×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [lhc baseline]
LHC Baseline = BCMS 25ns S. Hancock. Background 2 For given LHC optics and energy, luminosity scales roughly as the product of the beam brightness in
213 views
Session 3 Performance Improving Consolidation and Upgrade scenario 1 Malika Meddahi, Lucio Rossi Thanks to all speakers and contributors
221 views
I. Bejar Alonso – HL-LHC Technical coordinator On behalf of HL-LHC WPs Leaders
219 views
Session 3 Performance Improving Consolidation and Upgrade scenario 1
30 views
Powering requirements for HL-LHC triplet
43 views
Samy Chemli – 2014-06-11. Configuration Management - S. Chemli EN-MEF – 2014-06-11 2 Contents Configuration Management Hardware Baseline Change Management
217 views
Integration issues in the tunnel and Impact on general LHC systems
29 views
RLIUP 29 – 30 October 2013 Session 4 Summary “Upgrade Scenario 2 and alternatives”
50 views
Mechanical Constraints on the Beampipe Diameter
41 views
HL Best Practices Workshop - Configuration Management as a framework
49 views