tb-343-558-034a- rev 02-bms & acs specification... · ing the bms m and fire d vdc mult in...

45

Upload: nguyenduong

Post on 28-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 2: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

1.1  

 1.2

 

1.3

 

 Scope 

The scopepacking,  locontrol  Syconduits, csections ocommissio  Name of c Name of t

 Project Sit

Bill of Qu 

LOA BBB.II.ABB.II.A

Venplet 

Specific te 

i) A  fully coperatiosystemsThe Buil• Air• Ven• Fire• Sta• Illu

ii) The scopware) fotem, Va

Scope, Q

e of work incoading  at  wystem  (BMSconnector, inf this specificoning& testin

customer:   

the project:  

te:         

antities 

BOQ REF. .31.5 .31.4 

dor shall proe functionali

echnical r

computerizeon of  the mes as detailed ding manage‐conditioninntilation syste fighting ation water sumination sys

pe of work sor synchronizlve hall vent

±800KV, 6

Quantities

ludes designworks,  transpS  &  ACS)inclnterface equication to Agrng of a fully fu

 Power Gr

±800KV, 6Interconn

Agra (AG)

ITBuilding MAccess con

ovide detaileity of the spe

requireme

d and automechanical syin section 1 ement Systemg System tem for valve

storage and sstem 

shall cover azing/integratilation syste

6000MW, H

Building M

2

SECTI

s & Specif

n, manufactuportation  to luding  all  thipments etc.)ra site. The sunctionalBM

rid Corporati

6000 MW, HVector‐I Proje

TEM DESCRIPanagement strol system (

ed bill of quaecification. 

ents 

matic Buildinstems servin& 2 of this spm shall cover

e hall & DC H

supply 

ll necessary ting the BMSm and Fire D

HVDC MULTIN

ManagemenDoc

ION‐1  fic Technic

ring, assembsite  of  Buil

he  required ) as mentionscope of worMS & ACSat Ag

ion of India 

VDC Multi‐Tect 

PTION system (BMS(ACS)

ntity (definin

ng Managemng  the valvepecification.r the followin

Hall 

system provS with the coDetection & F

TI-TERMINNTERCONN

t System& A. No. : TB-3

cal Requir

bly, testing blding Managequipments ed in this secrk also includgra site. 

Ltd (POWER

Terminal NER

QUAS) 1 L

1 L

ng 1 LOT) req

ment System hall and se ng services: 

visions (incluontrol panelsFire Alarm Sy

NAL NER/ERNECTOR-I

Access Con343-558-03

rements 

before supplygement  systand  access

ction and in vdes complete

RGRID) 

R/ER–NR/WR

NTITY LOT LOT 

quired meet

  (BMS)  shallrvice buildin

uding hardwas of Air Condystem. 

R – NR/WR PROJECT

trol System34A Rev. 02

y, inspection,tem&  accesssories  (cable,various othere Installation,

ing the com‐

l control  theng and other

are and soft‐ditioning sys‐

R T

m2

, s , r , 

e r 

‐‐

Page 3: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

 

1.4  The the site  

  

1.5  

   

 iii) Monitor

Fire Wat 

iv) Control tem. 

v) Control  

vi) Control  

vii) All cableon the la 

viii) The equin EHV e 

ix) The ConChilled use of p 

x) The BMS  

Test Requ

vendorshallspecificationrespectively

i) Completii) System 

Documen

• Detaileditem 

• Technica• Clause‐w• Test cer• Referen

for at le

ring of Fire Fter Tanks etc

(Alarm ackn

and Monitor

& monitorin

es shall be suaying length,

uipments andenvironment

ntrol and MoWater Pumpprogrammab

S & ACS syst

uirement 

 submit a FAn  for Powergy. 

te operatingcommissioni

nts to be p

d BOQ to me

al datasheetwise compliatificates as pce list of theeast 2 years. 

