TATE OF CONNECTICUTBOARD OF TRUSTEES
FOR THE STATE COLLEGES
P. !O. Box 2008 NEW BRITAIN, CONNECTICUT 06050
TE '. NEW BRITAIN: 203~X TEL. HARTFORD: 203.566-7373
827-7700
RESOLUTION
concerning
SCR #77-131
..s:Le.. -; c;-I ~.2.
/
BOlDING REQUEST FOR REPAIRS FOR
January 6, 1978
THE STATE COLLEGES
WHEREAS, The buildings, grounds, and equipment of the Connecticut StateColleges require extensive repairs to protect the capitalinvestment of the State and to meet reasonable standards ofsafety, and to maintain the quality of instruction, and
WHEREAS, A cant nuing study of the cost of such repairs is beingmade, nd
WHEREAS, The ap ropriate State Officials have suggested that the costof suc repairs should be bonded, therefore, be it• RESOLVED, That tmilliomakingEducatmore t($3,50The fiDirect
e Trustees approve an amount not to exceed threefive hundred thousand dollars ($3,500,000) for the
of such repairs and, provided the Board of Higheron also approves, request the Governor to include notan three million five hundred thousand dollars,000) in the 1978-1979 capital budget for this purpose.al list of repairs shall be appproved by the Executiver after consultation with the College Presidents.
Certified True Copy:
'JiJl (~fAa/+;;=:,!), /... vvvv,1l1 1/z?\A/ames A. Frost
,/Executive Director
•-' .
BONDING REQUEST FOR .REPAIRSfor the
CONNECTICUT STATE COLLEGES
LIFE SAFETY
c-. ~f1.'l- dC..(!./II.C......C/..... -(()13 fJ. t~ - 1/1 7/7 g
Rev. January 17, 1978
Central Connecticut State College
DiLoreto Hall, Henry Barnard Hall - resurface and retilestairwells
Update fire alarm system - campus-wide
Eastern Connecticut State C<llege
Theater - repair of concretE steps and handrails at EmergencyExit
North Campus electrical sys em - installation of ground faultdetector
Media Bldg install handic pped entrance
,e)laCe steps and walks where deteriorated campus-wide
Shafer Auditorium - Replace dimming system
Academic BuildingS - UpgradE fire alarm ,system
Install Panic Handware whele required by code
Southern Connecticut State College
6,500.00
25,000.00
2,500.00
2,500.00
2,000.00
50,000.00
7,500.00
J.0,000.00
2,500.00
1,500.00
2,200.00
31,111.00
30,900 •00
.
..
Repair and update central
Engelman Hall, Administratfloor covering
.pair and update exterior
ire alarm system
on Building - 'Replace deteriorated
campus-wide'
I
150,000.00
15,000.00
50,000.00
'.Bondirlg Hequestfor Hepairs - Life SafetyPage 2
.~ern Connecticut State Col1e~e
Berkshire Hall Auditorium - Stage Lighting System _ repair/replacerenovate wiring, receptacles to meet code 60,000.00
)
Berkshire Hall Auditorium -. Construct entrance ramps forhandicapped 15,000.00
Higgins Hall - Electrical Sy~tem - replace breakers,. rewire,replace receptacles to meet code 20,000.00
Higgins Hall - Replace Vinyl asphalt tile in corridorsimproperly installed when b ilding was built 2,000.00
Higgins Hall - Increase heat ng capacity to prevent freezeupof emergency fire hose wate supply 6,000.00
.
White Hall - Replace sWitchg~ar in Concert Hall
Update emergency lighting syEtems and local fire alarm systemsto meet code requirements - campus-wide
50,000.00
234,000.00
•..~
Total Life Safety
ESSENTIAL REPAIRS
$775,311.00
. Central Connecticut State College
Replacement of broken and spaLIed sidewalks at various areas
Powerhouse - Replacement of r)of - c~nplete
Marcus White Hall, Administra ion Building - waterproof (silicone)complete
Wells Street, Henry Barnard Hall lot, Powerhouse driveway _Replacement of sidewalk aprops
,)
2,500.00
18,000.00
20,000.00• •
15,000.00
48,000:00
30,000.00
22,000.00
6,000.00
Replacement of water mainPowerhouse to Administration ~uilding(line is over fifty (50) yea~s old.
