Bald Hill Offtake and Project Update September 2017 Tawana Resources NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited (SGX:AMA) (AMAL) are pleased to provide this update for the Bald Hill Mine located in the Eastern Goldfields region of Western Australia. The Bald Hill project (the Project) is a joint project between Tawana and Alliance Mineral Assets Limited. Highlights Third prepayment of $4,375,000 received by Tawana from Burwill Holdings Ltd (Burwill) under the offtake agreement. AMAL received A$4,375,000 from Burwill on 30 September 2017 via subscription for equity shares in AMAL in lieu of the third prepayment under its own offtake agreement. EPC contract for Lithium DMS circuit gaining momentum: o Design approximately 70% complete o Concrete works well-advanced o Structural steel packages let, first package on site o Screens and pumps ordered; starting to arrive on site o Majority of mechanical equipment ordered o Buried services installation commenced Bulk earthworks near completion. Additional administration buildings placed. Communications towers installed and commissioned. Fuel and Power tenders closed and under review. Mining tenders closed and three contractors shortlisted. Award expected by mid - October 2017. Senior operations and development personnel appointed. Tawana Managing Director Mark Calderwood stated: “The rapid progress being made at the Project is very encouraging and gives us great confidence that the Bald Hill Mine will be in production in the quarter ending 31 March 2018. Our EPC contractors, Primero are progressing the Dense Media Separation processing plant on time, with commissioning still expected in the first quarter of 2018. A number of key contracts are expected to be awarded in October 2017 including mining, crushing, fuel and power. In addition, there have been a number of key appointments to further enhance the development, and operational skills as the joint venture moves forward with the development of the Bald Hill Lithium and Tantalum Mine” 10 October 2017 For personal use only

Upload: dodang

Post on 21-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tawana AMAL Project Highlights Burwill For personal … 6 | Structural Steelwork being erected Figure 7 | New site offices in position For personal use only Title Microsoft Word -

BaldHillOfftakeandProjectUpdateSeptember2017

Tawana Resources NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited(SGX:AMA)(AMAL)arepleasedtoprovidethisupdatefortheBaldHillMinelocatedin the Eastern Goldfields region of Western Australia. The Bald Hill project (theProject)isajointprojectbetweenTawanaandAllianceMineralAssetsLimited.Highlights

• Thirdprepaymentof$4,375,000 receivedbyTawanafromBurwillHoldingsLtd(Burwill)undertheofftakeagreement.

• AMAL received A$4,375,000 from Burwill on 30 September 2017 viasubscriptionforequitysharesinAMALinlieuofthethirdprepaymentunderitsownofftakeagreement.

• EPCcontractforLithiumDMScircuitgainingmomentum:

o Designapproximately70%completeo Concreteworkswell-advancedo Structuralsteelpackageslet,firstpackageonsiteo Screensandpumpsordered;startingtoarriveonsiteo Majorityofmechanicalequipmentorderedo Buriedservicesinstallationcommenced

• Bulkearthworksnearcompletion.

• Additionaladministrationbuildingsplaced.

• Communicationstowersinstalledandcommissioned.

• FuelandPowertendersclosedandunderreview.

• Mining tenders closed and three contractors shortlisted. Award expected bymid-October2017.

• Senioroperationsanddevelopmentpersonnelappointed.

Tawana Managing Director Mark Calderwood stated: “The rapid progress beingmadeattheProjectisveryencouragingandgivesusgreatconfidencethattheBaldHillMinewillbeinproductioninthequarterending31March2018.

Our EPC contractors, Primero are progressing the Dense Media Separationprocessing plant on time, with commissioning still expected in the first quarter of2018.

A number of key contracts are expected to be awarded in October 2017 includingmining,crushing,fuelandpower.

Inaddition, therehavebeenanumberofkeyappointmentsto furtherenhance thedevelopment, and operational skills as the joint venture moves forward with thedevelopmentoftheBaldHillLithiumandTantalumMine”

10 October 2017

For

per

sona

l use

onl

y

Page 2: Tawana AMAL Project Highlights Burwill For personal … 6 | Structural Steelwork being erected Figure 7 | New site offices in position For personal use only Title Microsoft Word -

EPCUpdate

• Engineeringiswell-advancedwithdesignmorethan70%complete.• Concreteworkswell-advanced.• Buriedservices(electrical/piping)progressingwithconduits&pitsbeingpositioned/installedand

HDPEpipesbeingweldedreadyforinstallation.• Steelwork isprogressivelybeingdetailedandprogressingthroughfabricationandpainting.First

packageofstructuralsteelhasarrivedandisbeingerected.• Procurementofmajorequipmentisprogressingwithcriticalordersontrack.

