Takoradi LNG Floating Storage Regasification
Unit
Stakeholder Engagement Plan
October 2015
Rotan Gas Limited
357718 PWR PHR 01 C
C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
28 October 2015
Takoradi LNG Floating Storage Regasification Unit
Stakeholder Engagement Plan
Takoradi LNG Floating Storage Regasification Unit
Stakeholder Engagement Plan
October 2015
Rotan Gas Limited
P.O. Box CT6218 Cantonments Accra Ghana
Mott MacDonald, Victory House, Trafalgar Place, Brighton BN1 4FY, United Kingdom
T +44 (0)1273 365 000 F +44(0) 1273 365 100 W www.mottmac.com
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
Revision Date Originator Checker Approver Description
A 18 September 2015 P. Gouws M. Rowan M. Rowan First draft SEP
B 16 October 2015 P. Gouws M. Rowan I. Scott Second draft SEP
C 29 October 2015 P. Gouws M. Rowan I. Scott Final for disclosure
Issue and revision record
Information class: Standard
This document is issued for the party which commissioned it and for specific purposes connected with the above-captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it.
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
Chapter Title Page
Glossary of Terms i
1 Introduction 1
2 Project Location and Description 2
3 National and International Regulatory Requirements 6
4 Summary of Previous Stakeholder Engagement 8
5 Stakeholder Identification and Analysis 9
6 Stakeholder Engagement Activities 13
7 Implementation Timescales and Responsibilities 17
8 Project Grievance Mechanism 19
9 Documentation, Monitoring and Reporting 22
Appendices 23
Appendix A. Grievance Registration Form _________________________________________________________ 24 Appendix B. Record of Meetings ________________________________________________________________ 25
Contents
i 357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
Term Definitions in line with International Finance Corporation (IFC) Good Practice Handbook on Stakeholder Engagement (2007) and Performance Standards
Consultation Consultation is a two-way process of dialogue between the project company and its stakeholders. Stakeholder consultation is about initiating and sustaining constructive external relationships over time.
Grievance Mechanism
Procedure provided by a project to receive and facilitate resolution of affected communities’ concerns and grievances about the project’s environmental and social performance.
Environmental and Social Impact Assessment (ESIA)
A forward-looking instrument that is able to proactively advise decision-makers on what might happen if a proposed activity is implemented. Impacts are changes that have environmental, political, economic or social significance to society. Impacts may be positive or negative and may affect the environment, communities, human health and well-being, desired sustainability objectives, or a combination of these.
Information Disclosure
Disclosure means making information accessible to interested and affected parties (stakeholders). Communicating information in a manner that is understandable to stakeholders is an important first and ongoing step in the process of stakeholder engagement. Information should be disclosed in advance of all other engagement activities, from consultation and informed participation to negotiation and resolution of grievances. This will make engagement more constructive.
Stakeholders Stakeholders are persons or groups who are directly or indirectly affected by a project, as well as those who may have interests in a project or the ability to influence its outcome, either positively or negatively.
Glossary of Terms
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
1
1.1 Stakeholder Engagement Plan Overview
Rotan Gas Limited (the Project Proponent) is developing an offshore Floating Storage and Regasification Unit (FSRU) ship to supply liquefied natural gas (the ‘Project’) to an onshore gas fired power station at Takoradi as well as to Ghana’s national gas pool, the West Africa Gas Pipeline, and other power plants in the area.
The Project will include: � The FSRU ship � The mooring for the FSRU � The process for the delivery of LNG to the FSRU, by visits by LNG carrier ships � A submarine gas pipeline from the FRSU mooring to the site of the on-shore power station � An on-shore buried gas pipeline to the Ghana Gas Takoradi gas station, with a branch to the header at
the end of the West African Gas Pipeline
The proposed Project is in the planning phase and an Environmental and Social Impact Assessment (ESIA) is under preparation.
This document is the Project’s Stakeholder Engagement Plan (SEP). The purpose of the SEP is to manage stakeholder engagement activities for the lifetime of the Project. It has been prepared in line with the laws of Ghana and the requirements of international lenders, typified by the International Finance Corporation (IFC).
The Project has been identified as being a Category A project which means that it could result in potentially significant and diverse adverse future environmental and/or social impacts. Stakeholder engagement has been planned in line with IFC requirements for Category A projects specifically.
This SEP orients information disclosure, consultation and engagement processes so that stakeholders can best contribute to the Project. The SEP proposes how to engage with stakeholders in ways that enhance the understanding of the Project and its anticipated impacts amongst interested and affected parties. The SEP aims to provide adequate and timely information to affected communities and other stakeholders, and to give these groups sufficient opportunity to voice their opinions and concerns.
The structure of this SEP is: � Chapter 2: Project location and description � Chapter 3: Summary of Ghanaian legal requirements and international requirements for consultation
and disclosure � Chapter 4: Summary of previous stakeholder engagement � Chapter 5: Stakeholder identification and analysis � Chapter 6: Stakeholder engagement activities � Chapter 7: Implementation timescales and responsibilities � Chapter 8: Project grievance mechanism � Chapter 9: Monitoring and reporting
More details about the Project are provided in the following section.
1 Introduction
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
2
2.1 Overview
The proposed Project is located offshore from the southwest coast of Ghana approximately 10km south
east of the towns of Sekondi and Takoradi and approximately 250km west of Accra.
An Environmental Impact Assessment (EIA) study is required to obtain approval from the Ghana
Environmental Protection Agency (GEPA) to proceed with the proposed Project. The EIA requirements for
Ghanaian approval are encapsulated in the ESIA which is currently under preparation and therefore one
set of documentation is being produced to satisfy both Ghanaian legislative requirements and the
requirements of any international lenders.
2.2 Project Location
The proposed FSRU will be located approximately 5.5km offshore on the southwest coast of Ghana. The
towns of Sekondi and Takoradi, in the Essipon District, are approximately 10km to the west of the
proposed Project location, which is 6km southwest from the shoreline of the nearest settlement, Aboadze
village, located on the south eastern end of the Shama District.
The FSRU will be located in the Sherbro Bank, which is the area off the coast in front of the proposed
Rotan power plant (subject to a separate ESIA). The existing West African Gas Pipeline (WAGP) runs
offshore and connects to onshore facilities in Takoradi located approximately 1.5km to the east of the
proposed FSRU and its sub-sea gas pipeline. There is an existing oil pipeline located approximately 2.5km
to the east that connects to a single point mooring owned by the VRA that supplies light crude oil to the
existing Takoradi Thermal Power Plant.
Where the sub-sea gas pipeline from the FSRU will come onshore, the land can be characterised as a
shore line, tropical beach environment dominated by sandy beaches and interspersed with near shore
rocky bottoms and outcroppings. There are a cluster of trees and long grasses. The land is predominantly
flat and low lying.
Figure 2.1 presents a map depicting the Project location relative to Aboadze and neighbouring
developments.
The ESIA refers to the:
� Project Affected Area (PAA): the areas where mooring tower will be located, connection of the FSRU
will occur, as well as the direct area where the subsea pipeline will be laid.
� Project Area of Influence (AoI): the PAA plus the surrounding vicinity where the Project can affect
receptors even if there is no direct Project activity taking place, for instance the liquefied natural gas
(LNG) carrier routings in the waters outside the PAA.
2 Project Location and Description
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
3
Figure 2.1: Project Location
Source: Rotan Gas
2.3 Project Description
The Project will consist of a number of components which are described in the following sub-sections.
2.3.1 Floating Storage and Regasification Unit
The FSRU will be a new build or an old converted vessel with a LNG capacity of approximately 175,000m3,
294m in length, 46m beam, and with a draft of 11.6m. It will be capable of receiving LNG, re-gasifing it and
supplying natural gas ashore, via the submarine gas pipeline described in Section 2.3.5.
The FSRU facilities include:
� Cryogenic storage tankers
� Regasification modules
� LNG receiving unit
� LNG pumping unit
� Vaporization equipment
� Boil off gas handling
� Gas export to shore
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
4
The FSRU will draw in seawater and use the heat of the seawater to vaporize the LNG, and discharge
cooler seawater to the ocean.
2.3.2 Mooring Tower
The FSRU will be permanently moored, via a single point turret mooring system with the FSRU weather-
vanning around the mooring tower to face into the weather. The mooring tower will be a substantial steel
structure standing on foundations in the sea bed. The mooring tower will be designed to allow the FSRU to
remain on station and in operation in all weather conditions and tidal states for a continuous period of 20
years or more.
2.3.3 Visiting LNG carriers
The FSRU will be restocked by visits from LNG carriers which will come alongside it and transfer the LNG
from ship to ship. The LNG carriers will be of similar dimensions to the FRSU. Restocking visits are
expected to be at frequencies of 20 to 40 days, depending on the rate of gas use.
2.3.4 Tugs
The Project will include the use of four ocean tugs of around 6,500 horse power each, to be located in the
nearby port of Takoradi. These tugs will mainly be used to assist in the manoeuvring of the visiting LNG
carriers, and for supply trips to the FRSU.
2.3.5 Sub-sea gas pipeline
A pipeline will run from the FRSU mooring to a gas receiving station in the south west corner of the power
station which is being developed on-shore. (The power station development is the subject to a separate
ESIA).
This sub-sea pipeline is expected to be of 20inch diameter, in concrete-cased steel, and buried in the
seabed with a 1.5m of cover over the pipeline, and with a design pressure of 100 bar and with a working
pressure of 75 bar. The position of the FSRU will be determined in the light of oceanographic and
manoeuvring studies, with the advice of the Takoradi harbour master and the permission of the Maritime
Authority, but can be assumed for the present to be some 5.5km off shore as indicated on Figure 2.1
above.
2.3.6 On-shore gas pipeline
The Project includes the construction of an on-shore gas pipeline to enable the re-gasified LNG to be
supplied to either the Ghana Gas gas station at Takoradi or the West African Gas Pipeline.
The route of the buried gas pipeline is shown on Figure 2.2. The line to the Ghana Gas gas station is
planned to run from the gas receiving station on the power station site through undeveloped, low lying land
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
5
for approximately 3km to the Ghana Gas gas station. The land is characterised by long grasses, sparse
clusters of small shrubs and trees, and large pools of water on account of the low lying nature of the land.
A branch is planned to connect with the header at the end of the West African Gas Pipeline, to the north of
the existing Takoradi power plant.
Figure 2.2: Onshore gas pipeline route
Source: Rotan Gas
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
6
3.1 Overview
This section outlines the key legislation of Ghana applicable to the Project’s stakeholder engagement
process as well as the requirements of the IFC regarding information disclosure, consultation and
grievance redress that this Project will meet.
3.2 National Requirements
The impact assessment process for this Project is regulated by the Environmental Assessment
Regulations (LI1 652, 1999 and amended in 2002) (the Regulations), the principle enactment within the
Environmental Protection Act (Act 490 of 1994).
Stakeholder engagement is an integral part of the environmental and social impact assessment (ESIA)
process. The Environmental Assessment Regulations (1999) require that activities likely to have an
adverse effect on the environment must be subject to environmental assessment and issuance of a permit
before commencement of the activity.
The Regulations require that a scoping notice be advertised to relevant Ministries and in at least one
national and one local (in the AoI) newspaper. Copies of the Scoping Report must be made available to the
general public in the Project locality for inspection. The Project must also advertise in a local and national
paper on the release of the ESIA report.
Once the ESIA is published it must be advertised and made available to the general public, public
agencies, organisations, non-governmental organisations (NGOs), Metropolitan, Municipal and District
Assemblies and local communities in order to allow these stakeholders to provide comments and
suggestions on the proposed project. The Regulations also provide for the GEPA to hold public hearings if
there is an adverse public reaction to the Project or if the project could have extensive effects on the
environment.
3.3 International Requirements
The International Finance Corporation is the private sector arm of the World Bank Group. Public
consultation, disclosure and stakeholder engagement are key requirements of the Performance Standards
(PSs) embodied within IFC’s 2012 Policy on Social and Environmental Sustainability.
The IFC PSs are applicable to private sector projects in emerging markets. Each PS has specific
consultation requirements and these are embedded in the general requirements specified in PS 1:
Assessment and Management of Environmental and Social Risks and Impacts. PS 1 refers to the need for
and means of achieving community engagement, disclosure of relevant project information, appropriate
consultation processes and grievance mechanisms throughout the project lifecycle. The main requirements
for stakeholder engagement in projects are:
� Start as early as possible in the project cycle
� Continue throughout the life of the project
3 National and International Regulatory Requirements
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
7
� Be free of external manipulation, interference, coercion, or intimidation
� Where applicable enable meaningful community participation
� Be conducted on the basis of timely, relevant, understandable, and accessible information in a
culturally appropriate format
The IFC PS1 requirements will be implemented for this Project.
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
8
4.1 Overview
This section presents a summary of the stakeholder engagement activities that have been undertaken to
date on the Project.
