×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [phase adjustment]
13 th April 2007FFAG 07 Carl Beard EMMA RF System, Costs Carl Beard, ASTeC, Daresbury Laboratory
219 views
Micro strip antenna
63 views
LHC BPM system: status, measurement reliability and outlook for 2011
29 views
PRR on Patch-Panel ASIC 9 Dec. 2002KEK SOS
32 views
Improvements of the A2 beamline for the linear polarised beam Patrik Ott Institut für Kernphysik Johannes-Gutenberg Universität Mainz 28.02.2011
218 views
RF System including Stand-Alone X-Band Source
37 views
LHC BPM system: status, measurement reliability and outlook for 2011
31 views
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end
218 views