tdr- water -direct cost redn in 15-16
TRANSCRIPT
TPI Head – Direct Cost reduction (Water cost)
TDR Registration
Amber Pune Unit
Theme - Reduce Water cost by 30% in 16-17
TDR leader - Amrit Raj Jaiswal
COOPl. Head Dir. Oprn.
THEME
EXISTING PROBLEM INNOVATION IDEA TARGET TEAM MEMBERS
NECK POINT BenefitsIMPLEMENTATION PLAN
PROCESS MONTH
Oprn Head
usages & plant capacity Working
TARGET DATE
Name Sign.
Monetary Effect
Target
Before
After
LEADER
Qualitative
Quantitative
Amrit
PUNE Unit
Water Cost Reduction
April.16 31 Oct.16Jun.16 31 Aug.16
Innovation Plan
Implementation
Monitoring & Control
10 % improvement
TDR Registration sheet
Manoj .
Ujjwal
NavnathSudam
•Improve basic condition of R.O. & DM plant & utilize capacity• Increase capacity of R.O.• Process water reuse by cascading system•R.O. reject water use for general purpose .
Rs. 14.4 Lacks / Year ( Till date-4.57 Lack)
Brainstorming & Data Collection
Year 15-16 – 0.34 of Sale % (Q 1- 0.29 % ,Q 2 – 0.42 %) (Q 3 – 0.49 % , Q 4 – 0.32 %) Sweta
31 Dec.16
Year 16-17 – 0.10 % of Sale (Q 1- 0.20 % ,Q 2 – 0.26 % ) (Q 3 – 0.10 %)
Wakle
Dept. :
Date : 01.04.2016
31 Dec ’16
Guide Satyendra/ Rishi
• High water cost due to R.O. water purchase • Capacity constraints in peak time•Water Quality not as per std. in peak time
Water Consumption Details- 2015
2015
Water cost Other costTotal cost Paint in sqm Cost /
sqmCost if no
innovation SavingsMIDC bill RO
Purchase Raw water Sub-total Maint cost Mambrane cost
Investment cost
Jan-15 20,578 313,600 2,400
336,578 -
336,578
77,485 4.34
Feb-15 20,665 312,000 7,200
339,865 -
339,865
95,477 3.56
Mar-15 23,440 372,000 20,800 416,240
-
416,240
88,419 4.71
Apr-15 12,767 320,000 7,200
339,967 -
339,967
83,238 4.08
May-15 30,743
94,000 5,600
130,343 -
130,343
42,919 3.04
Jun-15 27,546
- -
27,546 - 27,546
18,329 1.50
Jul-15 25,600
- -
25,600 12,550 - 38,150
15,954 2.39
Aug-15 22,529
- -
22,529 66,000 - 88,529
11,271 7.85
Sep-15 19,462 5,500 -
24,962 - 24,962
9,058 2.76
Oct-15 23,882
-
-
23,882
- 23,882
7,586 3.15
Nov-15 46,307
- -
46,307 - 46,307
15,748 2.94
Dec-15 15,433 5,200 -
20,633 - 20,633
25,623 0.81
Total 288,952 1,422,300
43,200 1,754,452 12,550 66,000 -
1,833,002
491,106 3.73
Water Cost Trend- 2015
Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Total0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
4.34
3.56
4.71
4.08
3.04
1.50
2.39
7.85
2.763.15 2.94
0.81
3.73
Water Cost / sqm
Basics• Capture database of purchase RO Water in Year
15-16• Enhance capacity planning if in-house mfg of RO
water
Actions
• Requisition of added new R.O. plant for capacity improve
• Cascading system implementation for process water re-use
• Preventive maint. & spares availability of R.O. & D.M. plant to enhance 100 % utilization
Monitoring
• Maintain RO plant with close monitoring of capacity enhancement
• Maintain equipment efficiency • Work on Greenco activity with water
conservation ideas
Activity Plan Sheet
Sr. No. Equipment Current Capacity Requirement Shortfall Remark
1 RO. Plant 1100 lit / hrs.Ok out put 1160 lit/ hrs max -60 lit/Hrs.
New R.O. plant to be install for
fulfill requirement
2. D.M. Plant 1000 lit/ Hrs. OK out put 600 lit /Hrs. + 400
lit/Hrs. No issue
3.Incoming Raw water capacity
from MIDC 75000 Lit / Day 70000 Lit/ Day +5000/Day No issue
RO plant capacity enhancement with availability
MIDC Inlet
70K
General Use
41.9K
E.T.P.
1.2K
R.O.
28.1K
For D.M.
13.6K
Direct R.O. Use
14.4K
D.M.