Welte Hall, Marcus White Anne (Art Department), Kaiser Hall,DiLoreto Hall, Henry Barnard Hall - retar and stone roof complete
Administration Building and Mreus White Hall - replace allwood cornice and top rails
S.estnck - repoint, rebrick & repair cement work
..morc-
t
BondinG Hcquest for He,pairs - Essential HcpairsPage 3
_tern Connecticut State Cc ller,e
Goddard Science Hall - repairs to bathrooms - replace tile
Shafer Hall - repair roof, lromenade deck
Repairs to Outdoor Physical Education Facilities
Sports Center Gym - Refinisl Tartan Floor - resurfacing,relining and resealing
Sports Center - Paint Pool
Schafer Hall - repair entra ce - stairs, patio, and wall
Shafer Hall - parking lot 0 east side'
North Campus - (10) drains or electrical manholes
Sports Center pool - instal ation of anti-siphon tank
Goddard Hall - Update venti ation system
SJ;>Qrts Center _ west side o-f' pool - install 180 lih'~ ft. radiation
.liuthern Connecticut State bollege
. ~dministration Building and Pelz Gym - replace deteriorated tilefloors
~an Auditorium Lot, Storage Building Lot, Physical Plant. Lot - repair surface of t1: ree parking lots
Administ~ation Building, PElz Gym - Waterproof Exterior Walls
Repairs to outdoor physico." education facilities
Repair and replace where nEcessary ramps and sidewalks
Western Connecticut State (ollege.'
Higgins Hall tIl Roof repa rs and brickwork
White Hall - Roof repairs
Berkshire Hall - Repair coping and flashing
Student Parking Lot - Pavirs and Drainage
Library _ Waterproof basement walls masonry pointing and deckeon Arcade .
HiC;Gins lIa1l - Observatory and greenho\1ce repair
-morc-
6,000.00
22,000.00
15,000.00
25,000.00
10,000.00
23,000.00
'50,000.00
50,000.00
20,000.00
75,000.00
4,000.00
.'18,000.00
50,000.00
24,000.00
29,000.00
9,000.00
•
20>900 . 00
10,000.00
13>500.00
50,000.00
22,000.00
10,000.00
Higgins Hall - Lecutre Room - replace A.C. system
Bonding Request for Repairs - Enscntiul RepairsPugc h.'t "lcstern Connecticut S 'ate Collcr;e
Sidewalk Repair
()
20,000.00
10,000.00
6,000.00Exterior paiHiggins Hall
Old Main - Roof - repair gu tel'S and fll1shing 110,000.00
Berkshire Hall - Men's Lock I' Room - install adequate ventilation,replace moldy plaster, up- ate plumbing (fixtures and pipes)
20,000.00
Library - Repair crumbling laster and repair interior entirebuilding
4,000.00
Higgins Hall - Repair damage to plaster and paint causedby roof leaks
6,000.00
Higgins Hall - Jack-up and epair exterior steps and porches thathave settled into ground
6,000.00
"
.'; White Hall - Exterior paint
White Hall Auditorium - Res are stage floor
4Itite Hall - Replace Air Co ditioning System for Computer Room-'
White 'Hall - Repairs to Outdoor physical education facilities, install drainage, resurface
White Street Campus - Higgi sHall - Rehabilitate Planetarium
Total Essential Repairs'.
8,000.00
8,000.00
24,000,00
6,000.00
78,000.00
9114·,000.00
ENERGY CONSERVATION
, '.
90,000.00
'.
Powerhouse to Student Cent I' pit - Ric-will replacement, steam andreturn lines
Central Connecticut State
Administration Building an t-larcus \fu.~te Hail - Replace all woodwindows and frames with m dern units and new balances.
Refurbish return line trap - steamlines 30,000.00
• -more-
130nc1ing Requcst for Hc}?uirs f- EnerGY CorwcrvntionPage 5
4Ittern Connect'icut Statc Co ,legc
Shafer Hall - Replace Pnewna~ic radiator valves and radiator. traps
. ,, . ,
Southern Connecticut State Cpllege
East Campus - Replace steam ~nd conduit lines) and replaceeight (8) antiquated access pits and add three (3) additionalaccess pits
Western Connecticut State·College
Heating Plant - Replace elec~ric heaters in oil tanks
Old Main - Heating System - ~epair and replace pipes) valves)radiators as required and update controls
Heating Plant - Boilers - replace oil burners with up-to-date
•dels) rebrick fire boxes and provide alternate (second) cityter connection for boilers
White .Street Campus - Update controls on heating equipmentto reduce energy consumption all buildings
Total Energy Conservation
42 2260.00
806)260.00
'.
,.