MajorContracts

• Mining tender closed; unit pricing equal to the Pre-feasibility study (PFS). Three contractorsshortlisted,withthepreferredtobenotifiedbymidOctober2017.

• FuelandPowertendersclosed;unitpricingconsistentwithPFS.• Crushingtendersclosed,currentlyunderreview.• Non-ProcessingInfrastructuretendersclosed;reviewunderway.• Haulroadupgradetenderclosed.

KeyPersonnel

EachoftheBaldHillLithiumandTantalumJointVenturepartnershasrespectivelymadeanumberofkeyrecentappointmentstofurtherenhancethedevelopment,andoperationalskillsasitmovesforwardwiththe development of the Bald Hill Lithium and Tantalum Mine in the eastern goldfields of WesternAustralia.Thesekeyappointmentsareasfollows:

TonyDominkovich-ProjectDirector,EPCSuperintendent(AMAL)

Tony has 37 years’ experience undertakingmining, infrastructure,mineral process and pharmaceuticalresearchprojects inAustralia,Africa,USA,theBalkansandAsia. Recentprojects includeMtWeldRareEarths(Lynas),BarrickGrannySmithupgrades,BarrickBulyanhuluandBuzwagiandFMGChristmasCreek.In addition to these projects, Tony has also been consulting to Pela Global on the restart of severalbrownfieldpolymetallicminingandprocessoperationsintheBalkans.

Other related roles includeDirectorshipof an industry superannuation fund and lecturing contract lawandestimating.

TonyundertakesanoversightandreviewfunctionforAMAL,monitoringallprojectactivities,approvalsandexpenditure.

SteveZaninovich–ProjectDirector(Tawana)

Stevehas 25 years’ experience in thedevelopmentof numerousprojects inAustralia andWestAfrica,with hismost recent role being VP -Major Projects at Teranga Gold Corporation, notably leading thedevelopmentofthecompany’sBanforaGoldProjectinBurkinaFaso.StevepreviouslyworkedasCOOforGryphonMinerals (prior to itsacquisitionbyTerangaGoldCorp.),asaProjectDirector for LycopodiumMinerals,aNon-ExecutiveDirector forCentaurusMineralsandOrwayMineralConsultants,andstartedhiscareerintheconstructionindustrywithUGLLimited.

Steve’sprojectmanagementexperience includesasProjectDirector forNewmont’s$1billion,7millionounce Akyem Gold Project in Ghana; Project Manager for the H2S Plant Project at Kwinana NickelRefinery, Tarkwa Phase IV Project in Ghana, Project Controls Manager at the Ridgeway Gold Project,CommissioningManagerattheBibianiUpgradeinGhana,andvariousstudies.

StevewillleadtheprojectdevelopmentoftheBaldHilllithiumandtantalumoperation.

For

per

sona

l use

onl

y

Page 3: Tawana AMAL Project Highlights Burwill For personal … 6 | Structural Steelwork being erected Figure 7 | New site offices in position For personal use only Title Microsoft Word -

RobBroad–ProjectManager

Robert is a highly experienced Project Manager and Principal Engineer having worked with WorleyParsons,Kaiser,BHPB,RioTinto,WorsleyAlumina,Alcoa,Hatch,Karara,NickelWest,Gwalia,Woodside,ChevronandHorizonPower,onmajorresourceandinfrastructureprojects.RoberthasbeenPMCertifiedbyPMI,BHPBandWorleyParsonsandhassetupprojectsystemsforanumberofminingandengineeringcompanies.

As a consultant engineer for over 35 years, Rob has designed and built awide range of refineries andmineralsprocessingplantsincludinglithium(spodumeneandcarbonate)andtantalum.

DarrenBuchholz–OperationsManager

Darrenhasasubstantialcareerinminingoperations.BeforejoiningTawanaResources,Darrenwasmostrecently a site General Manager for Mineral Resources Limited which included managing the miningoperationandassociated infrastructureaswell asmanaging the site. Prior to this,DarrenwasGeneralManager forGlobalAdvancedMetalswherehe ledandmanagedmine-siteoperationsandnotably ledstrategiestoreducecoststhroughinnovativeuseoftechnologyanddrivingefficiencies.InbothoftheserolesDarrenledasuiteofperformanceupliftsintheprocessingplantandtailingsdam.

Other previous roles that Darren has held include Processing Superintendent at Talison Tantalum andSeniorProcessingCoordinatorforSonsofGwalia,bothpositionsheldforanumberofyears.