±800KV, 6

Fighting Systec. 

nowledge, re

ring of Utility

ng of illumina

upplied as p, signal loss d

d cables instat which is pro

onitoring of ps, AHU's, vble controller

tem shall be 

AT (factory agrid/ BHEL a

 and mainteing and acce

provided b

eet the requ

/Catalogues/ance per relevant e Projects wh

6000MW, H

Building M

3

ems includin

eset & test)&

y Services i.e

ation system

er the relevadue to long l

alled in the vone to variou

all Air‐condvalve hall prrs. 

expandable

acceptance teapproval  tha

nance manueptance tests

by bidder 

irement of s

/brochures o

standards here similar 

HVDC MULTIN

ManagemenDoc

ng Fire Spray

& monitoring

e. Water Stor

ant IEC/IS anength and e

valve hall andus signal inte

ditioning Systressurization

e type. 

est) & SAT (sat will be use

uals and trains as specified

with quo

specification 

of the item

equipment f

TI-TERMINNTERCONN

t System& A. No. : TB-3

 and Hydran

g of fire dete

rage and Sup

nd selection nvironment.

d DC hall shaerference. 

tems includin  Fans, moto

site acceptaned during  in

ning of O&Md in site acce

tation 

with make, 

for similar a

NAL NER/ERNECTOR-I

Access Con343-558-03

nt systems, w

ection and fir

pply.  

of cables sh. 

all be suitabl

ing Chillers, orized damp

nce test) plaspection at 

 personnel. ptance test (

model& qu

application is

R – NR/WR PROJECT

trol System34A Rev. 02

water level in

re alarm sys‐

hall be based

e to operate

Condensers,pers, etc. by

an complyingworks &and

(SAT) plan. 

antity of the

s being used

R T

m2

, y 

g d 

d 01

01

01

Page 4: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

1.6

1.7

1.7.

1.7.

Drawing/ • Vendor 

routing.• Cable sc• All BOQ 

to be su• Cables s

shall be • Vendor 

tionality• Submiss• Operatio

ENVIRON Design para  1. Indoor w

 For nonappabov  

Ma

Mi

Ma

Mi  2. Control 

 Durioutdincr MaxMinMax 

/Documen

shall submit chedule for ritems makepplied as peshall be type witnessed bshall submity of all the BOsion of Site aon & mainte

NMENT 

meters for i

with control

normal oper‐operation  slication durive 60%. 

aximum tem

nimum temp

aximum relat

nimum relat

cabinets in 

ing the non‐door applicaease above 6

ximum tempimum tempeximum relati

±800KV, 6

nt Require

t a layout dra

espective sye & model, dr Powergrid tested in ac

by Powergridt a detailed FOQ items. Thcceptance tenance manu

ndoor equip

led environm

rating conditstate of  the ng shorter ti

perature  

perature  

tive humidity

tive humidity

control room

operation sttion during s60%. 

erature  erature  ve humidity 

6000MW, H

Building M

4

ement in t

awing indica

ystems as peratasheets shapproved vecordance wi/BHEL and rFactory accephe FAT shall best plan for aual meeting c

pment (as pe

ment 

tions the relastation,  theimes and the

°

°

y  %

y   %

tate of the stshorter time

°°

  %

HVDC MULTIN

ManagemenDoc

the event 

ating the sco

r section 2.hall be approendor list. th the relevaeport to be aptance test (be approvedapproval. customer spe

er document

ative humidit  temperaturen the maxim

Var

C   60

C  5 

%   60

%   10

tation, the tees, and then 

°C   5°C  5%   6

TI-TERMINNTERCONN

t System& A. No. : TB-3

of order 

pe of work a

oved by Pow

ant standardapproved be(FAT) plan tod by Powergr

ecification &

t 1JNL100122

ty is 50% in tres may be mum relative

alve  Hall rea  0  

 

0  

0  

emperaturesthe maximu

55  5  60  

NAL NER/ERNECTOR-I

Access Con343-558-03

along with ca

wergrid. Cable

ds (IS/IEC). Thefore supply.o verify the qrid. 

& application

2‐145 Rev 04

the valve halas  specified e humidity m

Indoor  Dhall 50  

5  

60  

10  

s may be as m relative h

R – NR/WR PROJECT

trol System34A Rev. 02

able/conduit

e & conduits

he type tests quality, func‐

4) 

ll. During thefor outdoor

may increase

DC  Other Area 40  

5  

60  

‐‐ 

specified forumidity may

R T

m2

e r e 

r y 

Page 5: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

1.7. 

