td lte ssr - 763 iloilo-jaro plaza

15
REQUIRED ATTACHMENT PER SCENARIO A1 Site Development Works Details A2 AC & DC Power Details A3 BTS & Antenna Details B1 Site Layout B2 Antenna Placement Layout B3 RRU Placement Layout B4 Equipment Layout and Propose Cable Layout B5 Coverage Details B6 Indoor Site Picture Details B7 Outdoor Site Picture Details B8 Manual Hauling Report Scenario 2 RRU Below Photo's and Sketches Site Details Scenario 1 RRU on TOP

Upload: paul-christian-aztronomo

Post on 10-Nov-2015

23 views

Category:

Documents


4 download

DESCRIPTION

Sample TSSR TDD

TRANSCRIPT

  • REQUIRED ATTACHMENT PER SCENARIO

    A1 Site Development Works Details

    A2 AC & DC Power Details

    A3 BTS & Antenna Details

    B1 Site Layout

    B2 Antenna Placement Layout

    B3 RRU Placement Layout

    B4 Equipment Layout and Propose Cable Layout

    B5 Coverage Details

    B6 Indoor Site Picture Details

    B7 Outdoor Site Picture Details

    B8 Manual Hauling Report

    Scenario 2

    RRU Below

    Photo's and Sketches

    Site DetailsScenario 1

    RRU on TOP

  • Scope:

    SMART Site ID:

    SMART Site Name:

    SUN Site ID:

    SUN Site Name:

    Area:

    GPS Coordinates:

    Site Address:

    Survey Date:

    Site Details

    A1 Site Development Works Details

    A2 AC & DC Power Details

    A3 BTS & Antenna Details

    Photo's and Sketches

    B1 Site Layout

    B2 Antenna Placement Layout

    B3 RRU Placement Layout

    B4 Equipment Layout and Propose Cable Layout

    B5 Coverage Details

    B6 Indoor Site Picture Details

    B7 Outdoor Site Picture Details

    B8 Manual Hauling Report

    763

    Iloilo Jaro-Plaza

    JAIME ST. NEAR E.LOPEZ ST., Brgy Fatima, Iloilo City

    Table of Contents

    WGS 84

    NEW DBS TD LTE

    Visayas

    SMART ENG - P&E Supp.

    Attached

    Vendor Rep.

    Map Datum

    SSR_00000_RET_REV_0

    SMART ENG - TPE

    SMART ROMCSMART BUILD

    DOCUMENT NO.

    SMART ENG - AP&E

    Elevation

    21m ASL

    Decimal

    122.558333

    Longitude

    122 33'30"

    Latitude

    10 43'21.2"

    Decimal

    10.722556

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    Tower location & type: Building site Building name No. of floors Radio room location

    Tripod ht m(AGL) Pole mounted ht m(AGL)

    Others ht m(AGL)

    Lot site 3 Legged SST 4 Legged SST Monopole Guyed pole Guyed trilon

    Structure height m

    Leased Area Yes

    Equipment room type: Concrete Room Van Outdoor installation Others pls specify

    Equipment room size: 12-footer (2.75m x 4.01m) 20-footer (2.75m x 6m) Others pls specify

    Ventilation type: Window ACU Split ACU Natural ventilation Others pls specify

    Site accessibility: 24/7 Office hours Mall/Bldg hours Others pls specify

    Manned Manned

    Available

    Needed

    Needed

    Available

    Available

    Band: GSM Height: m AGL Needed

    Band: GSM Height: m AGL Needed

    Band: UMTS Height: m AGL Needed

    Band: UMTS Height: m AGL Needed

    Band: LTE FDD Height: m AGL Needed

    Band: LTE TDD Height: m AGL Needed

    Mounting pole for RRU Height: m AGL Needed

    Available Requires new grounding bar

    Near antenna Below RRU Above RRU Available Requires new grounding bar Ohm Reading

    Available Requires new grounding bar Ohm Reading

    Available Requires new grounding bar Ohm Reading

    Available Requires new grounding bar Ohm Reading

    Available hole's needed: ,hole size

    Available Qty needed: 2 pcs, cable gland size 7/8

    New feeder / fiber line cable Needed If needed, length & size required:

    Needed Qty needed: pcs

    Available New DDF block required

    Available New DDF block required

    Needed Required length of jumper cable: m x pcs

    Yes

    Available Ampere: Qty: pc

    Not Available Required ampere: Qty: pc

    Yes No

    Yes No

    Yes Equipment type:

