tc 57 iec tc57 wg13 ems application program interfaces terry saxton convenor, wg13

6
TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

Upload: claribel-goodwin

Post on 04-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

TC 57

IEC TC57 WG13 EMS Application Program Interfaces

Terry Saxton

Convenor, WG13

Page 2: TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

2

TC 57

What is WG13?

Objectives Reduce the cost and time needed to add new applications to an

EMS or other system Protect the investment in existing applications that are working

effectively Improve the capability to exchange information between disparate

systems both within and external to the control center environment

Technical approach Provide an integration framework for interconnecting existing

applications/systems that is• Based on a common architecture and information model

• CIM• Generic Services

• Independent of the underlying technology (PIM)• Mappings to specific technologies (PSM)

WG13 Status

Page 3: TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

3

TC 57

Meeting Summary

Recent Meetings – 3 days typical Santa Clara, California, USA January 2008

• Meet in conjunction with WG16

Rome, Italy October 2007• Meet in conjunction with WG19

Minneapolis, USA May 2007• Meet in conjunction with TC57 Plenary

Planned Meetings Vesteras, Sweden June 2008 Seoul, Korea October 2008 ??? January 2009

WG13 Status

Page 4: TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

4

TC 57

Work Overview

WG13 Status

Page 5: TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

5

TC 57

TC57 WG13 Release Lifecycle for 61970-301 CIM Base

WG13 Status

Existing Standard

Existing Comments / User Group Inputs

Interoperability

Test

Meeting to Reconcile Existing Work and

Interoperability Test Results

New Standard

• CIM12r002 released and posted•Third Edition Part 301 ready to send to IEC• Need to bring together all CIM WGs to use same number schemes, ways of organizing UML models

• Profile/context standards

Resolutions Update Final Update

Page 6: TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

6

TC 57

Work Items and Issues

Part 301 Third Edition – based on CIM12 CIM issue resolution continues

Prioritized list CIM Planning project proposals ERCOT proposals

Part 450 – Profiles and compliance testing Part 452– Model Exchange Standard – based on NERC CPSM and recent interop

test updates Part 453 and 553-4 (SVG) – Graphics Exchange Standard

Need interop testing to advance

Part 454 – Naming Part 5xx – Document Structure of PSM specifications NWIPs

CIM/XML message header Part 502-8 Model Population State Estimator Solution CIS Part 406 Program Invocation OWL for CIM/XML Schema