  1.7.4

 3. Indoor w

MaxMax(dryMin

4. Outdoo

without con

ximum tempximum 24 h ay bulb) imum tempe

r environme

±800KV, 6

trolled envir

erature (dryaverage tem

erature (dry 

ent informat

6000MW, H

Building M

5

ronment 

y bulb)  °mperature 

°

bulb)  °

tion will be a

HVDC MULTIN

ManagemenDoc

°C   6

°C 6

°C  5

as per Sectio

TI-TERMINNTERCONN

t System& A. No. : TB-3

60 60 

on 3.

NAL NER/ERNECTOR-I

Access Con343-558-03

R – NR/WR PROJECT

trol System34A Rev. 02

R T

m2

 

01

Page 6: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

  

2.1   

 

 

Building m

2.1.1. The Buible an• • •

2.1.2. The in• •

2.1.3. The Cotercon

a) A Cefacein vopegeneeratdisk•

• • • •

b) BMSThiscontof st

managem

uilding Manand expandab Building LaySystem topoLine diagram

ntegration ofMonitoring Alarm/Malfupeated at BMIn  the  evenfloors  and  cDuct DampeIn the eventto help in ev ontractor shnnecting wirientral procee with the coarious areasrator's contreration, histtors control sk) with latest Colored TFTprinter, ExteWindows XPMultimedia Two sets of Following  pwith VPS (Vi‐ CPU of B

S outstationss outstation trol paramettand alone o

±800KV, 6

Equ

ment syste

agement Sysble. The BMSyout and Floology, pipingms, bar chart

f the fire Alarof status of eunctioning cMS control pnt  of  fire  alacontrol otheers. t of fire, Secuvacuation an

hall be respoings/cablingsssing unit  (Control, monits covered  in rol shall provorical data sshall includeconfiguratio

T 22” monitoernal USB 2.0P Prof. or latesoftware anAnti‐ virus Sports/video  oideo projectiBMS:  2 Nos.

s at the varioshall provideter dictated operation  in 

6000MW, H

Building M

6

SECTIO

uipment S

stem shall beS software shor plans g and duct wots, pie charts

rm System weach detectoconditions repanel. arm.  BMS wer  floors  to m

ured doors (pd also to avo

nsible for sus of: CPU)  locatedtoring and otthe BMS. T

vide for overtorage and r the latest Pon available ir, cordless k0 DVD writerest operatingd hardwareoftware withoutputs  alonion System) a DVI‐D port

ous locationse the  interfavia the centthe event o

HVDC MULTIN

ManagemenDoc

ON‐2  Specificat

e fully compuhall cover the

ork layout, p of consump

with BMS shaor by super ieported at  fi

ould  automminimize  sm

provided witoid intruder 

upply, install

d  in  the contther informaThe Central prall building retrieval, andentium PC (min the markeeyboard & cr and coloredg system ver

h license ng  with  suitare required

s: ace betweenral station Cof a BMS com

TI-TERMINNTERCONN

t System& A. No. : TB-3

ion 

uterized, usee following: 

plant symbolsption trends o

all include at mposing there system co

atically  shutmoke hazard 

th access conalarms on th

ation and co

trol room shation from thprocessing udata acquisid operator inmin 3.2 GHZet along withcordless opticd A4 Scannerrsion with lic

table  cable d: 

n the operatPU. Each oummunication

NAL NER/ERNECTOR-I

Access Con343-558-03

er friendly, m

s. of auxiliaries

least the fole same buildiontrol panel

tdown AHU'by  closing 

ntrol) would hese doors. 

ommissionin

hall provide he MCC’s/paunit  (CPU) oftion and tranterface. TheZ, 2GB RAM, h: cal mouse, cr cense 

required  for

ion of the ptstation shans failure. Th

R – NR/WR PROJECT

trol System34A Rev. 02

modular, flex‐

s. 

