1 OTTO, Frank DE Session 2 – Block 4 Barcelona 12-15 May 2003 Tailor-made solutions in response to increased demands on supply quality … paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany)

Upload: abiba

Post on 06-Jan-2016

26 views

Category:

Documents


2 download

DESCRIPTION

Tailor-made solutions in response to increased demands on supply quality. … paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany). Dresden - capital of Saxony. DRESDEN is a symbiosis of high technology and baroque. Sachsen.  also known as "Silicon Saxony". Fundamental statements. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Tailor-made solutions  in response  to increased demands  on supply quality

1OTTO, Frank DE Session 2 – Block 4

Barcelona 12-15 May 2003

Tailor-made solutions in response

to increased demands on supply quality

… paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany)

Page 2: Tailor-made solutions  in response  to increased demands  on supply quality

2OTTO, Frank DE Session 2 – Block 4

Barcelona 12-15 May 2003

Dresden - capital of Saxony

also known as "Silicon Saxony"

DRESDENis a symbiosis of

high technology and baroque

Sachsen

Page 3: Tailor-made solutions  in response  to increased demands  on supply quality

3OTTO, Frank DE Session 2 – Block 4

Barcelona 12-15 May 2003

Fundamental statements

• The basic standard of supply quality is a balance between the customers’ quality demands and the acceptance of the resulting costs in general.

• Changes in the basic standard are only possible in the long term and at great expense.

• Increased requirements for supply quality call for customer-specific solutions.

Page 4: Tailor-made solutions  in response  to increased demands  on supply quality

4OTTO, Frank DE Session 2 – Block 4

Barcelona 12-15 May 2003

110 kV grid of Dresden

Elbe

Caption:110 kV overhead line110 kV underground line110 kV undergrond line (planned)

power plant with 110-kV/MV-substation

110-kV/MV-substation110-kV/MV-substation (planned)

380-kV/110-kV/MV-substationpumped-storage power station with 110 kV network node

Location of mask house

380 kV

380 kV

G

Page 5: Tailor-made solutions  in response  to increased demands  on supply quality

5OTTO, Frank DE Session 2 – Block 4

Barcelona 12-15 May 2003

Connection of switchgear to 20 kV grid Wilschdorf substation

C D

MV switchgear mask house

n.o.

n.o.

C

HQ

GQ

n.o.

n.o. n.o.

UPS 1 UPS 2 UPS 3 UPS 4

A B C

D E

Automatic transfer gear

Connection to customer

Klotzsche substation

auto

mat

ic

byp

ass

han

d b

ypas

s

Page 6: Tailor-made solutions  in response  to increased demands  on supply quality

6OTTO, Frank DE Session 2 – Block 4

Barcelona 12-15 May 2003

Commissioning tests – Power failure

Phase-to-earth voltage L1 (HQ busbar)

Current L1 (GQ busbar)

Current L1 (HQ busbar)

HQ

GQ

UPS 2 UPS 3 UPS 4

Measuring-point GQ

Measuring-point HQ

Page 7: Tailor-made solutions  in response  to increased demands  on supply quality

7OTTO, Frank DE Session 2 – Block 4

Barcelona 12-15 May 2003

Principal conclusions

1. Cooperation as partners is necessary already in the planning stage economic efficiency is the scale.

2. Simply configured customer plants for:• classification of consumption points• economical system management.

3. Desensitisation of plants and equipment sensitively to faults.