4.2 Stakeholder Engagement Carried Out To Date
Table 4.1 below presents all preliminary introductory meetings held with stakeholders:
Table 4.1: Stakeholder engagement list
Date Location Activity Stakeholders Consulted
Monday 27 July 2015 Takoradi
Meeting at Shama District Assembly
Hon Kojo Appiah (DCE), Vincent Mawuli Wordi (Budget Officer) Rhoda Boachie-Ansah (Admin Officer)-Shama District Assembly (SDA)
Monday 27 July 2015 Takoradi
Meeting at Nana Atom IV residence
Nana Kwabena Attom III, Chief of Shama, David Amoah, Private Secretary (Shama Chief’s Palace), Emmanuel Arthur, Shama Chief’s Palace (Lawyer)
Monday 27 July 2015 Takoradi
Meeting with Takoradi GEPA
Sarfo Afriyie, Regional Director (GEPA, Takoradi, George Diewu, Senior Program Officer(GEPA, Takoradi)
Monday 27 July 2015 Takoradi
Meeting with Ghana Ports and Harbour Authority (GPHA)
Capt James Owusu Korangteng, Director of Port (GPHA, Takoradi)
Wednesday 29 July 2015
Accra Meeting with GEPA at Head Office in Accra
Kwabena Badu Yeboah, Director (GEPA, Head Office, Accra), Audrey Quarcoo (Principal Program Officer (GEPA, Head Office, Accra)
The initial meetings were aimed at introducing the proposed project, the Project Proponent and the ESIA
consultant to key stakeholders, and to introduce the ESIA process that will be followed. Stakeholders were
offered the opportunity to provide input and comments to the ESIA process, which will be ongoing
throughout the ESIA.
The main comments from stakeholders during the introductory meetings were centred on the need to
employ local community members, to implement appropriate community development programmes, and to
assess potential impacts to fishing livelihoods. There appears to be general discontent from communities
regarding power plant operators in the area which have reportedly made commitments to social investment
and preferential local employment but have not met these commitments. Communities are highly likely to
carry these expectations into the FSRU Project as well.
Subsequent meetings were conducted as part of the scoping phase consultation activities, which are
described in further detail in Section 6.3.
4 Summary of Previous Stakeholder Engagement
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
9
5.1 Overview
Stakeholders are people or groups who are directly or indirectly affected by a project, as well as those who
may have interests in a project or the ability to influence its outcome, either positively or negatively.
Stakeholders for the Project include locally affected communities and their formal and informal
representatives, national or local government authorities, civil society organisations and groups with
special interests, the academic community and businesses.
5.2 Categorising Stakeholders
Just as the degree of stakeholder interest may vary throughout the Project lifecycle, the most appropriate
communication and consultation methods will vary among stakeholders. By identifying appropriate
consultation methods in advance, this Project aims to give all stakeholders equal opportunity to participate
and influence the ESIA process.
An analysis of Project stakeholders, interests, and suggested communication and consultation method is
summarised in Table 5.1 below.
Table 5.1: Stakeholder Identification and Analysis
Stakeholders Relevance to Project Communication and Consultation Methods
Local Communities
Shama District Assembly, Paramount and Local Chiefs
Interested in how the Project will affect them during its lifetime, in particular regard to employment opportunities and community social investment activities.
Meetings with Shama District Assembly
Meetings with Paramount and Local Chiefs
Public consultation at appropriate locations
Provision of Project information, including a non-technical summary (NTS) or brochure, scoping documentation and ESIA documentation, in Aboadze
Ongoing engagement via Rotan Community Liaison Officer (CLO)
Project grievance mechanisms
Neighbouring villages:
Aboadze
Abuesi
Kwaku Anlo Village
Malam Village
Nyametease Village
Inchaban
Esipon Town
Interested in how the Project will affect them during its lifetime, in particular regard to employment opportunities and community social investment activities
Provision of Project information, including a NTS or brochure, scoping documentation and ESIA documentation
Public consultation meetings as required (via District Assembly and Local Chiefs)
Ongoing engagement via the CLO
Project grievance mechanisms
Nearby land and property owners/representatives
Interested in how the Project will affect them during its lifetime, in particular regard to land value and development
Provision of Project information, including a NTS or brochure, scoping documentation and ESIA documentation
Ongoing engagement via the CLO
Project grievance mechanisms
VRA Clubhouse and township Interested in how the Project will Provision of Project information, including a
5 Stakeholder Identification and Analysis
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
10
Stakeholders Relevance to Project Communication and Consultation Methods
affect them during its lifetime, in particular regard to employment opportunities and community social investment activities
NTS or brochure, scoping documentation and ESIA documentation
Ongoing engagement via the CLO
Project grievance mechanisms
Local minorities and marginalised groups
There is the potential for vulnerable groups to be excluded from communications and management measures
Measures to enable their inclusion in the Project will be identified and implemented
Provision of Project information, including a NTS or brochure, scoping documentation and ESIA documentation
Ongoing engagement via the CLO
Project grievance mechanisms
Fisher folk in the Project area Interested in whether the Project will affect their livelihood activities
Public consultation at appropriate locations
Provision of Project information, including a NTS or brochure, scoping documentation and EIA documentation, in Aboadze
Ongoing engagement via the CLO
Project grievance mechanisms
Government Authorities and Parastatal Organisations (central and local)
Regional Ministers and Regional Coordinating Councils
Project concept, approval and implementation
Face-to-face meetings
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Environmental Protection Agency (Western Region -Takoradi)
Will provide approval of Project and environmental permitting
Face-to-face meetings
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Volta River Authority (VRA) Neighbouring developer Face-to-face meetings
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Ministries of Fisheries and Aquaculture Development; Energy and Petroleum; Water Resources, Works and Housing; Chieftaincy Affairs and Traditional Affairs; Environment and Science; Foreign Affairs and Regional Integration; Trade and Industries
Can provide useful insights to assist in impact and mitigation identification
Face-to-face meetings where appropriate
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Ministry of Defence, Ghana Navy Security provision for offshore infrastructure
Face-to-face meetings
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Ghana Port and Harbour Authority Regulation of marine vessels, emergency response plans
Face-to-face meetings
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Ghana Maritime Authority Undersea pipelines Face-to-face meetings
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
11
Stakeholders Relevance to Project Communication and Consultation Methods
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Ghana Meteorological Services Department
Provision of meteorological data to inform impact assessment
Notification of availability of ESIA documentation in English
Land Valuation Division of Ghana Lands Commission (Sekondi Office)
Registration of land lease agreement and deed, valuation for compensation payments
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Bulk Oil Storage and Transportation Company Limited (BOST)
Natural Gas Transmission Utility License holder
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
West Africa Gas Pipeline (WAGP) Company
Neighbouring stakeholder Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
National Disaster Management Organization (NADMO)
Inputs into disaster management system
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Others
Research Institutes: Water Research Institute (WRI), Institute for Environment and Sanitation Studies of the University of Ghana, Academics at Ghanaian universities-University of Cape-Coast (Geography Department), International Water management Institute (IWMI)-West Africa Regional Office, Conservation International- Ghana
Inputs into mitigation measures Face to face meetings
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Emergency services in the Project area, Ghana Army, local Police regiments, fire brigades, ambulance services, VRA main hospital
Security issues Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
NGOs: Hope for the Youth Foundation, Aboadze, Friends of Nations, Hen Mpoano, Canoe Fishermen Council of Western Region
Interested in how the project will affect local communities and potential opportunities for community social investment activities
Project contact provided for direct feedback.
Notification of availability of ESIA documentation in English
Environmental NGOs: Ghana Wildlife Services, International Birdlife, IUCN
Interested in how the project will affect the local aquatic environment and endangered fauna and flora marine species
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Media - national and local newspapers (e.g. Ghanaian Times), radio services in Project area
Announcement of project related documentation and events
Project media contact to be established for installation and operation. For ESIA, the contact details are provided
Prospective Projects in the wider Potential needs for neighbouring Face to face meetings
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
12
Stakeholders Relevance to Project Communication and Consultation Methods
vicinity such as VRA, Jacobsen, Globeleq, One Energy, Amandi
offshore infrastructure.
Opportunities for joint CSR opportunities
Project contact provided for direct feedback
Notification of availability of ESIA documentation in English
Other local suppliers and businesses
Interested in potential direct and indirect business opportunities to arise from the proposed Project
Project contact provided for direct feedback
5.3 Vulnerable Groups
The Project team recognises that vulnerable, marginalised and disadvantaged groups are likely to
experience impacts differently from mainstream society. For instance, subsistence based fisher folk may
be less able to cope with changes to the nearby shoreline. As such, the ESIA will reflect the differential
impacts of the Project on these groups where evident. Consultation activities will be used to gather
information and opinions on how different groups are affected. Consultation and information disclosure
activities will take into consideration logistical and cultural factors such as language, physical access,
literacy levels, and time availability of these groups.
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
13
6.1 Overview
This section describes the main activities that will be undertaken throughout the ESIA process and on an
on-going basis throughout the life of the Project. During the ESIA phase, the stakeholder engagement
activities serve two key purposes:
� Disclosing appropriate information about the Project and the ESIA process. Disclosure of relevant
Project information helps stakeholders understand the risks, impacts and opportunities of the Project.
Consultation activities are more informed and constructive if stakeholders have accurate and timely
information about the Project and its impacts.
� Providing relevant stakeholders with the opportunity to voice their opinions, preferences and
grievances. This enables participation and involvement in the planning and design process.
The various engagement and disclosure activities to be undertaken for the Project are based on principles
related to informed consultation and participation as detailed within IFC PS1.
6.2 Informed Consultation and Participation
6.2.1 Overarching Approach
All stakeholders, including NGOs and members of affected communities, have the right to participate in the
ESIA process from the scoping phase onwards. The level of involvement will range from receipt of
information and key documents to face-to-face meetings and other methods of feeding back comments
and concerns. Local communication channels and public mass media will be used to enable accessibility
of information to the greatest number of people. Different forms of media such as phone calls and
meetings will be used to communicate information to those with literacy problems.
The Project Proponent will listen to the concerns of affected communities on issues that affect them
directly and will incorporate their views into its decision-making process. Consultation activities by other
developers surrounding the proposed Project have resulted in a degree of stakeholder distrust, and
therefore the Project Proponent will take special care to ensure that stakeholder comments will be
addressed on a continuous basis.
The consultation process will capture both men and women’s views and reflect their different concerns and
priorities about impacts, mitigation mechanisms, and benefits. Affected groups, for instance fisherfolk, will
be informed how their views and concerns have been incorporated into the Project’s plans and how
adverse risks and impacts will be avoided.
6.2.2 Community Liaison Officer
The Project Proponent has already appointed one part-time Community Liaison Officer, based in Takoradi,
who is responsible for community liaison and arranging communications with affected communities. The
CLO reports to the country managing director, who is also responsible for community relations. The CLO
will as far as possible be constant throughout the Project and will be largely responsible for implementation
6 Stakeholder Engagement Activities
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
14
of this SEP, particularly receiving and channelling comments and concerns during the ESIA phase and
management of the grievance mechanism during the installation and operational phases. The CLO will
also attend and record stakeholder engagement activities and maintain lines of communication with the
District Assembly, government departments, community leaders and other community members (also see
section 9).
6.2.3 Use of Electronic Media
The Project has established a website (http://www.rotangas.com/) which will be used to advertise the
availability of ESIA documentation, to provide links to the documents, and to publish relevant news of
interest to the public about the Project. It will also have a feedback page so that stakeholders can contact
the Project Proponent with views or concerns about the Project.
6.3 Consultations during the ESIA
Consultations regarding the ESIA will be undertaken through the following anticipated activities and
associated timeframes:
� ESIA Scoping Disclosure and Consultation:
– Scoping consultation meetings were conducted by the ESIA Consultant in August 2015
– A public consultation event was organised in September 2015 to gather opinions on key issues, the
terms of reference for the detailed ESIA and the proposed assessment methodologies
� Draft ESIA Disclosure and Consultation:
– The ESIA will be prepared giving due consideration to the views and concerns of affected
communities
– Announcements will be made using culturally appropriate means including local newspapers, the
Project website and consultation with key stakeholders and communities. The ESIA NTS will be
available for review. Public consultation meetings will aim to provide two weeks’ notice with location
and timing details. Letters will also be sent to notify selected stakeholders.
– In the announcements, comments will be invited and details will be given as to where comments
should be submitted in advance of the public consultation event
– The NTS and full ESIA will be distributed in the local area. They will be distributed to selected
stakeholders as detailed in Table 5.1.
– Public consultation on the draft ESIA will be organised in a suitable location so that governmental
and non-governmental stakeholders can attend as well as affected communities. The location and
exact dates are yet to be decided (expected in December 2015 as part of the process to finalise the
draft ESIA). The ESIA consultant and the Project Proponent will present non-technical information
about the risks, impacts and mitigations and hear comments and concerns. A feedback form will be
available to allow for comments (including anonymous ones) to be submitted.
– Comments received on the drafting findings will be forwarded to the ESIA consultants for
consideration by technical specialists and inclusion in the final ESIA.
– ESIA feedback collection will stay open for one month after announcement of disclosure.
Responses will be provided to those presenting questions as soon as is reasonably possible with
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
15
the timing depending on the complexity of the issue and source of information needed to provide
the answer.
The draft and final ESIA reports will be disclosed on the Project website.
The stakeholder engagement activities conducted thus far during the scoping phase included various
meetings with key authorities and representatives, as depicted in Table 6.1. The objective of the meetings
was to inform about the Project, let them know about the scoping announcement and to seek input for the
scoping report.
Table 6.1: Scoping phase consultation activities
Person/agency Consulted Date No. of Participants
Richard Oppong Mensah, Director Thermal Generation, Volta River Authority Aboadze
Mr Badger, Deputy CEO, Volta River Authority
26.08.2015
28.08.2015
6
6
Nana Kobina Attom III, Chief of Aboadze
John Kingsley Arthur (Stool Secretary (Aboadze Chief’s Palace)
Emmanuel Arthur (Lawyer Aboadze Chief’s Palace)
27.08.2015 9
Nana Amakye II (Chief of Abuesi Community) 27.08.2015 14
Aboadze and Abuesi communities 22.09.2015 88
Total 123
6.4 Consultation during the Installation and Operation Phases
Stakeholder consultation is a continuous process throughout the life of the Project. Consultation and
community engagement will continue throughout the installation and operation phases. The Project
website, newspapers and radio will continue to be used to provide public domain information as it becomes
available, such as information on management of installation impacts, monitoring reports and annual
sustainability reports.
