  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 1

    Category Excellent Energy Efficient Unit

    National Award In Excellence in Energy Management 2010

    Unit Tata Motors Limited ,Tata Motors Limited ,CVBU CVBU -- LucknowLucknow

    Sector Automobile

    Results Best in class Sp. Energy consumption- Sp. Water consumption &- Sp. Fuel consumption

    Lake View Within the Plant

    Plant Greenery

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 2

    National Award In Excellence in Energy Management 2010

    Tata Motors Limited Tata Motors Limited

    CVBU CVBU -- LucknowLucknow

    Presented By:-

    Srinu Babu . Matta Div Manager Energy Auditor

    Nitansh . Kamboj Manager Energy Manager

    Md. Amir Manager

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 3

    vTata Motors Limited is Indias largest automobile company, Consolidated revenues of Rs. 92,519.25 crores in 2009-10.

    (US $ 18.3 billion)

    We are the leader in commercial vehicles in each segment, The company is worlds fourth largest truck manufacturer, Worlds second largest bus manufacturer.

    TML - LucknowLake View Within the Plant

    Plant Greenery

    Company Profile:- Lucknow Plant

    vTata Motors -CVBU Lucknow is Established in 1992 to meet the demand of Commercial

    Vehicles in Indian & overseas market. Specialized in the designing and manufacturing of a range

    of modern buses Low floor, Ultra Low floor, CNG & RE Buses. Prominent customers include DTC & STU.

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 4

    Lucknow WorksEASTERN COMPLEX LUCKNOW WORKS

    Weld Shop

    Cowl & Cabin

    Vehicle Assembly

    Paint Shop TCFVehicle Factory

    Transmission Factory

    Integral Bus Factory

    Frame

    Cowl

    Vehicle Assembly

    Machining

    Heat Treatment

    Module Assembly

    Module Fabrication

    Bus Focused

    ERC setup

    Recon

    FBV Head

    Quarter

    TMML

    Service Training center

    Facilities @ LucknowWho are we

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 5

    * Delhi Transport Corporation

    **State Transport Unit

    Plant Process

    SUPPLY CHAIN

    Material from Vendor base -Local, Pune & Jamshedpur

    Vehicle Assembly Line Western ComplexBus Assembly Line

    TMMLVehicle Assembly Line

    Eastern Complex

    Engine Assembly

    Transmission Assembly

    AxleAssembly

    ChassisAssembly

    CowlAssembly

    BIW Shop

    Paint Shop

    DIS

    PAT

    CH DTC*

    Private Operator

    STU**

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 6

    Plant Energy Policy

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 7

    We have Energy Management Cell in our Plant, Which initiates & Manages all sorts of Energy Conservation measures across the Plant. The structure of the Energy Management Cell is,

    Energy Management Cell

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 8

    ENCON Summary

    Low Investment < Rs 10,000/-

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 9

    ENCON Projects 2006-2007

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 10

    ENCON Projects 2006-2007

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 11

    ENCON Projects 2006-2007

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 12

    ENCON Projects 2006-2007

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 13

    ENCON Projects 2006-2007

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 14

    ENCON Projects 2006-2007

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 15

    ENCON Projects 2006-2007

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 16

    ENCON Projects 2007-2008

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 17

    ENCON Projects 2007-2008

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 18

    ENCON Projects 2007-2008

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 19

    ENCON Projects 2007-2008

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 20

    ENCON Projects 2007-2008

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 21

    ENCON Projects 2007-2008

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 22

    ENCON Projects 2007-2008

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 23

    ENCON Projects 2007-2008

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 24

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 25

    ENCON Projects 2008-2009

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 26

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 27

    ENCON Projects 2008-2009

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 28

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 29

    ENCON Projects 2008-2009

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 30

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 31

    ENCON Projects 2008-2009

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 32

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 33

    ENCON Projects 2008-2009

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 34

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 35

    ENCON Projects 2008-2009

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 36

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 37

    ENCON Projects 2008-2009

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 38

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 39

    ENCON Projects 2008-2009

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 40

    ENCON Projects 2008-2009

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 41

    ENCON Projects 2009-2010

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 42

    ENCON Projects 2009-2010

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 43

    ENCON Projects 2009-2010

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 44

    ENCON Projects 2009-2010

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 45

    ENCON Projects 2009-2010

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 46

    ENCON Projects 2009-2010

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 47

    ENCON Projects 2009-2010

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 48

    ENCON Projects 2009-2010

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 49

    Burner

    SEALER OVEN

    Air

    BlowerBurner

    Air

    BlowerBurner

    Air

    BlowerBurner

    Temp 150 0 C

    Blower

    No FlameAir

    BlowerBurner

    Air

    BlowerBurner

    SEALER OVEN

    Before: Top mounted three burners oven maintains inside oven temperature i.e. 150 0 C for full baking of Cowl body.

    After:After Consultation with OEM and Internal Quality controller, we found baking of Cowl after sealant paint at 110 0C at its pregel stage, which fulfills the requirement. Accordingly one Burner out of three Burners has been stopped.

    Optimisation of Sealer Oven- Cowl Baking in Paint Shop

    Temp 110 0 C

    After CED process , Seam Sealant and Under body sealant is applied on body. After Sealant application it goes for baking in sealant Oven at 150 C. After Baking body goes for sanding , top coat application and again baking up to 150C. So sealant gets baked twice in one cycle.

    Make:Maxon-Oven Pak400

    Thermal O/p-426 KW

    Vol-60,000 M3/Hr

    ENCON Projects Zero Investment

    Total Investment : 0 Lakh Total Savings : 43.84 T CO2/annumPayback :Immediate

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 50

    In Phase 1 : 2008-09 : The compressed air pr. of 6.2 bar was under usage earlier. The Line pressure of the Compressed air reduced to 5.9 bar with no effect on the pressure delivered at the end user.

    In Phase 2 :2009-10: After detailed study and agreement from end user, further reduced the pressure setting optimally at 5.7 bar.

    Before Condition Phase 1

    Total Investment : 0 Lakh Total Savings : 0.92 Lakh/annumPayback :Immediate

    Optimizing the Compressor PressureENCON Projects Zero Investment

    Compressor House Phase 2

    6.2 bar 5.9 bar 5.7 bar

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 51

    After :Process improvement-Removed one motor after evaluate the prime mover capacity to operate the roller bed conveyor

    In Paint shop, after Top Coat & Sealer Oven ,cowl passes through the cooling Zone on roller bed conveyor for cooling the cowl body by forced draft blower.

    Before:Roller bed conveyor operates with three motor which connected with roller operated conveyor belt.