lowing: ing layout. l shall be re‐

s  in  the  firethe  relevant

be disarmed

g with all in‐

a user  inter‐anels locatedf  the centransfer, reporte central op‐120 GB hard

colored Laser

r  integration

lant and thell be capablehe Field Con‐

R T

m2

e t 

‐d l t ‐d 

e e ‐

Page 7: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

 

 

 

trollmoubase

2.1.4. Data c 

2.1.5. Full do 

2.1.6. The Baccura

  

2.1.7. I/O PO

The mlow. chang

A. I. 

lers shall perunted  comped controller

communicati

ocumentatio

MS shall proacy not to beTemperaturHumidity    Pressure    Flow       

OINT SUMMA

minimum conThe  quantitge/increase a

AIR‐MAI

a)  CHIL(1W1)& servi   

b)  CHIL(2W(1W1) &servi 

c)  HEACIRC(1  fofor ring (

±800KV, 6

rform remotpletely  self‐crs capable of

ions necessa

on for all soft

ovide stable e worse thanre    2 perce

  4 perce  2 perce  3 perce

ARY FOR BM

ntrol & monitty/  No.  of as per the re

CONDITIONIN SERVICE BLLERS: (2W+2

W+1SBY for op1W+1SBY foice building

LLED  WA+2SBY) 

W+1SBY for op 1W+1SBY foice building 

DER  CIRCUCUITS or  operator rest of the m(AC‐2)) 

6000MW, H

Building M

7

e data acquicontained,  ff stand alone

ary to affect a

tware provid

control of an: ent of sensorent of sensorent of sensorent of sensor

MS 

toring requirequipment

espective doc

ING SYSTEMBUILDING (M2SBY) perator roomor rest of the(AC‐2)) 

ATER  P

perator roomor rest of the(AC‐2)) 

UIT  :  2  H

room  (AC‐1main service

HVDC MULTIN

ManagemenDoc

isition and pfield  prograe operation.

a BMS data t

ded. 

ll connected

r span r span r span r span 

red for the Bt  mentionedcument/dra

M   MSB) 

m (AC‐e main 

•••••••

UMPS: 

m (AC‐e main 

••

••

EADER 

1) &  1  build‐

TI-TERMINNTERCONN

t System& A. No. : TB-3

rocess contrmmable,  re

transmission

d systems wi

BMS is summd  below  arwing. 

Chiller ‐ EnaChiller Run Chiller RefrFault AlarmCapacity CoChilled WatChiller Comtoring Individual Cture DifferentialIn & out Primary ChiPrimary ChiStart/Stop Primary ChiPump Manu Common ChTemperatuCommon ChTemperatuChilled Wat

NAL NER/ERNECTOR-I

Access Con343-558-03

rol. These sheal‐time  mic

n system. 

ith a closed 

marized in thre  indicative

able Status igerant Leak

ms ontrol ter Reset mpressor Curr

Chiller Supply

 Pressure Ac

illed Water Pilled Water P

illed Water Pual Operatio

hilled Waterre hilled Waterre ter Flow Met

R – NR/WR PROJECT

trol System34A Rev. 02

all be locallycroprocessor

loop contro

e I/O list be‐e  and  may

k Alarm 

rent Moni‐

y Tempera‐

cross Chiller 

Pumps Pump 

Pump Statuson Status 

r Supply 

r Return 

ter 

R T

m2

y r 

‐y 

01

01

01

02

Page 8: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

II.

B. 

C. 

 

d)  AIR H(1W1) &servi  

e)  EXPA(2 N

.  ADDa)  Pack

each

VENHALvalvetotatota 

FIRE2  npum2 no2 no 

±800KV, 6

HANDLING UW+1SBY for op 1W+1SBY foice building 

ANSION TANOS.) DITIONAL SERkage  AC  unh ASB) 

TILATION SYL& DC HALL:e hall/ DC hal 4 Valve hall 4 DC halls

E FIGHTING:nos.  electrimps os. jockey pumos. diesel fire

6000MW, H

Building M

8

UNITS: 2W+2perator roomor rest of the(AC‐2)) 