The primary stakeholders, particularly local communities and local government representatives, will be
closely consulted in the development of the relevant actions plans, such as those dealing with community
health and safety including emergency preparedness and response.
The Project will disseminate relevant Project information to key stakeholders throughout implementation.
This is likely to be information related to project implementation progress, policy approaches and action
plans, grievance mechanism, information related to operations and maintenance jobs and recruitment. The
dissemination will be through the use of various media including the Project website as well as print and
oral communication.
Throughout installation, and when there are milestones on the Project such as changes in key activities,
the CLOs will organise meetings with affected persons so they are informed of the installation schedule as
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
16
well as likely impacts and mitigation activities to minimise negative effects. These will occur at least once
annually. For more general notices, radio, brochures or the Project website will be used.
During installation, the contractor will need to carry out environmental and social monitoring activities. This
information will be summarised and reported to the Project Proponent and the company will prepare
annual reports on the Project performance during the construction installation and operational phases. The
installation contractor will also log and report on grievances, categorising them according to risk level. This
information will be summarised and reported to the Project Proponent and the company will make prepare
reports on Project performance during the installation and operational phases.
The SEP is a live document therefore the Project Proponent will review and update the SEP at least
annually during installation and operation, in order to assess whether:
� The type of consultation and disclosure activities are appropriate for the different stakeholders
� The frequency of consultation activities is sufficient
� Grievances are being adequately dealt with
� The stakeholder list remains appropriate
� Whether engagement should cease or be intensified
The next chapter identifies implementation and timescales.
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
17
Consultation and disclosure need to occur at appropriate times to allow stakeholders to be informed and
contribute to the management of environmental and social issues throughout the life of the Project. Table
7.1 assigns timescales and responsibilities to the activities identified in the previous section. This is a live
document and will be updated as the Project progresses with further details on specific timings, locations
and media for certain activities.
Table 7.1: Stakeholder engagement implementation, timescales and responsibilities
Activity Timing/detail Responsibility
1) ESIA Scoping Phase Consultation and Disclosure
Stakeholder meetings during scoping
Face to face meetings with stakeholders regarding scoping main issues and potential impacts, approach to detailed ESIA.
ESIA consultant
Announcement and implementation of public consultation on the Scoping ESIA and Terms of Reference
At least one week prior to meetings.
Informative meetings with key stakeholders to announce project and establish protocol for scoping and impact assessment engagement activities.
Publication and distribution of draft scoping report in Aboadze and on Project website.
ESIA consultant and the Project Proponent
Disclosure of draft and final scoping report
Submission to GEPA.
Disclosure of Final Scoping Report in English on Project website, distribution of paper copies to Shama District Assembly.
ESIA consultant and the Project Proponent
2) ESIA Phase Engagement
Stakeholder meetings during impact assessment
Face to face meetings with stakeholders regarding impact assessment main issues and impacts.
Focus group discussions with key stakeholder groups regarding impact assessment main issues and impacts.
Community meetings to obtain inputs regarding stakeholder concerns.
ESIA consultant
Announcement and implementation of public consultation on the draft ESIA
At least two weeks prior to meetings.
Adverts to be placed in local newspapers, in print press and on Project website identifying dates and locations of the public consultation meetings and how to submit comments.
Announcements in affected communities.
Letters of invitation to key stakeholders.
Separate meetings to be held with women to encourage their involvement.
ESIA consultant and the Project Proponent
Disclosure of draft and final ESIA
Disclosure of Draft and Final ESIA in English on Project website, distribution of paper copies to Shama District Assembly.
Two community meetings to be held. Locations, dates and times to be confirmed. Expected December 2015. The Project Proponent to present information about the Project and the findings of the Draft ESIA as well as proposed mitigation measures.
ESIA consultant and the Project Proponent
Announcement of final decision on Project, expected start date
Press release and follow up communication to stakeholders to announce availability of final ESIA.
ESIA consultant and the Project Proponent
Media communications As requested or when press releases deemed relevant. the Project Proponent to identify which manager has media
7 Implementation Timescales and Responsibilities
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
18
Activity Timing/detail Responsibility
liaison duties
3) Installation Phase Engagement
Consultation and disclosure on contents of Emergency Preparedness and Response Plan (EPRP) and other key plans affecting communities
Meetings with the nearest fire, ambulance, military and police services to discuss the EPRP and ensure they are aware of its contents. Communication channels between the Project and the service providers clearly established. Annual drills organised by the installation contractor.
Meetings with any communities potentially affected by emergencies to ensure that effective plans are in place. Announcements of meeting plans in affected communities at community meetings.
Consultation with community leaders and local authorities on key aspects of public health and safety plan, traffic management plan, etc.
As appropriate, disclosure of key elements of the EPRP and other plans in leaflet and meeting format.
Installation contractor
Ongoing community liaison and grievance logging, resolution and reporting
Communications with District Assembly, community leaders and community members.
Monthly reports by the Project Proponent CLO to senior management. In the event of important grievance, report immediately.
CLO
Installation contractor
Community consultation events
Information provided to communities on risk, impacts and mitigations prior to the start and end of construction/installation, and when other key changes in Project activities take place, including material changes to the Project description. At least annually.
CLO
Regular updates of website
Updates when activities change and milestones are reached,
Provision of public domain information as it becomes available, such as information on management of impacts, monitoring reports and annual reports.
CLO
Updating SEP At least annually the Project Proponent in discussion with CLO
Annual Reporting Project specific annual report summarising project performance, CLO activities including grievances, impact mitigation and management.
the Project Proponent
4) Operations and Decommissioning Phase Engagement
Grievance logging, resolution and reporting
Six-monthly grievance reporting by CLO to Senior Management. Operational CLO and Senior Management
Updating SEP Annually. Operational CLO and Senior Management
Annual Reporting Information about the Project during its operational phase will be included in the Project Proponent’s annual sustainability reporting.
Operational CLO and Senior management
Decommissioning consultation event
With staff prior to retrenchment proceedings.
With communities prior to ceasing operations (or any rehabilitation works).
Operational CLO and Senior Management
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
19
8.1 Overview
A grievance can be defined as an actual or perceived problem that might give grounds for complaint. As a
general policy, the Project Proponent will work proactively towards preventing grievances through the
implementation of impact mitigation measures (as identified by the ESIA) and community liaison.
Anyone will be able to submit a grievance to the Project if they believe a practice is having a detrimental
impact on the community, the environment, or on their quality of life. They may also submit comments and
suggestions. The sections below consider confidentiality and anonymity and the Project’s grievance
resolution process.
8.2 Confidentiality and Anonymity
The Project will aim to protect a person’s confidentiality when requested and will guarantee anonymity in
annual reporting. Individuals will be asked permission to disclose their identity. Investigations will be
undertaken in a manner that is respectful of the aggrieved party and the principle of confidentiality. The
aggrieved party will need to recognise that there may be situations when disclosure of identity is required
and the Project will identify these situations to see whether the aggrieved party wishes to continue with the
investigation and resolution activities.
8.3 Grievance Reporting and Resolution
Grievances will be logged in a formal logging system for which the CLO will be responsible. People may
register grievances using the form in Appendix A or by contacting the CLO or reporting to their local chief.
Contact details for the CLO will be included in appropriate Project communication materials such as the
non-technical summaries.
The CLO will classify grievances according to Table 8.1. Where investigations are required, Project staff
and outside authorities (as appropriate) will assist with the process. The CLO will collaborate with the
relevant contractor(s) and the Project Proponent management to identify an appropriate investigation team
with the correct skills to review the issue raised. The investigation will also aim to identify whether the
incident leading to the grievance is a singular occurrence or likely to reoccur. Identifying and implementing
activities, procedures, equipment and training to address and prevent reoccurrence will be part of the
investigation activities.
Table 8.1: Grievance Classification Criteria
Class-ification
Risk Level (to health, safety or environment) Response
Comment (not a grievance)
None or low CLO to identify whether the comment can be answered or the request can be accommodated. If it can, an action plan to implement will be developed.
Low None or low CLO will conduct investigation, document findings and provide a response.
8 Project Grievance Mechanism
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
20
Class-ification
Risk Level (to health, safety or environment) Response
Medium Possible risk and likely a once off event
CLO and an appropriate investigation team will conduct investigation. The Site Manager or Occupational Health and Safety Manager may decide to stop work during the investigation to allow the corrective preventive actions to be determined. The CLO will provide a response.
High Probable risk and could reoccur
CLO will get the contractor to organise a Major Investigation Team for prompt investigation and resolution. Work may be stopped in the affected area. The CLO will provide a response.
The CLO will explain in writing or verbally in person (especially where literacy is an issue) to the
complainant the review process, the results, and any changes to activities that will be undertaken to
address the grievance and how the issue is being managed to meet appropriate environmental and social
management systems. In some cases it will be appropriate for the CLO to follow up at a later date to see if
the person or organisation is satisfied with the resolution or remedial actions.
The CLO will summarise grievances weekly during construction and bi-annually during operation removing
identification information to protect the confidentiality of the complainant and guaranteeing anonymity. The
procedure will be at no cost and without retribution to project affected persons and stakeholders. The
procedure for processing grievances is depicted in Figure 8.1.
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
21
Figure 8.1: Grievance process
The current point of contact for grievances on Project performance is Project Proponent’s CLO:
Emmanuel Arthur
Telephone: 0208404104
Email: [email protected]
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
22
This SEP identifies various activities that require documentation, monitoring and reporting, including the
following:
� Updating the SEP
� CLO activities:
– A list of disclosure activities such as where, when and for how long key documents have been
disclosed with photographic evidence and clippings of adverts placed in newspapers and other
media
– Minutes of consultation meetings1 with dates, location, a gender-specific list of participants and
photos
– All original written consultation correspondence including comments and feedback left at meetings
will be retained as evidence of the process and outcomes
– Keeping records of press attention, such as newspaper and web articles
� Grievance logging and tracking: each grievance will be logged by the CLO, given an identification
number and followed through by recording details and timing for their resolution and closing out
� Annual reporting: a Project specific annual report summarising project performance, CLO activities
including grievances and updates to the SEP will be produced during installation. Information about the
Project during its operational phase will be included in Rotan Gas’s annual sustainability reporting
As part of the ESIA, an ESMP will detail specific monitoring and reporting requirements for environmental
and social Project performance. Some of the indicators and benchmarks for assessing the implementation
process and outcomes of the SEP are:
� Number of consultation meetings, focus group discussions, announcements, press releases
� Number and lists of participants at meetings
� Issues discussed at meetings
� Actions taken on key issues raised at meetings
� Number complaints and queries raised per recording period
� Types of complaints and queries
� Type of action taken to correct issues and prevent recurrence
� Time taken in addressing complaints
SEP reporting will be included in the annual reporting.
1 The minutes should identify whether comments or concerns were raised by males or females.
9 Documentation, Monitoring and Reporting
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
23
Appendices
Appendix A. Grievance Registration Form _________________________________________________________ 24 Appendix B. Record of Meetings _________________________________________________________________ 25
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
24
Full Name
Contact Information
Please identify how you wish to be
contacted (mail, telephone, e-mail)
By Post: Please provide mailing address
By telephone:
By e-mail:
Preferred language of communication? English …….. Other (please specify)………..………………………………….
Description of incident or grievance
(What happened? Where did it happen? Who did it happen to? What is the result of the problem?):
Date of incident/grievance
One time incident/grievance (date _______________)
Happened more than once (how many times? _____)
On-going (currently experiencing problem)
What would you like to see to resolve this problem?
Internal Use Only
Grievance received by:
Date:
Reference number:
Appendix A. Grievance Registration Form
Takoradi LNG Floating Storage Regasification Unit Stakeholder Engagement Plan
357718/PWR/PHR/01/C 28 October 2015 C:\Users\sto29582\Documents\Takoradi LNG\Rotan Gas FSRU SEP v3_Final for disclosure.docx
25
Appendix B. Record of Meetings
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Hon Kojo Appiah (DCE), Vincent Mawuli Wordi (Budget Officer) Rhoda Boachie-
Ansah (Admin Officer)-Shama District Assembly (SDA).
Date: 27.07.15 Purpose: Project/ESIA
introduction of
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah, & Charles
Tsagli, (EEMC)
Location: Shama District
Assembly
offices, Shama
Time: 9.00am Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the various companies working on the proposed Rotan Energy and Rotan Gas projects. Mr
Jumpah explained that the purpose of the visit to the Shama District Assembly is to introduce the Project to
the Assembly and begin the consultative processes towards the acquisition of Environmental Permit in line
with the requirements of the Environmental Protection Agency.
Introducing the projects, Mr Kofi Morna, the Chairman of Rotan Energy and Rotan Gas said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
The Primary Sponsor of the project is Rotan Energy Limited (Singapore), controlled by Mr Kofi Morna with
others as significant minority shareholders. Mitsui & Co are Co-Developers.
