take a look at wienstrom
DESCRIPTION
introduction of conditioned based maintenance at WIENSTROM using the knowledge-based expertsystem MABI. take a look at WIENSTROM. area: 2.000 km 2 stations: ca. Substaions40 nettransformers10.000 house service connec:220.000 electricity meters1.500.000 net: [km] 380kV56 - PowerPoint PPT PresentationTRANSCRIPT
25.09.2001 Folie Nr. 1© Michi Umspann- und Unterwerke CIRED 2003 Folie Nr. 1
introduction of conditioned based maintenance at WIENSTROM using the knowledge-based expertsystemMABI
DI Michael SWOBODA - A1- Session 6 – Block 4 – Question Z Folie Nr. 2
Barcelona 12-15 May 2003
take a look at WIENSTROMarea: 2.000 km2
stations: ca.
Substaions 40nettransformers 10.000house service connec: 220.000electricity meters 1.500.000
net: [km]
380kV 56110kV 76420kV, 10kV 7.1411kV 14.058
maximum load 1.918MWinstalled power 1.503MW
DI Michael SWOBODA - A1- Session 6 – Block 4 – Question Z Folie Nr. 3
Barcelona 12-15 May 2003
modern maintenance strategy
time based (TBM)
event orientated (Breakdown-Strategy)
condition based (CBM)
Reliability orientated (RCM)
risk based (RBM)
TBM: Time Based Maintenance, CBM: Condition Based Maintenance, RCM: Reliability Centered Maintenance, RBM: Risk Based Maintenance
DI Michael SWOBODA - A1- Session 6 – Block 4 – Question Z Folie Nr. 4
Barcelona 12-15 May 2003
Interface to the company strategy
flexible boarders
high: 100%
high: 100%
high: 100%
efficiency
wear out
importance
DI Michael SWOBODA - A1- Session 6 – Block 4 – Question Z Folie Nr. 5
Barcelona 12-15 May 2003
expertsystem in use
Browser (as used for internet)Browser (as used for internet)MMI
data
bank
condition
catch
condition
catchcondition
valuation
condition
valuationmaintenance
planing
maintenance
planingfunction
Data
care
Data
care
Working
stock
technik
Working
stock
technik
Working
stock
history
Working
stock
history
Breakdown
data
Breakdown
dataexpert
knowledge
expert
knowledge
Modulares Anlagenbewertungs- und Instandhaltungspaket
DI Michael SWOBODA - A1- Session 6 – Block 4 – Question Z Folie Nr. 6
Barcelona 12-15 May 2003
how it worksworking stock
data
working stockdata
stepstep no stepsno steps
expert knowledge
expert knowledge
decisiondecision
stratical valuationstratical valuation
conditioncatch
conditioncatch
condition O.K.condition O.K.
conditionvaluation
conditionvaluation
DI Michael SWOBODA - A1- Session 6 – Block 4 – Question Z Folie Nr. 7
Barcelona 12-15 May 2003
Breakdown log (protocol, review)
Expert Logfor a special analyse
Expert Logfor a special analyse
Working Logfor on side steps
Working Logfor on side steps
2 STEPS:
Tuning the expertsystem
Tuning the expertsystem
Special stepsSpecial steps
DI Michael SWOBODA - A1- Session 6 – Block 4 – Question Z Folie Nr. 8
Barcelona 12-15 May 2003
possible interfaces
mobile datamangement
calculations
digital plan (record-office)GIS / NIS Systeme
FM - Profil
DI Michael SWOBODA - A1- Session 6 – Block 4 – Question Z Folie Nr. 9
Barcelona 12-15 May 2003
Cost minimisation knowledge is independent from men and can be
used by everybody getting equal rules and equal maintenance all over
the company maintenance process synchronisation
experience