    No

    Recommended Not recommended

    2pcs-cable glands

    10m-LAN cable

    15m-DCDU cable to rectifier

    15m-BBU grounding cable

    70m-CPRI cable @ 3 runs

    70m-RRU dc cable @ 3 runs

    3500

    15m-GPS coax cable

    RESPONSIBLE TEAM REMARKS

    10m-RRU grounding cable @ 3 runs

    10

    Not Available

    Not Needed

    Not Needed

    7

    8

    Not Available

    Not Needed

    Not Needed

    5

    Visayas

    No. DESCRIPTION

    2

    3

    VENDOR

    STRUCTURE DETAILS

    A1 - Site Development Works Details

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    No. OTHER WORKS REQUIRED FOR SITE READINESS

    9

    22

    19

    13

    21

    15

    16

    SITE SURVEY REPORT2 of 13

    TECHNICAL SERVICES DIVISION

    1

    A

    REMARKS

    INDOOR & OUTDOOR

    SSR_00000_RET_REV_0

    DOCUMENT NO PAGE

    20

    C

    17

    B

    18

    11

    12

    14

    Not Needed

    6

    Not Available4

    Floor space (for new equipment)

    New van/equipment room needed?

    Van/equipment room extension needed?

    Cable ladder space for new feeder line cable(Indoor)

    Length

    Not Available

    Not Available

    Not Available

    3

    Not Available

    Not Needed

    No

    Not Needed

    Not Available

    UMTS

    2100

    UMTS

    850

    LTE

    2100

    Runs

    Not Needed

    Not Needed

    Cable ladder space for new feeder line cable(Outdoor)

    Mounting pole for additional antenna

    Not Needed

    Not Needed

    Middle of tower

    Not Needed

    Lower part of tower( before the bend)

    1800

    2100

    850

    2100

    Indoor grounding busbar termination

    70

    GSM

    900

    GSM

    1800

    Size

    LTE

    3500

    Porthole available for new feeder line?

    Cable gland available for new feeder line?

    Direct mount on tower leg

    Not Available

    Not Available

    Not Available

    Grounding busbar termination

    Not Available

    space for new equipment

    Triplexer installation recommended?

    Note: Required breaker ampere (40A).

    AC power upgrade required

    Requires jumper cable from feeder tapping point to BTS?

    TMA Installed

    POWER

    Circuit breaker available for new equipment

    45

    Air-Conditioning upgrade required

    OTHERS

    For pullout of idle battery bank/equipment to free up

    DDF block termination for external alarm available?

    900

    New feeder line grounding kit

    DDF block termination available?

    Before the porthole( after the bend)

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    SHELTER TYPE (VAN, CONCETE SHELTER, BLDG): CONCRETE

    TRANSFORMER QUANTITY & CAPACITY (KVA): NO LABEL

    MCB RATING (AT):

    GENSET 1 BRAND: Powercity

    GENSET RATING (KVA):

    GENSET WITH PAD & FUEL LINE (Y/N): N

    ACU BRAND: NO LABEL

    ACU RATING (HP): 2HP

    SHELTER AREA: INDOOR

    TYPE OF VAN (COLLAPSIBLE, RIGID) N/A

    4

    2

    SPARE

    N/A

    Powerone

    4

    2

    Sacred Sun 2V/600AH

    54.10V

    N/A

    53.29V

    Breaker Rating

    100A

    100A

    Rectifier 1 (Loading Inventory)

    Narada 2V/600Ah

    63A SPARE

    Huawei 2100 LTE/3G

    40A

    SPARE

    40A

    40A

    20A

    20A

    20A

    40A

    20A

    Eltek Valere

    Distribution Current :

    Rectifier Brand :

    # of Rectifier Module :

    # Battery Bank :

    Battery Brand & Capacity :

    Rectifier Voltage :

    Rectifier 2 (Loading Inventory)

    SPARE

    SPARE

    SPARE

    63A

    63A

    63A

    100A

    63A

    Breaker Rating

    100A

    Breaker Rating

    Load DescriptionLoad Description

    100A SPARE

    Breaker Rating

    SPARE

    100A

    SPARE

    SPARE

    SPARE

    Status (ON/OFF)

    Breaker Rating

    F1

    F2

    Load Description

    Rectifier 3 (Loading Inventory)

    40A

    80A

    SPARE

    20A

    20A

    SPARE

    NO LABEL

    SPARE

    SPARE

    SPARE

    SPARE

    SPARE

    SPARE

    80A

    TDD LTE Breaker

    SPARE

    40A

    40A

    40A

    80A

    F19

    F20

    F7

    F8

    F9

    F10

    F18

    F15

    F11

    F12

    F16

    F17

    80A

    63A

    63A

    63A

    F15

    F13

    CB Battery

    FB1

    FB2

    F4

    CB Branch

    F3

    80A

    SPARE

    80A

    SPARE80A

    100A

    100A100A

    Breaker Rating

    Status (ON/OFF)

    ON

    ON

    BRO

    ECI A

    SPARE

    BTS 3900 Upper

    SPARE

    SPARE

    CB18

    NO LABEL

    NO LABEL

    Status (ON/OFF)

    ON

    ON

    80A

    SPARE

    Tower lights

    Perimeter lights

    F5

    F6

    RECTIFIER EQUIPMENT DETAILS

    C.O.