Issues Raised / Discussed
Speaker Organisation Responses/Comments
KM Rotan Energy Rotan has been working on the proposed projects for the past 3 years and
Stakeholder Meeting Report
2 | P a g e
KA
Budget
Officer
SDA
SDA
has secured land from Nana Atom III. Permit for Gas supply has been
secured from government.
Coming with Mott Mac/EEMC is to commence the consultation processes
towards the acquisition of Environmental Permit. Additionally, there are
expects from various firms to engage the Shama District Assembly.
The DCE welcomed Rotan Energy and all groups of companies present. He said the Assembly is happy about the proposed project. He said the District Assembly has developed a website targeted at investors like Rotan and many others. It is good Rotan Energy has mentioned Nana Atom but in future Rotan Energy should liaise with the Assembly so that the Assembly will facilitate the processes with the help of the technical team of the District Assembly. SDA has earmarked about 700acre land for energy projects taking cognizance of the proximity of the area to the West African Gas Pipeline and the Aboadze Energy enclave. Three companies visited the site some time ago but are yet to come back. Rotan Energy should also consider visiting the said site earmarked by the SDA for Energy projects. The people of Aboadze are not happy. If you don’t respect the ordinary man thinking that you have money is not the best. VRA has lost faith with the peole of Aboadze. The people of Aboadze feels neglected for lack of training on safety, health and environmental issues to make them employable to benefit from emerging job opportunities. VRA, Jacobsen, Amardi, One Energy and VRA are all guilty of their Corporate Social Responsibilties. The success of the project will depend on cooperation with the District Assembly. The SDE must therefore be “married” with the proponents of various projects in the District. The SDE expects an expedite action by Rotan because the assembly is ready to help. In developing the CSR programmes for the District, Rotan needs to know the priorities of the SDA. Job opportunities in the area are lacking. Indegenes who are well educated are available but have not been recruited, rather people are brought from Accra for minor jobs that could have easily been undertaken by people from the area. Local people must be depended upon for advocacy. It will be required of Rotan Energy to pay business operating permits to the SDA. The cooperation of Roan Energy is therefore expected. collaborate with NR-Urban Roads Department used to be under the Municipal Assembly but they have been upgraded to a regional status.
Stakeholder Meeting Report
3 | P a g e
Nik Stone
KA
KM
MM
SDE
RE
Is there anything in the physical environment that needs to be looked at? There is a lot to be done with reference to the medium term development of the SDA. There is the occurrence of flooding due to the creation of backlog water. This has placed a lot of drain on the Assembly. The Anakwari river needs to be protected. This has been discussed with Amandi and it is expected that the companies in the area will collaborate to do this in other to avoid a disaster and potential loss of properties when disaster breaks out. There is an obvious need for the IPPs to collaborate to address the potential flooding threat.
Stakeholder Meeting Report
4 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Follow-up, documents provided, miscellaneous
The Medium Term Development Plan for the Shama District Assembly to be provided
by the District Assembly
Stakeholder Meeting Report
5 | P a g e
Name Organisation Position Telephone Email
Kojo Appiah (KA) SDA-Shama
District Assemby
District Chief
Executive
0242809773
Vincent Mawuli SDA-Shama
District Assemby
Budget Officer
Rhoda Boachie-
Ansah
SDA-Shama
District Assembly
Admin Officer
Kofi Morna (KM) Rotan Energy Ltd Chairman 0267168552 [email protected]
David Gardner Rotan Energy Ltd Engineer +44776820080 [email protected]
Diana Dimitrova Rotan Energy Ltd CFO +77810212367 [email protected]
Edwin Abanga Rotan Energy Ltd Director +23324442255 [email protected]
Rahim Mwaji Rotan Energy Ltd Power +16024107815 [email protected]
Toma Videnov Mitsui & Co Power +447739243464 [email protected]
Alwin Thomas Mitsui & Co Power +447850980545 [email protected]
Phyllis Squire Mitsui & Co Power +233501304557 [email protected]
Andrea Dal Mut Mott Mac Environmental +447788897788 Andrea.dalmut@mottmac
Nik Stone (NS) Mott Mac ESIA PM +447891673760 [email protected]
Dyson Jumpah (DJ) EEMC Dep Proj Mgr 0244649873 [email protected]
Kofi Agbogah EEMC Environmental 0266031882 [email protected]
Amoako Atta
Degraft-Johnson
EEMC Environmental 0208157728 [email protected]
Emmanuel Amekor EEMC Environmental 0244779983 [email protected]
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Nana Kwabena Attom III, Chief of Shama, David Amoah, Private Secretary (Shama
Chief’s Palace), Emmanuel Arthur, Shama Chief’s Palace (Lawyer)
Date: 27.07.15 Purpose: Project/ESIA
introduction of
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah, & Charles
Tsagli, (EEMC)
Location: Shama Chief’s
Palace
Time: 10.20am Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Mr. Emmanuel Arthur, with the permission of Nana Attom III, introduced him to Rotan Energy and various
companies present working for Rotan Energy. He said it wasn’t long ago when Rotan Energy visited the
palace and promised to come again with Rotan alliance partners working on the project.
Mr Kofi Morna said he had earlier indicated to Nana Attom that he will be bringing over the Consultants
who are undertaking the Environmental and Social Impact Assessment for the proposed CCGT Thermal
Project. Hence the purpose of the meeting was to introduce the ESIA Consultants to Nana Attom
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the various companies working on the proposed Rotan Energy and Rotan Gas projects. Mr.
Jumpah explained that the purpose of the visit by the ESIA Consultant is to begin the consultation processes
towards the acquisition of Environmental Permit for the project. Nana Attom, the land owners and his
community are key stakeholders so it is therefore appropriate to engage them in the Consultative Processes
to seek their concerns and ensure that they are integrated into the project development.
Introducing the projects, Mr. Kofi Morna, the Chairman of Rotan Energy and Rotan Gas said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
The Primary Sponsor of the project is Rotan Energy Limited (Singapore), controlled by Mr Kofi Morna with
others as significant minority shareholders. Mitsui & Co are Co-Developers.
Stakeholder Meeting Report
2 | P a g e
Issues Raised / Discussed
Speaker Organisation Responses/Comments
NA
KM
ADM
EA
ADM
NA
Shama Chief
Palace
RE
MM
SCP
MM
SCP
The main issue is that VRA has taught them some lessons. After VRA has
acquired land from them for the Aboadze Thermal project VRA did not give
them the required benefits. VRA claim they have used their benefits to
provide them community projects, toilets, schools, roads and cold stores.
He has taken VRA to court for non-payment of their compensation due the
land owners.
He has welcomed Rotan Energy and expressed his expectation Rotan will
fulfil agreements with the communities and people of Aboadze. He said the
President has declared the Aboadze an Energy Enclave. He therefore
expects Rotan to look after the communities well.
Rotan has promised to work with the Chiefs and people of Aboadze and
with the help of the Lawyer Rotan will do what is expected of them. He said
Rotan has taken note of the VRA problems and they are grateful to Nana
Attom.
What is the perception of the community about the Rotan project?
The people feel neglected in terms of job opportunities. He said the stools
also seems neglected by the companies. He cited how skilled labour are
brought from Accra to work in the companies in the area. Their expectation
is that people from the area will benefit from the project. Social
responsibilities must be met. Social responsibilities has nothing to do with
compensation payments to the chiefs so companies cannot refuse to
payment compensations for land claiming that they have provided social
amenities.
Is there any cultural significance attached to the proposed site for the project?
Yes, If the project is to begin there are some rights have to be performed
around the Anakwari wetland. T3 of VRA is not functioning VRA failed to
perform similar rites for the Kwesi Panyin wetland before the filling of the
Stakeholder Meeting Report
3 | P a g e
NA
DJ
SCP
EEMC
area for the project. The necessary rights must be performed on a
Thursday.
When will the consultation with the people be done? He expects an open forum to be done to enable the people understand the project. He expects the youth to be helped as well as provision of support to the elderly in the community.
We are just beginning the ESIA process. We will notify the community and
the elders at the appropriate time.
Stakeholder Meeting Report
4 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Stakeholder Meeting Report
5 | P a g e
Follow-up, documents provided, miscellaneous
Name Organisation Position Telephone Email
Nana Kwabena
Atom III
Shama Chief District Chief
Executive
0242140134 [email protected]
David Amoah Shama Chief’s
Palace
Private
Secretary
024979489
Emmanuel Arthur Chief’s Palace Lawyer 0208404104
Kofi Morna (KM) Rotan Energy
Ltd
Chairman 0267168552 [email protected]
David Gardner Rotan Energy
Ltd
Engineer +44776820080 [email protected]
Diana Dimitrova Rotan Energy
Ltd
CFO +77810212367 [email protected]
Edwin Abanga Rotan Energy
Ltd
Director +23324442255 [email protected]
Rahim Mwaji Rotan Energy
Ltd
Power +16024107815 [email protected]
Toma Videnov Mitsui & Co Power +447739243464 [email protected]
Alwin Thomas Mitsui & Co Power +447850980545 [email protected]
Phyllis Squire Mitsui & Co Power +233501304557 [email protected]
Andrea Dal Mut Mott Mac Environmental Andrea.dalmut@mottmac
Nik Stone (NS) Mott Mac ESIA PM [email protected]
Dyson Jumpah
(DJ)
EEMC Dep Proj Mgr 0244649873 [email protected]
Kofi Agbogah EEMC Environmental 0266031882 [email protected]
Stakeholder Meeting Report
6 | P a g e
Amoako Atta
Degraft-Johnson
EEMC Environmental 0208157728 [email protected]
Emmanuel
Amekor
EEMC Environmental 0244779983 [email protected]
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Sarfo Afriyie, Regional Director (EPA, Takoradi, George Diewu, Senior Program
Officer(EPA, Takoradi).
Date: 27.07.15 Purpose: Project/ESIA
introduction of
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah, & Charles
Tsagli, (EEMC)
Location: EPA, Takoradi
Office
Time: 12.30am Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the various companies working on the proposed Rotan Energy and Rotan Gas projects. Mr
Jumpah explained that the purpose of the visit to the Shama District Assembly is to introduce the Project to
the Assembly and begin the consultative processes towards the acquisition of Environmental Permit in line
with the requirements of the Environmental Protection Agency.
Introducing the projects, Mr Kofi Morna, the Chairman of Rotan Energy and Rotan Gas said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
The Primary Sponsor of the project is Rotan Energy Limited (Singapore), controlled by Mr Kofi Morna with
others as significant minority shareholders. Mitsui & Co are Co-Developers.
Issues Raised / Discussed
Speaker Organisation Responses/Comments
SA EPA Where is the Rotan Energy project being sited?
Stakeholder Meeting Report
2 | P a g e
KM
SA
KM
SA
KM
SA
DJ
SA
EA
NS
RE
EPA
RE
EPA
RE
EPA
EEMC
EPA
EEMC
MM
The site for the Rotan Energy project is between the existing VRA site and
the proposed Amardi project site at Aboadze.
Is the Rotan Energy site within the VRA Enclave?
No, the Rotan Energy site is outside the VRA enclave.
I am sure Rotan Energy is aware of the Independent Power Producers
Association (IPPAs).
Yes, Rotan Energy is aware of the IPPAs but Rotan Energy is not an active. I hope Rotan Energy is aware of the opposition from the Nchaban Community on the development of power plants. If yes then that tells you the scope of work that needs to be done to let them understand that the Rotan Energy project will not negatively impact the community. Rotan Energy should also engage he Shama District Assembly and the residents association including Dr Azantelo (0244621584). There was a suggestion theat the IPPs come together to come out with the impact of air emissions on the community. Rotan Enegry needs to get involve with the IPPs. What are some of the specific air quality impacts complaints being made by the communities? Cumulative impacts of particulate matter, Noise, Explosions. It is a general public complaint. The EPA has written to the Shama District Assembly to address this problem. EPA has also requested the IPPs to guarantee their businesses by preparing strategic environmental assessment within the enclave. A baseline studies should be conducted to enable us adequately assess the situation. Does EPA has the IPP Category list? If yes, then let us have them.
Stakeholder Meeting Report
3 | P a g e
SA
ADM
DG
SA
DJ
SA
NS
SA
EPA
MM
RE
EPA
EEMC
EPA
MM
EPA
Yes, EPA has the category list but can only be provided on a need basis. Part of our assessment is undertake cumulative impact assessment hence the need to have access to information on other projects available. NOX is a key issue. MM is mounting diffusion tubes for NOX. Then models will be done. However there are other companies such as Amandi, Jacobsen, One Energy etc so how much effort do you put in modelling. There is therefore the need to know what the future scenario is reasonably. How high are the NOX at the ground level is very important. Does the EPA has any view of the ground level concentrations? EPA has the results for PM10, NOX, SOX and TSP. Monthly and quarterly monitoring reports are submitted by VRA and TICO. We are in the process of completing Form EA2 for the Environmental Assessment registration of the Rotan Energy Project. Where should we submit the completed Form EA2? The completed Form EA2 can be submitted either in Accra or Takoradi. The proposed project site is erosion prone so Rotan Energy should take note of this sensitive issue and deal with it adequately. Does EPA has any specific requirement for the air quality monitoring and modelling? Yes, EPA Air Quality guidelines are there for air quality monitoring.