12.4K
MIDC water distribution chart
Water Consumption Reduction Action Plan
Sr.No. Type of water Dept. Present Source Action To Reduce
1 DM water
Paint shop
In-house DM plant used RO water to convert in DM
1.Casceding to be start with auto filling system 2.Rinse 5 water use for top up in Phospeting 3.Phospeting de-sludging pump to be start & increase bath de slugging frequency from one monthly to two monthly. 4. Repair all pipe line and valves to avoid leakages & wastages of water. 5. Change seals of pumps to avoid leakages
In-house R.O. plant used to make R.O. from MIDC water
1.Casceding to be start with auto filling system 2.Rinse 2 water use for top up in KOD & degreasing 3.Additional raw water tank for increase storage capacity. Up to 15K4.New R.O plant to be installed to avoid short falls.5.Primary filter increase from 1no to 4 nos. to increase membrane life6. Membrane change to increase out put.7. DM reject water collect & circulate through again RO plant.8. Change seals of pumps to avoid leakages
2 RO water
3 RawGeneral Use R.O. Plant reject flow water to
general purpose
Raw water can be use at canteen at hand wash basin with separate tank & one separate hand wash station for ladies with raw water connection
RO reject low (1800 ltr/hrs) use for toilet & fire fighting system (Daily appro. Generated 25K lit if all R.O. we made in house
Weld shop 1.Leakages from cooling towers arrest.2. Cooling tower PM to be carried out to improve performance
Action Plan
Best practices : Water cascading system in Pre-treatment lineImplementation of water cascading system for conservation
Issue Improvement Result
Before After
250100%
0
Paint peel off in PPM
Excess water uses in paint shop
1. Water filling in tank individually ,
wastage is higher
Water cascading system
1. Water Inlet pipeline in series to reduce
water drainage frequency
Quality improvement Water Reduction 3K / Day
Water Consumption / day
Before After
23KL 15%
20KL
Best practices : RO plant capacity enhancement activity
storage capacity increase from 5 k to 15 k
Issue Improvement Result
Leadership Through Innovation
Raw water capacity increase from 5K to 15K Eliminate raw water shortage for RO making
Raw water ( MIDC) storage capacity increase
from 5 k to 15 k , to use 100 % capacity of RO
working during shortage from MIDC supply
Storage capacity 5K only
1. Shortage water of water for RO
making
2. R.O. purchase from outside party
Water Consumption Details- 2016
Last year cost/Sqm. 3.73Water cost reduction - yearly ROI achievement sheet
2016Water cost Other cost
Total cost Paint in sqm Cost / sqm
Cost if no innovation Savings
MIDC bill RO purch. Raw water Sub-total Maint cost Mambrane cost
Investment cost
Jan-16 32,755
40,000
-
72,755 -
72,755
62,920 1.16
234,842
162,087
Feb-16 58,462
64,000
-
122,462 -
122,462
78,823 1.55
294,199
171,737
Mar-16 54,010
133,000
-
187,010 -
78,375
28,000
293,385
96,283 3.05
359,366
65,981
Apr-16 63,812
-
-
63,812 -
63,812
92,253 0.69
344,325
280,513
May-16
56,870 -
-
56,870 - 56,870
71,143 0.80
265,534
208,664
Jun-16
32,365 -
-
32,365 32,365
41,017 0.79
153,092
120,727
Jul-16
33,925
33,925 33,925
395340.86
147,556
113,631
Aug-16
43,000
43,000 43,000
17,793 2.42
66,411
23,411
Sep-16 -
- #DIV/0!
-
-
Oct-16 -
- #DIV/0!
-
-
Nov-16 -
- #DIV/0!
-
-
Dec-16 -
- #DIV/0!
-
-
Total
375,199
237,000 -
612,199 -
78,375
28,000
718,574 499,766 1.44
1,865,324
1,146,750
Water Cost Comparison- 2015 V/S 2016
2015 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Total cost
336,578
339,865
416,240
339,967
130,343
27,546
38,150
88,529
24,962
23,882
46,307
20,633 1,833,002
Painting in sqm
77,485
95,477
88,419
83,238
42,919
18,329
15,954
11,271 9,058
7,586
15,748
25,623
491,106
Cost / sqm painting 4.34 3.56 4.71 4.08 3.04 1.50 2.39 7.85 2.76 3.15 2.94 0.81 3.73
2016 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Total cost
72,755
122,462
293,385
63,812
56,870
32,365
33,925
43,000 718,574
Painting in sqm
62,920
78,823
96,283
92,253
71,143
41,027 39,534 17,793 499,776
Cost / sqm painting 1.16 1.55 3.05 0.69 0.80 0.79 0.86 2.42 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 1.44
Saving value 263,823
217,403
122,855
276,155
73,473
(4,819)
4,225
45,529
998,644
Water Cost Trend- 2015 V/S 2016
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
1.161.55
3.05
0.69 0.80 0.79 0.86
2.42
1.44
4.34
3.56
4.71
4.08
3.04
1.50
2.39
7.85
2.763.15 2.94
0.81
3.73
2016 2015