    CB5

    CB6

    Load Description

    Rectifier 1

    Rectifier 1

    Indoor lights

    SPARE

    ACU1

    ACU2

    AC Loading @ MAIN (AMPERES): 13.6A

    SIZE OF WIRE @ MDP - MAIN(mm/AWG): 30mm

    MAIN BREAKER RATING(AT): 150

    Load

    CB2

    CB3

    CB12

    CB13

    CB7

    70

    70

    40

    40

    40

    40

    CB4

    30

    CB14

    CB15

    CB16

    CB17

    CB8

    CB9

    CB10

    CB11

    VENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    Visayas

    A2 - AC & DC Power Details

    AC Power System

    Ma

    in D

    istr

    ibu

    tio

    n P

    an

    el

    Breaker Ratings(AT)

    CB1

    30

    30

    30

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 3 of 13

    TECHNICAL SERVICES DIVISION

    BTS 3900 Lower

    SPARE

    60

    100A SPARE

    100A SPARE

    100A SPARE

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    Band: GSM 900 DCS 1800 UMTS 2100 UMTS 850 LTE 2100 LTE 3500

    Existing BTS/Node B:

    New eqpt BTS/eNodeB:

    Existing configuration: + + New configuration: 1 + 1 + 1

    Application: Macro Pico Micro Marcro + Pico

    Installation type: Indoor Outdoor

    NEW ANTENNA/FIBER NEW ANTENNA/FEEDER

    ANTENNA CONFIGURATION

    ITEM

    Center height( meters)

    Orientation (degrees)

    Mechanical tilt

    Electrical tilt(if any)

    Application

    Antenna model

    Fiber/Feeder cable label

    Fiber cable

    7/8" Feeder cable

    1 5/8" Feeder cable

    (Jumper) BTS to feeder

    (Jumper) Feeder to antenna

    Triplexer used (Yes/No)

    (Jumper) BTS to Triplexer

    (Jumper) Triplexer to feeder

    Grounding kits installed 3 set 3 set 3 set

    TMA

    Other remarks

    RRU CONFIGURATION

    Installation Height in Tower

    45m

    m

    280

    45m 45m

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 4 of 13

    TECHNICAL SERVICES DIVISION

    m

    VENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    45m

    Visayas

    A3 - BTS & Antenna Details

    60 180 180 280

    RXD

    m

    TX/RX

    70 m

    SECTOR 1 SECTOR 2

    TX/RX RXD

    45m 45m45m 45m

    N/A

    N/A

    N/A

    SECTOR 2

    TX/RX RXD

    N/A

    N/A

    m

    m

    set

    N/A

    45m

    N/A

    Proposed

    m

    N/A

    N/A

    MACRO

    no label

    N/A

    60

    N/A

    70

    N/A

    N/A

    5

    5

    No

    N/A

    N/A

    5 m

    No

    no label

    N/A

    MACRO

    5 m

    N/A

    N/A

    70 m

    MACRO

    No

    N/A

    5

    N/A

    m

    m

    m

    m

    N/A

    5

    m

    m

    m

    N/A

    no label

    N/A

    SECTOR 1 SECTOR 2 SECTOR 2

    N/A

    EXISTING Proposed EXISTING Proposed EXISTING

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    TECHNICAL SERVICES DIVISION

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 5 of 13

    B1 - SITE CONSTRUCTION LAYOUT

    VENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    Visayas

    Proposed

    antenna

    location for

    Sector 3. At

    45m with

    azimuth of

    280 deg

    Proposed

    antenna

    location for

    Sector 2. At

    45m with

    azimuth of

    180 deg

    Proposed

    antenna

    location for

    Sector 1. At

    45m with

    azimuth of

    60 deg

    Proposed

    RRU location

    for Sector 1.

    At 45m with

    azimuth of 60

    deg

    Proposed

    RRU location

    for Sector 2.

    At 45m with

    azimuth of

    180 deg

    Proposed

    RRU location

    for Sector 3.

    At 45m with

    azimuth of

    280 deg

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    Sector 1

    Sector 2

    TECHNICAL SERVICES DIVISION

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 6 of 13

    Sector 3

    VENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    Visayas

    B2 - ANTENNA PLACEMENT LAYOUT

    Proposed

    antenna

    location for

    Sector 1. At

    45m with

    azimuth of

    60 deg

    Proposed

    antenna

    location for

    Sector 2. At

    45m with

    azimuth of

    180 deg

    Proposed

    antenna

    location for

    Sector 3. At

    45m with

    azimuth of

    280 deg

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    Sector 1

    Sector 2

    Sector 3

    VENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    Visayas

    B3 RRU PLACEMENT LAYOUT

    TECHNICAL SERVICES DIVISION

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 7 of 13

    Proposed

    RRU location

    for Sector 1.