    3 Motors

    Long belt

    Optimisation of Cooling Zone- Roller Belt operation in Paint Shop

    Cooling Zone

    M1M3 Sensor

    Cooling Zone

    M1M3 M2Sensor

    L1L2

    L1

    ENCON Projects Low Investment

    Total Investment : 0 Lakh Total Savings : 1,085 KWH/annumPayback : 5 Months

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 52

    Energy Conservation AchievementsInnovative approach with Zero & Low Investment

    Total ENCONs in last 4 years: 331

    71

    38 222

    Total ENCONS Zero Investments ENCONsLow Investment ENCONs

    21

    486

    Total ENCONs Zero Investments ENCONs Low Investment ENCONs

    Total Low Investment ENCONs : 71

    Total Savings: Rs. 72.734 Million

    Total zero investment ENCONs : 38 Total Savings thru. Zero investment ENCONs : Rs. 6.32 Millions

    Total Savings thru. Low Investment ENCONs : Rs. 21.22 Million

    Low Investments mean < Rs. 10,000 /- of investment

    ENCONs Savings

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 53

    Specific Energy ConsumptionYear

    Electrical KWH / Ton or unit of

    prodn

    Thermal tons or kL per ton or

    unit of prodn

    Electrical Thermal

    KWH * Million

    Rs Million Type of fuel

    Tons/KL (KL)

    Rs Million Eq. Veh. KWH/Eq.Veh.

    KL/Eq.Veh. % redn. % redn.

    200506 13.81 55.45 HSD 600 - - 31,049 445 0.0193 - - - -

    200607 15.52 62.49 HSD 720 24.85 43,073 360 0.0167 18.962 13.498

    200708 15.77 64.30 HSD 768 25.52 46,725 337 0.0164 6.343 1.670

    200809 12.02 50.64 HSD 612 20.31 33,366 359 0.0183 -6.379 -11.593

    200910 14.27 60.93 HSD 715 27.30 65,495 218 0.0109 39.276 40.451

    (April - March)

    Annual Energy consumption Prodn. in tons or any other unit of

    prodn.

    Specific Energy Consumption

    Redn. in Specific Energy consn. Over previous year

    **Electrical Thermal

    Best in Class

    Copper

    Text ile Ceramic - kJ / kg

    Ferti lizer Foundry Sugar Power Plant

    Specific energy consumption during 2007 - 08 = (B)

    - kWh/Tone of Cane & % of Steam on

    Reduct ion in Sp. Energy Consumption = B A x 100 = %

    - % Auxiliary power consumption & Heat Rate (kCals/kWh)

    ** Specific energy consumption during 2008 - 09 = (A)Example

    - G Cal / Ton

    - kWh / kg

    - G Cal / Ton- kWh/MT & KL or MT/MT of Product

    200

    300

    400

    500

    600

    2003

    04

    2004

    05

    2005

    06

    2006

    07

    2007

    08

    2008

    09

    2009

    10

    TML-LKO

    Specific Energy Consumption per Equivalent Vehicle produced

    The Energy conservation measures resulted in managing the Sp Energy consumption at 218 KWH/Eq Vehicle. This is National & International Bench mark across the class.

    Benchmark data : Reduction over 6 yrs

    Mahindra & Mahindra Ltd : 35 %

    Tata Motors Lucknow : 60 %

    KW

    H/E

    q. V

    ehic

    le

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 5454

    Specific Energy Consumption ( KWH / Eq Vehicle) & Specific Water Consumption ( M3/Eq. Vehicle) details

    SEC Comparison data

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 5555

    Specific Fuel Consumption ( M Kcal / Eq Vehicle) details :SEC Comparison data

    Based on above comparative SEC data of various companies, TATA Motors CVBU Lucknow plant is the Most Energy Efficient Automobile company. As part of continual improvement we would further reinvestigate all our processes to achieve further cost reduction by reducing Energy consumptions at all levels.

    To sustain the best achieved level :-We are following robust process of assessment of performance vis-a-vis comparative information / benchmark

    from different organisation & standards. Our emphasis is on:- To optimise the use of Resources while using appropriate and innovative method to reduce the energy

    consumption in all the areas of operation on the continuous basis through evaluation and improvement. Use of Latest technologies wherever possible. Maximize the use of non-conventional Energy resources wherever possible.

    Ultimate Object :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 56

    Energy Audit & Review ; Put up ENCONs thru Capex10-11

    Energy Audit & review ; TBEM ; ENCON Implementation

    WED Celebrations; Energy Audit & ENCON Implementation

    CII Energy Exim Award; TQMS Trg; Energy Audit & Review

    Energy Mgmt Trg -CII; Energy Audit,Review & Sugg. scheme

    Assessment of CDM project ; Energy Audit & Review

    Assessment of CDM project; Energy Week Celebrations.

    Carbon Foot printing of Lucknow Plant External

    Bench Marking with other Plants

    May10

    Apr10

    Jun10

    Jul10

    Aug10

    Oct10

    Nov10

    Feb11

    Dec10

    Road Map set for 2010-11 ::

    15% Reduction

    Sp. Suggestion campaign, Energy Audit & ReviewJan11

    Energ

    y

    Mgmt

    Cell

    Road Map for Sustaining Benchmark

    Completed

    Planned

    In progress

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 57

    Better

    35% of the volumes are

    from New Models

    Introducing New Products becomes more essential in the situation where the market is keen about fuel efficiency & alternate fuels with least impact on the environment.

    Lucknow Plant constantly focuses on NPI (New Product Introduction) to a great extent.

    The number of NPI rose to 98 from 62 nos till last year. We also monitor the Percentage contribution of the New Products in terms of Performance, Volume & Revenue to ensure effectiveness in addition to the NPI index.

    Innovation:- Way of Life at TML

    26

    62

    98

    0

    20

    40

    60

    80

    100

    120

    2007-08 2008-09 2009-10

    New Products Introduced

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 58

    Tata Motors, Lucknow celebrated its first Innovation and Technology festival- Mastishkotsavfrom 18th to 20th September 2008 with the following objectiveCreating awareness amongst employees on the Innovation initiative taken at Tata Motors, Lucknow in line with group initiativeEncourage employee participation in generating new ideasExposure on new technologies

    Novel Ideas in Suggestion

    Scheme

    Novel Ideas in Kaizen & CFT

    Special Campaigns on "Innovation"

    Posting to "Innovation Council"

    I.P.R

    Tata Innovation Day

    TrialExecution

    Campaigns LaunchedOpportunity Identification Campaign

    Ideas campaign launched for all gradesParticipation promoted through multiple communication

    Implementation campaign

    6 Task forces constituted for execution of ideas generated in campaign (low hanging fruits)Around 80 Lacs has been realized rest are in pipeline for execution

    Innovation and Technology Fest

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 59

    LPG Burners

    Before :

    Method used to raise the water temperature:-LPG burner were used to raise the temperature of water to 60C.

    Post Wash operation:-After the quenching process the metaquench42 oil layers needs to be cleaned from the components. To remove this oil layer we perform the post wash operation in which the components are dipped and wash with the spray of warm water which is maintained at the temperature of 60C.

    Post Wash Tank

    Conservation of electricity through utilization of temperature from heated waste gases to heat water in post wash chamber

    Innovation Project :

    MACHINE : 200 Kg/Hr CCHF

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 60

    LPG Burners

    (Partial Load)

    Method used to raise the water temperature:-Now a modification is made in the system in which the heat of the flue gases are extracted and used to raise the temperature of water used for post wash.

    The temperature of flue gases when burnt is 275C and with the help of heat exchanger we recovered the heat. And this extracted heat is used to raise the water temperature of post wash to the required level.