•
Life Safety Essertial Repairs
Energy Conservation
Grand Total
775)311.00
944)0'00.00.806 2260.00
2) 525) 511. 00
••
II
. TEL HARTFORD: 203.566.7373
S ATE OF CONNECTICUTBOARD OF TRUSTEES
FOR THE STATE COLLEGES
P. . Box 2008 NEW BRITAIN. CONNECTICUT 06050
TEL NEW BRITAIN: 203·229·1607
February 3, 1978
•
Senator AudreyRepresentative er Eo Wright, Jr.State CapitolHartford, Connecti 06115
Dear Senator Beck Representative Wright:
•
•
As indicated by Dr. W. Robert Bokelman's letter to me dated January 31, 1978(copy enclosed), t e Board of Higher Education has endorsed our Trustees' request for a capita appropriation in the amoUnt of $2,525,000 for alterationsand renovations, a additional appropriation of $2,200,000 for the constructionof a residence hal at Eastern Connecticut State College, and an additional appropriation of $1, 00,000, for a residence hall at Southern Connecticut StateCollege. As you k ow, the residence halls are self-liquidating projects. Therequest to make al erations and renovations is intended to improve safety, saveenergy, and protec the existing plantQ A list of the proj ts included in therequest for alter ions and renovations is enclosed.
I would be please to testify before the Fi ce Committee concerning thesethree requests. S ould you desire me to make a presentation I request that itnot be scheduled ing the period February 10-21, inclusive.
Thank you for your consideration of this matter.
Sincerely,•
James A. FrostExecutive Director
JAF/bencl.
cc: Governor Gras 0
Secretary Ao ilanoInterim Commi sioner S. GouldDr. Wo Ro Bok ImanMr. J. Polosh'an
"·1·
STA E OF CONNECTICUTBARD
P.O. Box 1320
OF HIGHER EDUCATIONHARTFORD, CONNECTICUT 06101
AREA CODE 203 566-3912 rl• I
.: 1: I
.q;
:.i"~i" i. "
"·1. ;
.: Ii- -i
.~
."\ .. ""
January 31, 1978
Frostf Trustees for State Colleges
regular meeting on Tuesday, January 24, 1978,igher Education approved the list of capitale attached table for funding in 1978-79. Foreges the list includes funding for renovationdditional funding for residences at Eastern andcticut State Colleges.
W. Ro ert Boke1man, DirectorFiscal Planning and Management
At ithe Board ofprojects onthe State Colprojects andSouthern Conn
ro:
SUBJ:
FROM;
:
-I;J.fltt~~~W. Robert Bokelman
ard also indicated its support of certain projectsthat had priooapita1 authorizations. This list included ascience build"ng for Southern connecticut State College and aclassroom bui ding and a residence hall for Western ConnecticutState College ..~.
. ... • #
",
WRB:jaEnclosure
, ,.'.. ;.
. "
Author1zations Approved byof lIigher Educatioil
$ 2,525,000$2,200,000
: 1 000,000
$2,525,000 $3,200.000.
· ..$6,100,000 ·
: 500,000.....
215,000 . .$6,815,000 . ·.
.i
-III,;I
i
J. i.I
$3;200,000
Sclf-linuidntin~
$
$ 9,000,0002,500,000
540,000$12,040,000
General Fund
$. 45,000300,000191,000.75,000 .605,000
. 50,000$,1,266.000
$22,721,000
UConn Health CenterOperating Room Suite Air ConditioningSite LightingHarehouse ExparsionMake Facili tie~ Accessible to HandicappedPhysical Plant Haintenance BuildingAuditoria Ligh ing
Universitv of ConnecticutSchool of La.v FacilityEnergy Conservation ProjectsAlterations an, Renovations
. .
Totals
State Technical Colle~es
Alterations and Renovations
Regionnl Cnm~unit~ Colle~es
Non~alk CC Clns~room BuildingTunxis CC Building and LandHousatonic CC Classroom Building Design
~tate Col1e~es
Alterations and RenovationsECSC--Addition<ll for ResidenceSCSC--Ad.ditionCll for Residence
..
•
....
~..-../J
.'1/24/78WRD:bw
. .
t..~..,
..",.'.
·r\
-... ... scn 11'('(-131
JJOARD OP TRUSTErJSI~OI~ Tilt: STATE COLLEGES
P. O. nox 2008 NEW HRITAIN. CONNECTICUT 06050
'rEf.. NEW II 'l1'AIN: 203)0%.YJXI1X. 827-7700
S'TA Ij.d ope 0 1'J NEe1-1 I C lJ1"1
TEL. J1ARTI~OIW: ?03.f66·7373
..•...
