TUNNEL BORING MACHINE (TBM) METHOD OF CONSTRUCTION CASE STUDY : KOWLOON SOUTHERN LINK RAILWAY PREPARED BY : FARRIS IZZAT BIN RAZALI 2010229528 RAMBA UGAK 2010413758 NOR BAIZURA BINTI MAHMUD 2010431768 SAFWANAH BT MOHD SUKRI 2010806896 NUR AFIFAH BINTI ABDUL RAHIM 2010460356 CHECKED BY: MDM.FARRAH NORRIZZAH YUSOFF CLASS : AP226 4B

Upload: nur-afifah

Post on 14-Oct-2014

57 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Tbm Presentation-bld 560

TUNNEL BORING MACHINE (TBM) METHOD OF

CONSTRUCTIONCASE STUDY :

KOWLOON SOUTHERN LINK RAILWAY

PREPARED BY :

FARRIS IZZAT BIN RAZALI2010229528RAMBA UGAK 2010413758NOR BAIZURA BINTI MAHMUD2010431768SAFWANAH BT MOHD SUKRI2010806896NUR AFIFAH BINTI ABDUL RAHIM2010460356

CHECKED BY:MDM.FARRAH NORRIZZAH YUSOFF

CLASS : AP226 4B

Page 2: Tbm Presentation-bld 560

BACKGROUND PROJECT

PROJECT TITLE : CENTRAL KOWLOON ROUTE

NAME OF PROJECT PROPONENT : HIGHWAY DEPARTMENT , HKSAR GOVERNMENT

PROJECT DURATION : 2005-2009

COST OF PROJECT : HK$ 2 MILLIONS

LINE LENGTH : 3.8 KM

NO OF STATION : 3

TYPE : HEAVY RAIL

Page 3: Tbm Presentation-bld 560

TBM : METHOD OF CONSTRCUTION

CRANE –TO ASSEMBLY THE

TBM

Component of TBM

This method starts by excavating a trench to provide a space for assembly the TBM components. The trench is reinforced with

diaphragm walls and steel struts.

Trench

Page 4: Tbm Presentation-bld 560

The TBM components is placing down into the trench using a crane

Page 5: Tbm Presentation-bld 560

TBM work under the flyover

Tunnel track under the flyover

Page 6: Tbm Presentation-bld 560

Tunnel segment installation

Page 7: Tbm Presentation-bld 560

During the drilling process, the assemble of components is doing at the same time.

Segment installation

Page 8: Tbm Presentation-bld 560

While the drilling works are carried out near the building, surveys will be conducted to monitor for any settlement that

may occur in any nearest buildings during the work.

TBM work

Survey work

Page 9: Tbm Presentation-bld 560

At the end of the point, the trench will be excavate similar with the start point as a receiver trench for the TBM. Upon arrival, the TBM is

then dismantled and brought upon to the surface

Page 10: Tbm Presentation-bld 560

Lastly, the tunnel is done when all the appliances is completely installed.

Page 11: Tbm Presentation-bld 560

PROBLEM DURING TUNNELING WORK

PROBLEM :

Noise & vibration nearest building

EFFECT :

Disruption to nearest premise

SOLUTION :

Strictly control the

noise & vibration

PROBLEM :

Geotechnical environment

1

2EFFECT :

Drilling different type of soil

(from hard rock to soft soil)

SOLUTION :

Using slurry types of TBM