NK 

RVICE BUILDnits  (1W+1SB

YSTEM FOR : 1W+1SBY Fall,  ls 

ical  fire  fi

mps  fighting pum

HVDC MULTIN

ManagemenDoc

•2SBY m (AC‐e main 

•••••••••

DING (ASB3 &BY  for  •

••

VALVE Fan per 

••

••

ighting 

mps 

•••••

TI-TERMINNTERCONN

t System& A. No. : TB-3

DifferentialIn & out Outside Air AHU Start/sAHU Start/SAHU BloweAHU ManuaAHU Filter SAHU ReturnAHU modulAHU supplyAHU supply Chilled Wating 

& ASB4) Start/Stop Trip/ Fault Return air Tty (RH) Fan start/sAir Fan) peFan Manua(1W+1SBY Svalve hall/Fan start/sAir Fan) peFan Manua(1W+1SBY Evalve hall/Heaters ONValve Hall/ Pressure(wTemperaturonment chinterfacing be providedMotorised dFilter dirty aElectrical Fitus Jockey PumDiesel fire fPressure in Sprinkler linFIRE ALARM

NAL NER/ERNECTOR-I

Access Con343-558-03

l Pressure Ac

 Temperaturstop Low SpeStop High Spr Status al OperationStatus n Air Temperlate Chilled Wy air temperay air humidity

ter Low Leve

status Temperature

top (1W+1SBer valve hallal Operation Supply Air Fa/ DC hall top (1W+1SBer valve hallal Operation Exhaust Air / DC hall N/OFF DC hall diffe.r.t atmosphre & Humiditheck (free cowith MACH d) damper opealarm re Fighting P

mps status fighting pumHydrant linene flow statuM SYSTEM 

R – NR/WR PROJECT

trol System34A Rev. 02

cross Chiller 

re and RH eed peed 

n Status 

rature & RHWater Valveature y 

el Monitor‐

e & humidi‐

BY Supply l/ DC hall Status an)per 

BY Exhaust l/ DC hall Status Fan) per 

erential here) ty: envi‐ntacts for 2 panel shal

n/close 

Pumps sta‐

p status e us 

R T

m2

01

01

01

02

Page 9: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

W=WSBY=

D. 

E. 

I

IIIV

V

F. 

G. 

WORKING =STANDBY 

ILLU

OTHI.   2 no

 

I.   2 no 

I.   2 no

V.   2 nosTran

V.   1 noat  mroof1 noat (ASB1 noat (ASBAIR RELA(1W12 N05 BUILGas 

±800KV, 6

MINATION S

HER SERVICESos. tube well 

os. domestic 

os. Fire waters. (1W+1SBY)nsfer pumps

os. treated wmain  servicf os. treated wAdditional B 3) roof os. treated wAdditional B 4) roof CONDITION

AY BUILDINGW+1SBY for eaNOS. ARB (ACNOS.  FRB

LDING) Genset (CNG

6000MW, H

Building M

9

SYSTEM: 

S: pumps 

raw water p

r storage tanY) Treated wa

water storagce  building

water storagservice  bu

water storagservice  bu

NING  SYSTEG ach ARB/FRBC RELAY BUIL  (FILTER

G) 

HVDC MULTIN

ManagemenDoc

•••

pumps  ••

nks  •ater •

ge tank g(MSB) 

ge tank uilding 

ge tank uilding 

EM  IN 

B) LDING) RELAY 

••

TI-TERMINNTERCONN

t System& A. No. : TB-3

Controls anlumination rated  centrbuilding Commandstion  buildishould  be  gof  the  dayweather  cooutside.  Thof  illuminatyard  area sdistribution Tube well PTube well PTube well PStatus Domestic RDomestic RON/OFF Domestic Reration Sta3‐step level

Treated watusAll water stel indicatioIndicate Floof treated wFlow rate, Ttreated wa

TemperatuStart/ Stop 

Gas Pressurline 

NAL NER/ERNECTOR-I

Access Con343-558-03

nd  commandsystem shalrally  integratmanagemen  for  the  lighing,outdoor given  accordy  and  also  aonditions  anhe  control  &tion  system shall be  at Mn board level