RESOLUTION. '
concerning
BONDING EQUEST FOR REPAIRS FOR THE S~\ATE COLLEGES
January 6, 1978
11IIEREAS, 'The' buildin s, grounds, and equipment of the Connecticut StateColleges re uire extensive repairs to protect the capitalinvestment f the State and to meet reasonable standards ofsa.fety, and to maintain the quality of instruction, and
!IIf
State Officials have suggested that the costshould be bonded, therefore, be it
~EAS,. A·continuin study of the cost o~ such repairs is beingmade, and
'WHEREAS, The approprof such rep
. RESOLVED, That the Tr stees approve an amount not to exceed threemillion fiv hill1dred thousand dollars ($3,500,000) for themaking of s ch repairs and, provided the Board of HigherEducation a so approves, request the Governor to include notmore than tree million five hundred thousand dollars{$3,500,000 in the 1978-1979 capital budGet for this purpose •.The final 1 st of repairs shall be appproved by the ExecutiveDirector af·er consultation with the College Presidents.
ames A. FrostExecutive Director
•
•
!>lJGGl: ~ IIUU COMMllll.: l:. 511): "'provo lOut UWI' '._l " "II 0''', . . i ,",',I ''''""\1''''''''': , ,'1 I ,--------. ---_...
SAVE TIMe: Il,rnJw,jt/tm tnlllSdgtJ 'If' tuuptab1e.
Uu (a,bon il 'You ,cally need" (Opy, IllypllU";IINI, ;1:"0" laint li"es.
ToNM'[
J. PildellAGENCY
Ailininistrative Affairs
11 ILL
V. P. Adm. AffairsADDRESS
IDAIL
December 6, 1971
-1------------+-----+-------------.,.----------NAME TITLE II Ell7P2H07Nl!.C. Biedingcr Superintendent
('0/71 t-,,:"'""G-u-.c-y----------t------+A-O-DR.;c.E-SS------------'"-----------
HaintcnnnceJOJECT
sub total
/112 Refurbish return line traps - steamlines
#9 Replace all wood corn sh and top rails, Administration Buildingand Marcus White Hall
~
$ 6,000.00
.. 90,000.00 .
I2,500.00 i
i18,000.00 l.
i
20,000.00i
15,000.00 t~
.~,ooO.oo
6,500.00
30,000.00
22,000.00 ..50,000.00
90,000.00
$ 39~,000.00
~30,000.00
428,000.00Charles BiedingerSuperintendent Plant &Maintenance
Replacement of broken and spalled sidewalks at various areas.
Replacement of sidewal aprons, Hells Street, Henry Barnard Halllot, Powerhouse drive\ol:!y - oil deliveries.
Replacement of roof - complete - Powerhouse.
Replacement of water main - Powerhouse to A~nistrationBuilding.Line is over fifty (50) years old.
Welte Hall, Harcus Whi[te Annex (Art Department), Kaiser Hall,DiLoreto Hall, Henry Barnard Hall - retar and stone roof - complete.
Stairwells (all) DiLoz eto Hall, Henry Barnard Hall - resurfaceand retile.
/Ill Central Clock System • connect all clocks to a central clocksystem so that all clpcks will be in synchronization.
#8 Marcus White Hall, AdJI inistration Building - waterproof (silicone)complete.
#10 Replace all wood windt>ws and frames with modern units and newbalances. Administr tion Building and Marcus \Yhite Hall.
#3
Capital expenditure prejects
#1 Smokestack - repoint, ebrick, and repair cement work.
#2 Ric-will replacement, team and return lines from Powerhouseto Student Center. pit.
#7
#4,
. .
---- SU~GESTION COMMITTEE S YI Improve Your Own Condl1loo; Eom Cash and Recognltlonl Send In a SU99utloni
'1.
Interdcpartmenf Message"01 REV.3/74 STATE OF CONNECTICUT
~No. 6938-051-01)
SAVE TIME: 1111fld'wrisllm m'SStlg's M, tUcepl"bl,.
Uti carbon il 'Y01I",,11, "eed" COP1. III'YP6WNllm, ;gnlW' I"inl lin,s.
ToNAME
Dr. Charles \vebbAGENCY
TITLE
PresidentADDRESS
IDATE
10-24-77
NAME
~'O~ Ronald V. Stephens• AGENCY
TITLE ITELEPHONE
Supvr. of Plant & Maint. II 348ADDRESS
SUBJECT
Pro.1ects that need at1 ention at ECSC.