    Furnace

    Copper coil

    Post Wash Tank

    Total Carbon emission reductions per annum : 45 T CO2

    Benefits :

    Innovation Project :

    After :

    X

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 61

    Optimisation of Cooling Zone Fans operation at Paint Shop

    Paint shop gets the Cowl from BIW Shop (Weld shop) for painting. In Paint shop, it passes first from Pretreatment stage, where oil, grease, dust & dirt is removed by hot water spray. Next, the Cowl body passes from Phosphate Station to make it ready for primer coat in ED (Electro- Deposition).

    A layer of primer is applies over the surface of cowl by CED process and reaches to the oven for baking & drying at defined temperature i.e. 150C. This oven is horizontally connected with cooling zone, where cowls gets cooled by two axial flow fans i.e.. 22KW & 30 KW.Before:The Cooling Zone - Axial flow fans are interlocked with the Pretreatment Stage conveyor as shown below. The Cooling fans automatically comes into operation as soon as the conveyor starts. It is found always in running mode once the line gets started. Cowl takes almost 2 hrs time to reach the oven from Pretreatment stage.

    + + + +++ +CED

    Pretreatment(PT)

    Hot water Spray Phosphating

    30KW22KW

    Air BlowerBurner

    Hot Air

    Oven Zone

    Cooling Zone

    Traveling time till Cooling Zone is 2

    Hrs

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 62

    After :A Position sensor has been provided at the starting end of cooling zone, which senses the entry of cowl into oven subsequently it gives the start signal to the axial flow fan to run.

    Total Carbon emission reductions per annum : 112 T CO2

    Benefits :

    + + + +++ +CED

    Pretreatment(PT)

    Hot water Spray Phosphating

    Air BlowerBurner

    Hot Air

    Oven Zone

    Cooling Zone

    Sensor

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 63

    To identify most energy & cost effective solution for transportation of modules from TML, Lucknow to TMML, Dharwad

    Trials and proving of best solution

    Models to be covered: LPO-1618 RE LE- CNG & Diesel

    Scope & ObjectiveScope & Objective

    Innovation Project:Energy & Cost Optimisation

    for transportation of modules from Lucknow to Dharwad

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 64

    By Road - DAC

    By Road On 40 Ft Trailer

    By Road On HCV Truck

    By Road On MCV Truck

    By Train

    Scenario-II

    Scenario-III

    Despatch of Modules from TML Lucknow to TMML Dharwad

    Options

    Scenario- I : Transportation of 1.5 Chassis through Trailer

    Scenario-II : Transportation of 2 Chassis through Trailer

    Scenario-III : Transportation of Chassis through road (DAC)

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 65

    1

    2Front module

    Rear module

    Transportation of 1 Chassis ( 1 Front & 1 Rear module) in 28 ft Trailer ( Existing Practice)

    Trailer Bed

    Existing Practice

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 66

    1

    2

    3

    Front module

    Rear module

    Transportation of 1.5 Chassis ( 1 Front & 2 Rear module ) in 40 ft Trailer (Existing Practice)

    Trailer Bed

    Scenario -I

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 67

    Front module

    1

    2

    3

    Rear module

    Transportation of 1.5 Chassis ( 2 Front & 1 Rear module ) in 40 ft Trailer (Existing Practice)

    Scenario -I

    Trailer Bed

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 68

    Improved method ofmodule transportation

    Scenario-II Improvement in stacking of modules and maximizing

    trailer utilisation Transportation trials of 2 Chassis (2 Front & 2 Rear)

    in a 40 ft Flat Bed Trailer

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 69

    2 Front & 2 Rear modules loaded on 40 ft flat bed trailer1

    4

    3

    2Space created on trailer bed for storage of CNG cylinders and other spares

    Rear module

    Front module

    Scenario -II

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 70

    Stand welded with trailer bed

    Stand welded with trailer bedEngine side

    Suspension side

    Wheel movement arrestedby wheel chock

    Scenario -II

    Arrangement for Rear moduleInnovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 71

    Rear Module

    Front Module

    Provisions for Front module

    Front end of front modulerested on rear module frameand clamped by U-bolt

    Front module tyressupported on stand

    Rear end Supported on stand

    a

    b

    c

    Scenario -II

    Arrangement for Front moduleInnovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 72

    Engine sideResting at front side

    c

    U BOLT

    Both the front modules rested on commonstand

    Front module restedon rear module and clamped with the help of U-bolt

    b a

    Supporting stand fortyres

    Arrangement for Front moduleInnovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 73

    Results of transportation trial conductedin August09 (Scenario-II)

    Scenario -II

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 74

    Front module unloaded atDharwad

    Rear module unloaded atDharwad

    Rear module

    Trailer on the way to Dharwad

    Transportation Trial

    Scenario -II

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 75

    Improved method ofchassis transportation

    Drive Away Chassis- Transportation of LPO-1618 RE LEChassis through road

    Scenario-III

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 76

    To integrate the front and rear module so that complete chassis can be driven down to Dharwad as a Drive away chassis for Bus body building.

    Front Module

    Rear Module

    Integrated Chassis

    Objective

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 77

    Proper ground clearance

    at engine side

    6300 mmWheel base

    Requirements for Drive Away ChassisRequirements for Drive Away Chassis

    Temporary Support Structure to be used for connecting Front & Rear Modules

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 78

    Box section support with pre-tensioning members to arrest the sagging of rear module

    Temporary Support Structure

    Rear Module

    Details of Temporary Support StructureInnovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 79

    320mm 220mm

    390mm530mm

    Ground Clearance-Before Improvement(Bellows in fully inflated condition)

    Ground Clearance-After Improvement(Bellows in fully inflated condition)

    In-house Trial ResultsInnovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 80

    IN-HOUSE TRIAL RESULTS OF LPO-1618 RE LE

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 81

    Status of chassis at Jhansi

    Transportation trial-DAC

    Status of chassis at Dewas

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 82

    Improved method ofchassis transportation

    2-Tier Drive Away Chassis- Transportation of LPO-1624 RE LE Chassis through road.

    Scenario -IV

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 83

    Objectives:

    To monitor the performance of 2-Tier Drive Away Chassis and collect transit observations for further improvement in design of temporary support structure and other accessories

    To establish the process of dismantling LPO 1624 RE LE front & rear modules which is loaded on the DAC along with temporary support structure at TMML, Dharwad

    To establish the process of recycling of temporary support structure and other accessories.

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 84

    LPOLPO--16181618--RELE CHASSIS AT LUCKNOW BEFORE RELE CHASSIS AT LUCKNOW BEFORE DISPATCH.DISPATCH.

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 85

    Status of chassis at Dewas

    No sagging of Rear module

    No sagging of Front module

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 86

    Status of Chassis at Pune

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 87

    Transit Observations checklist:

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 88

    Transit Observation Photographs.

    Complete module at a glance at TMML Complete module at a glance at TMML DharwadDharwad

    Rear End sideRear End side Front End Front End sideside

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 89

    Information shared with Dharwad

    Process of DismantlingProcess of Dismantling

    Front module U bolt unfastening

    U bolt unfastening of Middle cross-member Unfastening of rear module mtg. bolts from middle stand.

    Unfastening of tension rod from rear module.Unfastening of bolts from rear stand.

    Unfastening of additional plate at rear end of rear module and re-bolting after removing both the additional plate.

    Lift Rear module & keep on stand.

    Lift Front module & keep on stand.

    Upper tear is unloaded and kept aside.