Pumps statusPump ON/OFPump Manua

Raw water PuRaw water Pu

Raw water Matus l indication 

ater Transfer

torage tanksn ow rate, TDSwater  TDS & pH vaater High Ala

re in Relay b of aircondit

re indication

R – NR/WR PROJECT

trol System34A Rev. 02

ds  for  the  il‐l be incorpo‐ted with  thent  systemhting  of  sta‐yard  area

ding  to  timeaccording  tod brightness&monitoringfor outdoor

Main  lighting. 

s  FF al Operation

ump statusump 

Manual Op‐

r Pump Sta‐

s 3‐step lev‐

S & pH value

alue of arm 

building tioner 

n in input 

R T

m2

‐‐e . ‐a e o s g r g 

01

01

01

01

01

02

02

01

Page 10: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

 

2.2

 

Access Co Access  Contdoors  for  thcontrol cardand  it shoul(Guard Hut)access contrMain gate shtorisation ofThe ACS systDetails of ga

 S. No.  Loc1.  Sta

2.  Maen

3.  Ma

4.  Ading

5.  Ading

ontrol Syst

trol  includinhe  control  rods  (50 Nos.),ld be possib). The man grol cards.  hall be Doubf main gate ctem softwarates to be co

cation ation main ga

an  gate  fortry 

ain service b

ditional  serg‐pole 3 

ditional  serg‐pole 4 

±800KV, 6

tem 

g Motorisedoom building card  readele to operatgate (for pers

ble leaf slidincomplete wite shall be insntrolled thro

ate 

r  personnel 

uilding 

rvice  build‐

rvice  build‐

 

6000MW, H

Building M

10

d Gate  at  thg  including rs etc. shall e the gate fsonnel entry

ng type as peth all accessostalled on though Access 

Type of doDouble  lesliding typNext  togate(min. single leafDouble lea

Double lea

Double lea

HVDC MULTIN

ManagemenDoc

he  entrance provision ofbe providedfrom the cony) next to the

er gate drawories & functhe BMS contrcontrol syste

oor eaf,7  m  wpe o  the  m

1.25m  wf) af, hinged ty

af, hinged ty

af, hinged ty

 

TI-TERMINNTERCONN

t System& A. No. : TB-3

to  the  statif electromagd. The main ntrol room ae main gate 

wing (gate suptionality is inrol station. em: 

Operatide  Motori

push bain ide 

Accesscard  wdoor lo

ype  Accesscard  wdoor lo

ype  Accesscard  wdoor lo

ype  Accesscard  wdoor lo

NAL NER/ERNECTOR-I

Access Con343-558-03

ion  and  for gnetic door  lgate shall band from  insshall be acce

pply in BHELn vendor’s sc

tion  Qised with button. 

1

s  control with  EM ocks 

1

s  control with  EM ocks 

2

s  control with  EM ocks 

1

s  control with  EM ocks 

1

R – NR/WR PROJECT

trol System34A Rev. 02

all  entrancelocks, accessbe motorisedside the gateessible using

L scope). Mo‐cope. 

Quantity1 

R T

m2

e s d e g 

02

01

02

Page 11: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON

Plea 

ase refer Doccument TB‐3

±800KV, 6

GENERAL 

43‐316‐000

6000MW, H

Building M

11

SECTI

TECHNICA

for General 

HVDC MULTIN

ManagemenDoc

ION‐3  AL REQUI 

Technical Re

TI-TERMINNTERCONN

t System& A. No. : TB-3

REMENTS

equirements

NAL NER/ERNECTOR-I

Access Con343-558-03

S  

R – NR/WR PROJECT

trol System34A Rev. 02

R T

m2

Page 12: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 13: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 14: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 15: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 16: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 17: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 18: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 19: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 20: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 21: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 22: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 23: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 24: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 25: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 26: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 27: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 28: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 29: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 30: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 31: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 32: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 33: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 34: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 35: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 36: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 37: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 38: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 39: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 40: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 41: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 42: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 43: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 44: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON
Page 45: TB-343-558-034A- REV 02-BMS & ACS Specification... · ing the BMS m and Fire D VDC MULT IN anagemen Doc ON