team assignment #5

15
Team Assignment #5 K15T2_Team 5

Upload: axel-shepherd

Post on 02-Jan-2016

23 views

Category:

Documents


0 download

DESCRIPTION

Team Assignment #5. K15T2_Team 5. Content. Introduction. GQM of project. Expected result mapping with goals. Introduction. Goals of GQM. GQM of Project. Implement Project goals. Team member goals. Implement project goals. Goal 1: Release “Must have” functions for version 1.0 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Team Assignment #5

Team Assignment #5

K15T2_Team 5

Page 2: Team Assignment #5

Content

Introduction

GQM of project

Expected result mapping with goals

Page 3: Team Assignment #5

Introduction

Goals of GQM

Page 4: Team Assignment #5

GQM of Project

Implement Project goals

Team member goals

Page 5: Team Assignment #5

Implement project goals

Goal 1: Release “Must have” functions for version 1.0

Question 1(Q1): How many functions do release in version 1.0?

Measure: Number of functions are released in version1.0

Metric: No of functions (F)/ Total of functions (TF)

Rate : (F/TF) * 100%

Page 6: Team Assignment #5

Implement project goals

Goal 1: Release “Must have” functions for version 1.0

• Question 2(Q2): How long time do complete “Must have” functions?

• Measure: Time to complete “Must have ” functions that planned, Time to complete “Must have ” functions actual

• Metric: Time to complete “Must have ” functions that planned (TP) / Time to complete “Must have ” functions actual (TA)

• Rate: (TA/TP) * 100%

Page 7: Team Assignment #5

Implement project goals

Goal 2: Produce a quality product Question 3 (Q3): How many defects are found

in each phases (compile, unit test, integration test, system test)?

Measure: Number of defects (R) Metric: Number of defects (R)/ LOC Rate: (R/ LOC) * 100%

Page 8: Team Assignment #5

Implement project goals

Goal 2: Produce a quality product Question 4(Q4): How many defects are removed

in each phases (compile, unit test, integration test, system test)?

Measure: Number of closed defects (R1) Metric: Number of closed defects (R1)/ Number

of opened defects (R) Rate: (R1/R) * 100%

Page 9: Team Assignment #5

Implement project goals

Goal 3: Finish on time Question 5 (Q5): How to complete all tasks and

release product on time? Measure: Actual time to complete task 1

(T1), ...., Actual time to complete task n (Tn) Metric:( T1+T2+..+Tn)/ Time of project (T) Rate: [(T1+T2+..+Tn)/T]*100%

Page 10: Team Assignment #5

Implement project goals

Goal 4: Run a well managed project• Question 6 (Q6): How to reduce error estimation

task hours? • Measure: Estimated task hours (E), Actual task

hours (A)• Metric: [(Actual task hours (A) - Estimated task

hours (E)]/ Estimated task hours (E)• Rate: [(A-E)/E] *100%

Page 11: Team Assignment #5

Team member goals

Goal 5: Plan and track all your personal work Question 7 (Q7): How team member do plan and

track personal work? Measure: complete tasks of team member (CT)

on time log and actual data (AD) Metric: (CT/AD) Rate: (CT/AD)*100%

Page 12: Team Assignment #5

Team member goals

Goal 6: Apply knowledge of this course in to the project• Each member seft- assessment

No Meaning

1 Very poor (not learning at all)

2 Poor (learned somewhat but not applied correctly)

3 Fair (learned & applied many times but somewhat correctly)

4 Good (applied as learned)

5 Very Good (applied consistently as learned)

6 Excellent (applied beyond what I've learned)

0 NA (did not have an opportunity to apply)

Page 13: Team Assignment #5

Expected resultsGoal Question Expected result

Release “Must have” functions for version 1.0

Q1 60% functions must be release in version 1

Q2 (TA/TP) < = 1

Produce a quality product

Q3 (R/ LOC) * 100% In compile : < 20% Unit test : < 10% Build and integration: < 5% System test : < 3%

Q4 (R1/R) * 100%• In compile : > 10%• Unit test : > 50%• Build and integration: >

70%• System test : > 90%

Finish on time Q5 [(T1+T2+..+Tn)/T]*100% This rate must <=100%

Run a well managed project

Q6 [(A-E)/E] *100%Error in estimated task hours:< 20%

Page 14: Team Assignment #5

Expected Results

Goal Question Expected result

Plan and track all your personal work

Q7 (CT/AD)*100%This rate must = 100%

Apply knowledge of this course in to the project

Each team member should achieve >=4

Page 15: Team Assignment #5

Thanks for your listening!