Stakeholder Meeting Report
4 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Stakeholder Meeting Report
5 | P a g e
Follow-up, documents provided, miscellaneous
Contact Dr Azantelo
Name Organisation Position Telephone Email
Sarfo Afriyie (SA) EPA, Takoradi Regional
Director
0244639012
George Diewu EPA, Takoradi Senior Prog
Officer
Kofi Morna (KM) Rotan Energy Ltd Chairman
David Gardner (DG) Rotan Energy Ltd Engineer +44776820080
Diana Dimitrova Rotan Energy Ltd CFO +77810212367
Edwin Abanga Rotan Energy Ltd Director +23324442255
Rahim Mwaji Rotan Energy Ltd +16024107815
Toma Videnov Mitsui & Co +447739243464
Alwin Thomas Mitsui & Co +447850980545
Phyllis Squire Mitsui & Co +233501304557
Andrea Dal Mut
(ADM)
Mott Mac Andrea.dalmut@mottmac
Nik Stone (NS) Mott Mac [email protected]
Dyson Jumpah (DJ) EEMC Dep Proj Mgr 0244649873 [email protected]
Kofi Agbogah EEMC
Amoako Atta
Degraft-Johnson
EEMC
Emmanuel Amekor
(EA)
EEMC
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Capt James Owusu Korangteng, Director of Port (GPHA, Takoradi,)
Date: 27.07.15 Purpose: Project/ESIA
introduction of
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah, & Charles
Tsagli, (EEMC)
Location: GPHA, Takoradi
Office
Time: 3.00Pm Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the various companies working on the proposed Rotan Energy and Rotan Gas projects. Mr
Jumpah explained that the purpose of the visit to the Ghana Ports and Harbour Authoirty,Takoradi to
introduce the Project to the GPHA and begin the consultative processes towards the acquisition of
Environmental Permit in line with the requirements of the Environmental Protection Agency.
Introducing the projects, Mr Kofi Morna, the Chairman of Rotan Energy and Rotan Gas said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
The Primary Sponsor of the project is Rotan Energy Limited (Singapore), controlled by Mr Kofi Morna with
others as significant minority shareholders. Mitsui & Co are Co-Developers.
Issues Raised / Discussed
Speaker Organisation Responses/Comments
Stakeholder Meeting Report
2 | P a g e
JOK
DG
DG
JOK
GPHA
RE
GPHA
RE
GPHA
The Director of Port asked for more technical information on the Thermal
Plant and the associated marine FSRU facility.
The FSRU is a Floating Storage and Re-gasification Unit to be installed
offshore to receive LNG from vesels. There will be a Mooring system to
permanently place the FSRU in a fixed position at about 5km offshore
Aboadze.
A multi point buoy (CBM) for gas transmission via vertical risers, PLEM with
buried onshore and offshore subsea piping to power barge gas terminal
points at graving dock will be installed.
The exact location for the FSRU is however, yet to be determined but is
likely to be at the South Western end of the existing Power Plant on the
Western side.
The Power Plant will be mounted on a Power Badge. The main issue to
GPHA is the tower and the FSRU.
The location of the FSRU is what will be of interest to the GPHA. The
expected depth weight is 170,000cm3.
So far the safety features are OK and it will be handled.
The LNG vessels are more safety conscious than those seating at onshore.
Knowing the location to consider the navigation aspects and to manage the
STX operations is key.
Towage and communication needs to be properly handled.
The project is budgeted to have 4 tugs so 4 substantial new tugs are
needed.
The location, he dimensions of the vessels and the type of job to be done
need to be defined then then the GPHA will know where it will be safe for
the vessels to be handled.
GPHA is already undertaking STX operations so there is no problem. The
expected requirements are not new to GPHA.
Stakeholder Meeting Report
3 | P a g e
DG
JOK
EA
EA
NS
EA
NS
JOK
EA
JOK
KA
RE
GPHA
EEMC
GPHA
MM
GPHA
MM
GPHA
EEMC
GPHA
EEMC
The FSRU will be leased at a cost of about US$300 Million.
Towing and piloting is critical and will be done by the GPHA. Anybody can
be Captain but few men can be a pilot. It is important to know the terrain in
other to be properly assisted.
How is the emergency response plan of the GPHA so that Rotan Energy can collaborate with the GPHA GPHA has an emergency paln so there will be the need for ROTAN Energy to develop its own emergency plan to be fused with that of the GPHA since Rotan Energy will come directly under the GPHA. Other stakeholders will be involved since they may depend upon each other at the appropriate time. Rotan Energy could be involved in drill operations. Does the GPHA have any guidelines for consideration by Rotan Energy? Yes but guidelines will be developed tailored to the needs and operations of Rotan Energy. Since there is going to be an SBM they will not allow vessels to get close. They will put an ATM or a watch to direct other vessels. Are there any exclusion zones? There are no exclusion zones. Apart from the West African Gas Pipeline here is no any exclusion zone. There will be the need to relate with the Hydrographic Agency of the United Kingdom. There is the need for education to sensitize people to understand or know about the project prior to execution in other to avoid unnecessary rumours. Safety zone will be created. There have been problems with fishermen at the Aboadze SBM for VRA. What must Rotan do to avoid such problems? The bright lights around the SBM attracts fish so the fishermen go near the SBM to catch fish. The fishermen needs to be talked to and made to understand the dangers so that they back off. Creation of exclusion zone of about 500m will affect the fishermen so there is the need for an effective education
Stakeholder Meeting Report
4 | P a g e
NS
EA
DJ
JOK
DJ
EA
MM
GPHA
EEMC
GPHA
EEMC
GPHA
Are there marine charts that the ESIA Team could look at? Yes, there are BA charts. Some amount of dreging will be done. What is the potential impact? The expected dredging is not big issue because the dredging will be a controlled dredging. There will be the need to use tugs to push the dredged materials. Suggested that David Gardner prepares a high level technical brief for the attention of GHPA to enable respond officially be providing a documented technical comments and suggestions for consideration by Rotan Consulting Engineers and the ESIA Team. The Director of Port of GPHA Takoradi has agreed to this suggestion and recommended that such a document should be copied to the Harbour Master and Marine Services Manager. David Gardner has also agreed to prepare the high level technical brief on the marine components of the Rotan Energy project for the attention of GPHA. Security at Aboadze is outside the jurisdiction of GPHA so there Navy should be notified. However there is a good collaboration with the Marine Police. If a security program is prepared by Rotan Energy then the GPHA will extend their support operations to cover those areas.
Stakeholder Meeting Report
5 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Stakeholder Meeting Report
6 | P a g e
Follow-up, documents provided, miscellaneous
Name Organisation Position Telephone Email
Capt James
Owusu
Koraneng
GPPA,
Takoradi
Director of
Ports
0208127031 [email protected]
Capt Eben
Atadzi (EA)
GPHA,
Takoradi
HM 0208181428 [email protected]
Capt Francis
Micah
GPHA,
Takoradi
MSM 0244167488 [email protected]
Moses Duku GPHA,
Takoradi
Dep Port Sec 0573518260 [email protected]
James B.
Akanda
GPHA,
Takoradi
Dep. Port Sec 0244232035 [email protected]
Roderick
Ocloo
GPHA,
Takoradi
FM 0244261605 [email protected]
Joseph Lartey GPHA,
Takoradi
PEE 0208244555 [email protected]
Nana
Asamoah
Obimpeh
GPHA,
Takoradi
Dep PEE 0200722704 [email protected]
Kofi Morna
(KM)
Rotan Energy
Ltd
Chairman 0267168552 [email protected]
David Gardner
(DG)
Rotan Energy
Ltd
Engineer +44776820080 [email protected]
Diana
Dimitrova
Rotan Energy
Ltd
CFO +77810212367 [email protected]
Edwin Abanga Rotan Energy Director +23324442255 [email protected]
Stakeholder Meeting Report
7 | P a g e
Ltd
Rahim Mwaji Rotan Energy
Ltd
Power +16024107815 [email protected]
Toma Videnov Mitsui & Co Power +447739243464 [email protected]
Alwin Thomas Mitsui & Co Power +447850980545 [email protected]
Phyllis Squire Mitsui & Co Power +233501304557 [email protected]
Andrea Dal
Mut (ADM)
Mott Mac Environmental +447788897788 Andrea.dalmut@mottmac
Nik Stone
(NS)
Mott Mac ESIA PM +447891673760 [email protected]
Dyson
Jumpah (DJ)
EEMC Dep Proj Mgr 0244649873 [email protected]
Kofi Agbogah EEMC Environmental 0266031882 [email protected]
Amoako Atta
Degraft-
Johnson
EEMC Environmental 0208157728 [email protected]
Emmanuel
Amekor (EA)
EEMC Environmental 0244779983 [email protected]
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Kwabena Badu Yeboah, Director (EPA, Head Office, Accra), Audrey Quarcoo
(Principal Program Officer (EPA, Head Office, Accra).
Date: 29.07.15 Purpose: Project/ESIA
introduction of
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah, & Charles
Tsagli, (EEMC)
Location: EPA, Head
Office Accra
Time: 9.30am Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the various companies working on the proposed Rotan Energy and Rotan Gas projects. Mr
Jumpah explained that the purpose of the visit is to introduce the Project and its proponents and
consultants to EPA and begin the consultative processes towards the acquisition of Environmental Permit in
line with the requirements of the Environmental Protection Agency.
Introducing the projects, Mr Kofi Morna, the Chairman of Rotan Energy and Rotan Gas said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
The Primary Sponsor of the project is Rotan Energy Limited (Singapore), controlled by Mr Kofi Morna with
others as significant minority shareholders. Mitsui & Co are Co-Developers.
Natural gas wholesale license has been acquired and Power Purchase Agreement has been secured with
ECG.
Mott Mac/EEMC has been contracted to undertake the Environmental and Social Impact Assessment (ESIA)
The Team of Alliance partners and consultants have visited the proposed project site and consulted with the
Takoradi EPA and GHPAH on 27th
July 2015.
Issues Raised / Discussed
Stakeholder Meeting Report
2 | P a g e
Speaker Organisation Responses/Comments
DG
KBY
KM
KBY
KM
KBY
A
RE
EPA
RE
EPA
RE
EPA
RE
The concept of the project is based on Floating Storage and Regasification
Unit (FSRU). There are 2 major components of the project. The first
component is the Power Plant and the second is Gas Supply System called
the FSRU. The FSRU will receive vessels of about 300m long and located
at about 2-5km offshore.
The development concept is therefore to apply for 2 parrallel permits .
They are familiar with arrangement Rotan is proposing so no problem to
apply for separate permits. However, an integrated study could be done to
have one permit. The option is opened.
Due to lack of certainty for LNG hence the Gas project . There is the need
for offtakers as well for the gas project. If this goes through there will be the
need to have separate permits and operations.
Ghana 1000 is also putting up a Gas facility with excess capacity that can
be offloaded. Why wouldn’t Roan Energy consider a partnership with
Ghana 1000?
Partnering with Ghana 1000 is a good idea. Rotan Energy had a meeting
with Ghana 1000 but there is no substantive link yet on the ground. For this
reason Rotan Energy is pursuing an independent gas facility development.
If the future something positive happens the partnership could be
considered.
The environmental assessment regulation requires the EA process for a
permit issued before the start of the project. EPA is happy to work with
Rotan Energy to fulfil this requirement. EPA is prepared to reduce the 90
days timeframe for the review and permitting process to 60 days depending
on the performance of the ESIA Consultants and the quality of their
outputs.
EPA assures Rotan of an expedited action if the consultants performs.
There is a processing fee which is non-refundable and a permit fee to be
determined upon approval of the permit under the LI2216. If a special
review is requested it will attract a special fee to be determined by the EPA
Stakeholder Meeting Report
3 | P a g e
KM
NS
KBY
EPA
MM
EPA
and borned by Rotan Energy.
EPA expects the consultant ESIA Report to be concise. The reports must
be compressed as much as possible and consistent with what the law
requires to be done.
It should be noted that TOR is not a table of content as many consultants
have been doing.
Kofi Morna remarked that at certain times the voluminous nature of the
ESIA reports is influenced the requirements of the Equator Principles or
international requirements.
Where is the Rotan Energy project being sited?
The ESIA will be produced to satisfy both the EPA and International
requirements. Two separate permit applications will be made but the
linkage will be clearly demonstrated.
What are the Environmental Values of concern to the EPA?
The site for the Rotan Energy project is between the existing VRA site and
the proposed Amardi project site at Aboadze.
The Anankwari Wetland, mangrooves and the airshed are environmental valuesof concern to the EPA. Air quality modelling should take account of what is existing. Additional the fuel mix usage scenarios should be considered. EPA disclosed that USAID is considering undertaking a Strategic Environmental Assessment for the Aboadze Energy Enclave.
