tailor-made solutions in response to increased demands on supply quality
DESCRIPTION
Tailor-made solutions in response to increased demands on supply quality. … paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany). Dresden - capital of Saxony. DRESDEN is a symbiosis of high technology and baroque. Sachsen. also known as "Silicon Saxony". Fundamental statements. - PowerPoint PPT PresentationTRANSCRIPT
1OTTO, Frank DE Session 2 – Block 4
Barcelona 12-15 May 2003
Tailor-made solutions in response
to increased demands on supply quality
… paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany)
2OTTO, Frank DE Session 2 – Block 4
Barcelona 12-15 May 2003
Dresden - capital of Saxony
also known as "Silicon Saxony"
DRESDENis a symbiosis of
high technology and baroque
Sachsen
3OTTO, Frank DE Session 2 – Block 4
Barcelona 12-15 May 2003
Fundamental statements
• The basic standard of supply quality is a balance between the customers’ quality demands and the acceptance of the resulting costs in general.
• Changes in the basic standard are only possible in the long term and at great expense.
• Increased requirements for supply quality call for customer-specific solutions.
4OTTO, Frank DE Session 2 – Block 4
Barcelona 12-15 May 2003
110 kV grid of Dresden
Elbe
Caption:110 kV overhead line110 kV underground line110 kV undergrond line (planned)
power plant with 110-kV/MV-substation
110-kV/MV-substation110-kV/MV-substation (planned)
380-kV/110-kV/MV-substationpumped-storage power station with 110 kV network node
Location of mask house
380 kV
380 kV
G
5OTTO, Frank DE Session 2 – Block 4
Barcelona 12-15 May 2003
Connection of switchgear to 20 kV grid Wilschdorf substation
C D
MV switchgear mask house
n.o.
n.o.
C
HQ
GQ
n.o.
n.o. n.o.
UPS 1 UPS 2 UPS 3 UPS 4
A B C
D E
Automatic transfer gear
Connection to customer
Klotzsche substation
auto
mat
ic
byp
ass
han
d b
ypas
s
6OTTO, Frank DE Session 2 – Block 4
Barcelona 12-15 May 2003
Commissioning tests – Power failure
Phase-to-earth voltage L1 (HQ busbar)
Current L1 (GQ busbar)
Current L1 (HQ busbar)
HQ
GQ
UPS 2 UPS 3 UPS 4
Measuring-point GQ
Measuring-point HQ
7OTTO, Frank DE Session 2 – Block 4
Barcelona 12-15 May 2003
Principal conclusions
1. Cooperation as partners is necessary already in the planning stage economic efficiency is the scale.
2. Simply configured customer plants for:• classification of consumption points• economical system management.
3. Desensitisation of plants and equipment sensitively to faults.