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 90

    Information shared with Dharwad

    Process of DismantlingProcess of Dismantling

    Rear Module resting on stand

    Front Module resting on stand

    Place jack at the base of middle structure.

    U-bolt dismantling on rear module

    Wiring harness removal

    Air pipe unfastening

    Unfastening from inside of Front module.

    Spare wheel removal

    Rear module dismantling. From outside

    Rear module dismantling from inside

    Front module dismantling.

    Front module unfastened from middle structure.

    Middle structure removed Rear and Front module separated.

    Middle pillar dismantling

    Additional structure Unfastening

    Unfastening of U bolts front mod. side.

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 91

    vv TML Quality Check pointsTML Quality Check points::

    Mounting of rear and front modules to be checked thoroughly.

    All the bolts to be tightened with nyloc nut and properly torqued.

    All the quality checkpoints e.g PDI, Dynamometer testing, road testing etc to be assured before dispatch.

    vv TMML Quality Check points:TMML Quality Check points:

    Check for module sagging by measuring heights from ground level at pre-defined positions on front and rear module

    Check for tyre wear

    Functional testing of chassis to be done prior to dismantling of modules

    Hole elongations to be checked after dismantling of modules

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 92

    Observation after Dismantling

    No elongation of mounting holes at front and rear module mounting locations

    Uniform rear module height from ground level . No prominent tyre wear

    Innovation Project :

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 93

    Scenario-I -1.5 Chassis/Trailer II - 3 Chassis/Trailer III Drive away Chassis IV2 Tier Drive away Chassis

    Learning from successful implementation of this Project :

    Raise the bar when the solution is too obvious.

    Experiment & experiment and don't let the idea fail.

    Keep on exploring newer ways of solving the problem till you succeed.

    48000

    36000

    24000

    12000

    I II III IV

    Reduction by 75%3.75

    2.81

    1.91

    0.94

    I II III IV

    Carbon emission in T CO2 per Chassis transportation

    Freight - Rs/Chassis or module set

    Scenario Scenario

    Learnings

    Results :

    Summary

    Jun09 July09 Aug09 Sep09 Nov09 Dec09 Feb10

    Innovation Project :

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 9494

    S.No Name of EnCon idea * Source of EnCON idea*

    Ideaoriginated in

    FY **

    Extent of man-power involved***

    Progress ofimplementation

    1 Ins tallation of VFD in AHU of CAB office block at Metrology and Plant Head building

    Middle Management & Maintenance Engineer

    2007-08 Top Management, corporateoffice, Middle Management,Energy Cell, Project Execution Group, Maintenance Team.

    Idea Implemented

    2 Replaced all the conventional cu ballas t used in tube lights with the energy efficient electronic choke

    Workmen & Supervisor 2007-08 Workmen, Supervisor, Sectional Head, Energy Cell & Divisional Head

    Idea Implemented

    3 Ins tallation of energy saver at ETP & HT shop to reduce the energy consumption by without effecting the required lux level

    Middle Management & Maintenance Engineer

    2008-09 Top Management, corporateoffice, Middle Management,Energy Cell, Project Execution Group, Maintenance Team.

    Idea Implemented

    4 Ins tallation of cpacitor bank at Transmission factory to improve the PF

    Middle Management & Maintenance Engineer

    2008-09 Top Management, corporateoffice, Middle Management,Energy Cell, Project Execution Group, Maintenance Team.

    Idea Implemented

    5 In HT shop previously the whole cooling plant used to be put ON through out the year now cold sump pump and cooling tower fan switched off during winters (approx 120 days). And the pipe line of Hot sump is directly connected to the feeder in which cooling

    Workmen & Supervisor 2009-10 Workmen, Supervisor, Sectional Head, Energy Cell & Divisional Head

    Idea Implemented

    6 Frame Shop: Previous ly the long member transfer roller conveyors were running continiously whether the member is present over it or not. Now the provision is provided in which once the member is reached its desired location the motors of the conveyors get

    Middle Management & Maintenance Engineer

    2009-10 Top Management, corporateoffice, Middle Management,Energy Cell, Project Execution Group, Maintenance Team.

    Idea Implemented

    Involvement of Employees & Extent of team work in Encon

    Towards Excellence

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 95

    Preliminary Energy audit

    Detailed Energy audit

    Plant Coordinator

    GO AHEAD

    Energy savings discussion and presentation

    GO AHEAD for Implementation

    Energy savings monitoring and interim report to Energy Mgmt Cell

    Acceptance of Proposal

    Submission of Techno commercial proposal

    Team formation

    Energy Management Cell Implementation Methodology

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 96

    Frequency of review of energy consumption and energy conservation projects: Daily, Weekly, Monthly Quarterly, Half-yearly & Annually

    Daily Energy Consumption Performance Report: -Daily monitoring, analyzing and reporting of various key energy resources such as Electricity, Water, Compressed Air,

    Fuels. The Report is analyzed in detail at each shop Level in-charge w r t to production activity on daily basis. The daily Energy Performance vis--vis target is also displayed at shop floor to increase the awareness within entire teams in the shop.Monthly Performance Report: -

    Monthly report is generated on the basis of data from monthly consumption along with data of production and indicates the Monthly and cumulative Performance Ratios of major areas like CV,IBF,TMML,HT shop. All the Sp. energy, Sp. Compressed air, Sp. Compressed air is reported to the individual departmental heads.

    Monthly Report To Plant Head & Divisions: -Executive summary Report giving monthly and cumulative performance and the variance with respect to targets set ,

    previous year's performance, etc for the whole year and the corresponding period is sent to respective Divisional Heads for information & initiating necessary improvement actions. The report is also send to Plant Head for his perusal & information. Plant Head also reviews the Monthly report in the monthly Variable Conversion Cost (VCC) review meeting.

    Quarterly Performance Report:-This report gives the consumption, Monthly and cumulative, performance trends, and efforts taken. This report is sent

    to Plant Head (CVBU - Pune) & respective Divisional Heads.

    Half yearly Performance Feed back to Plant Head & Divisions: -

    The performance of the Divisions with reference to the target both monthly and cumulative along with the performance expected to achieve w r t the Target.

    Annual Performance Report: -This report giving consumption performance of various areas along with the efforts taken by various Divisions. This

    report is released to - Finance Division as Input for disclosures for Director's Report.

