×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [r78 slide]
T2.4 Performance Test Running in R78. Timeline T2.4 installed in R76 09-11-2010 First inspection on 16-11-2010 after 200k pulses Little or no wear/dust
214 views
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield
213 views