×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [prism assemblies]
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
216 views
Developments with MagE
43 views
WFIRST DRM2 candidate design – payload summary At SDT7 3/1-2/2012 consensus for concepts w/out overlap w/ other mission, aka “DRM2” was: 1.1m aperture,
212 views
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized
215 views