___t •.._.Goddard Hall - Repairs to bathrooms - replace tile ___.$ _.... 6,000.00
._---------...,.. --_._---_.._.•_._-----_._--.--2.-' Sports Center - west side of pool - install 180 linear ft. of______radiation _.. 4,000.00
~;·'··Burr Hall & Shafer Hall - Repair (2) roofs, promenade deck, Burr~__Hall connector and parapet and walls on same. ... ._.__ 30,000.00
--4;'-Repair tennis court fence.---------_·---·-----------·----··------·-··--·1,000.00----_ _-~ -..~.._.__._ _---+..------_._--_._..-.-----_._.__..__.. _ __.-
5. Repair dugouts. . 4,000.00•:. --- --- .. - --.._ -_.._-_.-_ _.. _.._---------._-_.----_ _-_.. .--Lighting and paving of Knight House Parking Lot. . .. '_'_"_.__ "' ._' 10,000.00
"-';--·-1..andscapeIntramural Fields (behind Hurley Hall)·--- --.-- --.---.--.-- ...... 10,000.00----_...-._--_.-..._------ ._ ...- ...-_...._.• -----'-"--"...---- ..--
_.8.!._I!~Pcrlr of c()I?-?~ete s~eps and handrails at Emergency Exit from theater. 2,500.00
---9.--Installation of ground fault detector on North Campus electrical system. 2,5000 00
--fO:-Surr"·Hall·-:'··Ueplace"(4) panels and feeders.---·----··---------··--··--,,500.00..---_._------,.----_._--'- ...._-_. _ ....
___11L..Resurface tennis courts (fill cracks, undercut)' _...... .._ ......_..... 15,000.00
19. Shafer Hall - parking lot on east side
-'-12. - Sports Center Gym - Refinish Tartan Floor - Resurfacing, relining,____.and resealing. __.. .._.. _........ .. -.. _ _ _ __ _ .
17. Burr Hall Kitchen - Remodel into office space and conference room.
411t. Shafer Hall - Pneumatic radiator valves and radiator traps. 2,000.00
50,000.00
.25,000.00
10,000.00
2,000.00
2;000.00
2.3,000.00
75,000.00
.-Installation of Kool shades at Planetarium14•
.- -15. Handicapped entrance to Media Bldgo ..._. ..._ ..... _ ..... _0'_.
·,6;" Repair entrance to Shafer - stairs, patio, and wall
SUGGESTION COMMITTEE SAY: IRlprovfI Your Own Condition; Eom Cash anel Recognition: Send In a Suggutlonl
Interdeparrtment ~~e5sage5TO-201 REV.3/74 STATE or CONNECTICUT
(Slock No. 6938-051-01)
SAVE TIME: HanawrillenmtlS14gtls tire 4c&tlpI4bl,.
Use (arbon i/ YON really need. Copy. 1/lyPlWrilltm, ;gnortl /.;111 lines. •NAME T ITLl t DATE
.ToAGENCY ADDRESS
NAME TITLE ITELEPHONE
FI't'Jrti AGENCY ADDRESS
SUBJECT
Continued - Page 2
_20. Burr Hall - Repair roof, coping, $offit, chinmey,sand blast amrepoint building.
__ 21. Campuswide - Replace steps and walks where deteriorated.
'-'-22. ( 10) drains for electrical manholes on North Campus.
$ 100,000.00
50,000.00
50,000.00
__~~._Shafer Hall - Update fire alarm system•. ,, . _'__ '. ._. },OOO.OO -.-Goddard Hall - Update fire alarm system.
" 230 Replace and increase size of main 3-phase, 4-wire feeder from M.P.D.----.~.--,~.- ·to Burr Hall main 20Q-amp disconnecto ... -.. _--....-~,----,---_.---_ ...._-- H~· •••• _ .,---"" ~-_·_'-~·~·--12,OOO.00
:---26~- Hurley Hall - Replace roof exhaust fan:---------- -.--------------.- ..---.---- 3,000.00 -
__2J._ Burr Hall and Knight House - Resurface parking areas. _____ .. .._. .1.6, 000. 00
--28.- -Shafer Auditorium - Replace dimming system.-·-------------- ~----------7,500.00
___.30. Sports Center - additional parking spaces (near tree grove).
"-31. - Sports Center pool - installation of anti-siphon tank.
.34,000.00
20,000.00
32. Goddard Hall - Update ventilation system. .75,000.00
-.33. Goddard Hall - Install necessary safety showers.. 10,000.00
-34. Keelor Hall, Portable Offices &Classrooms, Knight House, Beckert Hall,Nathan Hale Garage - Install emergency lighting. 2,500.00
.. .35. Nathan Hale Garage - Replace undersize overhead door with widermotorized door. 5,000.00 -
* ,36. Goddard Hall - Air-conditioning in Rms. 104, 105, 106, and 107.