    Energy Management Cell Prepares the Energy report Daily, Monthly( M), Quarterly (Q), Half-yearly (H) & Annual reports. Plant Head & MD reviews M, QY, HY, Annual reports

    Review by : Energy Auditor & Managers

    Review by : Energy Auditor & Asst GM

    Review by : Energy Auditor ,Asst GM, GM & Plant Head

    Review by : Energy Auditor ,Asst GM, GM, Plant Head, Sr. VP &MD

    Review by : Energy Auditor ,Asst GM, GM, Plant Head, Sr. VP &MD

    Review by : Energy Auditor ,Asst GM, GM, Plant Head, Sr. VP &MD

    Monitoring & reporting

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 97

    Monthly Energy Report to Top Management

    Q,H & Annual Energy Report to Top ManagementVARIABLE CONV COST (Rs. /Eq. Veh. ) 09-10

    CV Factory VARIABLE CONV COST (Rs. /Eq. Veh. ) 09-10 Transmission Factory

    Shop wise Energy consumption VARIABLE CONV COST (Rs. /Eq. Veh. ) 09-109

    38404098 4001

    4600462148115011

    4409 4145

    50834740 4717

    3611 367737053733 3919 3920 3820 3794

    38903605 36894671

    Ap

    r-0

    9

    Ma

    y-0

    9

    Ju

    n-0

    9

    Ju

    ly-0

    9

    Au

    g-0

    9

    Se

    pt-

    09

    Oc

    t-0

    9

    No

    v-0

    9

    De

    c-0

    9

    Ja

    n-1

    0

    Fe

    b-1

    0

    Ma

    rch

    -10

    Actual 09-10 Actual 08-09

    584639 610

    747772856

    925

    701 662

    885774

    935937 916933 890 885 863 840

    790863

    963 951869

    Ap

    r-0

    9

    Ma

    y-0

    9

    Ju

    n-0

    9

    Ju

    ly-0

    9

    Au

    g-0

    9

    Se

    pt-

    09

    Oc

    t-0

    9

    No

    v-0

    9

    De

    c-0

    9

    Ja

    n-1

    0

    Fe

    b-1

    0

    Ma

    rch

    -10

    Actual 09-10 Actual 08-09

    OTHERS7%

    RECON2%

    EAST COMP46%

    IBF6%

    TRAN FACT12%

    CV FACT11%

    MARCOPLO16%

    8631011 942

    1259

    13431472

    1618

    1167 1074

    17571794 1724

    14091346

    1395

    1305 1274 1249 1231 12191427 1434 14261424

    Ap

    r-0

    9

    Ma

    y-0

    9

    Ju

    n-0

    9

    Ju

    ly-0

    9

    Au

    g-0

    9

    Se

    pt-

    09

    Oc

    t-0

    9

    No

    v-0

    9

    De

    c-0

    9

    Ja

    n-1

    0

    Fe

    b-1

    0

    Ma

    rc

    h-1

    0

    Actual 09-10 TGT 09-10

    To Plant Head

    Prev Yr Consp

    Prev Yr Eq. Veh

    Specific Energy

    Consp till Dec

    Eq. veh till Dec

    Specific Energy

    Consp till Dec Eq. Veh till Dec

    Specific Energy

    08-09 08-09 08-09 08-09 08-09 till Dec 08 09-10 09-10 till Dec 09Units Nos. KWH/Eq. Veh Units Nos KWH/Eq. veh Units Nos. KWH/Eq. veh

    CV + IB Fact 5707472 29,101 196 4,479,432 22,069 203 5,408,501 36,580 148

    Trans Fact 3834062 4,265 899 3,026,580 3,251 931 2,905,410 2,833 1,026

    Others 2453210 33,366 74 2,202,250 25,320 87 2,157,571 39,412 55

    Total 11994744 33,366 359 9,708,262 25,320 383 10,471,482 39,412 266

    FromEnergy Auditor Asst General ManagerEnergy Auditor Cell Central Maint & Plant Services

    YTD Status

    Area

    Ist Jan 10

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 98

    10686

    20686

    29236

    37836

    45436

    57436

    0

    10000

    20000

    30000

    40000

    50000

    60000

    2004-05 2005-06 2006-07 2007-08 2008-09 2009-10

    Tress Planned for plantation in 2009-10 In the Plant Premises : 12,000 nosThru. CSR & at Vendor end (Through Associates) : 1 Lakh no.s

    Cum

    . No.

    of t

    rees

    pla

    nted

    Environmental Projects Tata Motors CVBU Lucknow is plant is having plot area of 600 Acres. We have Green cover of 52%. We celebrate World Environment Day, Earth Hour etc every year in the plant, at Vendor end and also at Villages through CSR teams ( Corporate Social Responsibility ). Utilise every opportunity for tree plantation & spreading the awareness on its importance across all the stake holders i.e. Community, Employees, Vendors & Business associates

    Lucknow Plant Lake View

    Afforestation

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 99

    2006-07Environmental Projects

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 100100

    2007-08Environmental Projects

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 101101

    2008-09Environmental Projects S.No Year Area

    Trigger for improvement

    Process improvement Result achieved Photographs

    1 2008-09 Whole Plant

    Facility required at the bore well site to monitor the frequency variation in ground water level

    Installation of Peizometer well at different location both in E.complex & W. complex to monitor th level of ground water aquifer & thereby complying consent conditions

    Tracking/ mainting records for the depletion or incres in ground water table

    2 2008-09 CTP site

    Waste coolant is having very different coplex chemical property & needs separte treatment otherwise it contaminates th wholw homogenous mixture & hinders in treatment process

    Instllation of Coolant treatment plant for the effective treatment of waste coolant as discharged from grinding machine at HT & Gear shop

    Coolant is being treated to crack the heavy emulsion & attain a level of parameters which doesn't disrupt after mixing with the quality of industrial effluent

    - -

    3 2008-09

    STP Site in Eastern Complex

    Facilitates the provisions for heavy load of domestic effluent

    Installation of one 1200 KLD FAB based STP for treating the effluent load generated from different process & activity & meeting statutory environmental norms

    Complete treatment of sewage for achieving the parameters well below the statutory specified limiting value

    4 2008-09

    W.complex & Eastern complex

    Analysis required for the quality of influent & & treated effleunt

    Dedicated Environmental Laboratory for undertaking testing of essential parameters & also regulating the dosing of chemicals

    Determination of chemical dosing quantity as per influent quality for effective treatment

    - -

    5 2008-09

    STP Site in Western Complex

    Inadequate provision for chemical & bilogical treatment of the increased sewage load

    Enhancement of two no. of 400 KLD Fludized bed reactor (FAB) based STP to cater the enhanced domestic sewage load & meeting statutory environmental norms

    Complete treatment of sewage for achieving the parameters well below the statutory specified limiting value

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 102102

    2009-10Environmental Projects S.No Year Area Trigger for improvement

    Process improvement Result achieved Photographs

    1 2009-10

    Primary ETP Site in Eastern Complex

    Waste water generated from Paint shop contains very complex orgnic paint resins which essentially requires prior physical & chemical treatment before sending it to secondary treatment

    Installation of one 450 KLD primary ETP at paint booth meeting for undertaking batch process treatment

    Reduction & prcipitation of heavy organic particulates, heavy metals etc.

    2 2009-10Western Complex

    Uncontrolled use of fresh water resource at the major point sources

    Installation of water flow meter at canteen, Recon shop, frame paint booth & cowl shop for tracking & regulating fresh water consumption

    Tracking & regulating the water consumption rate

    - -

    3 2009-10

    Eastern Complex

    Expansion project Installtion of 6 nos. of new borewells in E. Complex to cater the high water demand for domestic, industrial, process, fire service etc.

