008