    At 45m with

    azimuth of 60

    deg

    Proposed

    RRU location

    for Sector 2.

    At 45m with

    azimuth of

    180 deg

    Proposed

    RRU location

    for Sector 3.

    At 45m with

    azimuth of

    280 deg

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 8 of 13

    TECHNICAL SERVICES DIVISION

    B4 - EQUIPMENT LAYOUT AND PROPOSED CABLE LAYOUT

    VENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    Visayas

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 9 of 13

    TECHNICAL SERVICES DIVISIONVENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    PANORAMIC VIEW 150 degrees PANORAMIC VIEW 180 degrees

    Visayas

    B5 - COVERAGE DETAILS

    PANORAMIC VIEW 30 degrees PANORAMIC VIEW 60 degrees

    PANORAMIC VIEW 90 degrees PANORAMIC VIEW 120 degrees

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 10 of 13

    TECHNICAL SERVICES DIVISIONVENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    PANORAMIC VIEW 330 degrees PANORAMIC VIEW 360 degrees

    Visayas

    B5 - COVERAGE DETAILS

    PANORAMIC VIEW 210 degrees PANORAMIC VIEW 240 degrees

    PANORAMIC VIEW 270 degrees PANORAMIC VIEW 300 degrees

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    Proposed BBU and DCDU location

    Proposed porthole. For additional 2 cable glands

    Proposed 40A breaker

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 11 of 13

    TECHNICAL SERVICES DIVISIONVENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    CIRCIUT BREAKER OTHERS

    Visayas

    B5 - INDOOR SITE PICTURE DETAILS

    FLOOR SPACE INDOOR CABLE LADDER SPACE

    GROUNDING BUSBAR TERMINATION PORTHOLE/CABLE GLAND AVAILABILITY

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 12 of 13

    TECHNICAL SERVICES DIVISIONVENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    GPS PROPOSE LOCATION OTHERS

    Visayas

    B7 - OUTDOOR SITE PICTURE DETAILS

    TOWER PICTURES OUTDOOR CABLE LADDER SPACE

    GROUNDING BUSBAR TERMINATION NEAR ANTENNA BUSBAR

    Proposed GPS location

  • Scope:SMART Site No.:

    SMART Site Name:SUN Site No.:

    SUN Site Name:Area:

    DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 13 of 13

    TECHNICAL SERVICES DIVISIONVENDOR

    NEW DBS TD LTE

    763

    Iloilo Jaro-Plaza

    Visayas

    B8 - MANUAL HAULING REPORT

  • I. FROM SOURCE TO POINT OF DELIVERY

    ( Check if w/ in Island) ( Check if Provinces )

    ACCESS ROAD DESCRIPTION (joining the main road and point of delivery)

    FROM:

    II. POINT OF DELIVERY TO SITE ( Stage that cover the cost of hauling )

    III. MODES OF TRANSPORTATION

    specify if others

    DEGREE OF HAULING DIFFICULTIES

    EASY

    LOT PROFILE ( angle of inclination ) (degrees) DIFFICULT

    EXTREMELY DIFFICULT

    IV. DISTANCE OF MANPOWER HAULING(if any) (meters)

    V. TOTAL HAULING DISTANCE FROM PONT OF DELIVERY TO SITE (kilometers)

    SITE ELEVATION (meters)

    relative to nearest main road)

    FLOOD HISTORY (meters)

    Sketch Plan / Vicinity Map

    Attachments:

    1. PICTURES

    2. OTHERS

    PREPARED BY: ( CONTRACTOR ) CHECKED / APPROVED BY: ( NSA/ NCM-PM) NOTED BY: ( NCM ENGR.)

    SIGNATURE OVER PRINTED NAME DATE SIGNATURE OVER PRINTED NAME DATE SIGNATURE OVER PRINTED NAME DATE

    HAULING SURVEY REPORT

    DATE:

    REV NO.

    SITE NO. SITE NAME

    SITE ADDRESS

    CITY/TOWN REGION

    PROVINCE AREA

    BARANGAY

    BLDG NO,STREET

    TO:

    ( Source ) Specify location ( Main road )

    ( Specify pier, airport, terminal location) if in provinces

    ( main road ) ( Point of Delivery ) specify location

    TO:( Nearest SITE Location )

    TRUCKS: VAN(type, no. of units) (type, no. of units) (type, no. of units)

    HAULING DISTANCE (kilometers)

    YES NO If YES (Indicate water level)