    Fullfillment of water demand for manufacturing process

    - -

    4 2009-10

    Weatern Complex

    Earlier we had no recirculation system for the wash water generated due to washing of cowls

    Greater concern for water conservation has prompted us to install recirculation system

    Fresh Water resourceConservation

    5 2009-10

    ETP Site in Western complex

    Inadequate provision for chemical & bilogical treatment of the increased effluent load

    Enhancement of one 400 KLD hi-tech ETP for treating the enhanced effluent load generated from different process & activity & meeting statutory environmental norms

    Complete treatment of effluent for achieving the parameters well below the statutory specified limiting value

    6 2008-09

    ETP Site in Eastern complex

    Heavy load of effluent discharged during the process & operation containg homogenous mixuture of different type of complex contaminants

    Installation of one 1800 KLD hi-tech secondary ETP for treating the effluent load generated from different process & activity & meeting statutory environmental norms

    Complete treatment of effluent for achieving the parameters well below the statutory specified limiting value

    TCFPaint Shop

    2009-10

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 103

    Union LeadersGather for tree plantation

    Senior LeadersMr. A Chharia and U Tauheedplanting a tree

    Display of various posters and Paintings at the Service Provider site

    Service providersteam planting trees at Eastern complex

    Vendor end team planting trees at vendor end

    CSR plantation at Jainabad village

    Winners

    Winners

    Greenathon : Flag off by Mr.MC Pandey

    World Environmental Day Celebrations In the Plant & at Vendors end

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 104

    D . Projects linking with Carbon Emission ReductionLinking with Reduction in t CO2Environmental Projects : Few Examples

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 105

    D . Projects linking with Carbon Emission ReductionLinking with Reduction in t CO2Environmental Projects : Few Examples

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 106

    D . Projects linking with Carbon Emission ReductionLinking with Reduction in t CO2Environmental Projects : Few Examples

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 107

    D . Projects linking with Carbon Emission ReductionLinking with Reduction in t CO2Environmental Projects : Few Examples

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 108

    Solar Power Plant 25KW x

    4 nos - Grid connect type

    Solar Garden lights for

    Lake lightingSolar Traffic controlling Road Flasher for Plant premises

    Wind driven turbines-1200 nosTotal Capacity 39 Lakh CFM

    Light Pipes 500 Nos

    Switching to Renewable energy Source

    Other Renewable Projects in pipe line for 2010-11 :

    Energy Generated (Lac kWh)

    Annual Savings (Rs. In

    Millions)

    Energy Generated (Lac kWh)

    Annual Savings (Rs. In

    Millions)

    Energy Generated (Lac kWh)

    Annual Savings (Rs. In Millions)

    Wind 24.5 MW 559 167 576 227 529 175 Solar photovoltaic 110 W 1,318 0.005 1,318 0.005 1,318 0.005 Turbo ventillators

    1,403,663 CFM 619,488 2.48 495,590 2.12 650,462 2.78

    Type of RES Installed Capacity 2009-102007-08 2008-09

    Replacement of Electrical Energy with RES

    Replacement of Thermal Energy with RES

    Equ Fuel Savings

    Equ Fuel Savings

    Equ Fuel Savings

    (kL) (kL) (kL)Solar Thermal 700 LPD 0.53 16,960 0.53 19,080 0.73 26,280

    2008-09Annual Savings

    (Rs.)

    Annual Savings (Rs.)

    Type of RES Installed Capacity

    2007-08 2009-10Annual

    Savings (Rs.)

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 109

    Saving Potential

    Capital investment

    KWH Rs in Lakhs1 Celltec Pad Instead of Water Jet

    Nozzle388800 Less than jet

    nozzlesISHRAE - Indian Society of Heating Refregirating & Airconditioning Engineers

    MARCOPOLO, E.C 2007-08

    2 VSD Air screw Compressor for compressed air

    300000 45Lakhs/each

    Atals copco, Sweden

    Eastern Complex 2007-08

    3 Energy saver in street lights 109500 200000 CII Seminar, Chandigarh

    Eastern Complex 2007-08

    4 LPG gas heating 20000 500000 BEE Seminar, Kanpur

    Western Complex 2007-08

    5 VFD for AHU 10000 125000 CII Seminar Chennai

    Eastern Complex 2007-08

    6 Insulation of Closed cell polyethylene with metalized layer in FDV ducting

    14256 8.5 ISHRE SEMINAR All over E.C 2008-09

    Photographyear of implementati

    on

    SN Details of Technology absorption

    Absorbed/Learnt from

    Implemented in Plant / Sub

    location

    Technology Absorption Details of year wise efforts made in technology absorption relating to energyTechnology Absorption

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 110

    Saving Potential

    Capital investment

    KWH Rs in Lakhs7 Backward curve centrifugal

    Blower instead of forward curve1069200 Almost same

    as backward curve

    KRUGER , Germany

    All over E.C 2008-09

    8 Centrifigual compressor for catering of air CFM base load.

    200000 75 Lkhs/each

    Atals copco, Sweden

    Eastern Complex 2008-09

    9 Microprocessor based ES system for centralised controlling of compressors as per air CFM demand.

    180000 12 Lakh Chicago Pneumatic, US

    Eastern Complex 2008-09

    10 Energy efficient air circuit breakers

    7884 4500000 CII Seminar, Chandigarh

    Tata Motors Plant 2008-09

    11 LED type street lights 52560 1500000 CII Seminar, Delhi Tata Motors Plant 2009-10

    12 Emergency lights through solar panels

    2000 160000 Seminar orgainised by TATA BP solar

    Western Complex 2009-10

    13 Solar based Power Plant 225000 7500000 Renewable Energy Work shop by MNRE-India at New Delhi

    Western Complex 2010-11(Work in

    progress)

    year of implementati

    on

    PhotographSN Details of Technology absorption

    Absorbed/Learnt from

    Implemented in Plant / Sub

    location

    Technology Absorption Details of year wise efforts made in technology absorption relating to energyTechnology Absorption

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 111

    Targets 20011-12 :: Reduction in total carbon emissions : 60 %

    1657915114

    11247

    8500

    6632

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    18000

    20000

    2007-08 2008-09 2009-10 2010-11 2011-12

    T C

    O2

    Total Carbon reduction : T CO2 : 913Upto July10

    60%

    Summary Carbon Emission Reduction

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 112

    Impact of ENCON, Innovation & Carbon emission reduction measures on reduction of cost of production goods.

    Summary Impact on Plant Production

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 113

    Process Waste

    Output Waste

    Input Waste

    Nothing is Waste in this world !!!

    Plant Internal &

    External Authorized Agency

    External Authorized Agency

    Reuse

    Incinerate

    Recycle

    Waste Management

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 114

    Qty of waste generated

    Qty of waste generated and

    utilised2009-10 2009-10

    1 Packing Wood From Packing Kg 3,079,418 3,079,418 13 For Tool Boxes, with Drive away Chassis, Stand or pallet for storing material

    2 Packing Carton From Packing Kg 800,240 800,240 4 Sold to recycler for reuse of the same.

    3 Packing Polythene From Packing Kg 79,210 71,289 2

    4 Packing Jute Cartons From Packing Kg 167,310 158,945 11

    5 Process Used Cutting oil From Machining & Grinding Lt 8,610 6,027 22 Sold to recycler for filteration and resale

    6 Process Used Engine oil From Engine Reconditioning Kg 2,730 1,911 7 Sold to recycler for filteration and resale

    7 Process Paint Sludge From Paint Booths Kg 30,000 30,000 9 Disposed as incinerable waste

    8 Process Used Coolant From Machining & Grinding Kg 100,000 100,000 2 Disposed as incinerable waste

    9 Process ETP Sludge From ETP Drying Bed Kg 30,000 30,000 0.05 Disposed as incinerable waste

    10 Process Paint Drums - MS From Painting Process Nos. 35,000 35,000 - - Sold to recycler for re-use after cleaning

    11 Process Plastic Drums - Coolant/ OilFrom Oil Process Nos. 3,000 2,100 0.002

    Sold to recycler for re-use after cleaning

    12 Process Chips From Gear Cutting Kg 60,000 39,000 - - Sold to recycler for secondary use of steel

    13 Process MS OffcutsFrom Construction & Fabrication

    Kg 100,000 77,000 - -

    Sold to recycler forsecondary use of steel, for fabrication of stands and fixtures for internal use

    SN Type of the

    Waste used

    Name of the Waste generated

    Details of the Waste

    generated

    UOM

    Present usage of the waste

    Snap shotsWaste fuel as % of total

    energy

    Sold to recycler for reuse of the same.