Inaddition,thefollowingkeypersonnelhavebeenappointedandhavecommenceddutiesonsiteinthelast month to oversee or facilitate construction activities and commence operations readinesspreparationaswellastakeovermonitoringactivitiesfromcontractors:

• Superintendent-Mining• Superintendent-HealthSafety&Environment• Minegeologist• Surveyor• EnvironmentalAdvisorandRadiationSafetyOfficer

AccommodationCamp

Inadditiontothe40-roomexistingcamp,personnelarealsonowbeinghousedattheleased150-personLanfranchicamp.Tawanaiscurrentlyassessingthemeritsofexpandingthecurrent40-roomcampatBaldHill.

AbouttheBaldHillProject

TheBaldHillLithiumandTantalumMine(BaldHillMineortheProject)isownedbySingaporeExchange-listedAllianceMineralAssetsLimited(AMAL),withASX-listedTawanaResourcesNL(Tawana)holding50%ofthelithiumrights.Theprojectissubjecttoa50%earn-intoexistinginfrastructureandtantalumrightsbyTawanathroughtheexpenditureofA$12.5mondevelopmentcosts.Followingthe50%earn-inbyTawana,a new Joint Venture will become effective and the Work Program and Budget for remaining projectexpenditureinexcessoftheA$12.5mwillbesubjecttoJointVentureapproval.

APre-FeasibilityStudy (PFS) finalised in July2017confirmed the technicaland financial viabilityofa lowcapital cost 1.2Mtpa lithium Dense Media Separation circuit (DMS) adjacent to the existing tantalumprocessingfacility(TPF)atBaldHill.

ThefirstshipmentoflithiumconcentrateisscheduledforMarch2018.

EPCGroupPrimeromobilisedtotheBaldHillMineinJuly2017andconstructionworkcommenced,withbulkearthworkscompletedandinitialcementfoundationsbeingpoured.

For

per

sona

l use

onl

y

Page 4: Tawana AMAL Project Highlights Burwill For personal … 6 | Structural Steelwork being erected Figure 7 | New site offices in position For personal use only Title Microsoft Word -

Each of Tawana and AMAL executed an offtake agreement in April 2017 for the supply of lithiumconcentrate from Bald Hill over a five-year term with pricing for 2018 and 2019 of US$880/t (FOBEsperance)for6%Li2O.Theprepaymentsfromtheaforesaidofftakeagreementwillbeusedtowardsthecapital costs of the Project. AMAL had entered into a binding term sheet to vary certain terms of theaforesaid offtake agreement and subsequently, a definitive subscription agreement for the issuance ofordinary shares in the capital of AMAL to Burwill; further details of which can be found in AMAL’sannouncementontheSGXnetdated4October2017.

TheProject is located50kmsoutheastofKambalda intheEasternGoldfieldsofWesternAustralia. It islocatedapproximately75kmsoutheastoftheMtMarionLithiumMine.

TheProjectcomprisesfourminingleases,oneminingleaseapplication,twelveexplorationlicenses,eightprospectinglicensesandonegeneralpurposeleasetotalling790.1km.

A Maiden Indicated and Inferred lithium Mineral Resource of 12.8 million tonnes at 1.18% Li2O, and158ppmTa205ata0.5%Li2Ocut-offfortheProjectwasestimatedbyCSAGlobalPtyLtdandannouncedinJune2017.TheProjectremainssignificantlyunderexploredashighlightedbysignificantexplorationdrillresultsposttheJune2017resourcestatement.

Figure1|BaldHillprojectconstructionaerialview(September2017)

For

per

sona

l use

onl

y

Page 5: Tawana AMAL Project Highlights Burwill For personal … 6 | Structural Steelwork being erected Figure 7 | New site offices in position For personal use only Title Microsoft Word -

Figure2|FirstscreenbeingdeliveredtoBaldHillsite

Figure3|Cyclone&DistributorsfromSouthAfrica

For

per

sona

l use

onl

y

Page 6: Tawana AMAL Project Highlights Burwill For personal … 6 | Structural Steelwork being erected Figure 7 | New site offices in position For personal use only Title Microsoft Word -

Figure4|ConcreteworksforThickener

Figure5|FeedBinWall&ConcreteFootingscompleted

For

per

sona

l use

onl

y

Page 7: Tawana AMAL Project Highlights Burwill For personal … 6 | Structural Steelwork being erected Figure 7 | New site offices in position For personal use only Title Microsoft Word -

Figure6|StructuralSteelworkbeingerected

Figure7|Newsiteofficesinposition