×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [desired operational]
In tech demand-management_and_wireless_sensor_networks_in_the_smart_grid
113 views
Visual modeling using projective analysis (pan)
41 views
SCOR Benchmarking - Presentation
161 views
Campaign Planning Process 28 March 2006 Step 4A – Develop The Campaign Framework UNCLASSIFIED
217 views
1. Introduction 2 In this study, fuzzy logic (FL), multiple criteria decision making (MCDM) and maintenance management (MM) are integrated into one subject
218 views
Investing in Forest Fertilization: tools, measures, analyses By Ralph Winter Forest Practices Branch July 25, 2005
215 views
COTS Project Types CeBASE COTS research Ye Yang, Jesal Bhuta, Dan Port
218 views
Systems Development Life Cycle Plan Analyze Design Develop Test Implement Maintain
248 views
Project #4: Simulation and Experimental Testing of Allocation of UAVs Tim Arnett, Aerospace Engineering, Junior, University of Cincinnati Devon Riddle,
227 views
1 Fit For Purpose Example Capability Analysis 11 May 2010 Shelton Lee (Contractor) Architecture, Standards & Interoperability Directorate Office of the
233 views
= ( es ) 2 energy savings. 53% SAVINGS* THAN OTHER LEADING INVERTERS! Best Energy Savings! High 11+ EER CASSETTE INVERTER FLOOR STANDING INVERTER HIGH
222 views
© 2009 The MITRE Corporation. All rights reserved. Multi-Partner SOA Interoperability Presented to the US-NATO Information Sharing (UNIS) Technical Exchange
214 views
Next >