    Total Waste fuel is 70% of the total energy consumption

    Waste generated = Waste utilisedWaste Management

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 115

    ISO 14001 certification

    2003-04 2007-08 2009-10 2011-12

    ISO/TS certification

    OHSAS 18001:2007

    Certifications for Lucknow

    NABL certification

    All Energy & Environment certifications

    from regulatory bodies.

    Implementation from TS/ISO/OHSAS

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 116

    2005-06 2009-10 2011-12

    ISO journey for vendors

    ISO certified : 268

    TS certified: 195

    ISO 14001 - 30

    Aim: 100% vendors ISO/TS certified

    Certifications for Channel partnersImplementation from TS/ISO/OHSAS

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 117

    S.No

    Clause NCR Description Correction Corrective Action Status

    1 4.5.2

    Environmental board displayed outside the main entrance does not have updated information on Air & water consent with validity & analysis of treated effluent There is no evidence of analysis of used oil before disposal to authorised recyler

    Updated information on Air and Water consent with validity & analysis report of treated effluent have been mentioned on the Environmental information board. Used oil to be disposed has been analysed.

    Display of updated information on Air and Water consent, analysis report of treated effluent & analysis of used oil as per requirement will be reviewed in MR meeting in order to maintain continuity. Henceforth, used oil will be analysed before disposa

    Closed

    2 4.3.2

    Following changes in applicable legal requirements not identified in Legal Register Hazardous Waste Management & Handling Rules amendments -2008 Petroleum rules 2002 Indian Electricity rules amendments-2002

    The changes in applicable legal requirements have been identified in the Legal register and the register has been revised.

    Subscription to legal update has been renewed and updates are being received. Moreover, henceforth, alongwith review of legal compliance ; updation of Legal register also will be reviewed in MR meeting.

    Closed

    3 4.3.1

    Aspect-Impact related to the following activities not identified Storage and usage of CO2 Cylinders in Frame Shop Leakage of Compressed Air Generation of used oil filter

    Use (in welding) and storage of CO2 cylinders in Frame shop has been identified in IER of Frame CX Leakage of compressed air has been identified in IER of Engg. Services dept. Generation of used oil filter has been identified in IER.s of HT shop.

    Review of IER will be discussed in MR meeting as a regular review mechanism.

    Closed

    TS 16949, ISO 14001 & ISO 18001TS16949

    OSHAS 18001 : 2007

    Corrective actions & Status Report

    S.No Clause NCR Description Correction Corrective Action Status

    1 4.5.2

    Ambient air monitoring doesnt include all the parameters i.e.Pb is not being monitored as per the Enviornmental Protection Rule 1986 clause 3(3B) and schedule VII.

    Monitoring of Lead (Pb) concentration in ambient air quality has been started.

    Identified legal and other requirements will be complied with in an unbiased manner

    Closed

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 118

    ISO 14001 : 2004

    FORMAT OF Non-Conformity Reports

    TS 16949, ISO 14001 & ISO 18001 Corrective actions & Status Report

    S.No Clause NCR Description Correction Corrective Action Status

    1 8.2.3.1

    A systematic approach of performing process studies on new assembly processes to establish the objectives for process capability, reliability, maintainability and availability is not in place.

    System made to establish and monitor targets for process capability, reliability, maintainability and availability. RFQ will capture all the requirements and in machine acceptance criteria form it will be communicated to the user

    Procedure for product transfer process (LAPR-P02A) covering process design and development revised including targets for productivity, process capability, reliability, maintainability, availability.

    Closed

    2 8.1.2

    Understanding on basic statistical concepts and utilization of control charts is inadequate.

    (1) 1. Control limits established. UCL = 0.05, LCL = 02. Sample size increase 10 per day i.e 5 / shift(2) Cpk observed 3.87 was for ratio 41/6 pinion whereas during audit ratio running was 45/7 pinion. CpK study carried out for this ratio and found 0.7.

    1. Training for SPC planned in 3rd week of Dec' 092. Ratio wise CpK will be calculated3. Inspection frequency will be decided based on the CpK results

    Closed

    3 7.3.3

    Out put of manufacturing process design is not adequately addressed to facilitate effective process control. Ex. Control plan for machining for pinion 41/6 does not include surface finish and the process parameters such as speed, feed rate etc.

    Control plan for pinion 41/6 revisited.

    1. Training on control plan completed

    Closed

    All NCRs closed

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 119

    Knowledge through Learning & Sharing Replication of Best Practices

    TKC-Tata Knowledge ChainAll TATA Group companies can access the TKC internet based portal.Every one can learn & share the knowledge

    Vibes- Tata Motors IntranetAll TATA Motors employees can access the VIBES-the Intra net portal through which knowledge can be

    enhanced through learning & sharing.

    Knowledge through Learning (KTL) of CVBU Lucknow Plant, in 2009-10 year contributed 3680 numbers of knowledge pieces in the KTL Book of CVBU. Also a CD comprising of all the improvements were released. The divisions /departments who contributed significantly were also felicitated subsequently.

    In-house/External training program

    Knowledge sharing throughPlant visits

    Sharing of the best practices implemented though Video Conferencing

    Divisions / Departments which contributed significantly were

    Planning, Manufacturing, Central Quality, Transmission

    Factory, Assembly Line planning, Sourcing,

    Vehicle Factory, Lean Manufacturing, PTPA,

    PE, Integral Bus Factory, Sustenance &

    Training Centre

    Plant head inaugurating the KTL CD

    Yugandhara Is the thought at the core of the Tata Motors Climate Change web site. It brings together information and experiences regarding Climate Change & Energy Conservation initiatives across the Tata Motors. Every employee across the Tata Motors is having the access this web site.