Stakeholder Meeting Report
4 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Follow-up, documents provided, miscellaneou
Stakeholder Meeting Report
5 | P a g e
Name Organisation Position Telephone Email
Kwabena Badu
Yeboah
EPA, Accra Director 0244639012 [email protected]
Audrey Quarcoo EPA, Takoradi Principal Prog
Officer
0501301404 [email protected]
Kofi Morna (KM) Rotan Energy
Ltd
Chairman 0267168552 [email protected]
David Gardner
(DG)
Rotan Energy
Ltd
Engineer +44776820080 [email protected]
Diana Dimitrova Rotan Energy
Ltd
CFO +77810212367 [email protected]
Edwin Abanga Rotan Energy
Ltd
Director +23324442255 [email protected]
Rahim Mwaji Rotan Energy
Ltd
Power +16024107815 [email protected]
Toma Videnov Mitsui & Co Power +447739243464 [email protected]
Alwin Thomas Mitsui & Co Power +447850980545 [email protected]
Phyllis Squire Mitsui & Co Power +233501304557 [email protected]
Andrea Dal Mut
(ADM)
Mott Mac Environmental +447788897788 Andrea.dalmut@mottmac
Nik Stone (NS) Mott Mac ESIA PM +447891673760 [email protected]
Dyson Jumpah
(DJ)
EEMC Dep Proj Mgr 0244649873 [email protected]
Kofi Agbogah EEMC Environmental 0266031882 [email protected]
Amoako Atta
Degraft-
Johnson
EEMC Environmental 0208157728 [email protected]
Emmanuel
Amekor (EA)
EEMC Environmental 0244779983 [email protected]
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Richard Oppong Mensah (Director, Thermal Generation, VRA-Aboadze)
Date: 26.08.15 Purpose: ESIA Scoping
exercise for
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah (EEMC)
Location: VRA-Aboadze
Director’s Office
Time: 10.30am Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the ESIA team undertaking the scoping phase consultation on the proposed Rotan Energy and
Rotan Gas projects. Mr Jumpah explained that the purpose of the visit to the VRA-Aboadze Thermal Plant,
Takoradi is to introduce the Project to the VRA and begin the consultative processes towards the
identification of key issues for the preparation of ESIA Scoping report as part of the processes for the
acquisition of Environmental Permit in line with the requirements of the Environmental Protection Agency.
Introducing the projects, Mr Andrea Dal Mut, the ESIA Project Manager said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
Mr Andrea Dal Mut referred to July visit by Rotan Energy together with Mott Mac and EEMC. He said this
visit is a followup visit to begin the ESIA Scoping studies for the proposed Rotan Energy project. He said new
experts on the team are the Social Scientist, Marine Ecologist, Coastal Processes Specialist and Hydrologist.
Issues Raised / Discussed
Speaker Organisation Responses/Comments
JW MM He is interested in the fate of the dredging processes under the Rotan
Energy offshore facilities development, numerical modelling of offshore
conditions, climatic changes issues, datasets on bathymetry offshore, data
Stakeholder Meeting Report
2 | P a g e
RB
PG
ADM ROM NKA
DJ ADM
ROM
MM
MM
MM
VRA
AP
EEMC MM VRA
on wave climate and extreme wave conditions etc.
He is interested in marine species that may be impacted as well as the
fisheries species available, type of sea grass etc.
He Is interested in the communities, populations, livelihoods, impact of project on nearest communities, information on fish catch etc.
Will be assisting the teams on transportation, waste management and
landfills, Air quality issues etc.
The study has to be completed by December 2015. Two ESIAs will be
submitted. Interest is to comply with the Ghana EIA procedures as well as
the World Bank Standards and in compliance with requirements of
international finance institutions.
Since VRA came to Aboadze a lot of projects have taken place here. Some
are the West African Gas Pipeline project, TAQA, other IPPs such GE who
also wants to develop an FSRU facility.
VRA has a team coordinating all the activities of the IPPs so they can help
in the routing of facilities under the Rotan Projects. MM will be introduced to
the VRA Team.
WAGP, TAQA etc should be able to give MM/EEMC data on sea condition.
VRA is now extracting a lot of sea water so the conditions may be affected.
T1 and T2 are being converted into CCGTs. T4 has been awarded but
construction is yet to begin.
All the plants are running on gas from Ghana Gas.
There is an SBM pipeline that delivers gas from ocean tankers.
There is an existing right of way (ROW) owned by Ghana Gas. If Rotan
want to work within the ROW they must ask permission.
MM/EEMC will need to formally write to introduce the Rotan Project to the
VRA through the Head Office of VRA in Accra so that the Rotan Project can
be introduce to the VRA Technical Committee.
Who can give us maps?
A real estate person on the VRA Committee should be able to give MM
maps. WAGP has an office in Accra but the project office is in Takoradi.
Stakeholder Meeting Report
3 | P a g e
PG
ROM
PG
ROM
DJ
ROM
ADM
PG
ROM
RB
ROM
PG
MM
VRA
MM
VRA
EEMC
VRA
MM
MM
VRA
MM
VRA
MM
MM needs to write to WAGP
Who drives the consultation processes among the IPPs? VRA drives the consultation processes among the IPPs. EPA insists on a single point of water extraction. VRA is looking at that on behalf of all the IPPs. VRA is also putting up a fire station to support the IPPs. This will be a commercial support. How does VRA relate to the communities at various levels? VRA has a community relations person. Efforts to provide a common front to reach the communities on Corporate Social Responsibilities hasn’t been successful. This is due to the variability of capacities of the various companies. There is the need to have a common front. You mentioned that there is one main sea water extraction point. What about discharge points? There are two discharge points. The other plants are considering air cooling so it is not likely that more seawater discharge points will be needed. However, there is a controlled intake of water. We are interested in the cumulative impacts. Do you know what the plants are doing? What are the community supports provided by VRA? Water is a big issue. VRA has extended water supply to the community There are two water. VRA has constructed a reservoir so that water can be supplied to the community. Public toilets have also been constructed for the communities namely Aboadze, Dwumor and Abuesi. MM needs to consult with Ghana Water Company Limited (GWCL) Does VRA manage fisheries with the Communities? No. Cold store was built for the community but they could not manage it. What are the significant changes that have occurred in the area? VRA is the biggest employer in the area.
Stakeholder Meeting Report
4 | P a g e
ROM VRA Employment is an issue now in the area. Most of them people have gone to school. There are Polytechnic Schools in the area. VRA has built a hospital in the area. There is also a District Hospital and the Efiekuma Hospital. The VRA hospital however now seems small.
Stakeholder Meeting Report
5 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Follow-up, documents provided, miscellaneous
Stakeholder Meeting Report
6 | P a g e
Name Organisation Position Telephone Email
Richard Oppong
Mensah
VRA-Aboadze Director-
Thermal
Generation
0202026887 [email protected]
Dyson Jumpah EEMC Environmental 0244649873
Pierre Gouws Mott MacDonald Social
Scientist
Jon Williams Mott MacDonald Marine
Processes
Specialist
Rowan Byrne Mott MacDonald Marine
Ecologist
Andrea Dal Mut Mott MacDonald Project
Manager
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): George K.M. Impraim (Area Manager,Takoradi)
Date: 26.08.15 Purpose: ESIA Scoping
exercise for
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah (EEMC)
Location: GRIDCO-
Takoradi Office
Time: 9.00am Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the ESIA team undertaking the scoping phase consultation on the proposed Rotan Energy and
Rotan Gas projects. Mr Jumpah explained that the purpose of the visit to GRIDCO, Takoradi is to introduce
the Project to GRIDCO and begin the consultative processes with particular attention to power transmission
lines and evacuation issues towards the identification of key concerns for the preparation of ESIA Scoping
report as part of the processes for the acquisition of Environmental Permit in line with the requirements of
the Environmental Protection Agency.
Introducing the projects, Mr Andrea Dal Mut, the ESIA Project Manager said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
Mr Andrea Dal Mut referred to July visit by Rotan Energy together with Mott Mac and EEMC. He said this
visit is a followup visit to begin the ESIA Scoping studies for the proposed Rotan Energy project. He said new
experts on the team are the Social Scientist, Marine Ecologist, Coastal Processes Specialist and Hydrologist.
Mr Dal Mut also gave a brief on the status of the ESIA process and the registration done with EPA.
Stakeholder Meeting Report
2 | P a g e
Issues Raised / Discussed
Speaker Organisation Responses/Comments
JW
RB
PG
ADM GKMI NKA
MM
MM
MM
MM
GRIDCO AP
He is interested in the fate of the dredging processes under the Rotan
Energy offshore facilities development, numerical modelling of offshore
conditions, climatic changes issues, datasets on bathymetry offshore, data
on wave climate and extreme wave conditions etc.
He is interested in marine species that may be impacted as well as the
fisheries species available, type of sea grass etc.
He is interested in the communities, populations, livelihoods, impact of project on nearest communities, information on fish catch etc.
Will be assisting the teams on transportation, waste management and
landfills, Air quality issues etc.
The study has to be completed by December 2015. Two ESIAs will be
submitted. Interest is to comply with the Ghana EIA procedures as well as
the World Bank Standards and in compliance with requirements of
international finance institutions.
There is the Tema/Accra Office that is responsible for all external issues. It
is therefore appropriate that we see the Director of Engineering at the
Tema Office. Mr Charles Doe is the Director of Engineering-
0244266077/0233266077.
Rotan/Mott Mac should write to GRIDCO to formally introduce the project.
At the Aboadze Energy enclave, GRIDCO is responsible for the
management of the switchyard. There are 161KVA and 330KVA switch
guards.
Rotan needs to get GRIDCO involve in their planning since GRIDCO will be
undertaking the evacuation of the power to be generated by Rotan based
on the system capabilities GRIDCO Has in place.
The map for the national interconnected transmission system was
explained.
Stakeholder Meeting Report
3 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
Stakeholder Meeting Report
4 | P a g e
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Follow-up, documents provided, miscellaneous
Arrange meeting with GRIDCO H/O Accra and Collect Enclave layout plan for power
evacuation and existing ROW
Stakeholder Meeting Report
5 | P a g e
Name Organisation Position Telephone Email
George K.M.
Impraim
GRIDCO Area Manager 0545518873 [email protected]
Dyson Jumpah EEMC Environmental 0244649873
Pierre Gouws Mott MacDonald Social
Scientist
Jon Williams Mott MacDonald Marine
Processes
Specialist
Rowan Byrne Mott MacDonald Marine
Ecologist
Andrea Dal Mut Mott MacDonald Project
Manager
Kwaku Amoako
Atta Degraft
Johnson
EEMC Terrestrial
Ecologist and
Botanist
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Nana Kobina Attom III, Chief of Aboadze, John Kingsley Arthur (Stool Secretary
(Aboadze Chief’s Palace), Emmanuel Arthur (Lawyer Aboadze Chief’s Palace)
Date: 27.08.15 Purpose: ESIA Scoping
exercise for
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah (EEMC)
Location: Aboadze Chief’s
Palace
Time: 10.30am Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Mr. Emmanuel Arthur, with the permission of Nana Attom III, invited Messrs Mott Mac/EEMC to introduce
themselves. Introducing the team, Mr Dyson Jumpah referred to July visit by Rotan Energy together with
Mott Mac and EEMC. He said this visit is a followup visit to begin the ESIA Scoping studies for the proposed
Rotan Energy project. He said new experts on the team are the Social Scientist, Marine Ecologist, Coastal
Processes Specialist and Hydrologist. Specifically, the call on Nana Attom was to provide the Mr Pierre
Gouws, the Social Scientist the opportunity to engage Nana Attom on important social safeguard issues.
Issues Raised / Discussed
Speaker Organisation Responses/Comments
PG
NKA
MM
Aboadze Chief
Palace
How is the Aboadze Chieftaincy structure?
There are 4 Divisional Chiefs under the Shama Paramountcy. These are
the i) Dunkwa Division ii) Yabew-Adonten Division, iii) Lower Inchanban
and iv) Upper Inchanban.
There 8 Communities under the Upper Incahnban Division namely i)
Aboadze ii) Abuesi iii)Dwomor, iv) Ntuma, v)Nyankrom, vi) Konfoeko, vii)
Shama Junction Lower and viii) Shama Junction Upper.
All the communities are headed by Odikros. Hence Nana Attom is the
Odikro of Abiadze.
Stakeholder Meeting Report
2 | P a g e
PG NKA
PG
NKA
PG
NKA
PG
KA
KADJ
MM
AP
MM AP MM
AP
MM
AP
EEMC
What is the expectation of the communities of the IPPs including Rotan
Energy?
Yes the expectations are very high. It depends on the companies and what
agreements is there.
They expect employment opportunities, education with scholarship
schemes and social amenities. If these things are done there will be no
problem.
Nana Attom, have you been consulted by the IPPs and what are the issues? They conducted open forum and shared ideas. Education, roads, pipe borne water, payment of royalties and ultimate signing of agreements. At the forums the presentations are made and potential impacts of the projects are discussed. The spokesperson of NKA added that a major issue is the synchronisation of the development plans of the communities and that of the District Assembly. He said he is taking this matter up with the District Assembly
What is the mechanism for grievance redress?
There is a major problem with VRA. Land was acquired under Executive Instrument. The Chiefs were not involved in the acquisition process. Compensation hasn’t been paid.
A land lease agreement has made with Rotan Energy. Generally, the period of lease for the companies is 50 years and 99 years for individual residential facilities.
Rotan is supposed to compensate affected persons on the land. It was disclosed that two buildings located on the South western (with 10 plots of land) end and North Western ends of the land belong to Mr Ntim Aboagye and Mr Amuzu. Mr Emmanuel Arthur is to contact the owners of the building and come to terms for compensation.
Is there any exclusion zone agreement preventing fishing in the area?
There is No Agreement.
Has provision been made along the coastline in order not to cause restriction of access to the movement of local fishermen and other people in search of their livelihoods. DJ added that restriction of access is a major social safeguard issue and must be ensured by the District Assembly and relevant IPPs in the Aboadze Energy enclave.
Stakeholder Meeting Report
3 | P a g e
PG
NKA
MM
AP
Are there NGOs operating in the area? Yes, the NGO in the area are Hope for the Youth.