37. Install sump pump in water mater pit at Low Rise Apts.
. 39. Knight House - Replace )mob and tube wiring.
1f,800.00 •
750.00
1,500.00
SUGGESTION COMMITTEE SAY: Improvo You, Own Condition; Earn Cosh and ROCo9nltlon: Sond In a Suggostionl......._-=..~~~~=~:::...::..:~~~~~~~~.:::::::..:.~:::.:....:::.:.:::..:..::~:..:.:.:.:;:.:.;:....:.:::.::.::..::.:..:.:...:::::,)L\!.::.:..:.:.::.:.:.:..- _
Int~rdcEJortmenf tv1essc,geSTO-201 Rlv.3174 STATE Of CONNECtICUT
(Slack No, 6?18--i>~1-01J
5AVE TIME: llmu!w,;lIcn tneJJdgeJ 11'6I1cceplable.
VStl ~4fbon il ')011 ,ell"" nC6d II tOPY. lllypcw,illen, ignore I"inl /inel,
NIIM( TITLE
AGlNCY ADORESS
TITLENAMl ITELEPIlONE
FtOmI-AG-E-N-CY-----------I--------+A-O-OR-E-S-S--------- -1.. _
SUBJECT
Continued - Page 3.
400 Sports Center - Repl~ce eXisting breakable fixture lens and framers tonon-breakable in (5) handball courts. $ 2,200.00
* RVS:mwrcc: Dr. Bruce. Bradford
•
Dr. Delbert HeyerJohn Berkett
- file
51 VI: TIME: I} (ONI'OIl..,,'. b,mdu>rl" '(If'" 10 und•., on IJm J,ml# Jhul.
.
SUGGESTION COMMITTEE SAY Improve Your Own Condition; E orn Cosh and Rocognition: Send in a SUCJgestlon!
Interdepa.·tment Messag~STO-201 IHv.3/74 qAT[ or CONNrCTICUT($'., 6'1111-051-01)
SAVE TIME: lIandwrilltm rTumagcs arc acceplable.
Use filrbon 4 you fClllJy 'Iced a copy. II Iypewrillcn, igllore Iilinl lincs.
ToNAME
Brendan KennedyAGENCY
Board of Trustees for he State Co
T 11 LE IOATE
December 7, 1977
06050
r NAM~. C. Scheuerman TITLE Vice President for IHLEPHON!.
rfOm r:-::-::-=::- -+ -t__~A~d~m~l.=.!·n~i~s~t~r~a~t~i,=_,v~e:::_£A~f~f~a~i.,;r,_"s~_L.~3~9.!..7_-.:!4~5~8~5 ~AGUKY AODRESS
SUBJECT
Southern Conn. State allege
Major Capital Repair 'roiect
501 Crescent Street, New Haven, Conn. 06515
Recently you indica ed that there were prospects that a special bondissue might be floa ed which would finance major repair projectsthroughout State Go~ernment. You asked that I identify and proposeany projects which appear needed at Southern Connecticut State College.
Scope: 3,200 feet of 611 to 8" steam feeder lines and 3,200 feet of1-1/211 to 411 conder: sate return lines with Ric-Hil or Perma Pipe.
After consultation ~ith the Director of Physical Plant and his staff,I am proposing one major capital repair project as follows:
•Replace steam and condui t lines, Eas t Campus.· Cost: $480,000.
Replace eight (8) ~ntiquated access pits and add three (3) additionalaccess pits.
We estimate that wwater per month thloss per se is theleaks. The extentwhere snow coversby the melting ofmajor economies in
are losing approximately 130,000 gallons of softbugh underground leaks. More important than the waterloss of steam energy which is dissipated through theseof these leaks is clearly indicated on those occasionshe ground. The path of the steam lines is indicatedhe snow. In other words, it is clearly evident thatenergy costs will result from this investment.
The State Departmeht of Public Works Estimating Division has given us anestimate of $150 per running foot for the conduit together with thefeeder and return lines.
•
"
Cflt&fl/1'HM~J. C. Scheuerman
JCS:pb
cc: }mnson Van B. JenningsAnton Wagenbrenner
,I ~ ,
I-LJ.,' I. •.
