taken november 6, 2016 by bccd gunstock brook, route 11 b ...€¦ · taken november 6, 2016 by...

5
Taken November 6, 2016 by BCCD Gunstock Brook, Route 11 B, Gilford Stabilized streambank on opposite side of Route 11B from Gunstock Brook project site.

Upload: others

Post on 17-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Taken November 6, 2016 by BCCD Gunstock Brook, Route 11 B ...€¦ · Taken November 6, 2016 by BCCD . Gunstock Brook, Route 11B, Gilford . Engineering Plan Reference 1+40.00/1+40

Taken November 6, 2016 by BCCD Gunstock Brook, Route 11 B, Gilford Stabilized streambank on opposite side of Route 11B from Gunstock Brook project site.

Page 2: Taken November 6, 2016 by BCCD Gunstock Brook, Route 11 B ...€¦ · Taken November 6, 2016 by BCCD . Gunstock Brook, Route 11B, Gilford . Engineering Plan Reference 1+40.00/1+40

Taken November 6, 2016 by BCCD Gunstock Brook, Route 11B, Gilford Downstream, opposite side of Route 11 B, looking up stream through box culvert to project site

Page 3: Taken November 6, 2016 by BCCD Gunstock Brook, Route 11 B ...€¦ · Taken November 6, 2016 by BCCD . Gunstock Brook, Route 11B, Gilford . Engineering Plan Reference 1+40.00/1+40

Taken November 6, 2016 by BCCD Gunstock Brook, Route 11B, Gilford Taken atop box culvert looking down on Route 11 B downstream of project site.

Page 4: Taken November 6, 2016 by BCCD Gunstock Brook, Route 11 B ...€¦ · Taken November 6, 2016 by BCCD . Gunstock Brook, Route 11B, Gilford . Engineering Plan Reference 1+40.00/1+40

Taken November 6, 2016 by BCCD Gunstock Brook, Route 11B, Gilford Engineering Plan Reference 1+40.00/1+40 Small area of stone fill to be installed opposite of failed bank. Taken atop box culvert looking down on portion of project site along wall of box culvert (in DOT set back). Rip rap will be installed along wall to help absorb energy. Aggregate to the left of image will be moved to become incorporated into streambank stabilization (majority of project on Wright property).

Page 5: Taken November 6, 2016 by BCCD Gunstock Brook, Route 11 B ...€¦ · Taken November 6, 2016 by BCCD . Gunstock Brook, Route 11B, Gilford . Engineering Plan Reference 1+40.00/1+40

Taken November 6, 2016 by BCCD Gunstock Brook, Route 11B, Gilford Engineering Plan Reference 1+90.00/1+90 Taken upstream from area where project access will be established and on opposite side of bank from restoration.