Stakeholder Meeting Report
4 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Follow-up, documents provided, miscellaneous
Stakeholder Meeting Report
5 | P a g e
Name Organisation Position Telephone Email
Nana Kobina
Atom III
Aboadze Chief’s Odikro 0242140134 [email protected]
John Kingsley
Arthur
Aboadze Chief’s
Palace
Stool
Secretary
0244830523
Emmanuel Arthur Chief’s Palace Lawyer 0208404104
Robert Adjei Aboadze Chief’s
Palace
Family
Linguist
02848305
Amoako Atta
Degraft-Johnson
EEMC Environmental 0208157728 [email protected]
Dr Philip Gyau-
Boakye
EEMC Hydrologist 0208170581
Dyson Jumpah EEMC Environmental 0244649873
Pierre Gouws Mott MacDonald Social
Scientist
Jon Williams Mott MacDonald Marine
Processes
Specialist
Rowan Byrne Mott MacDonald Marine
Ecologist
Andrea Dal Mut Mott MacDonald Project
Manager
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Nana Amakye II (Chief of Abuesi Community)
Date: 27.08.15 Purpose: ESIA Scoping
exercise for
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah (EEMC)
Location: Abuesi Chief’s
Palace (ACP)
Time: 1.45pm Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Mr. John Kingsley Arthur invited Messrs Mott Mac/EEMC to introduce themselves to Nana Amakye and his
elders. Introducing the team, Mr Dyson Jumpah referred to July visit by Rotan Energy together with Mott
Mac and EEMC. He said this visit is a followup visit to begin the ESIA Scoping studies for the proposed Rotan
Energy project. He said new experts on the team are the Social Scientist, Marine Ecologist, Coastal
Processes Specialist and Hydrologist. Specifically, the call on Nana Amakye and his elders was to provide the
Mr Pierre Gouws, the Social Scientist the opportunity to engage Nana Amakye on important social
safeguard issues.
Issues Raised / Discussed
Speaker Organisation Responses/Comments
PG NA
MM ACP
How long has the Abuesi community been around and how has the community been growing? The people of Aboadze and Abuesi are brothers and actually one family. VRA has brought job opportunities and many people have migrated to the community. This has put pressure on the social amenities such as water, school etc. Similarly Rotan Energy’s project will attract people to the area thereby increasing the social pressure on existing amenities. The palace for the community does not suit him. He deserves a better palace. They also want scholarship for their school children. Fishing is their main occupation but this has dwindled such that parents could not cater for their children’s school fees leading to high school dropout rates and unemployment.
Stakeholder Meeting Report
2 | P a g e
PG NA PG NA PG NA PG NA PG NA PG NA PG NA
MM ACP MM ACP MM ACP MM ACP MM ACP MM ACP MM MM
What consultation has been done or being done by the IPPs with the chiefs? TIKO has been giving scholarship but not enough. WAGP has been repairing the drains and also giving scholarships though not enough. He intends to bring the IPPs together to help build his palace. Frequency of meeting with the IPPs is quarterly and at the community centre. The most recent meeting was on the 26
th August 2015. VRA
donated 8 big poly tanks for the Aboadze and Abuesi Communities and toilet for Abuesi. The community needs technical school for skills development. The community is growing in the east and northern directions. Which other companies are engaging the community? Amandi, Jacobsen, Global Energy etc What are the biggest challenges for the community? Financial weaknesses and challenges of the fish mongers. What is the population of the fishermen? Abuesi community has the largest population after Shama. About 70% of the people are fishermen. How is fish processed in the community? Drying, salting and smoking. Processed fishes are sent to Kumasi, Accra, Bolgatanga for selling. Is there anything else done along the beach by the community? Collecting of stones for construction and terrazzo works. Fishing expeditions using hooks are done along the coast. There is a ban on turtle catching. Are there any mechanisms for grievance redress? Grievances are addressed by the chiefs or elders in the community. Most of the issues are social vices, stealing and teenage pregnancy.
Stakeholder Meeting Report
3 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
Stakeholder Meeting Report
4 | P a g e
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Follow-up, documents provided, miscellaneous
Stakeholder Meeting Report
5 | P a g e
Name Organisation Position Telephone Email
Nana Amakye II Abuesi Chiefs
Place
Odikro 0242140134 [email protected]
John Kingsley
Arthur
Abuesi Chiefs
Place
Stool
Secretary
0244830523
Nana Bofo
Mensah
Abuesi Chiefs
Place
Chief’s
Linguist
0244682281
Samuel T Otoo Abuesi Chiefs
Place
Elder 024545284
Ransford
Essuman
Abuesi Chiefs
Place
Linguist 0249967594
Ibu Essuon Abuesi Chiefs
Place
Cashier Land
Committee
0543430911
Kojo Ampiah Abuesi Chiefs
Place
Linguist 0275278597
Lucy Mensah Abuesi Chiefs
Place
Queen
Mothers Sec
0201926803
Amoako Atta
Degraft-Johnson
EEMC Environmental 0208157728 [email protected]
Dr Philip Gyau-
Boakye
EEMC Hydrologist 0208170581
Dyson Jumpah EEMC Environmental 0244649873
Pierre Gouws Mott MacDonald Social
Scientist
Jon Williams Mott MacDonald Marine
Processes
Specialist
Rowan Byrne Mott MacDonald Marine
Ecologist
Andrea Dal Mut Mott MacDonald Project
Manager
Stakeholder Meeting Report
6 | P a g e
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Mr Badger (Deputy CEO of VRA)
Date: 28.08.15 Purpose: ESIA Scoping
exercise for
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah (EEMC)
Location: VRA-Aboadze
Director’s Office
Time: 11.40am Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the ESIA team undertaking the scoping phase consultation on the proposed Rotan Energy and
Rotan Gas projects. Mr Jumpah explained that the purpose of the visit to the VRA-Aboadze Thermal Plant,
Takoradi is to introduce the Project to the VRA and begin the consultative processes towards the
identification of key issues for the preparation of ESIA Scoping report as part of the processes for the
acquisition of Environmental Permit in line with the requirements of the Environmental Protection Agency.
Introducing the projects, Mr Andrea Dal Mut, the ESIA Project Manager said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
Mr Andrea Dal Mut referred to July visit by Rotan Energy together with Mott Mac and EEMC. He said this
visit is a followup visit to begin the ESIA Scoping studies for the proposed Rotan Energy project. He said new
experts on the team are the Social Scientist, Marine Ecologist, Coastal Processes Specialist and Hydrologist.
Issues Raised / Discussed
Speaker Organisation Responses/Comments
D.CEO VRA Is there going to be a negotiation with Ghana Gas to get connection to gas
supply?
Stakeholder Meeting Report
2 | P a g e
ADM D. CEO ADM D. CEO ADM D. CEO JW ADM D. CEO
MM VRA MM VRA MM VRA MM MM VRA
Yes, this negotiation might be going on with Rotan A common corridor is to be created so that other IPPs are not stranded. The corridor has to be created for fuel, water and power. Amandi is tapping into the SBM. Jacobsen will do same to receive LCO. The same corridor should should be able to provide gas pipeline for Rotan. Will this be done by VRA Accra or Takoradi? There is a team in Akuse working on the creation of the common corridor. We will like to get advice from the VRA on this. We need to submit our ESIA to EPA BY December 2015. We need to know the places to be utilized by Rotan so as to consider the resettlement and compensation issues. VRA has already acquired all the corridors that Rotan might need. VRA needs to define the common areas to be used. Within the next one month it could be appropriate for the VRA to come out with something whilst Rotan also clearly defines their layout and proposed routes for utilities as well as power evacuation. VRA is considering the channelling he Anankwari to improve the flow into the sea. JW thinks the channelling of the Anakwari will be problematic because the Anankwari seems lower than the coastline barrier. Part of the issues to be looked at is the flooding issue. A numerical modelling to look at this has to be done We of the Rotan team sees the project as one that will have a lot of interaction with other IPPs so we are concerned about cumulative impacts. The need for the IPPs to come together the meet the needs of the communities with a common front. The Rotan Team needs to introduce the project to VRA and make the necessary technical requests for submission to VRA by Rotan. Communication is to be addressed to the CEO of VRA attentioned Mr Badger, the Deputy CEO. The draft site layout of the Aboadze Enclave obtained the Rotan team from Aboadze is to be attached to an email request of the said communication.
Stakeholder Meeting Report
3 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Follow-up, documents provided, miscellaneous
Stakeholder Meeting Report
4 | P a g e
Name Organisation Position Telephone Email
Mr Badger VRA-Accra Deputy CEO 020202684 [email protected]
Dyson Jumpah EEMC Environmental 0244649873
Pierre Gouws Mott MacDonald Social
Scientist
Jon Williams Mott MacDonald Marine
Processes
Specialist
Rowan Byrne Mott MacDonald Marine
Ecologist
Andrea Dal Mut Mott MacDonald Project
Manager
Stakeholder Meeting Report
1 | P a g e
Stakeholder(s): Henry Aryertey, Joseph Adam, Nii Ashong
Date: 28.08.15 Purpose: ESIA Scoping
exercise for
Proposed
Rotan Energy
Power Project
Facilitator(s): Dyson Jumpah (EEMC)
Location: Energy
Commission
Office Accra
Time: 1.15pm Report
prepared by:
Dyson Jumpah
Information provided to stakeholders during the Introduction
Messrs Environmental Engineering and Management Consult (EEMC) represented by Dyson Jumpah broadly
introduced the ESIA team undertaking the scoping phase consultation on the proposed Rotan Energy and
Rotan Gas projects. Mr Jumpah explained that the purpose of the visit to the VRA-Aboadze Thermal Plant,
Takoradi is to introduce the Project to the VRA and begin the consultative processes towards the
identification of key issues for the preparation of ESIA Scoping report as part of the processes for the
acquisition of Environmental Permit in line with the requirements of the Environmental Protection Agency.
Introducing the projects, Mr Andrea Dal Mut, the ESIA Project Manager said the following:
The project is a 66Omw Combined Cycled Gas Turbine (Barge mounted) thermal facility located at Aboadze,
right next to TAPco and TICO. He said gas supply will be through the importation of LNG to be stored and re-
gasified on a Fuel Storage & Regasification Unit (FSRU) to be docked about 5 km offshore Aboadze and
replenished periodically via a ship-to-ship transfer.
Mr Andrea Dal Mut referred to July visit by Rotan Energy together with Mott Mac and EEMC. He said this
visit is a followup visit to begin the ESIA Scoping studies for the proposed Rotan Energy project. He said new
experts on the team are the Social Scientist, Marine Ecologist, Coastal Processes Specialist and Hydrologist.
Issues Raised / Discussed
Speaker Organisation Responses/Comments
ADM
MM
What are the processes and requirements for licensing by the Energy Commission?
Stakeholder Meeting Report
2 | P a g e
HA ADM NA ADM HA
EC MM EC MM EC
Firstly, you need to apply for a provisional license. There is a licensing manual we can access from the website of the Energy Commission. EPA requires that the Energy Commission is consulted. There is sitting committee made up of people from Ministry of Defence, Lands Commission. To get a provisional license, the form stipulates three main processes and about 20 exhibits that are required. Upon submission of the application, it will be reviewed by the Board to either grant the application or otherwise. The Energy Commission depends of the EPA Permit to issue license. The project ESIA is used as the baseline document for monitoring and followup at various stages of the project. Copies of project scoping reports for project are passed on to the Energy Commission for review comments. Rotan has already been issued with a Provisional License. So the next stage is the acquisition of the citing Permit which will involve the Ghana Maritime Authority, EPA and Ministry of Defence. Normally, this is done before the ESIA. Siting committee will do the site inspection. Siting offshore is under the jurisdiction of the Ghana Maritime Authority. After the siting Permit a Construction Permit will be issued prior to the submission of the necessary exhibits. Has the Energy Commission met the IPPs to consider the maximum generation of power that the Aboadze Enclave can accommodate? Yes, this is seriously being considered with focus on particularly the Environmental Impacts. EPA is making some efforts in this area. Power evacuation is also an issue being looked at. GRIDCO is being involved in these processes. We agree with the views being shared by the EC Officers. We are also interested in the cumulative impacts, social issues, air quality, transportation, wastes etc. We also need to know the other IPPs that are in the area so if EC has any information we will be happy to have them. Amandi, Jacobsen, One Energy, ASG, Astro have received siting permits from the Energy Commission. Provisional licenses have been issued to Chris Power, Rotan and Amanful Power Group. Rotan needs to give a serious thought of Corporate Social Responsibility considering the potential of air quality impact. Possibly, an agreement could be signed and an understanding reached with the communities.
Stakeholder Meeting Report
3 | P a g e
Photographs
Stakeholder Engagement in ‘Action’ 1
Stakeholder Meeting Report
4 | P a g e
View over Stakeholder Engagement Location (including stakeholders)
Supportive of project and happy to engage further.