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 120

    KAIZEN Exercises within Plant & at TMLs Vendors

    Kaizen Sustenance (%)

    8278

    8184 84 84

    60

    70

    80

    90

    08

    -09

    Ist

    Qtr

    IIn

    d Q

    tr

    IIIr

    d Q

    tr

    IVth

    Qtr

    09

    -10

    Better

    Target : 80

    TM & LS Participation ( % )

    81

    21

    40

    76 82 82

    0

    20

    40

    60

    80

    100

    08

    -09

    Ist

    Qtr

    IIn

    d Q

    tr

    IIIr

    d Q

    tr

    IVth

    Qtr

    09

    -10

    Better

    Target : 80

    No of Kaizen Events

    103

    21

    48

    88

    108 108

    020

    4060

    80

    100120

    08

    -09

    Ist

    Qtr

    IIn

    d Q

    tr

    IIIr

    d Q

    tr

    IVth

    Qtr

    09

    -10

    Better

    Target : 100

    Major Kaizen

    Vendor Kaizen at M/s. Suprabha Industries

    Productivity improvement kaizen at BIW

    Installation and layout finalization at M/s. Lucknow Grinding (Recon)

    Process streamlining to achieve single piece flow at M/s. Narayan Engg. (Recon)

    3P for cost economic shedding for tyre yard

    Re-arrangement of fastener store

    Kanban implementation in Frame CX

    Employee Participation in %

    Kaizen Sustenance in %No. of Kaizen events

    Replication of the Best Practices implemented on Energy conservation Through Associates

    TATA Motors Ltd. - CVBU Lucknow has conducted special drives at business associates /Vendor end to optimise the over all vendor management process. We have conduced KAIZENs AT VENDORs END. The results of this special drive are,

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 121

    Aligning associates to Changing Market Scenario & Optimising overall productivity process

    TATA Motors Ltd. - CVBU Lucknow has conducted special drives at business associates /Vendor to optimise the over all vendor management process. We have conduced QUALITY AT SOURCE event in November09 & December09. The results of this special drive are,

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 122

    TATA Motors Ltd. - CVBU Lucknow has conducted various programs like Technology Up gradation awareness program, Modern trend in vehicle assembly system, Green Initiatives, Energy Conservation measures etc to business associates / vendor to enhance the productivity & quality of material they supply inturn reduce the cost of poor quality.

    The Quality Month communication has been conducted in December2009 at Tata Motors-Lucknow plant and all the associates/vendors participated the event. Various rewards been given to vendors for their good quality of product. Couple of snap shots are,

    Replication of the Best Practices implemented on energy Through Associates

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 123

    Senior Management team of TATA Motors Ltd. - CVBU Lucknow regularly visits the Associates/Vendors plant to constantly motivate their employees on Safety, Energy conservation, Quality, Cost, Deliverability & Environment. Here are couple of snap shots of sr. mgmt visit to neighboring Vendor plants.

    Replication of the Best Practices implemented on energy Through Associates

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 124

    Tata MotorsLucknow

    Tata MotorsPune

    Tata MotorsJamshedpur

    Tata MotorsPantnagar

    Tata MotorsSanand

    Jagaur&

    LandRover

    Tata DaewooHispano

    Vendors Associates

    CIIBEEISHRAE

    Earnst & YoungMckensy

    TKCInnovista

    CSR

    Safety

    Yugandhara

    ISO 9001

    OSHAS

    TQMS

    KNOME

    EnterpriseSystem Manual

    Knowledge Pond

    Vibes

    Climate Change

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 125

    0.31

    0.27

    0.19

    0.1

    0.15

    0.2

    0.25

    0.3

    0.35

    2007-08 2008-09 2009-10

    %

    Vendor Quality Incoming PPM level

    Direct Material Cost reduction

    Results of the replication arising out of Best Practices implemented on energy front through associates areProcess has been institutionalized at Lucknow

    Rs

    in C

    rore

    s

    Energy Cost as a % of manufacturing cost

    Energy Cost as a % of

    manufacturing cost in 2009-10 is

    0.192 % Best in Class

    20

    06

    -07

    Better

    Better

    Better

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 126

    List of Certifications:-1) Quality Certification: ISO/TS -16949.2) Environment Certification: ISO -14001 : 20043) Occupational Health & Safety Management SYSTEM Certification: OHSAS - 18001

    List of Awards

    2007-2009Rewards & Recognitions

    1) Tata Motors CVBU-Lucknow Plant bagged the most prestigious Excellent Energy Efficient Unit Award-2009 conducted by CIIon 19th & 20th of Nov2009 at Chennai.

    2) CVBU Lucknow won the second prize in the prestigious INSSAN Award for Excellence in Suggestion Scheme at the Annual Regional Convention 2010 of INSSAN (Indian National Suggestion Schemes'' Association)- Eastern India Chapter.

    3) Tata Motors CVBU-Lucknow Plant received the IME Award 2008.(IMEA-Indian Manufacturers Excellence Award)

    4) Tata Motors bags the NDTV Profit Business Leadership Award 20085) Tata Motors has been ranked First in India in Investor Relations, in the Thomson Reuters

    Extel Asia (ex-Japan) Survey 2008.6) Tata Motors has been awarded the 'Top Exporter Gold Trophy in the Large Enterprise category by the Engineering

    Export Promotion Council (EEPC) for the year 2006-07.7) Tata Motors has received the Emerson Network Power and Express Computer Uptime Champion Award 2007 The Aggregates Business of Tata Motors' Commercial Vehicle Business Unit has won the 'Best Supplier Award 2007

    from Escorts Construction Equipment Ltd (ECEL).

    1)

    2)

    3)

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 127

    Our Message through this presentation is

    Systematic, Sustainable, Continual improvements,

    Knowledge sharing, Innovation, and Team Work

    are the core pillars to make a plant an

    Excellent Energy Efficient unit

    Thank You ! ! !

    Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 128

    SN Mode of transportation Rate Load Carrying Capacity

    No of chassis per

    Trailer

    Cost per Chassis

    Scenario

    1 TRAILER-28 FT 48000 15T 1 48000 Existing Scenario

    2 TRAILER-40 FT-3516 72000 20T 1.5 48000 Scenario - I

    3 Two Chassis Transportation thru Trailer 40FT 72000 20T 2 36000 Scenario - II

    4 Drive Away Chassis 1 Scenario - IIIDistance from LKO to Dharwad 1900KM, Milleage 4KMPL.Cost of fuel 17100 17100Driver - Daily allowance - Rs 250 for 6 days 1500 1500Return charges for driver 750 750Road Toll tax 4550 4550

    23900Cost of Drive away Chassis transportation 24000 Scenario - III

    5 2 Tier - Drive away Chassis 2 Scenario - IV

    Fuel cost - 17100 9500Driver - Daily allowance - Rs 250 for 6 days 1500 750Return charges for driver 750 375Road Toll tax - Consolidated rebate 2799 1400

    1202512000 Scenario - IV

    Assumptions :Cost of temporary support recycling is not considered.

    Innovation Project : Optimisation of Energy & Cost of Bus Module - transportation

  • Sohrabji Godrej Green Business Centre- CVBU LUCKNOW 129

    Heat contained in Flue Gas=Qg= m x Cp x TgFlow rate of flue gas=180 M3/hr

    Density=(MW/359)x(492/(460+Tg)

    Qg= 208 kcal/sec

    Amount of heat required for heating the water=m x Cp x (T2-T1)

    Where (T2-T1)=(65-40)=25 0 C ; m(flow rate)= 5.5 Kg/sec; Cp =1Kcal/kg c

    =137.5 Kcal/ sec

    Heat exchanger

    Q=137.5=U A (LMTD)

    U=Overall heat transfer Coeff

    A= surface area

    LMTD=Log Mean Temp difference

    A=Q/(U x LMTD)= 0.95 M2