tcob meeting new orleans, la david e. lee systems & design group 02 march 2012

5
TCOB Meeting New Orleans, LA David E. Lee Systems & Design Group 02 March 2012

Upload: evan-osborne

Post on 17-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TCOB Meeting New Orleans, LA David E. Lee Systems & Design Group 02 March 2012

TCOB MeetingNew Orleans, LA

David E. LeeSystems & Design Group

02 March 2012

Page 2: TCOB Meeting New Orleans, LA David E. Lee Systems & Design Group 02 March 2012

Group Required Reviews

• As per Policy 8.1, Group Operating Boards are to review technical divisions at least every 5 years and (new) technical subdivisions at least every 3 years; Group Operating Boards are also responsible for a 2 year review of divisions not maintaining viable status

• Also, from the TCOB Operation Guide (§2.4)– Each Technical Group Operating Board (TGOB) is

required to perform an evaluation of the Technical Group Leader following this same process except the report shall be provided to the TGL and the TCVP, preferably by the Leadership Training Conference (“LTC”) each spring.

2

Page 3: TCOB Meeting New Orleans, LA David E. Lee Systems & Design Group 02 March 2012

Division Periodic Evaluations

• Process– Build off of CDOT DHA &

tie into other cycles (bylaws, strategic plans, membership drive)

– Feedback to division, CDOT, TCOB, members

• Sequence– 2012+3 years: MEMS, ISPS,

CIE– 2013+3 years: FPST, DED– 2014+3 years: EPPD, DSC

• Calendar– July: Request to division– Aug: Division response– Sept: Eval assessment– Oct: Evaluation to division;

Xmit to CDOT– Nov/Dec: Division response– Jan: S&DG ExComm– Feb: Division Response– Mar: S&DG Operating Board

Review; Xmit to TCOB– Apr – Jun: Division comm to

membership; next steps–

Page 4: TCOB Meeting New Orleans, LA David E. Lee Systems & Design Group 02 March 2012

S&DG Annual Division Reviews

• Process:– Use simplified division

assessment form

– 2 MALs review both report and plan for each division, prefer 1 MAL from the division under review

– Division reviews to be completed w/in next month+

Page 5: TCOB Meeting New Orleans, LA David E. Lee Systems & Design Group 02 March 2012

2011-12 S&DG TGL Review

• Process– Run by Past TGL

Beaman

– Survey sent to SDGOB voting members and responses received

– Review Score Composite: 4 out of 5