Follow-up, documents provided, miscellaneous
Stakeholder Meeting Report
5 | P a g e
Name Organisation Position Telephone Email
Henry Ayertey Energy
Commission-
Accra
Environmental
Officer
0244895076 [email protected]
Nii Ashong Energy
Commision
Technical
Officer
Joseph Adams Energy
Commission
Technical
oficer
Dyson Jumpah EEMC Environmental 0244649873
Pierre Gouws Mott MacDonald Social
Scientist
Jon Williams Mott MacDonald Marine
Processes
Specialist
Rowan Byrne Mott MacDonald Marine
Ecologist
Andrea Dal Mut Mott MacDonald Project
Manager
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE ROTAN TAKORADI LNG FLOATING STORAGE REGASIFICATION UNIT (FSRU)
SCOPING PUBLIC CONSULTATION MEETING
Venue: Aboaze Community Centre, Western Region
Date: 22nd September, 2015
Time Started: 11: am
Time Ended: 1: 21 pm
General Meeting Details: Description of the Project The Combined Cycle Gas Turbine Power Plant and Floating Storage Regasification Unit (Rotan CCGT and LNG FSRU Projects) will be located west of Aboadze in the Shama District of the Western Region, with the FSRU located approximately 5.5 km offshore from the Aboadze enclave. The CCT Power Plant will be build close to the VRA facility near Anankor River. Objective of the Consultation Meeting We are here today to give you information about the Rotan CCGT and LNG FSRU Projects and to listen to your opinions, ideas and concerns in relation to the Project. EEMC want to know your views about the key impacts in order to address in the terms of reference for the ESIA study. More importantly because the project is located in Aboadze we need the opinions/concerns of the residents (Chief, Elders, Women, and the Youth). This is exercise is a requirement of EPA, and in line with the process of securing permit for the Project. Project Proponents, Key Stakeholders and their Responsibilities Rotan Power and Rotan Gas is the Project Developer. Its core business is to generate and distribute electrical energy in Aboadze, Ghana. Rotan Power main responsibility is to develop and operate the Project to high technical, financial, environnemental, social, & management standards. Other responsibilities include
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
power generation, onshore gas pipeline and receiving station, transmission line, buildings, access, accommodation village, near Aboadze .Rotan LNG FSRU is also responsible for the development of the floating storage regasification unit, mooring tower, visiting LNG carries, sub-sea LNG gas pipeline. EEMC & Mott MacDonald are ESIA Consultants; they are responsible for carrying out the ESIA. To ensure that the ESIA meets national & international standards, addressing environmental and social impacts as well as proposing the appropriate mitigation measures. Other responsibilities include engagement of local communities, the public and other stakeholders and also providing them with relevant information. EPA is the permitting Authority and would decide on the basis of evidence, whether the Project should go forward or not Components of the Project There are several components of the Project namely: technical, financial, environmental, social, management. Presently, impact analysis or evaluation is underway for the various components. Aim of the Project We all know the problem confronting Ghana’s energy sector, we need power generation and supply to meet increasing domestic demand of the country and also provide the opportunity for Ghana to export power i.e. improved Ghana’s energy situation. Need for the CCGT and FSRU World Bank predicts 1500MW shortfall in electricity capacity in Ghana by 2022. Gas fired independent power production is most efficient way to develop additional generation capacity as well as addressed power shortages. The ESIA process Ghanaian law, Environmental Protection Agency Act 1994 (Act 490) requires Rotan to conduct EIA. International guidelines of the Work Bank and IFC) also require ESIA. The ESIA process covers Registration, Screening, Scoping and Detailed ESIA (impact assessment – positive and negative). Throughout this process there would be public consultations and engagement. The ESIA must: - Present clearly an assessment of the impacts based on the terms of reference established during scoping - Identify potential direct, indirect, cumulative and transboundary impacts on the environment and social context, covering the pre-construction, construction, operation, decommissioning and post decommissioning stages. - Provide mitigation, enhancement, management and monitoring measures to address the impacts identified Consultations so far:
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
Rotan Power has visited the Project location and neighbouring project communities. So far more than 11 meetings have been held at different levels both national and district levels with stakeholders, people interested in or affected by the Project Frequently Asked Questions Who is Rotan Power and Rotan Gas? Rotan Power Ltd is an independent power producer registered in Ghana, and Rotan Gas Ltd is a registered gas company in Ghana. The projects are sponsored primarily by Rotan Energy Ltd, a Singapore based company, with Mitsui & Co. Ltd as development partner and EOSon Infrastructure Ltd as a minority shareholder. Enhancement measures? Possible additional measures to get the full benefit of positive impacts - Community Development Support, Fisheries Development Support, and Skills Development Programme. What are the potential benefits? Improved the national power system, contribute to the filling of the electricity capacity gap in Ghana, relieving the power stability problem. Will land be leased or acquired for the Project? Land will be leased or acquired for the Project through agreement with the relevant landowners. Is there another option for the Project? Other technology options for electricity generation have already been considered and this is the best technology for the project. The Project is in the feasibility stage so available design options are still being studied. Potential Impacts Physical and Biological
• Emissions and dust related to on-site plant and vehicles, construction activities, emissions from combined cycle power plant stacks.
• Coastal erosion processes
• Increased flood risk in low lying areas
• Disturbance of soils
• Changes to landscape and visuals
• Impacts on inshore and offshore fish population and other marine animals
• Noise and vibration from traffic, construction activities, operational facilities such as gas turbines, generators, transformers, exhaust systems
• Terrestrial and aquatic ecology
• Changes in water quality
• Waste generation, especially during construction
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
• Human activities along the shorelines would be affected/ change in access route Potential Impacts Social, Economic and Cultural
• Benefits to society in the form of electricity production and opportunities for community development initiatives
• Loss of two structures potentially resulting in relocation and economic displacement
• Opportunities for employment during construction and operation
• Nuisance effects from construction, including traffic movements, noise, dust and exhaust emissions
• Occupational and community health risks
• Immigration and induced development
• Changes to access routes – loss of footpath along beach Next Steps/The Way forward
� Baseline surveys and field work – marine, terrestrial and aquatic ecology, air quality, socio-economic and community � Impact assessment production � Mitigation & enhancement, management and monitoring plans � 2nd round of public consultation on the draft ESIA findings/ Second round of public consultation meetings to discuss the ESIA study draft results � Issuance of environmental permit, construction and operation � Fields studies are underway, more stakeholder meetings, focus group discussions would be held to provide opportunity for residents to get involved to
prevent them from making statement like we are not aware of the Project.
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
EEMC and Project Team Members: Dyson Jumpah, Kwaku Amoako Atta de-graft Johnson, Emmanuel Amekor, Gilbert Sam Government Representation: Media present: Number of Participants (excluding EEMC and Project Team such as Rotan): Number of women: 42 Number of men: 46 Language used: English and Fanti Photo Identification Numbers:
Comments/Questions / Suggestions Made by Response
Made by
1. Rotan Power met the Chief and Elders of Aboadze Community and briefed us about the Project. We told them about our past experiences with other energy companies operating in the Aboadze enclave. Our concern are:
• We want older people in Aboadze Community who cannot work to benefit from the Project. Hope for the youth, local NGO to benefit
• To alley our fears about potential earthquake as result of their activities by telling us the frequency of the earthquake
• The project we know is for the entire nation but Aboadze community will suffer most of the negative impacts so we must benefit from the Project.
Nana Attom III, Chief of Aboadze Community
• We are not saying there is going to be earthquake as result of the Project. We mean there would be vibrations or shaking as result of earth moving equipment or movements of heavy duty vehicles during the construction phase.
• There will also be air pollution from dust. This kind of pollution can be minimised through the use of water.
De-graft Johnson, EEMC
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
• We would like Rotan Power, the contractor for the Project. to be present anytime there is a meeting such as this one so that we can tell them our needs.
• We would like to sign an agreement with Rotan Power and also make sure that everything agreed are documented in order to hold them accountable.
• Would there be blasting? We don’t want blasting and if there should be any blasting we have to be informed. In the past blasting took place in the sea and killed a lot of the fishes.
• Too much partisan politics is disturbing Aboadze community. We don’t want any party politics with the job opportunities that are likely to come with Rotan Power Project. I want the Project to give employment to the youth so that they will be able to support the development initiatives of the community.
• The kind of shaking or vibrations that is likely to take place is definitely not earthquakes. If anything happens contrary to what is in the EIA. Then the Chief, together with the people can stop the Project through complaints to EPA who may be issuing permit conditions.
• There will be some dredging in the sea. But at this stage, we are unable tell if there is going to be blasting. But if the rocky nature of shoreline requires blasting, it will be done. However, there will be full disclosure of such activity to the Chief and the people.
Dyson Jumpah, EEMC
2
• We have seen similar projects like that of VRA and TICO. Aboadze Community did not enjoy the benefits as promised but got the negative impacts. Equipment used during the construction phase impacted on our buildings by causing cracks in our houses.
• The township for the companies (VRA) do not experience light off but Aboadze community has been experiencing rampant light offs. Under Rotan Power Project, we want light-outs to be a thing of the past in our community. We need transformer for Aboadze community.
• The pipelines under the seabed will have weeds growing along it; this can impact on the fishing industry.
• The pipelines for the West African Pipeline Project got burst some time back, this led to widespread of cough among the people leading to some deaths. Gas project is dangerous to our health and lives.
• Residents of Aboadze community are predominantly farmers and fishers, compensation paid to affected persons under previous projects range between 500 to1000 Ghana Cedis. The amount paid as compensations were inadequate.
Nana Adam Eduafo, Chief Fisherman, Aboadze
• It is part of our duties to identify all the impacts that is likely to occur. Currently, we are at the scoping stage, we want to understand the issues; we are gathering views, ideas, concerns for detail investigations. We will get to another level where called the impact assessment stage where issues identified would be further scrutinized.
• Rotan Power is consulting with the Maritime Authority, Ghana Harbour Authority, and the Ghana Navy in connection with the pipelines and other installations off shore.
• The floating storage regasification facility would be enclosed. The gas will come in a liquid form. But of cause there could be an accident. There will not be gas flaring. We hope that there will not be any leakages. Preventive measures would be put in place to reduce leakages.
• The proposed technology for the Project has
Dyson Jumpah, EEMC
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
• Already there are rigs and other facilities constructed on the marine waters which is negatively affecting the fishing industry. Now that Rotan Power is also planning to develop floating storage regasification facility this will seriously affect fishing since there would be some restrictions. We (the fishers) need to sit with Rotan Power to discuss issues relating to the Sea particularly where we do our fishing work.
• Today, Aboadze community has many educated young people. We have qualified people, so I proposed that 80% of the employment opportunities under Rotan Power Project be reserved for residents of Aboadze. I am a professional diver and can work in Rotan Power.
been tested and it is being used all over the world.
• Fisher folks should come out with suggestions for consideration. Aboadze is a fishing community so the project has a fishing development programme
• Dyson Jumpah thanked Nana Adam for his insightful contributions. An invitation was extended to Nana Adam to participate and share his rich experiences in the next consultation meeting.
• Following the compilations of community concerns, the EIA Consultant is going to investigate the issues deeper. The possibility of weeds growing along the gas pipelines and possible impacts on fishing activities would be investigated and appropriate mitigations recommended.
De-graft Johnson, EEMC
3 • This is not the first time we are hearing promises of this nature from companies, I want to know if we will be restricted in our movement i.e. would the Project affect access routes?
• Is it really possible for the Chief and the people to stop a Project of this kind?
• Would our building experience cracks as result of the Project?
• We need broader consultations among ourselves so Rotan Power should give the community time to do its own consultations before any further engagement.
Raymond Abakah, Opinion Leader
• There will be some restrictions of access along the beach front and to some extent the lagoon areas. Movements somehow would be managed. However, other access routes would be provided and proper layouts would be put in place. Discussions are underway with the District Assembly. Note that development comes with some sacrifices. Various stakeholders must protect their interest.
Dyson Jumpah, EEMC
4 • We would like to have our own broader consultations. Meet with various family heads, church leaders, leaders of associations and assembly
Nana Kow Meano,
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
members and then finally meet the Consultant.
• Once the thermal plant starts operating, certainly there is going to be vibrations. Are you saying we can stop Rotan Power from working in the event of any violations?
• I think we should rent our land and increased the rent periodically so that we can get money to take care of the elderly in our community.
Opinion Leader
5 • Is the government of Ghana part of the financiers of the Project?
• Often we are promised jobs but we end up getting nothing. We don’t want a situation where we will be told to see the DCE or Minister.
Isaac Baidoo, Assembly man
• The Project is purely 100% private sector investment. The Government is only creating the enabling conditions to facilitate the Project. In other words, the Government of Ghana is not contributing money towards the Project.
• The Project will certainly create job opportunities. The community will benefits from the following: community development programme, and support for the fishing industry. Community benefits must be community driven.
• Rotan Power has its own objectives so community members should manage their expectations. They should not expect that all their needs would be addressed by Rotan Power. Engaging a local person to be an interpreter for this meeting is also a way to create opportunity for skills development.
Dyson Jumper, EEMC
6 • Many companies are operating in Aboadze community but when community members need help they do not know when to go to. I propose that Rotan Power should set-up a community relation directorate which will be responsible for community issues and relations.
Pastor Ben Arthur
7
• My observations with other companies operating in the Aboadze community are that community members are hired as temporary workers. I hope this Project would be different. It will give permanent jobs to the people.
Helena Bonney
• The opportunities are coming so you must prepare yourselves to engage the company and demand what you want.
Dyson Jumpah, EEMC
ESIA Rotan LNG FSRU September 2015
ESIA Rotan LNG FSRU Public Consultation Meeting Minutes, Scoping, September 2015
8 • The offshore floating storage regasification facility will certainly affect fishing activities.
Mary Efua Mensah
• We have identified the impact of the offshore floating storage regasification facility. This would be addressed
Dyson Jumper, EEMC
9 • What can Rotan Power do to help us, the young girls who are interested and desire to acquire some vocational skills training?
Esther Mensah
• Aboadze community has many companies already operating here and there are news ones coming. I proposed that Nana together with his opinion leaders compiled list of both skilled and unskilled people. Again, compile list of projects that you need and make presentation to the companies for support.
Emmanuel Amekor, EEMC
10 • We want you to share you to share minutes of this meeting with us
• We will certainly share the report with Abaodze Community.
Dyson Jumpah, EEMC