..,~ . __ ,~ I;
-- _.._.~..' __. ..,. ,__"~__.__ ._ __ ._.._>.__ ..__.._ ' , _,. ·M·_'~_·.__,. • ••. • _
~.'~ f\ vr~ 1'1 ~H~ II C"""'·'lff"J/, hJJI.Ht.,.lIrt irfl!,- 10 1(,,,.1,"1' 41"')'" 1.IfJlc~ ,;'('rl
S ATE OF CONNECTICUTw: STERN CONNECTICUT· STATE COLLEGE
181 HITE 'STREET • DANBURY CONNECTICUT 06810
December 15, 977
Mr. Brendan K nnedyBoard of Trus ees for State CollegesPOBox 2008New Britain, onnecticut 06050
Dear Brendan:
In accqrdanceI" am enclosinestimate of rbring the buiable standard
with our telephone conversation of 12-13-77,five pages of material representing our best
pairs and renovations required at this time todings and grounds of the college up to reasonof preservation, operation and safety.
immediately on B-301's five of these itemsto 6) plus Priority 1 (Replace electric heaterst boiler plant) for a total of $117,500. Theems are estimated at $58,000 making a total ofage 1.
Page 1 lists en items previously .submitted on B-30l's asearly as 11-2 -74 •
We plan to re(Priori ties 2in oil tanksrest of the i$175,000 for
•Pages 2 and 3 list work not previously requested on B-301'sfor a total 0 "$446,000.
Total cost es imated for pages 1, 2, and 3 is $621,000.
Page 4 repres nts work requested originally on CHE-7 in July1976 for a to al of $404,040. Subsequently on CHE-7 in July '77.
••
Page 5 repres nts work requested originally on B-IOO 'in September 1975 an sUbsequently on CHE-7 in July 1977 for a totalof $573,000
(continued)
QEC[UVlEDDEC 191977'
BOAiW OF TRUSTE£SfOR "flit ~ IAfil: CQI..\..l~l:S
December 15, 1977
Mr. Brendan Kennedy
- 2 -
-- ------------------------------------------------
•The grand total is $1,598,840. If 10% is added for contingencies the total cost of this list will be about $1,800,000 •.
Sincerely,
John W. DeeganDirector of InstitutionalResearch and Planning
JWD:me
Encls. (5)
•
WESTERN CONNECTICUT STATt:: COLLEGE 1
• Minor IF.1D'Ovements - Repi'\irs & Dernoli.tion,
Priori ty:
1. Boiler Plal!t;. - replace electric heaters in oil tanks
The following ii ems were submitted on B-301s 11-25-74:
2. Hiaqins Hall (I - Roof repairs & Brickwork
3. White Hall - Ro()f repairs
4. Berkshire Hall • Repair coping and flashing
5. Student Parkina Lot - Paving & Drainage
$14,000
20,000
10,000
1.3,500
50,000
6. Library: - Water)roof basement walls and deck on Arcade lOl~OOTotal $117,~OO
Will be submitted on B-300·5 - December 1977
Total $ 58,000
Higgins Hall - Lecture Room - replace A.C. system - Paint 20 000,
•
•
Also:
Library - Masonry and Pointing
Higgins Hall - Observatory & Greenhouse repair
Sidewalk Repair
Higgins Hall - Exterior painting
12,000
10)000
10,000
6,000
IIIt
. I
.:II
:
O.l.R.12-12-77
WESTERN CONNECTICUT STATE COLLEGE 2
~inor Imrrovemen~ - Repairs & Demolition
~ previously requested on B-300s - B-30ls .'Gen~ral Fund Pro~ects:
$10,000
1,000
2,000
New North Ramps (exterior) - provide lockable gates
Ventilate Locksmith's Shop
Utility Tunnel - provide 0.5. Air Vent and Lighting
Heating System - repair and replace pipes, valves, radiatorsas required 50,000
Update controls 20,000
Roof - repair gutters and flashing 40,000
Floors - rep1~ce carpet where necessary 24,000
Interior painting 12,000
Old Main
New Campus
Repairs to drainage ditches
Clean out catch basins
Road - remove weeds
Erect barricades
Erect "No Trespassing" signs
Sanitary Sewer: Locate infiltration of ground waterand repair pipe
12,000 .~
8,000
30,000
16,000
10,000
20,000
•
theatre)Irepair/replace/renovate w~r~ng,
receptacles (to meet Code)
Men's Locker Room - install adequate ventilation,replace moldy plaster, up-dateplumbing (fixtures and pipes)
Construct Entrance Ramps for Handicapped
Construct Supply Line for Natural Gas for EmergencyLighting M. G. Set.
Corr.idors, Lobby
Room 114 (Laboratory
stage Lighting System ~
5.
6.7.
4.
