tdc2tcc2 réunion de chantier 7 13.12.2013 in sharepoint: workspace/tcc2wg/ls1%20worksite%20meeting

6
TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint: https://espace.cern.ch/sba-worksp ace/tcc2wg/LS1%20worksite%20meeti ng/

Upload: tyler-morrish

Post on 28-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting

TDC2TCC2 Réunion de chantier 7

13.12.2013In sharepoint:

https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/

Page 2: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting

Statut

• Retrait MDLV • Mise en place protection table plug-in TCSC• Manutention et stockage chambre a vide• Visite GS-CE à planifier en S51• Bilan des doses

Page 3: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting

MDLV

Page 4: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting

MDLV

Page 5: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting

Protection TCSC

Page 6: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting

Liste des ImpactsIntitule Numero Dose cumulee (uSv)

Retrait TCSC 37401 (closed) 363

Suite et remontage TCSC 38522 209

Retrait 5 aimants 37405 2369

Consolidation vide 37404 81

Survey EN-EL 39450 0

Signalisation TDC2-TCC2 39150 9