Berkshire Hall1. Stage Lighting System - repair and relamp
2. Lighting Instruments (to meet Code)
3. Interior Painting - all rooms
Auditorium
WESTERN CONNECTICUT ST 'I'E COLLEGE 3
4,000
4,000
$24,000
for EngineerProvide office
Boiler Plant
Boil~rs: reDIa e oil burners with up-to-date models(Ener y Conservation)Re-brick fire boxes
Water (make-up) provide alternate (second) city waterconne tion
•
ion, air exhaust Room 201
plaster and repair interior entire building
ondensing water circuit - pipe & Valves
Library
Install door on first floor between Lobby and TechnicalServi es Division
Provide ventila
Repair crumblin
Alterations to
10,000
1,000
4,000
2,000
IJfIIti
III
ti,i
6,000
6,000
6,000
10,000
Higgins I) - replace.breakers, rewire,20,000replace receptacles (to meet Code)
power source for projector 2,000
replace vinyl asphalt tile in corridorsimproperly installed when building wasbuilt 2, 000
Stairways in Hi gins III - increase heating capacity to. prevent freeze-up of emergency fire hose
water supply
Repair interior damage to plaster and paint caused by roofleaks
Planetarium - p
In Higgins III
Jack-up and rep ir exterior steps and porches that havesettled into ground .
Interior painti g
Higgins Hall
Electrical Syst
•
•
White Hall
Exterior paint
Interior paint
Auditorium: Re tore stage floor
New Air Conditi ning System for Computer Room
Exterior
Tennis Courts
Repair, ins all drainage, resurfaceTotal
Grand Total
8,000
10,000
8,000
24,000
6,000$446,000
$621 t 500
O"ItR •l~- 2-77
Major Repairs & Renovations
From CHE-7 7-12-77
Originally requested on CHE-7 7-6-76
Western Connecticut State College
White Street Campus Renovation and Repair $404,040
1. Berkshire Hall
Replace Switchgear in Auditorium
2. \'Jhite Hall
Replace Switchgear in Concert Hall
3. Higgins Hall
Alterations and Conversion to Laboratory spaceto provide classroom seating
4. All Buildings
Update Emergency Lighting systems and LocalFire Alarm systems to meet Code requirements
Total
O.l.R.12-12-77
4
$404,040
•
.r
e;
•ajor Repairs & Renovations
F'rom CHE-7 7-12-77
Originally requested on B-100s Sept. '75
Western Crnlnecticut State College
White Street Campus Renovation and Repair S57~,300
Constr-.u; ticn Fi):c<l.Eq'Ji~).
29,4[,4
41"L96
51,870
$ 63,796 ~ 9,{:28y
22,604 4,,914
34,398 hh;226
Audio P.eif'..forcer::ent Syskrals in C1n.ssroom·,.. • }J ~ I ;:l , " t'all, tllgglllS .al. , ..... erKsr.J-l'C .~
Rch!~bili t~tc a.id ExtenBuildings - '<Jhi te Ha
~~ Park1.n~ Co~t!'ol: rene ng, Gates, Bu:;;p3rs, }rarxing; Surfacing _11ain ParldJJi; INt
.60 Update Fire Alar:":1 Sj'S m - Emcl'sency Po~"er fer' (Bldgs. not now so
equipP2d) RCpUt.cci,:en of Obsolete Pull Boxes
4.
1. Conversion of S::i11l Cl ssroo:ns to LT::'sC kct'Jre Halls includingAudio & Visual Eq'Ji .ent - Hhi tc Hill, Higgins Eall
2. Rch?,bili tat.e Obscl'vato - Hil;Cir..S Eall
. 3. Rehabilitate Plam ta!'i m - Higgins Hall
9;B28
':1,17,690
16" 708
22,60h
L8,IS7
S2,198
$h70,lOS
h,91h
I,:1
'·1
I, r
------'----, ,l
C:-103 ' <:! •.0,' " ~.~.~ fTotals
".
Hall
90 libratJ~ ll~prOV€ments - Stack Rearrrolgement - Additional Storage
•7. Rcpn:.i.r3 and Replac€:r.en Equipment in L3.rge Assembly Rooms (Sounds,
Ligh~s" 5crcl3ns) ~Jhi e Hall, Hif,(;ill3 Eall
8. RClnps, f...ntra.Hces, and ther Facilities for Eand5.cawed - BerkshireHall, l'~e::lOrial Hall
10. Update Controls on Hca ing Equirwent to Reduce Energy Consumption _All Buildings 42,260
12. Plr.nning and Fees
11. Major noof Repairs - H
13. Contineency
••Total Totals
•t:
$>73,,300